infill drilling plan map infill drilling plan map us$1300 current pit 1’ 1’2’ 3’ s north...

4
1 Infill Drilling Plan Map US$1300 current pit 1’ 1’ 2’ 3’ Section lines NORTH Holes with pending assay result Holes with assay results received US$1300 ultimate pit US$1300 current pit 100m 0

Upload: ngokiet

Post on 09-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

1

Infill Drilling Plan Map

US$1300 current pit

1’

1’ 2’ 3’

Section lines

NORTH

Holes with pending assay result

Holes with assay results received

US$1300 ultimate pit

US$1300 current pit

100m

0

2

Infill Drilling Section 1

10m @ 2.73 g/t Au from 239m

21m @ 3.43 g/t Au from 331m

22m @ 4.50 g/t Au from 361m

11m @ 0.95 g/t Au from 264m

6m @ 3.12 g/t Au from 366m

20m @ 2.06 g/t Au from 407m

Infill drill holes

1’

US$1300 ultimate pit

US$1300 current pit

1

100m

3

Infill Drilling Section 2

30m @ 3.17 g/t Au from 240m

13m @ 7.33 g/t Au from 304m21m @ 3.43 g/t Au from 331m5m @ 3.54 g/t Au from 328m

6m @ 3.12 g/t Au from 366m

Infill drill holes

2’

US$1300 ultimate pit

US$1300 current pit

2

100m

4

Infill Drilling Section 3

1’

26m @ 8.49 g/t Au from 176m

10m @ 3.94 g/t Au from 215m

42m @ 3.17 g/t Au from 255m

43m @ 2.65 g/t Au from 304m

6m @ 1.87 g/t Au from 259m

Infill drill holes

3’

US$1300 ultimate pitUS$1300 current pit

3

100m