inspection and test plan (kdbk)
DESCRIPTION
Inspection and Test Plan (KDBK)TRANSCRIPT
Inspection Codes HP Hold Point V Visual Inspection WP Witness point D Dimension Inspection M Monitor/Audit R Review & Approve Documentation S Surveillance Inspection WC 100% Examination by Sub.
Responsibility PE Project Engineer/foreman ST Store man SE Safety engineer EX Inspection/Expeditor SC Sub-Contractor QC Quality Inspector
Inspection and Test Plan
CONCRETE WORKS ITP NUMBER: ITP-KDBK-002 REV. : A DATED: 22.09.2012 PURCHASER: BLACK & VEATCH SPECIAL PROJECTS CORP. SUBCONTRACTOR: AEPC-DSWP JOINT VENTURE CONTRACT NO. : 042246 - KDBK.73.1010
REVISION RECORD:
A 22-08-‘12 First issue AEPC-WSWP Revision Date Description Prepared Approved
Approval and Change History
Inspection Codes HP Hold Point V Visual Inspection WP Witness point D Dimension Inspection M Monitor/Audit R Review & Approve Documentation S Surveillance Inspection WC 100% Examination by Sub.
Responsibility PE Project Engineer/foreman ST Store man SE Safety engineer EX Inspection/Expeditor SC Sub-Contractor QC Quality Inspector
1. Scope and objective
The purpose of an Inspection and Test Plan (ITP) is to put together in a single document that records all inspection and testing requirements relevant to a specific process. On a construction contract the process is likely to be a construction activity, element of work, trade work or providing a product section. An Inspection and Test Plan identifies the items of materials and work to be inspected or tested, by whom and at what stage or frequency, as well as Hold and Witness Points, references to relevant standards, acceptance criteria and the records to be maintained. Inspection and Test Plans, when properly implemented, help ensure that, and verify whether, work has been undertaken to the required standard and requirements, and that records are kept.
2. References: This Inspection and Testing Plan should be read in conjunction with the below referenced documentations.
• Contract Specification and drawings. • Civil Execution Plan (Issued for Distribution vide DSF-080 dated 5 March 2012) • Project Quality Plan (Issued for Distribution vide DSF-043 dated 14 January 2012) • Project HSE Plan (Issued for Distribution vide DSF-045 dated 14 January 2012)
3. Definition ITP -Inspection and Test Plan The minimum requirement of the activities for quality control and inspection of the field construction work.
Hold Point (HP): A point which requires inspection/verification and acceptance by Purchaser before any further processing is permitted. The Subcontractor’s shall not process the activity/item beyond the Hold Point without written approval from Purchaser.
Witness Point (WP): Any point which requires witness by Purchaser when activity is performed.
Review (R): Subcontractor’s documentation to be reviewed by Purchaser.
Surveillance inspection (S): Monitoring of observations to verify whether or not materials/items/services confirms to specified requirement. Surveillance activities may include audit, inspection, and witness of testing, review of quality documentations and records, personnel qualifications etc. WC:
Inspection Codes HP Hold Point V Visual Inspection WP Witness point D Dimension Inspection M Monitor/Audit R Review & Approve Documentation S Surveillance Inspection WC 100% Examination by Sub.
Responsibility PE Project Engineer/foreman ST Store man SE Safety engineer EX Inspection/Expeditor SC Sub-Contractor QC Quality Inspector
100% examination by Subcontractor’s. 4. Inspection and Testing Details
No Inspection/
Test Activity (Spec./ Dwg. Refs.)
Responsibility Frequenc
y Acceptance Criteria Record Notes
QC
PE
SE
SC
B&
V
1 Receiving Inspection
Receiving inspection shall be carried out on all incoming permanent materials, to ensure conformance to the relevant documents.
HP
WP
WP
Per Delivery
On receipt of the material at site, the same shall be inspected by the Store Keeper / Site Engineer / QA/QC Engineer to ensure the materials are delivered, in a good condition and without damage as per the approved material submittal.
Material Receiving
Report Form No.: AQP-001 Delivery
Ticket for Concrete
2 Setting out
2.1 Checking layout H
P
HP
V S Each
structure
Layout, dimension and level of each structural member checked and are as shown in relevant drawing
Check list Form No.: C-002
Survey
3 Equipment Calibration
3.1 Equipment and machinery HP
S
V
RW
Each equipment Equipments are certified Calibration
report Survey Equipment
4 Material testing
4.1 All construction materials -00756.1.2.3
HP
M
RW
Each
material
Cement, aggregate, water, ready mix are as per specs
Test report Concrete
Ingredient
No Inspection/ Responsibility Frequency Acceptance Criteria Record Notes
Inspection Codes HP Hold Point V Visual Inspection WP Witness point D Dimension Inspection M Monitor/Audit R Review & Approve Documentation S Surveillance Inspection WC 100% Examination by Sub.
Responsibility PE Project Engineer/foreman ST Store man SE Safety engineer EX Inspection/Expeditor SC Sub-Contractor QC Quality Inspector
5. Checklist forms Material Receiving Report Form No. AQP-001 Inspection Checklist - PCCP Pre pour
Test Activity (Spec. / Dwg. Refs.) Q
C
PE
SE
SC
B&
V
5
Formwork
5.1 Structural formworks HP
V
W
C
WP
Each Location
Check line and level of shuttering are acceptable.
Formwork are braced, stable and level
Check list Form No.:
C-002
6 Reinforcement
6.1 Placement of reinforcement 00756.1.2.7.7
HP
9S
W
C
WP
Each location
Bar sizes and lengths are as per drawing, concrete cover as per specs.
Check list Form No.: C-002
7 Concreting
7.1 Concrete pour HP
W
C
S
HP
Each pour Ensure all tested are
taken when concreting
Check list Form No.: C-003
7.2 Slump & Air Content test 00756.1.2.6.2 & 00756.1.2.6.3
WP
W
C
WP
Each Delivery
00756.1.2.4 Limiting Requirements
Field report &
Form No.: C-003
Three Consecutive batches
8 Curing
8.1 Structure water curing WP
W
C
S
WP
Each structure Ensure structures is watered, covered until full strength is attained
Check list Form No.: C-004
8.2 De-shuttering WP
W
C
S
WP
Each structure 00756.1.2.18 Repairing Defective Concrete
Check list Form No.: C-004
9 Final Inspection
9.1 Final Concrete Inspection HP
HP
Each structure ACI 301 Section 1.7 – Acceptance of structure
Check list Form No.:
C-004
Inspection Codes HP Hold Point V Visual Inspection WP Witness point D Dimension Inspection M Monitor/Audit R Review & Approve Documentation S Surveillance Inspection WC 100% Examination by Sub.
Responsibility PE Project Engineer/foreman ST Store man SE Safety engineer EX Inspection/Expeditor SC Sub-Contractor QC Quality Inspector
Inspection check list for formwork and reinforcement Concrete Pre-Pour Inspection Form No.: C-002 Concrete Pour Inspection Form No.: C-003 Concrete pour card Final Concrete Inspection Form No.: C-004 Inspection check list for Scaffolding Concrete Works Inspection Request Form Material Receiving Report Hold Release Form AMCC – Delivery Ticket GMTC – Sample Fresh Concrete Test Report GMTC – Sample Compressive Strength Test Report