infrastructure design study bridge and culvert calculations
TRANSCRIPT
DO NOT SCALE THIS DRAWING - USE FIGURED DIMENSIONS ONLY
VERIFY ALL DIMENSIONS ON SITE
Telephone +61 3 9861 1111
Facsimile +61 3 9861 1144
Email: [email protected]
Melbourne VIC 3006
Level 15
28 Freshwater Place
VIC 3006
PO BOX 19016
Australia
Southbank, Melbourne
DATEREV DESCRIPTION
A3 ORIGINAL
NCSI certified Quality System to ISO 9001
ABN 80 078 004 798
SCALES
APPROVED FOR AND ON BEHALF OF
PROJECT
REV.
document or the information.responsibility to any third party who may use or rely upon this representation, undertakes no duty and accepts no than that for which it was supplied by PB. PB makes no copied or reproduced in whole or part for any purpose other authorised recipient and this document may not be used, document and the information are solely for the use of the this document ("the information") is the property of PB. This Copyright in the drawings, information and data recorded in © Parsons Brinckerhoff Australia Pty Limited ("PB")
DESIGN VERIFYDRAWN CHECK
CLIENT
PROJECT No.
DATE
DISCIPLINE NUMBERSIGNED
PARSONS BRINCKERHOFF AUSTRALIA PTY LIMITED
50
mm A
T F
ULL SIZ
E
28/10/2016 11:05:39 AM \\Apmelfil01\proj\M\METROPOLITAN_PLANNING\2113308A_SUNBURY_SOUTH_AND_LANCEFIELD\09_CADD\Drawings\04_Structures\02_Drawings\2113308A-STR-0100.dgn
PRELIMINARY ISSUENOT FOR CONSTRUCTION
B
A
B
SUNBURY STH AND LANCEFIELD RD PSP
2113308A STR
ISSUED FOR INFORMATION
0100
0100
PIER 1
CL.
PIER 2
CL.
PIER 3
CL.
1 : 500
PLAN
BEARINGS
ABUTMENT A &
CL.
BEARINGS
ABUTMENT B &
CL.
BEARINGS
ABUTMENT A &
CL.
PIER 1
CL.
PIER 2
CL.
PIER 3
CL.
BEARINGS
ABUTMENT B &
CL.
35000 3500035000 35000
APPROACH SLAB
4000 4000
APPROACH SLAB
GIRDERS
SUPER-T
LEVEL BARRIER
MEDIUM PERFORMANCE
E.J.E.J.
1 : 500
ELEVATION
JACKSON CREEK BRIDGE (SS-BD1)
SHEET 1
(TYP)
LINK SLAB OVER PIERS
E E E
E - DENOTES EXPANSION BEARING
NOTES
WALL
RETAINING
E E
CREEK (RL. TBC.)
JACKSONS
LEVEL (INDICATIVE ONLY)
100YEAR ARI FLOOD
BARRIER OVER
WITH OFF-STRUCTURE
RETAINING WALL
10/12/15 SK GW SHS FR
GENERAL ARRANGEMENT1050 15
Full Size 1:500 A3;
SCALE (m) 7/03/16 ISSUED FOR INFORMATION DH FR JA FR
EMBANKMENT TYP.
STONE BEACHING
DO NOT SCALE THIS DRAWING - USE FIGURED DIMENSIONS ONLY
VERIFY ALL DIMENSIONS ON SITE
Telephone +61 3 9861 1111
Facsimile +61 3 9861 1144
Email: [email protected]
Melbourne VIC 3006
Level 15
28 Freshwater Place
VIC 3006
PO BOX 19016
Australia
Southbank, Melbourne
DATEREV DESCRIPTION
A3 ORIGINAL
NCSI certified Quality System to ISO 9001
ABN 80 078 004 798
SCALES
APPROVED FOR AND ON BEHALF OF
PROJECT
REV.
document or the information.responsibility to any third party who may use or rely upon this representation, undertakes no duty and accepts no than that for which it was supplied by PB. PB makes no copied or reproduced in whole or part for any purpose other authorised recipient and this document may not be used, document and the information are solely for the use of the this document ("the information") is the property of PB. This Copyright in the drawings, information and data recorded in © Parsons Brinckerhoff Australia Pty Limited ("PB")
DESIGN VERIFYDRAWN CHECK
CLIENT
PROJECT No.
