innovative drilling and production technology for deep geothermal...
TRANSCRIPT
1
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
© 2016 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION INCLUDED THEREIN IS THE
CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INF ORMATION OF BAKER HUGHES (COLLECTIVELY " INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS
UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER AGREES TH AT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR
IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF BAKER HUGHES, AND MA Y NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES’ INTEREST.
Prof. Dr. – Ing. Joachim Oppelt Prof. Dr. – Ing. Sven Krueger Dipl.-Ing. Joerg Lehr
Dipl.-Ing. Matthias Moeller Dr.-Ing. Helmuth Sarmiento-Klapper Dr. – Ing. Ralf Mieting
Dipl.-Ing. Ingolf Wassermann Dr.-Ing. Michael Neubert M.Sc. Sergiy Grymalyuk
Technical University Dresden: Prof. Dr.- Ing. Günther Kunze Dipl. – Ing. Erik Anders
Technical University Freiberg: Prof. Dr.- Ing. Matthias Reich Dipl. – Ing. Franziska Lehmann
Leibniz University Hannover : Dr.- Ing. Thomas Hassel Dipl. – Ing. Aret Varahram
Innovative Drilling and Production Technology
for Deep Geothermal Wells
IEA Geothermal - Central and South America Workshop April 19th 2016 Cuernavaca
2
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
PRESSURE PUMPING Cementing, hydraulic fracturing,
acidizing, stimulation, coiled tubing
About Baker Hughes
■ Revenues: $24.6 billion
■ R&D: $613 million
■ 62,000 employees
■ Facilities in 72 countries
Operations in 90+ countries
INDUSTRIAL SERVICES Refining, water management, petrochemical,
process and pipeline services, polymers and
well service products
COMPLETION and PRODUCTION Completion, intervention,
intelligent production systems,
artificial lift, completion fluids, oilfield
chemicals
*FY 2014: Baker Hughes
DRILLING and EVALUATION Drill bits, directional drilling,
formation evaluation, coring, surface
logging, wireline, drilling fluids
RESERVOIR DEVELOPMENT SERVICES Gaffney, Cline & Associates, reservoir engineering
and simulation, geological modeling and analysis,
software
3
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Motivation & Projects Goals
– Reduction of Cost per kWh „Stromgestehungskosten“
– Reduce non-productive time
– Reduce planning risks
– Improve safety and reliability
– Improved productivity over time
Source: BMU
Drilling
(70 %)
Production pumps (2%)
Stimulation (2%)
Planing (3%)
Else (3%)
Conversion equipment
(15%)
Thermal water cycle
(5%)
4
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Ways
■ Innovative Wellbore Construction
■ Drilling Process Control and Automation
■ Advanced Drilling BHA
■ Alternative Drilling Technologies
■ Innovative Production Systems
5
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
© 2016 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION INCLUDED THEREIN IS THE
CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INF ORMATION OF BAKER HUGHES (COLLECTIVELY " INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS
UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER AGREES TH AT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR
IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF BAKER HUGHES, AND MA Y NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES’ INTEREST.
Innovative Wellbore Construction
VAM
6
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Well Designs
Standard Design Expandable Design
7
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Well Bore Construction Cost Analysis Workflow
■ Well Bore Design
– Bore hole, casing, etc.
■ Time
– Drilling, tripping, etc.
■ Cost
– Drilling service, rig, fluid service, completion service, etc.
– Condensed Cost
8
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Innovative Monobore Wellbore Construction Cost Savings
26%
18%
10%
9%
7%
6%
6%
4%
4%
3%2%
2% 2% 1%
Standard Design 14.7 Million EUR
Contract Rig
Casing / Liner / Expandable
Drilling Fluid Services
Completion
Directional Drilling Services
Well Planning / -Preparation
Electric Wireline Logging
Drilling Bits
Cementing Services
Mobilization- / Demobilization Rig
Mud Logging
Waste Management
Personnel Cost
Coring Equipment Services
29%
11%
10%8%
7%
7%
7%
6%
5%
3%
3%2% 1%1%
Expandable Design12.8 Million EUR
Contract Rig
Casing / Liner / Expandable
Completion
Directional Drilling Services
Electric Wireline Logging
Drilling Fluid Services
Well Planning / -Preparation
Drilling Bits
Cementing Services
Mobilization- / Demobilization Rig
Mud Logging
Personnel Cost
Waste Management
Coring Equipment Services
9
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Innovative Monobore Wellbore Construction Process
Gesamtansicht
http://www.dea-group.com/de/technologie/bohrung/expandable-tubular-verrohrung
10
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Innovative Monobore Technologies for Geothermal Applications
High Temp Metal to Metal Hanger/Packer
Expansion System
Monobore Installation
Welded Connections
VAM
11
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Expandable Welding Technology
Magnetic Impelled Arc Welding
• Short welding times
• High level of automation
• Combinations of materials
• High welding quality
• High temperature gas tight
Welded 9.5/8” N80 Tubular at Leibniz University Hannover
12
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
© 2016 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION INCLUDED THEREIN IS THE
CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INF ORMATION OF BAKER HUGHES (COLLECTIVELY " INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS
UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER AGREES TH AT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR
IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF BAKER HUGHES, AND MA Y NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES’ INTEREST.
