Quality. Service. Value. ® Where each dollar goes Capital Improvements Water Production Other Operations & Maintenance 31% 40% 7% Local Water Professionals (Pump Operators, Utility Workers, etc.) Centralized Services (Water Quality, Engineering, etc.) Conservation 8% 12% 2% 4 New Storage Tanks To replace aging redwood tanks and enhance reserve supplies 3 New Emergency Generators To ensure water system operates during power outages Booster Pump Station Upgrades To enhance system reliability and water pressure 23,416 Feet of Pipeline to be Replaced To prevent failure of aging and high-risk pipelines Security Enhancements To protect water system infrastructure, employees, and customers Infrastructure Improvement Planning for Livermore California Water Service (Cal Water) has proposed our triennial Infrastructure Improvement Plan for 2019 to 2021 to ensure we are able to continue providing a reliable supply of high-quality water for customers’ everyday needs and sufficient resources for firefighters. Here are some of these improvements: For these important upgrades and increased costs to maintain and operate the system, under this proposal, the typical customer using 8,976 gallons of water per month would pay an additional 7 cents per day beginning in 2020. For more information on the improvements in your district, contact us toll-free at (855) CALWATER (855-225-9283) or email us at [email protected].

Upload: others

Post on 29-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Infrastructure Improvement Planning for Livermore · Water Production Other Operations & Maintenance 31% 40% 7% Local Water Professionals (Pump Operators, Utility Workers, etc.) Centralized

Quality. Service. Value.®

Where each dollar goes

Capital Improvements

WaterProduction

Other Operations & Maintenance

31% 40% 7%

Local Water Professionals(Pump Operators, Utility Workers, etc.)

Centralized Services(Water Quality, Engineering, etc.)

Conservation

8% 12% 2%

4 New Storage Tanks

To replace aging redwood tanks and

enhance reserve supplies

3 New Emergency Generators

To ensure water system operates

during power outages

Booster Pump Station UpgradesTo enhance system

reliability and water pressure

23,416 Feet of Pipeline to be

ReplacedTo prevent failure

of aging and high-risk pipelines

Security Enhancements

To protect water system infrastructure,

employees, and customers

Infrastructure Improvement Planning for Livermore

California Water Service (Cal Water) has proposed our triennial Infrastructure Improvement Plan for 2019 to 2021 to ensure we are able to continue providing a reliable supply of high-quality water for customers’ everyday needs and sufficient resources for firefighters. Here are some of these improvements:

For these important upgrades and increased costs to maintain and operate the system, under this proposal, the typical customer using 8,976 gallons of water per month would pay an additional 7 cents per day beginning in 2020.

For more information on the improvements in your district, contact us toll-free at (855) CALWATER (855-225-9283)

or email us at [email protected].