INDOT 25-Year Long Range Plan 2003 Amendment Update Executive Summary INDOT 25-Year Long Range Plan The Indiana Department of Transportation (INDOT) 25-Year Long Range Plan lays out a strategy for the future of the state highway system, which is intended to provide Hoosiers the highest level of mobility and safety possible, and to meet the needs of economic development and quality of life into the next quarter century. The Long Range Plan provides an update of the 1995 Statewide Multimodal Transportation Plan entitled Transportation in Indiana: Multimodal Plan Development for the 1990’s and Beyond. The 1995 multimodal policy plan provides a foundation for developing more detailed plans for specific transportation modes. This highway plan document is intended to extend the planning period for highway improvements from the initial five years of the 1995 Plan to a 25 year planning horizon. This extended planning period provides INDOT and our planning partners, including the state’s Metropolitan Planning Organizations (MPOs) and other key transportation stakeholders, a long range vision of how the state jurisdictional highway system will develop in the future. 2003 Amendments INDOT has amended its 2000 to 2025 Long-Range Transportation Plan that was originally adopted on March 6, 2002. The 2003 amendments were introduced in order to maintain the INDOT long range plan relative to new information resulting from planning and environmental studies, in addition to revisions of project schedules and costs from the INDOT production scheduling system. Some recent planning and environmental studies which have provided more detailed information on major expansion transportation improvements include: The I-69 Evansville to Indianapolis Environmental Impact Statement (EIS) US 31 Corridor Study and EIS The Ohio River Bridges EIS The SR 62 (Lloyd Expressway) Corridor Planning Study & Environmental Assessment (EA) The US 231, I-70 to I-65 Corridor Planning Study The Northeast Connections Planning Study & EIS for I-69 & I-465 in Indianapolis The SR 25 Hoosier Heartland. The amendments to the INDOT Long Range Transportation Plan consist of fifty-nine primary amendments of significant cost (over $10 million per project) and 136 minor cost and schedule revisions. Additionally, forty-two projects identified in the initial twenty-five year plan have been let and or completed and have been removed from the active funding listing within the plan. These projects do remain listed for historical purposes; they can be identified in the project listings as projects that have the word “Let” in the plan support column and have a zero under the cost column. Public Input is Vital INDOT has established a proactive public involvement process in the planning and development of transportation projects. Over the past several years, INDOT has communicated the plan development process to state transportation professionals, local elected officials, and the public at a variety of venues, including an annual series of INDOT District “Open House” meetings, the Purdue University Road School and Consultation meetings held with Metropolitan Planning Organization (MPO) and Rural Planning Organizations (RPOs). INDOT also conducted an Indiana Futures Symposium, bringing national transportation experts and community and business leaders together to identify potential improvements to the state’s transportation system. The 25-Year Long Range Plan has been developed with the input of our statewide planning partners, including the state’s Metropolitan Planning Organizations, the

Upload: vokiet

Post on 07-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

INDOT 25-Year Long Range Plan

2003 Amendment Update Executive Summary

INDOT 25-Year Long Range Plan The Indiana Department of Transportation (INDOT) 25-Year Long Range Plan lays out a strategy for the future of the state highway system, which is intended to provide Hoosiers the highest level of mobility and safety possible, and to meet the needs of economic development and quality of life into the next quarter century. The Long Range Plan provides an update of the 1995 Statewide Multimodal Transportation Plan entitled Transportation in Indiana: Multimodal Plan Development for the 1990’s and Beyond. The 1995 multimodal policy plan provides a foundation for developing more detailed plans for specific transportation modes. This highway plan document is intended to extend the planning period for highway improvements from the initial five years of the 1995 Plan to a 25 year planning horizon. This extended planning period provides INDOT and our planning partners, including the state’s Metropolitan Planning Organizations (MPOs) and other key transportation stakeholders, a long range vision of how the state jurisdictional highway system will develop in the future.

