index of electric issuances - usda rural development · utilities program . informational ....

39
1 United States Department of Agriculture Utilities Program Informational Publication 200-3 Index of Electric Issuances Borrower’s Edition

Upload: lyquynh

Post on 28-Jul-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

1

United States Department of Agriculture Utilities Program Informational Publication 200-3

Index of Electric Issuances Borrower’s Edition

Page 2: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

2

I N T R 0 D U C T I 0 N This index serves as a valuable resource for identifying current RUS issuances and maintaining current files To maintain your files, you may wish to make a periodic check of your bulletins files against the numerical list (Part III) to identify any missing or rescinded issuances. RUS is continuing its efforts in the renumbering of its publications. New and revised electric issuances will appear with a 1700 series number, which corresponds with RUS policy issued in the Code of Federal Regulations (CFR). RUS Borrowers will be notified of new and revised bulletins by memo or e-mail. RUS borrowers should notify their business associates of the availability of these bulletins. New and revised RUS bulletins will be available on the RUS Home Page at: http://www.usda.gov/rus/electric/. We encourage you to visit our home page. If you have any questions, CALL (202) 720-8674, FAX (202) 720-8435 or send an E-mail to [email protected]. Certain items are available directly from the Government Printing Office (GPO). These publications are indicated by a, "#" in Part III of this publication. See Part V for GPO ordering information.

Page 3: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

3

CONTENTS Page

INTRODUCTION..........................................................................................................2

CONTENTS....................................................................................................................3

PART I New, Revised, and Rescinded Issuances.....................…......................5-6

PART II Alphabetical Index by Subject...................................…........................7-20

PART III Numerical index of all current RUS bulletins, specifications, Electric Operations Manual (EOM) section and Informational Publications (I.P.) for the electric program. Supplements and partial revisions are listed with their related publication. SECTION A Numerical list of all current RUS bulletins with their associated specification number, if applicable, for the electric program ..........................................................….......................21-30 SECTION B EOM section...........................................…....................31 SECTION C Numerical list of Informational Publications …............33 PART IV List of RUS’ electric policies and procedures that have been codified in the Code of Federal Regulations (CFR) under Title 7 Chapter XVII...............…………………………....…....….......35-38 PART V List of electric program items on sale at the US Government Printing Office (GPO). Request for sales items should be referred to the Superintendent of Documents, GPO. An order form has been included to be used in ordering items directly from GPO................................................................................….…..…39-40

Page 4: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

4

THIS PAGE INTENTIONALLY

LEFT BLANK

Page 5: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

5

PART I

LIST OF NEW, REVISED, AND RESCINDED RUS ISSUANCES

NEW BULLETINS

NEW RUS BULLETINS DATE REPLACES

Page 6: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

6

REVISED BULLETINS

REVISED RUS BULLETINS DATE PREVIOUS DATE

1724E-214 03/23/2017 02/10/2009

RESCINDED BULLETINS

RESCINDED RUS BULLETINS

Page 7: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

7

PART II

ALPHABETICAL SUBJECT INDEX OF CURRENT RUS ELECTRIC ISSUANCES

ACCOUNTING:

Audits (see AUDITS) Construction Cost - Bul. 1767B-3 Borrowers' Loan Budget Subsidiary Record -Bul. 26-1, 180-4 Interpretations for Rural Electric Borrowers - Bul. 1767B-1 Loan Account Computations and Statements - Bul. 20-9 Requirements - 7 CFR 1770 Retirement Units - Bul. 181-2 Uniform System - Bul. 1767B-1 Work Order Procedure - Bul. 1767B-2

ACQUISITIONS:

Merger and Consolidation - Bul. 115-2 ADVANCE OF LOAN FUNDS:

Budgetary Control - Bul. 26-1 General Information - EOM 4 Payments - Bul. 20-9 Post-Loan Policies and Procedures of Insured Electric Loan - 7 CFR 1721

ADVANCE PAYMENTS:

Application of - Bul. 20-9 AGREEMENTS: (also see CONTRACTS) Basis Date - Bul. 20-9

Operation and Management of Telephone Borrowers' Systems - Bul. 100-5 AMORTIZATION: (see INTEREST) ANCHORS:

Guide for Design - Bul. 1724E-153 Specification for Steel Plate - Bul. 50-56(T-3) Specification for Power Installed Screw - Bul. 50-22(DT-10)

ANNUAL MEETING GUIDE:

Bul. 101-4 ANNUAL STATISTICAL REPORT: I.P. 201-1 APPLICATIONS, LOAN: (also see LOANS)

Prepayment - 7 CFR 1786.31 ARCHITECTURAL SERVICES:

Plans and Specifications for Buildings - Bul. 1724E-400

Page 8: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

8

AREA COVERAGE: 7 CFR 1710.103

ASSEMBLY UNIT NUMBERS AND STANDARD FORMAT Bul. 1728F-800

AUDITS:

Audit Working Papers - 7 CFR 1773, Subpt. C Audits of Borrowers' Records (CPA) - 7 CFR 1773 Policy - 7 CFR 1773

BASIS DATE AGREEMENTS: Bul. 20-9 BOARD OF DIRECTORS: (see DIRECTORS) BONDS:

5 Percent Treasury Certificates of Indebtedness - RUS Series and 2 Percent Treasury Bonds - RUS Series - Bul. 103-9

BORROWERS:

RUS Relationship with - Bul. 2-1 BUDGETS: (see FINANCIAL PLANNING) BUILDINGS:

Closeout Procedure - 7 CFR 1726 Plans and Specifications - Bul. 1724E-400 Pre-Construction Activities of Headquarters Facilities for Electric Borrowers - 7 CFR 1726

"BUY AMERICAN" REQUIREMENT: Bul. 43-9 BYLAWS:

Model Bylaws - Bul. 101-5 CAPACITORS:

Application to Rural Electric Systems - Bul. 1724D-112 CAPITAL CREDITS:

Consumer Benefits - Bul. 102-1 Waivers of Security Instrument Provisions Relating to Certain Returns of Capital - Bul. 102-2

CERTIFICATION OF INDEBTEDNESS: US Treasury - 5 Percent Series - Bul. 103-9 CERTIFIED PUBLIC ACCOUNTANTS: Qualifications - 7 CFR 1773.5 CIVIL RIGHTS:

Nondiscrimination among Beneficiaries of RUS Program - Bul. 1790-1

Page 9: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

9

CLOSEOUT DOCUMENTS: 7 CFR 1726 CODE 0F FEDERAL REGULATIONS: RUS Parts - 7 CFR 1600-1759, 1760-1939 COMMITTEES:

Line-Staff - Bul. 1700-51 CONDUCTORS:

Low Voltage Circuits Reduced Size Neutral - Bul. 1724E-104 Replacing Storm – Damaged Conductors – 1724D-106 Sag Checking by Return Wave Method - Bul. 1726C-115

CONSERVATION: (see ENERGY CONSERVATION) CONSTRUCTION:

Architectural Services – 7 CFR 1724 Budget - Bul. 26-1 Buildings (See BUILDINGS) Closeout Documents (see CLOSEOUT DOCUMENTS) Construction Work Plans, Electric Distribution Systems - Bul. 1724D- 101B Contracts (see CONTRACTS) Equal Employment Opportunity - Bul. 20-15 Generation Facilities (see GENERATION FACILITIES) Headquarters (see BUILDINGS) Inspection (see INSPECTION) Materials and Equipment (see MATERIALS AND EQUIPMENT) Mechanical Design Manual for Overhead Distribution Lines - Bul. 1724E-150, 1724E-151, 1724E-152, 1724E-153, 1724E-154 Narrow Profile and Armless Construction for Distribution Borrowers - Bul. 61-12 Plant Accounting Work Order Cost Records - Bul. 1770-1 Policies and Procedures - 7 CFR 1726 Sag Checking by Return Wave Method - Bul. 1726C-115 System Design (see DESIGN, SYSTEM) Transmission Facilities (see TRANSMISSION FACILITIES) Underground Rural Construction - Bul. 1728F-806(D-806) Work Order Construction Manual - Bul. 1767B-2

CONSTRUCTION WORK PLANS: 7 CFR 1710, Subpt. F; Bul. 1724D-101B

CONSULTANTS:

Borrower Use of - Bul. 103-8 Use of Consultants Funded by Borrowers - 7 CFR 1789 CONTINUING PROPERTY RECORDS:

Guide for Establishing - Bul. 184-3 CONTRACTS:

Architectural Services – 7 CFR 1724 Award and Method of Construction - 7 CFR 1726 Basis Date - Bul. 20-9 "Buy American" Requirement - Bul. 43-9 Construction Cost - Bul. 1767B-3

Page 10: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

10

Closeout Procedure (see CLOSEOUT DOCUMENTS) Distribution Facilities - 7 CFR 1726; 50-4(D-801), Bul. 1728F-804(D-804), 1728F-803(D-803), 1728F-806(D-806) Equal Employment Opportunity - Bul. 20-15 Evaluation of Large Power Transformer Losses - Bul. 1724E-301 Forms, List of Electric Contract - 7 CFR 1726, Subpt. I Generation - 7 CFR 1726 Irrigation - Bul. 112-6 Large Power - Bul. 112-6 Operation and Management of Borrowers' System - Bul. 100-5 Seasonal Electric Services - Bul. 112-6 Specifications and Drawings - Bul. 1728F-804(D-804), 50-4(D-801), 1728F-803 (D-803), 1728F-806 (D-806), 1728F-810(T-805A), 1728F-811(T-805B) Transmission Facilities - 7 CFR 1726; Bul. 1728F-810 (T-805A), 1728F-811 (T-805B) Wholesale Power - Bul. 111 -1

CONTROL, INTERNAL:

Evaluation and Enforcement - Bul. 182-1 COOPERATIVE EDUCATION:

Expanding Manpower Resources - Bul. 109-7 CROSSARMS:

Inspection and Quality Control - 7 CFR 1728.202; Bul. 1728H-702(DT-19) Specifications - 7 CFR 1728.201; Bul. 1728H-701(DT-5B) Specifications, Z Wishbone-Type Assemblies - Bul. 50-57(T-5)

CUSHION OF CREDIT:

7 CFR 1785, Subpt. B DEBARMENT AND SUSPENSION:

7 CFR 1710.123 DEFALCATION: Bul. 182-1 DELEGATION OF AUTHORITY: Program - 7 CFR 1700 DELINQUENT BORROWERS:

Identification and Assistance - Bul. 100-4 DEPOSITORIES FOR FUNDS: Selection of - Bul. 180-6 DEPRECIATION:

Rates and Procedures - Bul. 183-1

Page 11: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

11

DESIGN, SYSTEM: Electric System Design - 7 CFR 1724, Subpt. E Electric System Long Range Planning Guide - Bul. 1724D-101A Electrical Characteristics of RUS Alternating Current Transmission Designs - Bul. 62-5 Embedment Depths for Concrete and Steel Poles – 1724E-205 Evaluation of Large Power Transformer Losses - Bul. 1724E-301 Guys and Anchors Guide - Bul. 1724E-153 Mechanical Design Manual for Overhead Distribution Lines - Bul. 1724E-150, 1724E-151, 1724E-152, 1724E-153, 1724E-154 Narrow Profile and Armless Construction for Distribution Borrowers - Bul. 61-12 Neutral Conductors, Reduced Size - Bul. 1724E-104 Oil Spill Prevention & Control at Substation - Bul. 1724E-302 Rural Substations - Bul. 1724E-300

System Planning Guide, Construction Work Plans; Bul. 1724D-101B System Planning Guide, System Mapping Guide; Bul. 1724D-103

Transmission Line Manual - Bul. 1724E-200 DIRECTORS:

Constitution, Power Supply Borrowers - Bul. 101-1 Minutes of Meetings of Boards of Directors, Members or Stockholders - Bul. 100-2 Manager's Monthly Report - Bul. 103-5 Reporting and Controlling - Bul 106-1

DISTRIBUTION FACILITIES:

Construction Contract Closeout Documents - 7 CFR 1726 Design and Construction (see CONSTRUCTION, CONTRACTS, & DESIGN, SYSTEM) Specifications and Standards (see SPECIFICATIONS AND STANDARDS) System Review and Evaluation - 7 CFR 1730; Bul. 1730-1

DIVIDENDS:

Waiver of Security Instrument Provisions Relating to Certain Returns of Capital - Bul. 102-2 DRAWINGS: (see SPECIFICATIONS & STANDARDS) EMERGENCY RESTORATION PLAN: Bul. 1730B-2 ENERGY CONSERVATION:

Load Management Program - 7 CFR 1710, Subpart H

ENGINEERING AND OPERATIONS MANUAL:

Bul. 160-1, 1724E-150, 1724E-151, 1724E-152, 1724E-153, 1724E-154 EQUAL EMPLOYMENT OPPORTUNITY:

RUS Financed Construction - Bul. 20-15 EQUIPMENT: (see MATERIALS AND EQUIPMENT)

Page 12: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

12

FINANCIAL AND STATISTICAL REPORTS: Guidelines, Distribution Borrowers - 1717B-2 Guidelines, Power Supply Borrowers - 1717B-3 FINANCIAL PLANNING:

By Borrowers - 7 CFR 1710, Subpt. G Control and Advance of Loan Funds - Bul. 26-1 Distribution Borrowers - 7 CFR 1710.301; Bul. 105-5 Operating, Distribution-Type Borrowers - Bul. 105-1 Operating, Power-Type Borrowers - Bul. 105-2 Power Supply Borrowers - 7 CFR 1710.302; Bul. 105-7 Purpose - Bul. 105-6 RUS Recommendations - Bul. 105-4 Reporting and Controlling - Bul. 106-1

FINANCIAL STATEMENTS:

Budgetary Control - Bul. 26-1 Distribution Borrowers - Bul. 1717B-2 Power Supply Borrowers - Bul. 1717B-3

FUNDS:

Advances (see ADVANCE OF LOAN FUNDS) Depository Selection by Borrowers - Bul. 180-6 Investment in Supplemental Lending Institutions with Deferment of Principal Repayments - Investment of US Treasury Bonds - Bul. 103-9 Use and Investment of General Funds - Bul. 103-2

GENERATION FACILITIES: Closeout Documents - 7 CFR 1726

Construction Methods - 7 CFR 1726 Loan Policies and Application Procedures - Bul. 20-22 Power Supply Surveys - Bul. 111-3

