industry presentation 3- united states advanced ... · dedicated procedure vdus ¾a procedure vdu...
TRANSCRIPT
![Page 1: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/1.jpg)
May 21, 2008
USAPWRComputer Based Procedures
(Electronic Procedures)
![Page 2: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/2.jpg)
Computer based procedures are displayed on dedicated Procedure VDUs
A Procedure VDU is at each operator station
RO1, RO2, SRO, STA
CBP are compatible with corresponding paper procedures
Used for degraded HSI backup
Only paper procedures are used at the Diverse HSI Panel
MCR Features
![Page 3: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/3.jpg)
Full Scope Simulator - Pittsburgh
![Page 4: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/4.jpg)
Full Scope Simulator - PittsburghProcedure VDUs
Procedure VDUs are located on the desktop area at the consoles, easily accessible while using the Alarm VDU or the Operating VDU.
![Page 5: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/5.jpg)
HSI System Integration
1. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
+
1. XXXXX1.1 XXX1.2 XXX
1.1 XXX
1.2 XXX
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Menu Ala rm Menu
Ca llOp.VDU
At t achBookmark Clea rBookmark Clea r AllBookmarks
1. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
+
1. XXXXX1.1 XXX1.2 XXX
1.1 XXX
1.2 XXX
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Menu Ala rm Menu
Ca llOp.VDU
At t achBookmark Clea rBookmark Clea r AllBookmarks
Large Display Panel
Alarm Display
Operational Display
Operating ProcedureDisplay
Hyperlink Navigation
![Page 6: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/6.jpg)
Each Procedure VDU hasProcedure navigation function
• Hierarchical links (Table of Contents)• Hyperlink to related procedure
Display navigation function• Hyperlink to related display on Operational
VDUCheckmark function
• Which procedure step is completeCheckmarks can be added or removed for each stepAll checkmarks can be deleted with button at the bottom of the display window
This functionality is equivalent to Electronic Procedures in industry white paper
CBP Functions
![Page 7: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/7.jpg)
CBP Configuration
Table of Contents Area
Current displayed Procedure
Check mark function
![Page 8: Industry Presentation 3- United States Advanced ... · dedicated Procedure VDUs ¾A Procedure VDU is at each operator station 9RO1, RO2, SRO, STA ¾CBP are compatible with corresponding](https://reader033.vdocuments.us/reader033/viewer/2022052501/6075b0f7329ae0478068ce84/html5/thumbnails/8.jpg)
CBP DevelopmentMitsubishi is developing the following CBP functions:
Live data within the Procedure VDU• With acceptance criteria color coding• Based on validated data
Soft controls in the Procedure VDU• Multi-division*
Procedure based automation• Multi-division*
These functions are not within the scope of the USAPWR
*In accordance with DI&C-ISG-04