2003 Amendments

INDOT has amended its 2000 to 2025 Long-Range Transportation Plan that was originally adopted on March 6, 2002. The 2003 amendments were introduced in order to maintain the INDOT long range plan relative to new information resulting from planning and environmental studies, in addition to revisions of project schedules and costs from the INDOT production scheduling system. Some recent planning and environmental studies which have provided more detailed information on major expansion transportation improvements include:

The I-69 Evansville to Indianapolis Environmental Impact Statement (EIS)

US 31 Corridor Study and EIS The Ohio River Bridges EIS The SR 62 (Lloyd Expressway) Corridor Planning

Study & Environmental Assessment (EA) The US 231, I-70 to I-65 Corridor Planning Study The Northeast Connections Planning Study & EIS

for I-69 & I-465 in Indianapolis The SR 25 Hoosier Heartland.

The amendments to the INDOT Long Range Transportation Plan consist of fifty-nine primary amendments of significant cost (over $10 million per project) and 136 minor cost and schedule revisions. Additionally, forty-two projects identified in the initial twenty-five year plan have been let and or completed and have been removed from the active funding listing within the plan. These projects do remain listed for historical purposes; they can be identified in the project listings as projects that have the word “Let” in the plan support column and have a zero under the cost column.

Public Input is Vital INDOT has established a proactive public involvement process in the planning and development of transportation projects. Over the past several years, INDOT has communicated the plan development process to state transportation professionals, local elected officials, and the public at a variety of venues, including an annual series of INDOT District “Open House” meetings, the Purdue University Road School and Consultation meetings held with Metropolitan Planning Organization (MPO) and Rural Planning Organizations (RPOs). INDOT also conducted an Indiana Futures Symposium, bringing national transportation experts and community and business leaders together to identify potential improvements to the state’s transportation system. The 25-Year Long Range Plan has been developed with the input of our statewide planning partners, including the state’s Metropolitan Planning Organizations, the

Federal Highway Administration, the Regional Planning Organizations (RPOs), and INDOT’s District Offices. System Definition The 25-Year Long Range Transportation Plan created a new and simplified three tier highway hierarchy. Descriptions of these three tiers follow.

1. Statewide Mobility Corridors

Statewide Mobility Corridors serve as the connection between urban areas of 25,000 persons or greater in Indiana and neighboring states, provide macro-level accessibility to cities and regions around the state, and play a vital role in economic development. These roadways carry long distance trips, heavier commercial vehicle flows and warrant upper level design standards, such as multiple travel lanes, railroad and highway grade separations, and bypasses of congested areas.

6

421

60

62

37

26

15

36231

14

32

52

3

1

41

145

24

67

7

29

231

2

135

9

4044

70

31

33

20

114

65

3518

66

37

64

164

50

30

74

69

46

69

20

469

63

25

94

24

69

0 20 40 60

Miles

Planning ClassificationsCensus Place (2000)Local Access CorridorsRegional CorridorsStatewide CorridorsProposed Alignments

Corridor Hierarchy

Statewide Mobility Corridor Characteristics:

Upper level design standards High speed Free flowing traffic conditions Serves long distance trips Large through traffic volumes Heavy commercial vehicle flows Carry longer distance commuter traffic Generally multi-lane, divided Full access control desirable, no less than partial

access control Railroad and highway grade separations desirable Desirable to bypass congested areas

Statewide Mobility Connections between Population Centers

$

$$

$

$

$ $

$

$

$

$$

$

$

$Marion

To Lansing / Detroit

To Dayton

To Cincinnati

To Central Illinois

Muncie

South Bend / ElkhartNW Indiana

Lafayette

Kokomo

AndersonIndianapolis

Fort Wayne

Columbus

Bloomington

Terre Haute

New Albany

EvansvilleTo St. Louis

To St. Louis

To DetroitTo Chicago

To Louisville

To Toledo

To Toledo

Metro Areas > 25000 Population

$ $ $750000 300000 25000

Richmond

To St. Louis

2. Regional Corridors

Regional Corridors serve as a connection to smaller cities and regions, feed traffic to the Statewide Mobility Corridors, and provide for regional accessibility.