GRANTS:

Distance Learning & Medical Link - 7 CFR 1703, Subpt. D GUARANTEE, LOANS: (also see LOANS) Bulk Power Supply Facilities - Bul. 20-22 Post-Loan Policies & Procedures - 7 CFR 1717 Pre-Loan Polices & Procedures - 7 CFR 1710 GUYS AND ANCHORS:

Guide for Design - Bul. 1724E-153 Power Installed Screw – 50-61(T-10) Specifications for Anchors - Bul. 1728F-700(DT-5C)

HEADQUARTERS FACILITIES: (see BUILDINGS) INFORMATION:

Public Information Policy - 7 CFR 1700, Subpt. C

Page 13: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

13

INSPECTION: Distribution Line - Bul. 161-3 Poles, Stubs, Crossarms - 7 CFR 1728.202; Bul. 1728H-702(DT-19), 1730B-121

(see also OPERATION & MAINTENANCE) INSURANCE:

Insurance and Fidelity Coverage for Borrowers, Contractors, and Engineers - 7 CFR 1788 INTEREST:

Computation and Loan Account Statements - Bul. 20-9 Payments - Bul. 20-9

INTERNAL CONTROL:

Evaluation and Enforcement - Bul. 182-1 Report, CPA Submissions - 7 CFR 1773.33

INVESTIGATION AND AUDIT REPORTS:

Audits of RUS Borrowers - 7 CFR 1773 IRREGULARITIES:

Borrower - Bul. 182-1 IRRIGATION:

Contracts - Bul. 112-6 JUDICIAL PROCEEDINGS: Appearance of RUS Personnel - Bul. 1700-3 LARGE POWER CONTRACTS: Bul. 112-6 LEGISLATION:

Rural Electrification Act - I.P. 100- 1 LIEN ACCOMMODATION:

Policy - 7 CFR 1717, Subpts. R & S LINE EXTENSIONS:

7 CFR 1710.103 LOANS:

Advance and Budgetary Control - Bul. 26-1 Advance of Funds - EOM 4 Applications for Generation and Transmission - Bul. 20-22 Area Coverage - 7 CFR 1710.103 Basis Date Agreements - Bul. 20-9 Generation and Transmission Facilities - Bul. 20-22 Guarantee for Bulk Power Supply Facilities - Bul. 20-22 Headquarters Building - 7 CFR 1726 Interest and Principal Payments - Bul. 20-9

Page 14: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

14

LOANS: (continued) Loan Account Computations and Statements - Bul. 20-9 Payment - 7 CFR 1785 Policies and Application Procedures - 7 CFR 1710, 1714 (Pre-), 1717 (Post-); Bul. 20-22 Power Supply Surveys - Bul. 111-3 Prepayment - 7 CFR 1786 Security, Electric Borrowers - Bul. 100-4

LOBBYING: Restrictions - 7 CFR 1710.125

MAINTENANCE: (see OPERATIONS AND MAINTENANCE) MANAGEMENT:

Agreements between Borrowers - Bul. 100-5 Financial, RUS Recommendations - Bul. 105-4

MANAGER:

Report to the Board of Directors - Power Supply Borrowers - Bul. 103-5 Reporting and Controlling - Bul. 106-1

MANPOWER RESOURCES: Expansion - Bul. 109-7 MAPPING:

System Guide - Bul. 1724D-103 MARGINS AND CAPITAL:

Capital Credits - Bul. 102-1 Waiver of Security Instrument Provisions Relating to Certain Returns of Capital - Bul. 102-2

MATERIALS AND EQUIPMENT:

Acceptance - IP 202-1 Anchors (see ANCHORS) "Buy American" Requirement - Bul. 43-9 Conductors (see CONDUCTORS) Crossarms (see CROSSARMS) Design Guide for Rural Substations - Bul. 1724E-300 Evaluation of Large Power Transformer Losses - Bul. 1724E-301 Guide Specification for Steel Pole Structures - Bul. 1724E-204 Guys and Anchors Design Guide - Bul. 1724E-153 List of Acceptable Materials – IP 202-1, 7 CFR 1728.60 Poles (see POLES) Purchase of - 7 CFR 1726 Specifications and Standards (see SPECIFICATIONS AND STANDARDS) Shunt Capacitors Application - Bul. 1724D-112 Transformers - Bul. 61-16

MEETINGS: (see DIRECTORS) MERGER AND CONSOLIDATION: 7 CFR 1710.108; Bul. 115-2 MINUTES OF MEETINGS OF BOARDS OF DIRECTORS, MEMBERS, OR STOCKHOLDERS:

Bul. 100-2

Page 15: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

15

MODEL ACT BYLAWS: Bul. 101-5 MORTGAGE NOTES: (see NOTES) NARROW PROFILE AND ARMLESS CONSTRUCTION: Guide for Distribution Borrowers - Bul. 61-12 NONDISCRIMINATION:

Civil Rights Title VI - Bul. 1790-1 Equal Employment - Bul. 20-15

NOTES:

Interest Computations and Loan Account Statements - Bul. 20-9 OPERATING BUDGETS:

Distribution-Type Borrowers - Bul. 105-1 Power-Type Borrowers - Bul. 105-2

OPERATING REPORTS:

Distribution Borrowers - 1717B-2 Power Supply Borrowers and Distribution Borrowers with Generating Facilities - Bul. 1717B-3

OPERATION AND MANAGEMENT: Agreement between Borrowers - Bul. 100-5 OPERATIONS AND MAINTENANCE:

Design Guide for Rural Substations - Bul. 1724E-300 Determination of Fault Current at Service Entrance Equipment - Bul. 61-14 Distribution Line Records - Bul. 161-3 Electric System Operation and Maintenance (O&M) - 7 CFR 1730; Bul. 1730-1 Poles - Bul. 1730B-121 Service Interruptions - Bul. 1730A-119 Shunt Capacitors, Application - Bul. 1724D-112 Voltage (see VOLTAGE)

PATRONAGE CAPITAL: (see CAPITAL CREDITS) PLANNING, SYSTEM AND FINANCIAL: (see FINANCIAL or SYSTEM PLANNING) POLES:

Embedment Depths for Concrete and Steel Poles – Bul. 1724E-205 Inspection and Quality Control - 7 CFR 1728.202; Bul. 1728H-702(DT-19) Guide Specification for Spun, Prestressed Concrete Poles and Concrete Pole Structures – 1724E-206 Guide Specification for Standard Class Spun, Prestressed Concrete Transmission Poles – 1724E-216 Maintenance - Bul. 1730B-121 Preservative Treatment - Bul. 1728F-700(DT-5C) Steel Single Pole and H-Frame Structures – Bul. 1724E-204

POLICY: RUS Relationship with Borrowers - Bul. 2-1

Page 16: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

16

POWER LOSSES: Evaluation of Large Power Transformer Losses - Bul. 1724E-301 Evaluation of Distribution Transformers - Bul. 61-16

POWER SUPPLY SURVEYS:

Bul. 111-3 PREPAYMENT:

Guaranteed and Insured Loans - 7 CFR 1786 PRINCIPAL AND INTEREST: (see INTEREST) PROPERTY:

