independent laboratory testing part 6 regulations mechanical & engineering safety division...

7
Independent Laboratory Independent Laboratory Testing Testing PART 6 Regulations PART 6 Regulations Mechanical & Mechanical & Engineering Safety Engineering Safety Division Division Robert Setren Robert Setren Mechanical Engineer Mechanical Engineer

Upload: ralf-conley

Post on 23-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

Independent Laboratory Independent Laboratory TestingTesting

PART 6 RegulationsPART 6 Regulations

Mechanical & Engineering Mechanical & Engineering Safety DivisionSafety Division

Robert SetrenRobert Setren

Mechanical EngineerMechanical Engineer

Page 2: Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

M+ESDM+ESD

16 Engineers and Scientists, - 2 16 Engineers and Scientists, - 2 engineering techniciansengineering technicians

Responsible for mechanical aspects Responsible for mechanical aspects of mining equipment as it relates to of mining equipment as it relates to the safety and health of minersthe safety and health of miners

Approval programs include dust Approval programs include dust collectors evaluated under part 33 collectors evaluated under part 33 and diesel machines evaluated under and diesel machines evaluated under part 36 part 36

Page 3: Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

M+ESDM+ESD

Our laboratory and field test functions Our laboratory and field test functions include:include: Dust collector field test followed by laboratory Dust collector field test followed by laboratory

analysis of dust samplesanalysis of dust samples Laboratory and field tests of diesel machines Laboratory and field tests of diesel machines

and componentsand components Engines – emissions – under part 7Engines – emissions – under part 7 Power Package – surface temperature, explosion, and Power Package – surface temperature, explosion, and

safety control tests under Parts 7 and 36safety control tests under Parts 7 and 36 Diesel powered machine field tests under part 36Diesel powered machine field tests under part 36

Page 4: Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

M+ESDM+ESD

Test procedures are documented in Test procedures are documented in 30CFR and standard operating 30CFR and standard operating proceduresprocedures

Page 5: Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

M+ESDM+ESD

An independent lab considering An independent lab considering conducting testing for the MSHA approval conducting testing for the MSHA approval of a mining product must produce a of a mining product must produce a product equal or better than our present product equal or better than our present capability to maintain the integrity of the capability to maintain the integrity of the MSHA approval MSHA approval Test equipment must be equal or better than Test equipment must be equal or better than

MSHA including up to date calibration– MSHA including up to date calibration– equipment specifications found in 30CFR, equipment specifications found in 30CFR, MSHA website, or call usMSHA website, or call us

Page 6: Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

M+ESDM+ESD

Data collecting, record keeping, report Data collecting, record keeping, report writing requiredwriting required

Quality AssuranceQuality Assurance

Page 7: Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer

M+ESDM+ESD

Any ?Any ? Call the M+ESD and speak to us Call the M+ESD and speak to us

anytimeanytime 304 547 2042, John Faini304 547 2042, John Faini