Regional Corridor Characteristics: Mid-level design standards High to moderate speed Free-flow to the extent practicable in rural areas Serve medium distance trips Carry medium distance commuter traffic Moderate through traffic volumes Moderate commercial vehicle flows Potential for heavy local traffic volumes Typically, at grade intersections with highways and

railroads, with consideration for railroad separation High-level two-lane or multi-lane Partial access control desirable Conventionally routed through cities and towns

Highway Needs 2000 – 2025 Traffic growth rates from the Indiana Statewide Travel Demand Model are used to identify future year traffic volumes based upon forecasted socio-economic growth. Over the 2000 – 2025 time period, statewide population is forecasted to increase 17%, statewide employment is forecasted to increase 30%; however, travel demand is estimated to increase much more rapidly at 62%. The Highway Economic Requirements System for Indiana (HERS_IN) is one of the system planning tools developed for statewide transportation plan development. HERS_IN is a long-range planning tool for the analysis of highway system investments. HERS_IN is developed from the National Highway Economic Requirements System developed by the Federal Highway Administration (FHWA) for national highway investment analysis. INDOT has modified the national model for specific application to Indiana’s highway system analysis needs in developing HERS_IN. Two alternative levels of highway system investment were evaluated for the years 2000 to 2025. A full needs scenario, which allows the selection of any HERS_IN identified highway improvement, is compared to a no-build alternative to identify the impacts of future growth without any highway investment.

3) Local Access Corridors Local Access Corridors serve intra- and inter-county short distance trips, provide access to local residences and businesses, and provide access to rural areas and small towns.

Local Access Corridor Characteristics:

Lower-level design standards Moderate to low speed At-grade intersections with highways and railroads Minimal access control Short distance trips Low through traffic volumes Moderate local traffic volumes Typically two-lane with multi-lane exceptions Frequent interaction with non-motorized vehicles

and pedestrians Routed through cities and towns

90 90

74

94

80

6569

64

70

65

469

164

465

275150

421

27

31

30

33

20

35

50

24

231

52

6

41

36

136

40

231

12131

HERS_IN NEEDS ANALYSIS 2000-2025

Map LayersCountiesCensus PlaceDistrictsState HighwaysU.S. HighwaysInterstatesIMP_2025 Layer

The full needs scenario identified 1074 miles of added travel lanes projects. Assuming these improvements were made, the miles of congested highway would decrease from 4% in 2000 to 2% in 2025. Urban Interstate speeds would remain constant from 2000 to 2025. Overall highway system performance would remain stable with a 1% reduction from 53 mph in 2000 to 52 mph in 2025. The no-build scenario resulted in the increase of congestion from 4% of highway mileage in 2000 to 25% in 2025. Urban Interstate system speed would decrease 25% by 2025. Overall system performance as measured by operating speed would decrease 10% from 53 mph in 2000 to 48 mph in 2025. The Fiscal Forecast As part of the plan update process to evaluate the proposed amendments, the fiscal forecast developed in the initial INDOT Long-Range Transportation was revisited to determine fiscal constraint. The earlier forecast, prepared under the oversight of the INDOT Office of the Chief Financial Officer estimated revenues over the next 25 years at $ 31.3 billion. The fiscal evaluation for the plan update effort evaluated the 1980 to 2003 historical funding trend line of approximately 9 % annual growth in addition to the upcoming federal reauthorization proposals for the anticipated next six-year USDOT legislation. A funding scenario of an 8.5 % annual increase during the next federal reauthorization legislation with a remaining 1 % annual increase over the balance of the 25 year forecast period results in an estimated $ 33.2 billion being available for transportation investment. Of this amount 45 % would be used for added capacity improvements associated with the 25 year plan and 55 % for system preservation activities.

