220kV Substation,Nawbasta,Kanpur
ByIshank Ranjan1006421033
![Page 2: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/2.jpg)
Substation An Electrical Substation is a subsidiary
station of an electricity Generation , Transmission And Distribution System where voltage is transformed high to low or reverse using transformer.
Examples of Substation:- 400kV/220kV substation 220kV/132kV substation 132kV/33kV substation 33kV/11kV substation 33kV/.4kV substation
![Page 3: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/3.jpg)
220kV Substation It is devided into two(2) parts:-
A. Panel SectionA. Control Panel SectionB. Relay and Protection Panel Section
B. Switch YardA. 220kV SectionB. 132kV sectionC. 33kV section
C. Battery Room (Extra)
![Page 4: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/4.jpg)
A. Panel SectionIt is a room which contains all types of
panels. It has two sections:-
Control Panel Section
It contain panels related to controlling of instruments. E.g.:- feeder panel, X-mer panel, etc.
Relay And Protection Panel Section
It contains panels related to relay systems and protection systems. E.g.:- Relay panel, line protection panel, etc.
![Page 5: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/5.jpg)
B. Switch YardIt is the field where components used
in controlling supply and measuring supply(incoming and outgoing) are placed.
Some of these many components are:- C.Bs Isolators C.Ts P.Ts L.As X-mers, etc.
![Page 6: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/6.jpg)
220kV Substation ,Kanpur
Incoming line220 kV from(i) Bhauti {PGCIL}
(ii)Fatehpur
Outgoing lines132kV to (i) Krishna Nagar
(ii)Malwah (iii)LML
33kV to (i) Harish Ganj (ii)Anandpuri,etc.
![Page 7: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/7.jpg)
220kV SectionIt works on 220kV.There are two bus bars in which
one is main bus and the other is transfer bus of 220kV.
It has two 220kV incoming feeders i.e. From PGCIL ,Bhauti and Fatehpur.
The incoming 220kV line is from the Northern Grid.
![Page 8: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/8.jpg)
132kV SectionIt works on132kV.It has two buses i.e. Transfer Bus
and Main Bus.220kV voltage is converted to
132kV voltage using a 160MVA transformer.
In other words it is 220kV /132kV substation.
This line is directly feded to many industries like LML , etc.
![Page 9: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/9.jpg)
33kV SectionThis section works on 33kV.It has three feeders of 33 kV.One from 63 MVA transformer
and two from 40 MVA transformer.
132kV/33 kV conversion is done using 63MVA transformer and two 40MVA transformer.
In other words it is 132kV / 33kV substation.
![Page 10: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/10.jpg)
Important TermsTripping – Power goes due to over load . It is
for the protection of components.Shut down – Power is cut due to
maintenance in progress. It is done manually.Break down – Power goes due to any fault in
the line. When fault is removed , power is back.
Rosting – Power is cut deliberately on order of higher authority due to shortage of power.
![Page 11: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/11.jpg)
ConclusionOne must have never thought that
so many things are required for just switching on a television or a refrigerator or say an electric trimmer. The three wing of electrical system viz. Generation, transmission and distribution are connected to each other and that too very perfectly. Lots of labour, capital and infrastructure is involved in the system just to have a single phase,220V,50Hz power supply at our houses.
![Page 12: Industrialtraining 140208223401](https://reader036.vdocuments.us/reader036/viewer/2022071821/55b6ccb4bb61eb286c8b4600/html5/thumbnails/12.jpg)
At last I would say...
Energy Saved Is Energy Produced...!
Thank you