Guide for Establishing Continuing Records - Bul. 184-3 Merger and Consolidation - Bul. 115-2 Purchase by Borrowers - Bul. 20-8 Removal or Relocation of Electric Facilities Resulting from the Exercise of Rights by Government Agencies - Bul. 115-3 Sales by Electric Borrowers - Bul. 1717M-2

PUBLICATIONS:

Index - I.P. 200-3 RATES: (also see RETAIL RATES or WHOLESALE RATES) Power Supply Borrowers (Pre-emption) - 7 CFR 1717, Subpt. G Electric Borrowers in Bankruptcy (Pre-emption) - 7 CFR 1717, Subpt. H REAL ESTATE:

Purchase by Electric Borrowers - Bul 20-8 Sale by Electric Borrowers - Bul. 1717M-2

RECORDS:

Guide for Establishing - Bul. 184-3 Line Inspection and Maintenance, Distribution Lines - Bul. 161-3 Operations and Maintenance, Distribution Equipment - Bul. 1730A-119 Operations and Sectionalizing Points - Bul. 1730A-119 Preservation - Bul. 180-2

REPORTS:

Borrower Reports: Interruption Reporting - Bul. 1730A-119 Manager's to Board of Directors, Power Supply Borrowers - Bul. 103-5 Financial and Statistical, Distribution Borrowers - Bul. 1717B-2 Financial and Statistical, Power Supply Borrowers and Distribution Borrowers with Generating Facilities - Bul. 1717B-3 Operating Reports, Distribution Borrowers Having Generation Facilities - Bul. 1717B-3 Reporting and Controlling - Bul. 106-1

RUS Reports: Statistical - I.P. 201-1

RETAIL RATES: Area Coverage and Line Extension Plans - 7 CFR 1710.103 Large Power Rates and Contracts - Bul. 112-6

Page 17: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

17

RETIREMENT UNITS: Standard List - Bul. 181-2

RIGHT-OF-WAY:

Accounting for First Clearing - Bul. 1767B-1 Obtaining - Bul. 20-3

RURAL ELECTRIFICATION ACT: I.P. 100-1 SAFETY:

Seismic - 7 CFR 1792; Bul. 1792C-1 SALES OF PROPERTY: Bul. 1717M-2 SEASONAL ELECTRIC SERVICE:

Contracts - Bul. 112-6 SECTION 12 EXTENSIONS: SERVICE CONTINUITY: Bul. 1730A-119 SERVICE ENTRANCE EQUIPMENT: Determinations of Fault Current - Bul. 61-14 SHUNT CAPACITORS:

Application to Rural Electric Systems - Bul. 1724D-112 SPECIAL PAYMENTS:

Application of - Bul 20-9 Sales of Capital Assets - Bul. 1717M-2

SPECIFICATIONS AND STANDARDS:

Distribution Facilities: Anodes, Zinc - Bul. 50-21(DT-9) Anodes, Magnesium - Bul. 50-22(DT-10) Bolts, Clevis - Bul. 50-19(DT-7) Bolts, Single and Double Upset Spool - Bul. 1728F-804(D-5) Braces, 60", Wood Crossarm - Bul. 50-23(DT-18) Brackets, Angle Suspension - Bul. 50-16(DT-4) Brackets, Pole Type for Channel Type Pins - Bul. 50-40(D-14)

Page 18: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

18

SPECIFICATIONS AND STANDARDS: (continued)

Cable, 600 v. Neutral Supported Secondary Service Drop – Bul. 50-30(D-2) Clevises, Insulated Conduit - Bul. 50-42(D-16) Clevises, Secondary Swinging - Bul. 50-34(D-6) Clevises, Service Dead-end - Bul. 50-36(D-8) Clevises, Service Swinging - Bul. 50-35(D-7) Construction Specifications and Drawings - Bul. 1728F-804(D-804); 50-4(D-801), 1728F-803(D-803), 1728F-806(D-806) Crossarms (Solid and Laminated), Pole Keys - 7 CFR 1728.201; Bul. 1728H-701(DT-5B), 1728H-702(DT-19) Enclosures, Equipment - Bul. 50-72(U-4)

Guide Specification for Steel Pole Structures - Bul. 1724E-204 Guide Specification for Standard Class, Spun, Prestressed Concrete Transmission Poles – Bul. 1724E-216 Incorporated by Reference - 7 CFR 1728.97 Materials and Construction - 7 CFR 1728

Pedestals, Power, Secondary - Bul. 50-74(U-6) Pins, Pole Top with 1" Diameter Lead Thread - Bul. 1728F-804(D-3) Pins, Pole Top with 1 3/8' Lead Thread - Bul. 50-15(DT-3) Pins, Steel Crossarm Mounted with 1 " Diameter Lead Threads - Bul. 1728F-804(D-4) Poles (Wood), Stubs, Anchor Logs, and Preservatives - Bul. 1728F-700(DT-5C) Spun, Prestressed Concrete Poles and Concrete Structures – Bul. 1724E-206 Standard Spun, Prestressed Concrete Transmission Lines – Bul. 1724E-216 Standard Class Steel Transmission Poles – Bul. 1724E-214 Transformers, Rural Distribution - (2:1 Ratio, 25 and 15 kV) - Bul. 50-43(D-18) Transformers, Pad Mounted - Bul. 50-73(U-5) Underground Cable - 15 & 25 kV - Bul. 50-71(U-2) Underground Electric Distribution - Bul. 1728F-806 (D-806) Voltage Limits, Radio Influence, Bul. 1728F-804 (D-11) Wireholder, Conduit for Pipe Mast Deadends - Bul. 50-42(D-16) Wireholders, Service - Bul. 50-41(D-15)

Substations: Regulators - Bul. 50-90(S-2) Transformers, Step-Down - Bul. 50-91(S-3) Transformers, Step-Up - Bul. 50-92(S-4)

Transmission Facilities: Anchors, steel Plate - Bul. 50-56(T-3) Bolts, Clevis - Bul. 50-19(DT-7) Brackets, Angle suspension - Bul. 50-15(DT-3) Brackets, Overhead Ground Wire Support - Bul. 50-55(T-2) Construction Specifications and Drawings - Bul. 1728F-810(T-805A), 1728F-811(T-805B) Crossarm Assemblies, Double Armed and Brace Type - Bul. 50-58(T-7) Crossarm Assemblies, Double Armed and Brace Type (230 kV) - Bul. 50-59(T-8) Crossarms, Wood (Solid and Laminated), Transmission Timber and Keys - 7 CFR 1728.201; Bul. 1728H-701(DT-5B) Crossarms, Z Wishbone Type Assemblies - Bul. 50-57(T-5) Pins, Pole Top with 1 3/8" Lead Thread - Bul. 50-15(DT-3), 1728F-700(DT-5C) Poles (Wood), Stubs, Anchor Logs, and Preservatives - Bul. 1728F-700(DT-5C) Structures, Steel, single Pole - Bul. 50-60(T-9), 1724E-204

STATISTICAL REPORTS: (see REPORTS)

Page 19: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

19

SUBSTATIONS: Prevention and Control of Oil Spills - Bul. 1724E-302 Design Guide for Rural Substations - Bul. 1724E-300

SUPPLEMENTAL FINANCING: Policy - Bul. 20-14

SYSTEM DESIGN: (see DESIGN, SYSTEM) SYSTEM PLANNING:

Construction Work Plans, Electric Distribution Systems - Bul. 1724D- 101B Electrical Characteristics of RUS Alternating Current Transmission Designs - Bul. 62-5

Long Range Planning - 1724D-101A System Mapping Guide - Bul. 1724D-103 Transmission Studies - Bul. 1724E-202

TECHNICAL ADVISORY COMMITTEE: Power-Type Borrowers - Bul. 101-1 TIMBER PRODUCTS:

Specifications for Crossarm Assemblies - Bul. 50-57(T-5); 50-58(T-7), 50-59(T-8) Specifications for Crossarms, Transmission Timbers and Pole Keys 7 CFR 1728.201; Bul. 1728H-701(DT-5B) Specifications for Poles Stubs and Anchor Logs - Bul. 1728F-700(DT-5C) Specifications for Quality Control and Inspection - 7 CFR 1728.202; Bul. 1728H-702(DT-19)

TITLE PROCEDURE:

Obtaining Adequate Right-of-Way and Submission of Title Evidence by Electric Borrowers - Bul. 20-3 TRANSFORMERS:

Economic Evaluation of Distribution Transformers – 1724D-107 Pad-Mounted - Bul. 50-73(U-5) Rural Distribution – Bul. 50-37(D-10); Bul. 50-43(D-18); Bul. 1728F-804(D-10) Substation - Step-Down - Bul. 50-91(S-3) Substation - Step-Up -Bul. 50-92(S-4)

TRANSMISSION FACILITIES:

Characteristics of RUS Alternating Current Transmission Designs - Bul. 62-5 Construction Contract Closeout Documents - 7 CFR 1726 Line Manual - Bul. 1724E-200 Power Supply Surveys - Bul. 111-3 Specification and Drawings - Bul. 1728F-810(T-805A), 1728F-811(T-805B) Specifications and Standards (see SPECIFICATIONS AND STANDARDS) Upgrading Lines - Bul. 1724E-203

U.S. TREASURY CERTIFICATES OR BONDS: RUS Series - Bul. 103-9 UNDERGROUND DISTRIBUTION:

Specifications and Standards (see SPECIFICATIONS AND STANDARDS) Underground Rural Distribution - Bul. 1728F-806(D-806)

Page 20: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

20

UNIFORM SYSTEM OF ACCOUNTS: Bul. 1767B-1 VOLTAGE:

Composite Insulators, Voltage Class 34.5 kV and Above – Bul. 1724E-220 Conductor-Low Voltage Circuits Levels - Bul. 1724D-113 Regulator Applicator - Bul. 169-27

WHOLESALE POWER: Contracts - 7 CFR 1717

WHOLESALE RATES: RUS Policy - Bul. 111-4

WORK ORDER CONSTRUCTION:

Accounting Procedures - Bul. 1767B-2

Page 21: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

21

PART III

NUMERICAL LISTING OF CURRENT RUS ISSUANCES

SECTION A

BULLETINS AND SPECIFICATIONS Spec. Issue Bulletin Number Date Title Expires 2-1 08/69 Guiding Statement of RUS Policy Concerning its n/a Relationship with Borrowers 20-3 07/56 Obtaining Adequate Right-of-Way and Submission of n/a Title Evidence by RUS Electric Borrowers 03/60 Supplement 04/66 Supplement 06/72 Supplement 10/76 Supplement 20-8 07/63 Purchase of Real Estate by Electric Borrowers n/a 20-9 09/82 Loan Payments and Statements n/a 09/88 Supplement 20-10 05/73 Identification System for Borrowers, Loan n/a Applications, Loans & Related Items 01/74 Revised Page 3 20-15 07/70 Equal Employment Opportunity in Construction n/a Financed with RUS Loans 20-22 04/77 Guarantee of Loans for Bulk Power Supply Facilities n/a 26-1 05/71 Budgetary Control & Advance of Electric Loan Funds n/a 11/72 Supplement 05/73 Supplement 10/79 Supplement 43-9 07/55 "Buy American" Requirement n/a

Page 22: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

22

Spec. Issue Bulletin Number Date Title Expires 50-4 D-801 11/86 Specifications and Drawings 34.5/19.9kV Distribution n/a Line Construction 50-15 DT-3 01/51 RUS Specifications for Pole Top Pins with 1-3/8" n/a Diameter Lead Thread 50-16 DT-4 03/52 RUS Specifications for Angle Suspension Brackets n/a 50-19 DT-7 08/53 RUS Specifications for Clevis Bolts n/a 50-21 DT-9 06/78 RUS Specifications for Zinc Sacrificial Anodes n/a 50-22 DT-10 06/78 RUS Specification for Magnesium Sacrificial Anodes n/a 50-23 DT-18 02/71 RUS Specifications for 60" Wood Crossarm Braces n/a 50-30 D-2 02/78 RUS Specification for 600 Volt Neutral-Supported n/a Secondary and Service Drop Cables 50-31 D-3 02/79 RUS Specifications for Pole Top with 25.4mm (1") n/a Diameter Lead Threads 50-32 D-4 10/50 RUS Specifications for Steel Mounted Pins with n/a 1 -inch Lead Threads 50-33 D-5 02/51 RUS Specifications for Single Double Upset Spool n/a Bolts 50-34 D-6 12/70 RUS Specifications for Swinging Clevises n/a 50-35 D-7 09/52 RUS Specifications for Service Swinging Clevises n/a 50-36 D-8 09/52 RUS Specifications for Service Clevises n/a 50-37 D-10 07/79 RUS Specifications for Distribution Transformers n/a (Overhead Type) 50-38 D-11 04/51 RUS Standard for Radio Influence Voltage Limits for n/a 14.4/24.9 Insulators and Apparatus 50-40 D-14 09/51 RUS Specifications for Pole Top Brackets for Channel n/a Type Pins

Page 23: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

23

Spec. Issue Bulletin Number Date Title Expires 50-41 D-15 11/51 RUS Specifications for Wireholders n/a 50-42 D-16 07/54 Insulated Conduit Clevises and Conduit Wireholders n/a for Pipe Mast Deadends 50-43 D-18 01/78 RUS Specifications for Distribution Transformers n/a (2:1 Ratio, 25 kV to 15 kV Class) 50-55 T-2 05/53 RUS Specifications for Ground Wire Support n/a Brackets 50-56 T-3 12/53 RUS Specifications for Steel Anchors for n/a Transmission Lines 50-57 T-5 01/61 RUS Specifications for "Z" Type Crossarm n/a Assemblies 50-58 T-7 11/62 RUS Specifications for Double and Braced Type n/a Crossarm Assemblies (138 kV and 161 kV Transmission Lines) 50-59 T-8 09/79 RUS Specifications for Double Armed and Braced n/a Type Crossarm Assembles (230 kV Transmission Lines) 50-60 T-9 12/81 RUS Specification - Single Pole Steel Structures, n/a Complete with Arms 50-61 T-10 05/77 RUS Specifications and for Power Installed Screw n/a Anchors for Guying 50-71 U-2 02/75 RUS Specification for 600 Underground Power Cable n/a