Drilling Process Control and Automation
13
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Drilling Systems Automation
• Reduce Well Delivery Costs • Reduce Operational Risk
OBJECTIVES
* 10 levels of automation following Sheridan & Verplank
14
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Conventional vs. Automated Drilling Systems Control
Driller <<action>>
<<monitor>>
Rig Sensors: RPM, WOB, …
set point control and validation
Controller (PLC)
Rig Actuators - Drawworks - Top drive - Mud pump
in-the-loop control
<<actuate>>
<<measure>>
Field Engineer
<<m
on
ito
r>>
Conventional
Service Company Displays
Automation
Driller Advisor App Monitor App
<<recommend>>
<< feedback >>
<<recommend>>
<< feedback >> Control App
<<ac
tio
n>>
<<m
on
ito
r>>
15
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Remote Operating
Center
OPC UA
Operators
Remote Operating
Center
OPC UA
OPC UA
Drilling Fluid
OPC UA
Downhole
DSA Applications
OPC UA
OPC UA
Surface Logging
Service Companies
Remote Operating
Center
OPC UA
Driller's Display
OPC UA
Drilling Rig
Drilling Rig
Gateway
OPC UA
Rig Contractors
OPC UA Aggregation Server
Equipment Suppliers
Drilling Automation System Architecture
16
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
© 2016 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION INCLUDED THEREIN IS THE
CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INF ORMATION OF BAKER HUGHES (COLLECTIVELY " INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS
UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER AGREES TH AT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR
IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF BAKER HUGHES, AND MA Y NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES’ INTEREST.
Advanced Drilling Technology
17
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Advanced Drilling BHA
with integrated GaugePro™ Echo Reamer and AutoTrak Steering Unit
Near Bit Gamma +5 ft.
MWD/LWD Steering Unit
8 ¼" BHA, 10 5/8" x 12 ¼"
18
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
© 2016 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION INCLUDED THEREIN IS THE
CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INF ORMATION OF BAKER HUGHES (COLLECTIVELY " INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS
UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER AGREES TH AT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR
IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF BAKER HUGHES, AND MA Y NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES’ INTEREST.
Alternative Drilling Technology Future
19
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Bit Example 6“ Electrode – Granite drilling test in Water under atmospheric pressure
Electro Impulse Drilling
20
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
High Pressure Performance Feasibility
Electro Impulse Research Lab and Team TU Dresden and TU Freiberg
500 Bar (~7k psi) Granite Test-samples
Drilling Simulator of TU Clausthal in Celle
21
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
BHA Example Electric Impulse Drilling
Mud Motor + Gear Box
Alternator + Transformer
Marx Generator + Trigger
Rectifier
Electrode
System Concept: TU Bergakademie Freiberg and TU Dresden
22
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
© 2016 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION INCLUDED THEREIN IS THE
CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INF ORMATION OF BAKER HUGHES (COLLECTIVELY " INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS
UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER AGREES TH AT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR
IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF BAKER HUGHES, AND MA Y NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES’ INTEREST.
Innovative Production Systems
23
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Innovative and Reliable Production Systems
• Geothermal ESP
• Heat Exchanger Design
• Tubular Connection
• High Temperature Packer
• Scaling and Corrosion
Monitoring
• Reservoir Monitoring
• Self-driving after initiation?
24
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Baker Hughes, Geothermal ESPs
ESP swap at Unterhaching
None Public Picture
25
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Challenges of Geothermal Applications
Combination of
High motor power requirements (voltage max. 6,5kV)
Frequent speed adjustments / power cycles
Frequent thermal cycles
High fluid flow, high flow velocities
Temperatures > 140°C
Shallow installation depth (low ambient pressure)
Scales from thermal water (calcium carbonate)
scaling from production tubing
26
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
ESP-Development in Celle
Team of 5 conducts
■ Lab and field testing
■ Failure investigation, materials examination
■ Reliable motor bearing development
■ Scale resistant pump development
■ Geothermal seals development
for reliable oil containment
■ 175°C ESP-gauge electronics development
with failure prediction board layout for 175°C gauge electronics
geothermal pump prototypes (100 l/s, 200l/s)
Non Public Picture
Non Public Picture
27
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Hi-Tempemperature Test-Bench: „HotLoop“
High temp pressure vessel
control room
High-flow pump-test-bench
28
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
„Thermal cycle“ tests
• automated thermal cycle testing (5 cycles/day)
• increased stress on insulation materials
• increased load for length and oil compensation
• permanent temperature measurement on outer face seal
resistance &
insulation measurement
140°C
65°C
pre-heat 1 cycle
60Hz 38Hz
Stop /
Start
Stopp /
Start
Stopp /
Start
60Hz
water temperature
t
29
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
FLEX- ESP Development
High Power FLEX-pumps
developed for:
■Wider, more flexible, flow operating
range for power plant demand
adjustment
from 75 – 100% => 40 – 100%
■Optimized power efficiency
from 79 => 82%
Operational Flexibility in Liter/second
30
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Design Improvement of Pump Bearings
■ Scaling on bearings after short time
■ Bearings get blocked, ESP shafts twist off
■ Improved and tested design
■ No failures after implementation in 7 wells
Non Public Picture
Non Public Picture
31
© 2
016
Bak
er H
ughe
s In
corp
orat
ed. A
ll R
ight
s R
eser
ved.
Long Term Corrosion Investigation in North German Brine