DATE
DISCIPLINE NUMBERSIGNED
PARSONS BRINCKERHOFF AUSTRALIA PTY LIMITED
50
mm A
T F
ULL SIZ
E
28/10/2016 11:06:06 AM \\Apmelfil01\proj\M\METROPOLITAN_PLANNING\2113308A_SUNBURY_SOUTH_AND_LANCEFIELD\09_CADD\Drawings\04_Structures\02_Drawings\2113308a-str-0101.dgn
PRELIMINARY ISSUENOT FOR CONSTRUCTION
B
A
B
SUNBURY STH AND LANCEFIELD RD PSP
2113308A STR
ISSUED FOR INFORMATION
0101
0101
JACKSON CREEK BRIDGE (SS-BD1)
SHEET 2
1 : 100
FRONT ELEVATION
PIER
RC. CROSSHEAD
DRIVEN PILES
PILECAP
PIER
RC. COLUMN
BRIDGE
PIER &
CL.
FLUCTUATION
TO SUIT WATER LEVEL
SKIRT WALL LENGTH
10/12/15 SK GW SHS FR
GENERAL ARRANGEMENT
1 : 100
FRONT ELEVATION
ABUTMENT
13500 BETWEEN KERBS
SLAB
200 DECK
500
3500 30003500
TRAFFIC LANE TRAFFIC LANE SHARED PATH PATH
500
SHOULDER
SUPER-T BEAMS
6NO. 1800 DEEP
BLOCK
ANTI SLIDING
ABUTMENT
RC. CROSSHEAD
BRIDGE
ABUTMENT &
CL.
RETAINING WALL
BEHIND RC
BORED PILES
3% FALL
SHOULDER
BARRIER
MEDIUM LEVEL3% FALL
2000
SHOULDER
500
13500 BETWEEN KERBS
SLAB
200 DECK
SUPER-T BEAMS
6NO. 1800 DEEP
ISSUED FOR INFORMATION DH GW SHS FR
DO NOT SCALE THIS DRAWING - USE FIGURED DIMENSIONS ONLY
VERIFY ALL DIMENSIONS ON SITE
Telephone +61 3 9861 1111
Facsimile +61 3 9861 1144
Email: [email protected]
Melbourne VIC 3006
Level 15
28 Freshwater Place
VIC 3006
PO BOX 19016
Australia
Southbank, Melbourne
DATEREV DESCRIPTION
A3 ORIGINAL
NCSI certified Quality System to ISO 9001
ABN 80 078 004 798
SCALES
APPROVED FOR AND ON BEHALF OF
PROJECT
REV.
document or the information.responsibility to any third party who may use or rely upon this representation, undertakes no duty and accepts no than that for which it was supplied by PB. PB makes no copied or reproduced in whole or part for any purpose other authorised recipient and this document may not be used, document and the information are solely for the use of the this document ("the information") is the property of PB. This Copyright in the drawings, information and data recorded in © Parsons Brinckerhoff Australia Pty Limited ("PB")
DESIGN VERIFYDRAWN CHECK
CLIENT
PROJECT No.
DATE
DISCIPLINE NUMBERSIGNED
PARSONS BRINCKERHOFF AUSTRALIA PTY LIMITED
50
mm A
T F
ULL SIZ
E
28/10/2016 11:06:23 AM \\Apmelfil01\proj\M\METROPOLITAN_PLANNING\2113308A_SUNBURY_SOUTH_AND_LANCEFIELD\09_CADD\Drawings\04_Structures\02_Drawings\2113308a-str-0102.dgn
PRELIMINARY ISSUENOT FOR CONSTRUCTION
A
A
SUNBURY STH AND LANCEFIELD RD PSP
2113308A STR
ISSUED FOR INFORMATION
0102
0100
PIER 1
CL.
PIER 2
CL.
PIER 3
CL.
PLAN
BEARINGS
ABUTMENT A &
CL.
BEARINGS
ABUTMENT B &
CL.