Page 24: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

24

Spec. Issue Bulletin Number Date Title Expires 50-72 U-4 10/79 RUS Specification for Electrical Equipment n/a Enclosures (5 through 35 kV) 50-73 U-5 01/77 RUS Specifications for Pad- Transformers n/a (Single and Three-Phase) 50-74 U-6 04/79 RUS Specifications for Pedestals n/a (600 Volts and Below) 50-90 S-2 08/75 Specifications for Substation Regulators n/a 50-91 S-3 01/78 RUS Specifications for Step-Down Distribution n/a Substation (34.4-138 kV) 50-92 S-4 02/63 RUS Specifications for Step-Up Substation n/a Transformers 61-1 07/56 Conductor - Low Voltage Circuits n/a 61-12 08/72 Guide for Narrow Profile and Armless Construction n/a (Electric Distribution) 07/73 Supplement 61-14 04/73 Determination of Fault Current at Service Entrance n/a Equipment 61-16 08/83 Guide for Economic Evaluation of Distribution n/a Transformers 62-5 07/76 Electrical Characteristics of RUS Alternating Current n/a Transmission Line Designs 08/79 Supplement 100-2 03/60 Minutes of the Meetings of Boards of Directors, n/a Members or Stockholders 100-4 04/72 Financial Security of RUS Borrowers n/a 02/75 Supplement 100-5 06/62 Agreements for the Operation Management n/a of Borrower's Systems

Page 25: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

25

Spec. Issue Bulletin Number Date Title Expires 101-1 08/77 Constitution and Operations of the Board of n/a Directors of a Power Supply Cooperative Borrower 101-4 11/75 Annual Meeting Guide for Rural Electric and n/a Telephone Cooperatives 101-5 01/67 RUS Model Act Bylaws n/a 05/71 Revised Pages 10/77 Supplement 102-1 03/64 Capital Credits - Consumer Benefits n/a 12/73 Supplement 08/74 Appendix B 102-2 07/71 Waiver of Security Instrument Provisions Relating n/a to Certain Retirements of Capital by Distribution Borrowers 103-2 12/80 Use and Approval of General Funds for Extensions n/a and Additions to Plant 103-5 09/71 Manager's Monthly Report to the Board of n/a Directors - Power Supply Borrowers 103-8 06/58 Use of Consultants n/a 103-9 10/77 5 Percent Treasury Certificates of Indebtedness - n/a RUS Series and 2 Percent Treasury Bonds - RUS Series 105-1 01/72 Annual Work Programs and Budgets for Rural n/a Electric Distribution Systems 105-2 03/57 Operating Budgets for Power-Type Borrowers n/a 105-4 05/73 Financial Management n/a 105-5 10/82 Financial Forecast - Electric Distribution Systems n/a

Page 26: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

26

Spec. Issue Bulletin Number Date Title Expires 105-6 01/61 Where's Your Electric Co-op Headed? n/a 105-7 09/72 Long Range System and Financial Planning - n/a Power Supply Borrowers 106-1 07/73 Reporting and Controlling Procedures for Rural n/a Electric Distribution Systems 109-7 06/86 Expanding Manpower Resources Through n/a Cooperative Education 111-3 04/78 Power Supply Surveys n/a 111-4 03/72 Electric Wholesale Rates - Power Supply Borrowers n/a 112-6 09/72 Large Power Rates and Contracts n/a 115-2 11/72 Merger and Consolidation of Electric Distribution n/a Borrowers 115-3 02/58 Removal or Relocation of Electric Facilities Resulting n/a from the Exercise of Rights by Governmental Agencies 160-1 01/68 Engineering and Operations Manual for Rural n/a Electric System 161-3 07/75 Inspection and Maintenance of Distribution Lines n/a 169-27 01/73 Voltage Regulator Application on Rural Distribution n/a Systems 180-2 06/03 Record Retention Recommendations for RUS Electric n/a Borrowers 180-4 09/57 Borrowers' Loan Budget Subsidiary Records n/a 180-6 04/71 Selection of Depositories for Funds of RUS Borrowers n/a 181-2 05/68 Standard List of Retirement Units n/a 07/74 Pen and Ink Changes

Page 27: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

27

Spec. Issue Bulletin Number Date Title Expires 182-1 01/65 Evaluation and Enforcement of Internal Control n/a of Borrowers' Enterprises 183-1 10/77 Depreciation Rates and Procedures n/a 184-3 09/61 Guide for Establishing Continuing Property Record n/a 12/68 Pen and Ink Changes 1700-3 03/92 RUS Staff Relations with Public, Administrative, 03/95 Judicial and Legislative Bodies 1700-51 09/92 Electric Program Coordinating Committee 09/95 1710B-1 02/98 Guide to Federal Financing Bank Loans Guaranteed 02/98 by RUS 1710C-1 02/97 Temporary Processing Procedures for Insured 02/01 Electric Loans 1717B-2 02/02 Guide For Preparing Financial and Statistical n/a Reports For Electric Distribution Borrowers Facilities 1717B-3 05/06 Guide For Preparing Financial and Statistical 12/97 Reports For Power Supply Borrowers and Electric Distribution Borrowers with Generating 1717M-2 02/05 Sale or Transfer of Capital Assets by Electric Borrower n/a 1724D-101A 02/17 Electric System Long-Range Planning Guide n/a 1724D-101B 12/12 System Planning Guide, Construction Work Plans n/a 1724D-103 04/11 System Planning Guide, System Mapping Guide 1724D-104 02/98 An Engineering Economics Computer Workbook n/a Procedure 1724D-105 05/09 Rural Distribution System Voltage Conversion n/a Consideration 1724D-106 06/05 Considerations For Replacing Storm-Damaged n/a Conductors 1724D-107 08/16 Guide for Economic Evaluation of Distribution n/a Transformers

Page 28: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

28

Spec. Issue Bulletin Number Date Title Expires 1724D-112 04/01 The Application of Capacitors on Rural Electric Systems n/a 1724D-113 05/12 Voltage Levels on Rural Distribution Systems n/a 1724E-102 10/12 Design Guide for Sectionalizing Distribution Lines n/a 1724E-104 09/99 Reduced Size Neutral Conductors for Overhead Rural Distribution Lines 1724E-150 08/14 Unguyed Distribution Poles – Strength Requirements n/a 1724E-151 02/16 Mechanical Loading on Distribution Crossarms n/a 1724E-152 07/03 The Mechanics of Overhead Distribution Line n/a Conductors 1724E-153 04/01 Electric Distribution Line Guys and Anchors n/a 1724E-154 07/03 Distribution Conductor Clearances and Span n/a Limitations 1724E-200 12/15 Design Manual for High Voltage Transmission Lines n/a 1724E-202 02/93 An Overview of Transmission System Studies 02/96 1724E-203 02/16 Guide for Upgrading RUS Transmission Lines n/a 1724E-204 02/08 Guide Specifications for Steele Single Pole and H-Frame n/a Structures 1724E-205 08/95 Design Guide: Embedment Depths for Concert and Steel 02/02 Poles 1724E-206 08/16 Guide Specification Prestressed Concrete Poles and n/a Concrete Pole Structures 1724E-214 03/17 Guide Specification for Standard Class Steel n/a Transmission Poles 1724E-216 07/16 Guide Specification for Standard Class Spun, n/a Prestressed Concrete Transmission Poles 1724E-220 03/05 Procurement and Application Guide for Non-Ceramic n/a Composite Insulators, Voltage Class 34.5 kV and Above 1724E-224 04/07 Electric Transmission Guide Specifications and Drawings n/a for Steel Pole Construction 34.5 to 230 kV

