Page 1: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

DCC 2011

INDC Costa RicaA summary of the process

Partnership Assembly Meeting (PA 12)Barcelona, Spain

May 29 to 30, 2015

Page 2: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

INDC Process Costa Rica

• The process started in January 2015 with a workshopwith:– Sector technical counterparts, – INDC national team (DCC-consultants) and – Work Bank technical team.

• In each sector, the technical team has been working inthe identification of mitigation-sequestration options.

• Currently, sector workshops are feeding back themodeling process and the definition of mitigationoptions.

• Technical analysis of main drivers of emissions in everysector.

Page 3: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Drivers analysis: Energy Sector

Electricity demand

Vehicle fleet

Energy sector highlycorrelated with GDP.

Page 4: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Drivers analysis: Industry Sector

Cement production

Page 5: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Drivers analysis: Livestock sector

Beef production

Milk

Page 6: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Drivers analysis: Agriculture sector

Page 7: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Drivers analysis: Forest sector

Distribution of forest cover

Page 8: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Main drivers projection

Population

Gross Domestic Product

1 US$ = ȼ535

Page 9: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

INDC Conceptual Framework• Contributions to be defined respect emissions of a reference year.• Feasibility of mitigation options (short and long term) to determine the

targets and year to set the contributions.

Main challenges:• Must C-neutrality be

target of the country contributions?

• Other emission levels (e.g. inventory 2010) can be the target as path to C-neutrality level?

• Which is the target year (2020, 2025, 2030, other?

Page 10: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Mitigation options in transport

Transport moderate scenario

Transport “ambitious” scenario

First set of mitigation options have been identified by sector.

Page 11: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Mitigation options in Solid Waste Management

Page 12: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Marginal Cost Waste Management Sector

Escenario medio

12

Escenario medio

Some preliminary results are the marginal cost in some sectors.

Page 13: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

ER_Pin_PES_Priv_La...ER_Pin_PES_Private...

ER_Pin_PES_Priv_Fo...

0

1

2

3

4

5

6

7

0 10 20

USD

/t C

O2e

Cumulative abatement (Million t CO₂e)

Forestry (Alternative Options)

• In forest sector the preliminary analysis focused in strengthen of environmental services payment system (private land).

• The cost are associated to payment and the type of transition (to secondary forest, medium growth forest or old groth forest)

Page 14: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

INDC Process: Next phase

• The process is defining options in five sectors:– Electricity,

– Transport,

– Agriculture and livestock

– Industry, and

– Forest

• In July finishes the technical phase with inputs to begin a political validation phase.

• This INDC process has to be complemented with further studies in next stages to evaluate deeply other more ambitious mitigation options.

Page 15: INDC Costa Rica A summary of the process · INDC Process Costa Rica •The process started in January 2015 with a workshop with: –Sector technical counterparts, –INDC national

Muchas GraciasWilliam Alpízar Z, Director