JACKSON CREEK BRIDGE (SS-BD1)
E E E
E - DENOTES EXPANSION BEARING
NOTES
BARRIER OVER
WITH OFF-STRUCTURE
RETAINING WALL
DH FR JA FR
PIER 4
CL.
PIER 5
CL.
PIER 6
CL.
PIER 7
CL.
PIER 8
CL.
1 : 1000
PIER 1
CL.
PIER 2
CL.
PIER 3
CL.
BEARINGS
ABUTMENT A &
CL.
BEARINGS
ABUTMENT B &
CL.
PIER 4
CL.
PIER 5
CL.
PIER 6
CL.
PIER 7
CL.
PIER 8
CL.
35000 35000 35000 35000 35000 35000 35000 35000 35000
1 : 1000
ALTERNATIVE LONG OPTION
GENERAL ARRANGEMENT
SHEET 17/3/16
CREEK (RL. TBC.)
JACKSONS
LEVEL (INDICATIVE ONLY)
100YEAR ARI FLOOD
PIERS (TYP)
LINK SLAB OVER
E E EEEE
E.J.
EE.J.
APPROACH SLAB
LEVEL BARRIER
MEDIUM PERFORMANCE
GIRDERS
SUPER-T
20100 30
Full Size 1:1000 A3
SCALE (m)
APP
RO
X. 43
m
APPROACH SLAB4000
4000
ELEVATION - OPTION E (LONG)
EMBANKMENT TYP.
STONE BEACHING
DO NOT SCALE THIS DRAWING - USE FIGURED DIMENSIONS ONLY
VERIFY ALL DIMENSIONS ON SITE
Telephone +61 3 9861 1111
Facsimile +61 3 9861 1144
Email: [email protected]
Melbourne VIC 3006
Level 15
28 Freshwater Place
VIC 3006
PO BOX 19016
Australia
Southbank, Melbourne
DATEREV DESCRIPTION
A3 ORIGINAL
NCSI certified Quality System to ISO 9001
ABN 80 078 004 798
SCALES
APPROVED FOR AND ON BEHALF OF
PROJECT
REV.
document or the information.responsibility to any third party who may use or rely upon this representation, undertakes no duty and accepts no than that for which it was supplied by PB. PB makes no copied or reproduced in whole or part for any purpose other authorised recipient and this document may not be used, document and the information are solely for the use of the this document ("the information") is the property of PB. This Copyright in the drawings, information and data recorded in © Parsons Brinckerhoff Australia Pty Limited ("PB")
DESIGN VERIFYDRAWN CHECK
CLIENT
PROJECT No.
DATE
DISCIPLINE NUMBERSIGNED
PARSONS BRINCKERHOFF AUSTRALIA PTY LIMITED
50
mm A
T F
ULL SIZ
E
28/10/2016 11:06:51 AM \\Apmelfil01\proj\M\METROPOLITAN_PLANNING\2113308A_SUNBURY_SOUTH_AND_LANCEFIELD\09_CADD\Drawings\04_Structures\02_Drawings\2113308a-str-0103.dgn
PRELIMINARY ISSUENOT FOR CONSTRUCTION
B
A
B
SUNBURY STH AND LANCEFIELD RD PSP
2113308A STR
ISSUED FOR INFORMATION
0103
0103
JACKSON CREEK BRIDGE (SS-BD1)
1 : 100
FRONT ELEVATION
ABUTMENT
1 : 100
FRONT ELEVATION
PIER
DH FR JA FR
ALTERNATIVE LONG OPTION
GENERAL ARRANGEMENT
SHEET 2
13500 BETWEEN KERBS
SLAB
200 DECK
500
3500 30003500
TRAFFIC LANE TRAFFIC LANE SHARED PATH PATH
500
SHOULDER
SUPER-T BEAMS
6NO. 1800 DEEP
BLOCK
ANTI SLIDING
ABUTMENT
RC. CROSSHEAD
BRIDGE
ABUTMENT &
CL.
