implementing an offset: more than a mass balance equation
TRANSCRIPT
![Page 1: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/1.jpg)
IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION
Ross Bigwood
Paul Maxwell
Shannon Mooney
![Page 2: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/2.jpg)
Nutrient offset history in Queensland, Australia
2014
• Flexible options for managing point source water emissions: A voluntary market-based mechanism for nutrient management
2017
• Point-Source Water Quality Offsets Policy – Consultation Draft
2019
• Revised policy anticipated
![Page 3: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/3.jpg)
Simple mass balance equation
Total mass is conserved:
Total Mass in = Total Mass out + Total Mass accumulated
![Page 4: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/4.jpg)
Environmental Offset – mass balance
![Page 5: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/5.jpg)
Pilot Project: Beaudesert2013 2015
2016 2017
![Page 6: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/6.jpg)
How do we ensure we are getting value for money?
• Are there additional benefits that contribute to:
• The catchments where work is planned
• Water quality; local and downstream
• Habitat connectivity
• Community aspirations
• Recreational use and waterway appreciation
• Farming and food security
• Flood resilience
• ….
![Page 7: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/7.jpg)
Laidley Creek case study
![Page 8: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/8.jpg)
Ex-Tropical cyclone impacts
![Page 9: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/9.jpg)
Bank reprofiling; Grade control structures
![Page 10: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/10.jpg)
Creating floodplain roughness
![Page 11: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/11.jpg)
Recovery process
• Strong local community,
government and industry support
• Building upon existing relationships
and developed trust
• Whole-of-farm planning workshops
• Expert geomorphic and agronomic
advise
• Reach scale coordinated planning
![Page 12: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/12.jpg)
What do community relationships and flood
recovery activities have to do with
nutrient offset delivery?
![Page 13: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/13.jpg)
Community / stakeholder relationships
•Presence
•Trust
•Maturity
Science / data / information
•Plans
•Supporting information
•Assessments
•Interpretation
Policy / legislative maturity
•Risk appetite
•Wllingness
Experience
•Delivery
•Capability
•Internal
•External
![Page 14: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/14.jpg)
Lockyer
Total stream length 960 km
Master plan 24 km
% of stream 2.5%
Impacts on:
• Catchment health
• Natural Resource Management Plan targets
• Community sense of achievement
![Page 15: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/15.jpg)
Lockyer 2018(D+)
Riparian vegetation
Freshwater health
Wetlands
Pollutant loads
2.5%
improvement= C-
![Page 16: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/16.jpg)
Summary
Meaningful relationships
Quality information transfer and
understanding
Enduring multi-benefit
solutions
![Page 17: IMPLEMENTING AN OFFSET: MORE THAN A MASS BALANCE EQUATION](https://reader030.vdocuments.us/reader030/viewer/2022012916/61c69bef5e26fe11c3266d8d/html5/thumbnails/17.jpg)
Level 19, 160 Ann St, Brisbane QLD 4000
PO Box 13204, George St, Brisbane Qld 4003, Australia
T. 07 3177 9100 | F. 07 3177 9190
hlw.org.au