Page 29: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

29

Spec. Issue Bulletin Number Date Title Expires 1724E-226 04/07 Electric Transmission Guide Specifications and Drawings n/a for Concrete Pole Construction – 34.5 to 230 kV 1724E-300 06/01 Design Guide for Rural Substations (CD only) n/a 1724E-301 03/09 Guide for Evaluation of Large Power Transformer n/a Losses 1724E-302 01/08 Design Guide for Oil Spill Prevention and Control n/a at Substations 1724E-400 08/95 Guide to Presentation of Building Plans and 12/01 Specifications 1726-601 10/13 Electric System Construction Policies and n/a Procedures - Interpretations 1726C-115 09/98 Checking Sag in Conductor by the Return Wave 10/95 Method 1726I-602 02/04 Attachment to Electric Program Standard Contract n/a Forms 1728F-700 DT-5C 05/11 RUS Specification for Wood Poles, Stubs and n/a Anchor Logs 1728F-800 12/98 Assembly Unit Numbers and Standard Format n/a 1728F-803 D-803 12/98 Specifications and Drawings for 24.9/14.4 kV n/a Line Construction 1728F-804 D-804 04/05 Specifications and Drawings for 12.47/7.2 kV Line n/a Construction 1728F-806 D-806 06/00 Specifications and Drawings for Underground Electric n/a Distribution 1728F-810 T-805A 03/99 Electric Transmission Specifications & Drawings, n/a 34.5kV through 69kV \

Page 30: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

30

Spec. Issue Bulletin Number Date Title Expires 1728F-811 T-805B 03/99 Electric Transmission Specifications & Drawings, n/a 115kV through 230kV 1728H-701 DT-5B 06/11 RUS Specifications for Wood Crossarms n/a (Solid and Laminated) Transmission Timbers and Pole Keys 1728H-702 DT-19 05/12 RUS Specification for Quality Control and Inspection n/a of Timber Products 1730A-119 03/09 Interruption Reporting and Service Continuity Objectives n/a for Electric Distribution Systems 1730B-121 08/13 Pole Inspection and Maintenance n/a 1730B-2 01/05 Guide for Electric System Emergency Restoration Plan n/a 1767B-1 09/09 Uniform System of Accounts - Electric n/a 1767B-2 01/94 Work Order Procedure (Electric) 01/01 1767B-3 12/94 Preparation and Use of the RUS Form 254, 12/98 Construction Inventory 1790-1 01/00 Nondiscrimination Among Beneficiaries of RUS 01/07 Programs

Page 31: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

31

SECTION B

ELECTRIC OPERATION MANUALS (EOM) Number Issued Title 4 11/88 Guidelines for the Implementation of 7 CFR 1711.1, Electric Loans - Advance of Funds

Page 32: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

32

THIS PAGE INTENTIONALLY

LEFT BLANK

Page 33: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

33

SECTION C

INFORMATIONAL PUBLICATIONS (I.P.)

Number Issued Title 100-1 09/15 Rural Electrification Act of 1936 with Amendments as Approved through February 2014 200-3 05/16 Index of Electric Issuances - Borrower Edition 201-1 12/11 2010 Annual Statistical Report - Rural Electric Borrowers 201-1 04/13 2011 Annual Statistical Report - Rural Electric Borrowers 202-1 07/08 List of Materials Acceptable for Use on Systems of RUS Electrification Borrowers

Page 34: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

34

THIS PAGE INTENTIONALLY

LEFT BLANK

Page 35: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

35

PART IV

RUS POLICIES AND PROCEDURES FOR THE ELECTRIC AND TELEPHONE PROGRAMS

LOCATED IN THE CODE OF FEDERAL REGULATIONS (CFR)

(as of January 2013) RURAL UTILITIES SERVICE Part Subpart Subject 1700 GENERAL INFORMATION Subpart A General Subpart B Agency Organization and Functions Subpart C Loan and Grant Approval

Authorities Subpart D Substantially Underserved Trust Areas

1703 RURAL DEVELOPMENT Subpart A-B [Reserved] Subpart C Rural Business Incubator Program [Reserved] Subpart D Distance Learning and Telemedicine Loan and Grant Program – General Subpart E Distance Learning and

Telemedicine Grant Program Subpart F Distance Learning and Telemedicine

Combination Loan and Grant Program Subpart G Distance Learning and Telemedicine

Loan Program Subpart H Deferments of RUS Loan Payments for

Rural Development Projects 1709 ASSISTANCE TO HIGH ENERGY COST

COMMUNITIES Subpart A General Requirements Subpart B RUS High Cost Energy Grant Program Subpart C Bulk Fuel Revolving Fund Grant

Program Subpart D-F [Reserved] Subpart G Recovery of Financial Assistance Used

for Unauthorized Purposes 1710 GENERAL AND PRELOAN POLICIES AND PROCEDURES COMMON TO LOANS AND GUARANTEES

Subpart A General Subpart B Types of Loans and Loan Guarantees Subpart C Loan Purposes and Basic Policies Subpart D Basic Requirements for Loan Approval Subpart E Load Forecast Subpart F Construction Work Plans and Related

Studies

Part Subpart Subject

Subpart G Long-Range Financial Forecasts Subpart H [Reserved] Subpart I Application Requirement and

Procedures for Insured and Guaranteed Loans

1714 PRE-LOAN POLICIES AND PROCEDURES FOR INSURED ELECTRIC LOANS Subpart A General

Subpart B Terms of Insured Loans

1717 POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS Subpart A-C [Reserved] Subpart D Mergers and Consolidations of Electric

Borrowers Subpart E -F [Reserved]

Subpart G Federal Pre-emption in Rate Making In Connection With

Power Supply Borrowers Subpart H Federal Pre-emption in Rate Making In Connection With RUS Electric Borrowers in Bankruptcy Subpart I-L [Reserved]

Subpart M Operational Controls Subpart N Investments, Loans, and Guarantees by Electric Borrowers

Subpart 0 [Reserved] Subpart P [Reserved] Subpart Q [Reserved] Subpart R Lien Accommodations and Subordinations for 100 Percent Private Financing Subpart S Lien Accommodations for Supplemental Financing

Required by 7 CFR 1710.110 Subpart T [Reserved] Subpart U [Reserved] Subpart V [Reserved] Subpart W [Reserved] Subpart X [Reserved] Subpart Y Settlement of Debt

Page 36: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

36

Part Subpart Subject 1718 LOAN SECURITY DOCUMENTS FOR ELECTRIC BORROWERS Subpart A General Subpart B Mortgage for Distribution Borrowers Subpart C Loan Contracts with Distribution Borrowers 1720 GUARANTEES FOR BONDS AND NOTES ISSUED

FOR ELECTRIFICATION OR TELEPHONE PURPOSES

1721 POST-LOAN POLICIES AND PROCEDURES FOR INSURED ELECTRIC LOANS Subpart A Advances of Funds Subpart B Extension of Payments of Principal and Interest 1724 ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Subpart A General Subpart B Architectural Services Subpart C Engineering Services Subpart D Electric System Planning Subpart E Electric System Design Subpart F RUS Contract Forms 1726 ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES

Subpart A General Subpart B Distribution Facilities Subpart C Substation and Transmission Facilities Subpart D Generation Facilities Subpart E Buildings Subpart F General Plant Subpart G Procurement Procedures Subpart H Modifications to RUS Standard Contract Forms Subpart I RUS Standard Forms Subpart J Contract Closeout 1728 ELECTRIC STANDARDS AND SPECIFICATIONS FOR MATERIALS AND CONSTRUCTION

1730 ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Subpart A General Subpart B Operations and Maintenance Requirements Subpart C Interconnection of Distributed

Resources 1735 GENERAL POLICIES, TYPES OF LOANS,

LOAN REQUIREMENTS-TELECOMMUNICATIONS PROGRAM

Part Subpart Subject

Subpart A General Subpart B Loan Purposes and Basic Policies

Subpart C Types of Loans Subpart D Terms of Loans Subpart E Basis Requirements for Loan Approval Subpart F Mortgage Controls on Acquisitions and Mergers Subpart G Acquisitions Involving Loan Funds Subpart H Acquisitions or Mergers Not

Involving Additional Loan Funds Subpart I Requirements for All

Acquisitions and Mergers Subpart J Toll Line Acquisitions

1737 PRE-LOAN POLICIES AND PROCEDURES

COMMON TO INSURED AND GUARANTEED TELECOMMUNICATIONS LOANS Subpart A General Subpart B Preapplication Stage Subpart C The Loan Application Subpart D Preloan Studies-Area Coverage

Survey and Loan Design Subpart E Interim Financing of Construction of Telephone Facilities Subpart F Review of Application Procedures Subpart G Project Cost Estimation Procedures Subpart H Feasibility Determination Procedures Subpart I Characteristics Letter Subpart J Final Loan Approval Procedures Subpart K Release of Funds Procedure

1738 RURAL BROADBAND ACCESS LOANS AND LOAN

GUARANTEES Subpart A General Subpart B Loan Purposes and Basic Policies Subpart C Types of Loans Subpart D Terms of Loans 1739 BROADBAND GRANT PROGRAM Subpart A Community Connect Grant Program Subpart B [Reserved] 1740 PUBLIC TELEVISION STATION DIGITAL

TRANSITION GRANT PROGAM Subpart A Public Television Station Digital Transition Grant Program

Page 37: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

37

Part Subpart Subject 1741 PRE-LOAN POLICIES AND PROCEDURES

FOR INSURED TELEPHONE LOANS [RESERVED} 1744 POST-LOAN POLICIES AND PROCEDURES COMMON TO GUARANTEED AND INSURED TELEPHONE LOANS

Subpart A [Reserved] Subpart B Lien Accommodations and

Subordination Policy Subpart C Advance and Disbursement of Funds Subpart D [Reserved] Subpart E Borrower Investments

1748 POST-LOAN POLICIES AND PROCEDURES FOR INSURED TELEPHONE LOANS [RESERVED] 1751 TELECOMMUNICATIONS SYSTEM PLANNING AND DESIGN CRITERIA, AND PROCEDURES

Subpart A [Reserved] Subpart B State Telecommunications

Modernization Plan 1753 TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES

Subpart A General Subpart B Engineering Services Subpart C [Reserved] Subpart D Construction of Buildings Subpart E Purchase and Installation of Central Office Equipment

Subpart F Outside Plant Major Construction by Contract Subpart G Outside Plant Major Construction by

Force Account Subpart H Purchase and Installation of Special Equipment Subpart I Minor Construction

Subpart J Construction Certification Program

1755 TELECOMMUNICATIONS STANDARDS AND SPECIFICATIONS FOR MATERIALS, EQUIPMENT AND CONSTRUCTION

1757 TELEPHONE SYSTEMS OPERATIONS AND MAINTENANCE [RESERVED]

Part Subpart Subject 1758-1759 [Reserved] 1767 ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS

Subpart A General [Reserved] Subpart B Uniform System of Accounts Subpart C Depreciation Rates and Procedures [Reserved]

Subpart D Preservation of Records [Reserved] 1770 ACCOUNTING REQUIREMENTS FOR RUS TELEPHONE BORROWERS

Subpart A General Provisions Subpart B Uniform System of Accounts

Subpart C Accounting Interpretations 1773 POLICY ON AUDITS OF RUS BORROWERS

Subpart A General provisions Subpart B RUS Audit Requirements Subpart C RUS Requirements for the

Submission and Review of the Auditor's Report, Compliance, Report

on Compliance and on Internal Controls Over Financial Reporting and

Management Letter Subpart D RUS Reporting Requirements

Subpart E RUS Required Audit Procedures and Documentation

1775 TECHNICAL ASSISTANCE AND TRAINING GRANTS 1777 SECTION 306C WWD LOANS AND GRANTS 1778 EMERGENCY COMMUNITY WATER

ASSISTANCE GRANTS 1779 WATER AND WASTE DISPOSAL PROGRAMS

GUARANTEED LOANS 1780 WATER AND WASTE LOANS AND GRANTS Subpart A General Policies Requirement Subpart B Loan and Grant Application

Processing Subpart C Planning, Designing, Bidding,

Contracting, Consulting and Inspections

Subpart D Information Pertaining to Preparation of Notes or Bonds and Bond Transcript Documents for Public Body Applicants

Page 38: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

38

Part Subpart Subject

1781 RESOURCE CONSERVATION AND DEVELOPMENT (RCD) LOANS AND WATERSHED (WS) LOANS AND ADVANCES

1785 LOAN ACCOUNT COMPUTATIONS, PROCEDURES AND POLICIES FOR ELECTRIC AND TELEPHONE BORROWERS Subpart A [Reserved] Subpart B RUS Cushion of Credit Account Computations and Procedures 1786 PREPAYMENT OF RUS GUARANTEED AND INSURED LOANS TO ELECTRIC AND TELEPHONE BORROWERS Subpart A General [Reserved]

Subpart B Prepayment of RUS Guaranteed Federal Financing Bank Loans Pursuant to Section 306(A) of the RE Act

Subpart C Special Discounted Prepayments on RUS Direct/Insured Loans

Subpart D [Reserved] Subpart E Discounted Prepayments on RUS

Notes in the Event of a Merger of Certain RUS Electric Borrowers

Subpart F Discounted Prepayments on RUS Electric Loans

Subpart G Refinancing and Prepayment of RUS Guaranteed FFB Loans Pursuant to Section 306(c) of the

RE Act

1788 RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELEPHONE BORROWERS Subpart A Borrowers Insurance Requirements Subpart B Insurance for Contractors,

Engineers, and Architects, Electric Borrowers

Part Subpart Subject

Subpart C Insurance for Contractors, Engineers,

and Architects, Electric Borrowers

1789 USE OF CONSULTANTS FUNDED BY BORROWERS Subpart A Policy and Procedures with Respect to

Consultant Services Funded by Borrowers-General

Subpart B Escrow Accountant Funding and Payments

1792 COMPLIANCE WITH OTHER FEDERAL STATUES, REGULATIONS, AND EXECUTIVE ORDERS Subpart A and B [Reserved]

Subpart C Seismic Safety of Federally Assisted New Building Construction

1794-1799 [Reserved]

Page 39: Index of Electric Issuances - USDA Rural Development · Utilities Program . Informational . Publication 200-3 . Index of Electric Issuances ... Architectural Services – 7 CFR 1724

39