RETAINING WALL
BEHIND RC
BORED PILES
3% FALL
SHOULDER
BARRIER
MEDIUM LEVEL3% FALL
2000
SHOULDER
500
13500 BETWEEN KERBS
SLAB
200 DECK
RC. CROSSHEAD
DRIVEN PILES
PILECAP
PIER
SUPER-T BEAMS
6NO. 1800 DEEP
BRIDGE
PIER &
CL.
SEGMENTS
RC. COLUMN
PRECAST
LEVEL
EXISTING SURFACE
ISSUED FOR INFORMATION DH FR JA FR
07/03/16
DO NOT SCALE THIS DRAWING - USE FIGURED DIMENSIONS ONLY
VERIFY ALL DIMENSIONS ON SITE
Telephone +61 3 9861 1111
Facsimile +61 3 9861 1144
Email: [email protected]
Melbourne VIC 3006
Level 15
28 Freshwater Place
VIC 3006
PO BOX 19016
Australia
Southbank, Melbourne
DATEREV DESCRIPTION
A3 ORIGINAL
NCSI certified Quality System to ISO 9001
ABN 80 078 004 798
SCALES
APPROVED FOR AND ON BEHALF OF
PROJECT
REV.
document or the information.responsibility to any third party who may use or rely upon this representation, undertakes no duty and accepts no than that for which it was supplied by PB. PB makes no copied or reproduced in whole or part for any purpose other authorised recipient and this document may not be used, document and the information are solely for the use of the this document ("the information") is the property of PB. This Copyright in the drawings, information and data recorded in © Parsons Brinckerhoff Australia Pty Limited ("PB")
DESIGN VERIFYDRAWN CHECK
CLIENT
PROJECT No.
DATE
DISCIPLINE NUMBERSIGNED
PARSONS BRINCKERHOFF AUSTRALIA PTY LIMITED
50
mm A
T F
ULL SIZ
E
28/10/2016 11:07:20 AM \\Apmelfil01\proj\M\METROPOLITAN_PLANNING\2113308A_SUNBURY_SOUTH_AND_LANCEFIELD\09_CADD\Drawings\04_Structures\02_Drawings\2113308a-str-0106.dgn
PRELIMINARY ISSUENOT FOR CONSTRUCTION
1 : 100
ABUTMENT ELEVATION
END WALL
PRECAST RC.
BEAM
APRON SLAB EDGE
CAST IN-SITU RC.
BASE SLAB
CAST IN-SITU RC.
END WALLS
HANDRAILS ON WINGWALLS &
BOX CULVERT (TBC)
PRECAST RC 2100X900
SECTION A
-1 : 100
END WALL
PRECAST RC
RC BASE SLAB
CAST IN-SITU
EX. SURFACE
SLAB & EMBEDDED INTO
BE FLUSH AGAINST APRON
ROCK BEACHING SHALL
3600
SHARED PATH
500 3500 TRAFFIC LANE 3500 TRAFFIC LANE 500 1500
SHLDRSHLDR PATH
EDGE BEAM
GUARD RAIL
12500 BETWEEN BARRIERS
CONCRETE
BLINDING
BOX CULVERT
PRECAST RC
1.0% FALL
RL.248.3
TO SHOULDER
100 MIN FREEBOARD
RL.248.0
RL. 249.65
H.W.L. =
A
A
SUNBURY STH AND LANCEFIELD RD PSP
2113308A STR
ISSUED FOR INFORMATION
0106
0106
1 : 200
PLAN
1800
A
-
HARPERS CREEK CULVERT (LR BD4)
APRON SLAB
CAST IN-SITU RC.WINGWALL
PRECAST RC.
L-SHAPED
GUARDRAIL
FLOW
21000
21000
29678 (500mm MIN ROCK SIZE)
ROCK BEACHING
5
1
10/12/15 SK GW JT FR
GENERAL ARRANGEMENT
ARI EVENET.
530 AFFLUX OCCURS UPSTREAM DURING 100 YEAR 8.
ROAD LEVEL SHOWN IS INDICATIVE ONLY.7.
TO HEAD WATER LEVEL (HWL) IN 100 YEAR ARI EVENT
PROVIDE MIN 100mm FREEBOARD FROM SHOULDER LEVEL6.
TO BE 2.1m WIDE BY 0.9m HIGH.
