Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development Services (LDS) Moving Rain Water Harvesting to the Mainstre October 22, 2008

Upload: tabitha-mckinney

Post on 25-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Implementing Rain Water Harvesting into Building

Construction in VA

Presented by:Guy Tomberlin, CBO

Code Specialist III

Fairfax County

DPWES, Land Development Services (LDS)

“Moving Rain Water Harvesting to the Mainstream”

October 22, 2008

Page 2: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

ObjectivesObjectives

• Identify potential Rain Water Harvesting issues related to the adopted building codes in VA.

• Illustrate areas of building code application through actual examples of Rain Water Harvesting systems.

• Discuss and provide solutions to key areas of concern with Rain Water Harvesting.

Page 3: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Four key interface areas implementing Rain Water

Harvesting with the VA Building Codes

Page 4: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Implementation of Rain Water Implementation of Rain Water HarvestingHarvesting

1. Location of the installation:

– The built environment (existing locations)

– New construction

Page 5: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Implementation of Rain Water Implementation of Rain Water HarvestingHarvesting

2. The type of the installation:

– Commercial

– Residential

Page 6: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Implementation of Rain Water Implementation of Rain Water HarvestingHarvesting

3. The point of utilization:

– Outside (typically non–building use related)– Irrigation

– Inside – Plumbing fixtures, fire sprinkler systems, etc..

Page 7: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Implementation of Rain Water Implementation of Rain Water HarvestingHarvesting

4. The quality of the water:

– Potable

– Non–Potable

Page 8: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

How do we help How do we help make Rain Water make Rain Water Implementation Implementation

possible?possible?

Page 9: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Partnerships andPartnerships andwworking together! orking together!

Health DepartmentDesigner/Customer

Site Regulation & Enforcement

Building Code Regulation & Enforcement(Possibly the Office of the Fire Marshal)

Page 10: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

The Building Code ElementThe Building Code Element

Page 11: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Building Code RegulationsBuilding Code RegulationsVA - Uniform Statewide Building Code (USBC)VA - Uniform Statewide Building Code (USBC)

The document used to enforce building code provisions across the Commonwealth as set forth by the Code of Virginia.

Page 12: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

USBCUSBC• Established in 1972.• Updated approximately every 3 years.• Currently references the 2006 edition of

the International Code Council (ICC) family of codes.– International Plumbing Code (IPC)

Page 13: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

IPC RequirementsIPC Requirements

601.1 Scope. This chapter shall govern the materials, design and installation of water supply systems, both hot and cold, for utilization in connection with human occupancy and habitation and shall govern the installation of individual water supply systems.

Page 14: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

IPC RequirementsIPC Requirements

602.2 Potable water required. Only potable water shall be supplied to plumbing fixtures that provide water for drinking, bathing or culinary purposes, or for the processing of food, medical or pharmaceutical products. Unless otherwise provided in this code, potable water shall be supplied to all plumbing fixtures.

Page 15: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

IPC RequirementsIPC Requirements

• 602.3 Individual water supply. Where a potable public water supply is not available, individual sources of potable water supply shall be utilized.

• 602.3.1 Sources. Dependent on geological and soil conditions and the amount of rainfall, individual water supplies are of the following types: drilled well, driven well, dug well, bored well, spring, stream or cistern. Surface bodies of water and land cisterns shall not be sources of individual water supply unless properly treated by approved means to prevent contamination.

Page 16: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

IPC RequirementsIPC Requirements

608.1 General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonpotable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.16.10.

Page 17: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

IPC RequirementsIPC Requirements

608.8 of potable and nonpotable water. In all buildings where two or more water distribution systems, one potable water and the other nonpotable water, are installed, each system shall be identified either by color marking or metal tags in accordance with Sections 608.8.1 through 608.8.3.

Page 18: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

IPC RequirementsIPC Requirements

1101.2 Where required. All roofs, paved areas, yards, courts and courtyards shall drain into a separate storm sewer system, or a combined sewer system, or to an approved place of disposal. For one- and two-family dwellings, and where approved, storm water is permitted to discharge onto flat areas, such as streets or lawns, provided that the storm water flows away from the building.

Page 19: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

USBC – Code ModificationsUSBC – Code Modifications

106.3 Issuance of modifications. Upon written application by an owner or an owner’s agent, the building official may approve a modification of any provision of the USBC provided the spirit and functional intent of the code are observed and public health, welfare and safety are assured. The decision of the building official concerning a modification shall be made in writing and the application for a modification and the decision of the building official concerning such modification shall be retained in the permanent records of the local building department.

Page 20: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Residential ScenarioResidential Scenario

• Location on property• Building code safety

issues • Freezing• Overflow• Environment

Page 21: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development
Page 22: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Backflow Protection and Filter Backflow Protection and Filter SystemsSystems

Page 23: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Location of system componentsLocation of system components

Page 24: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Commercial ScenarioCommercial Scenario

Page 25: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Storage LocationStorage Location

Page 26: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

InstallationInstallation

Page 27: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Potable and Non–Potable Water Potable and Non–Potable Water SystemsSystems

Page 28: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Fire SuppressionFire Suppression

Page 29: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Multiple TanksMultiple Tanks

Page 30: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development
Page 31: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Obtain a copy of the VA USBC

http://www.dhcd.virginia.gov/StateBuildingCodesandRegulations/PDFs/2006/2006_VirginiaConstructionCode.pdf

Page 32: Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development

Questions – Comments?

Thank You!Special thanks to VA Tech, the Virginia

Department of Conservation & Recreation and the Potomac Watershed Roundtable.

Guy Tomberlin, CBOCode Specialist III

DPWES, Land Development Services (LDS)12055 Government Center Parkway, Suite 630

Fairfax, Virginia 22035-5504Desk: 703-324-1611Fax:    703-324-1846

[email protected]