25 Year Fiscal ForecastEstimated Expansion/Preservation Split

$0.0

$200.0

$400.0

$600.0

$800.0

$1,000.0

$1,200.0

$1,400.0

$1,600.0

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Year

Fund

s (M

illio

ns)

Preservation ($millions) Expansion ($millions)

INDOT CONSTRUCTION SPENDING HISTORY FY 80 Thru FY 02

0100200300400500600700800900

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

Fiscal Years

Dol

lars

(mill

ions

)

The 25-Year Long Range Plan The 25-Year Long Range Plan Projects map illustrates the highway improvements recommended in the INDOT 25-Year Long Range Plan. The full INDOT 25-Year Long Range Plan provides maps of each district and MPO, along with detailed project listings, providing improvement type and implementation phasing information.

Non-Expansion Projects Include: Road Rehabilitation, Road Reconstruction, and Transportation Systems Management (TSM) Improvements Two placeholder projects are not shown on the map due to uncertainty over their potential alignments but, are included in the plan’s 25-year program improvements. These are:

1. Central Indiana Suburban Transportation Improvements 2. North West Indiana South Suburban/Illiana Expressway

150

090

039

421

024

074

067

027

022

094

080

031

052

030

068

018

028

033

063

020

056

065

058

003

069

064

241

066

120

142

035

070

047

050

231

025

002

075

114

250

009

062

037

218

048

337

014

005

006

046

041

054

065

026

001

019

036

124

038

059

129

164

055

015

111

160

104

040

252

168

110

070

057

234

043

013

161

032

145

064

016

010

105

044

049

007

119

350

060

229

065

545

165

061

256

136

011

341

227

166

156

004

008

450

245

257

244

240

205

128

017

069

116

159

101

246

327

045

550

135

446

042

130

340

358 235

352

164

224

261

236

115

238

331

258

154

267

109

364

162

071

167

023

029

465

213

362

103

157

265

144121

427

163

012

356 335

262

143

524

225

219

053

249

526

232

650

131

140

930

645

100

148

662

441

201

357

0 20 40 60

Miles

Map LayersState BorderSTATEDET LayerExpansion ProjectsNon Expansion Prj

69

INDOT 25-Year Long Range Plan Projects

Long Range Plan Improvement Types

The Long Range Plan is focused upon improvement types that increase the carrying capacity of the transportation system and improve the highway's ability to serve longer distance, higher speed inter-city travel, including commercial vehicles. These expansion projects receive special attention due to their long development time. A typical expansion project usually has a minimum seven to eight year development process made of four stages: planning/environmental studies, design engineering, land acquisition, and construction. Each stage requires one, two, or sometimes three years for completion. In addition to the long lead time needed for project implementation, expansion projects may create significant impacts to our environment which require consideration of long-range impacts. Improvement types are:

1. Added Travel Lanes

2. New Road Construction

3. Reconstruction 4R

4. Rehabilitation 3R

5. Transportation System Management

6. Median Construction

7. Interchange Modification

8. New Interchange Construction

9. New Bridge Construction

10. Freeway Upgrade

For more information regarding the INDOT 25-Year Long Range Transportation Plan, please contact the Long Range Transportation Planning Section at: [email protected].

An Evolving Document The Indiana Department of Transportation 25-Year Long Range Plan is an evolving document. The 25 year project listing contained within the full report is flexible. Predicting the future is a difficult task. This plan will be amended periodically so that we can adapt to changing needs, priorities, and fiscal realities. INDOT anticipates that our Long Range Plan will be formally updated every two years. In the meantime, we are receptive to and encourage your comments. Together, we can provide for a safe, efficient, effective, reliable transportation system for all Hoosiers and those who pass between our borders here at the Crossroads of America.

The INDOT 25-Year Long Range Transportation Plan, including detailed maps and project listings, and the 2003 amendments are both available on INDOT’s Web site: http://www.in.gov/dot/pubs