INTERNAL DIMENSION OF EACH CULVERT PRESUMED 5.
AS1657.
HANDRAILS SHALL BE DESIGNED IN ACCORDANCE WITH 4.
BARRIERS SHALL BE IN ACCORDANCE WITH AS38453.
VICROADS STANDARD SPECIFICATION 619 & 616 .
OF PRECAST BOX SHALL BE IN ACCORDANCE WITH
MANUFACTURE, TESTING DELIVERY AND INSTALLATION 2.
AS5100.2 AND UP TO 2.0m OF FILL.
FOR SM1600 LOADING IN ACCORDANCE WITH
BE DESIGNED IN ACCORDANCE WITH AS1597.2-2013
PRECAST REINFORCED BOX CULVERTS SHALL 1.
NOTES:
Appendix CCulvert calculations
RL 248.81
6.5785 Sq. mAREA = 11.5857mWETTED PERIMETER =
255
250
245
260
255
250
245
EXISTING CHANNEL CROSS SECTION
UPSTREAM OF EXISTING CULVERT
260
Stage discharge curve for the existing channel at the outlet (immediately upstream of existing culvert location)
Assuming a trapezoidal shapechannel slope (S) 0.05 m/mSides slope (x to y) 1.5 to 1Base width 6.8 mManning's n 0.05
Depth Area (A)
Wettedperimeter(P)
HydraulicRadius(R)
Velocity(V)
Discharge(Q)
m m m m m/s m3/s0 0 6.8 0.00 0.00 0.00
0.05 0.34375 6.980278 0.05 0.60 0.210.1 0.695 7.160555 0.10 0.94 0.66
0.15 1.05375 7.340833 0.14 1.23 1.290.2 1.42 7.52111 0.19 1.47 2.09
0.25 1.79375 7.701388 0.23 1.69 3.040.3 2.175 7.881665 0.28 1.90 4.12
0.35 2.56375 8.061943 0.32 2.08 5.340.4 2.96 8.242221 0.36 2.26 6.69
0.45 3.36375 8.422498 0.40 2.43 8.160.5 3.775 8.602776 0.44 2.58 9.75
0.55 4.19375 8.783053 0.48 2.73 11.460.6 4.62 8.963331 0.52 2.87 13.28
0.65 5.05375 9.143608 0.55 3.01 15.220.7 5.495 9.323886 0.59 3.14 17.27
0.75 5.94375 9.504163 0.63 3.27 19.440.8 6.4 9.684441 0.66 3.39 21.72
0.85 6.86375 9.864719 0.70 3.51 24.100.9 7.335 10.045 0.73 3.63 26.60
check0.75 5.94375 9.504163 0.63 3.27 19.44
Q = 19.75 m3/sTWL = 0.75 m Tailwater level
0.00
5.00
10.00
15.00
20.00
25.00
30.00
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Flow
Rat
e (m
3/s)
Flow depth (m)
Stage discharge curve
Series1
Stage discharge curve for culvert 2100x900 Box culvert
Calculation of outlet velocity under inlet control
culvert slope (S) 0.01 m/mSides slope (x to y) 0 to 1Base width 2.1 mManning's n 0.013
Depth Area (A)
Wettedperimeter(P)
HydraulicRadius(R)
Velocity(V)
Discharge(Q)
m m2 m m/s m3/s0 0 2.1 0.00 0.00 0.00
0.1 0.21 2.3 0.09 1.56 0.330.2 0.42 2.5 0.17 2.34 0.980.3 0.63 2.7 0.23 2.92 1.840.4 0.84 2.9 0.29 3.37 2.830.5 1.05 3.1 0.34 3.74 3.920.6 1.26 3.3 0.38 4.05 5.100.7 1.47 3.5 0.42 4.31 6.340.8 1.68 3.7 0.45 4.54 7.630.9 1.89 3.9 0.48 4.75 8.97
check0.58 1.218 3.26 0.37 3.99 4.86
Q = 4.9 m3/s per barrelV = 4 m/s Outlet velocity
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00Fl
ow R
ate
(m3/
s)Velocity (V)
Stage discharge curve
Series1