A Step by Step
Guide
Implementing a Placemaking Project
![Page 2: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/2.jpg)
Involvement Process/Visioning
Place Improvement Strategies
Implementation Capacity Building
Create a Short Report and Presentation 10.
11.
12.
13.
9.
8.
7.
6.
5.
4.
3.
2.
1.
Develop a Visual Concept Plan / Diagram
Implement Short-Term Actions
Develop a Long-Term Design, Action & Management
Plan
Assess Results and Replicate
Translate the Ideas into Action with a
Working Group
Share Workshop Findings
The Placemaking Workshop
Prepare for Place Evaluation Workshop
Data Collection
Assess Public Space Challenges
Identify Key Stakeholders
Select a Site
![Page 3: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/3.jpg)
1. Select a Site
The best sites are:
• Connected, catalytic spaces
• Have political potential
• Can get people excited
• Have many partners and stakeholders
• Desperately in need of help!
• Endangered or at risk from some
development
• Constantly complained about
![Page 4: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/4.jpg)
What Types of Sites? Key destinations
• Schools
• Pocket Parks
• Playgrounds
• Local Stores (outdoor displays,
streetscapes, cafes)
• Mini-plazas (farmers’ markets,
performances, events)
• Transit Stations
• Religious Institutions
• Hospitals
• Major Streets and their Sidewalks
• Residential Streets
1. Select a Site
![Page 5: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/5.jpg)
Typical stakeholders:
•Local officials
•NGOs
•Community groups
•Local experts
•Neighborhood councils
•Downtown organizations and area
retailers
•Managers or owners of properties
facing the site
•Government representatives who have a
responsibility for maintaining or
improving the space
2. Identify Key Stakeholders
![Page 6: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/6.jpg)
Washington Square Park, New
York
![Page 7: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/7.jpg)
2. Identify Key Stakeholders
![Page 8: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/8.jpg)
Site assessment
Observations
Surveys
Sociabi
lity
Access &
Linkages
Comfort
& Image
Uses &
Activities
PLACE
3. Assess Public Spaces
Challenges
![Page 9: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/9.jpg)
Houston Market Square
![Page 10: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/10.jpg)
![Page 11: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/11.jpg)
![Page 12: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/12.jpg)
![Page 13: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/13.jpg)
Square Assets
• The story and history told by the
works of art
• The artworks themselves
• The historical nature of the park
• The green, open space quality of the
park
• The beautiful oak trees and the shade
they provide
• The downtown location in the Historic
District
• The adjacency to the clock tower
• The surrounding historic buildings
and the adjacent restaurants/bars
![Page 14: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/14.jpg)
High Point
Low Point
Natural slope
Market Square Issues
![Page 15: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/15.jpg)
+
Channeled paths
Natural slope
=
Market Square Issues
![Page 16: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/16.jpg)
Channelized paths
prevent easy
circulation and
movement through
the square
Market Square Issues
![Page 17: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/17.jpg)
No way to walk from
one artwork to
experience another
Market Square Issues
![Page 18: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/18.jpg)
Artworks that speak to
Market Square’s history
are difficult to see and
have been either
neglected or vandalized.
Market Square Issues
![Page 19: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/19.jpg)
There are few reasons to
go to Market Square
Park.
-No park activities or
programs
-Few surrounding uses
that spill into the park.
- Unless you have a dog.
Market Square Issues
![Page 20: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/20.jpg)
Signage in and around
Market Square is either….
…too intense…
…too discreet… …or inadequate
Market Square Issues
![Page 21: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/21.jpg)
Adjacent properties are
dominated by parking
(50% of the uses that
face the park!).
Market Square Issues
![Page 22: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/22.jpg)
The parkades do not
have any active ground
floor uses that contribute
positive energy to the
sidewalks.
Market Square Issues
![Page 23: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/23.jpg)
Two active edges –
Travis and Congress
Street.
La Carafe, has the
added distinction of
being listed on the
National Register for
Historic Places.
Market Square Assets
![Page 24: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/24.jpg)
Clear Crosswalks
Parallel parking (3 sides)
Bus connections
Market Square Assets
![Page 25: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/25.jpg)
Mature trees line the
park’s perimeter and
are located in the
park as well
Market Square Assets
![Page 26: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/26.jpg)
Market Square Assets
Public art works make an
important contribution
![Page 27: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/27.jpg)
James Searles - “Points of View” Paul Hester - Etched Photos
Richard Turner, Doug Hollis – walkways,
plaza, architectural remnants Malou Flato - Tiled Benches
![Page 28: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/28.jpg)
The Market Square Opportunity
What other focal points
and activities would
increase its user base?
![Page 29: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/29.jpg)
and how do those
activities come
together to define
one destination –
Market Square?
The Market Square Opportunity
![Page 30: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/30.jpg)
How can Market Sq expand outwards
and better relate to
its edges and draw in
the edge uses?
The Market Square Opportunity
![Page 31: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/31.jpg)
4. Data Collection
![Page 32: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/32.jpg)
Placemaking Process During the Holiday Season 2012
![Page 33: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/33.jpg)
Interviews & Focus Groups
Key Stakeholder Meetings &
Interviews
Focus groups (neighborhood
leaders, food entrepreneurs,
DEDA)
![Page 34: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/34.jpg)
Placemaking Workshops
Three Placemaking workshops
Total number of participants: 90
Broad mix of attendees:
41% downtown employees
20% downtown residents
13% city wide
25% area entrepreneurs
Number of zip codes represented: 27
![Page 35: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/35.jpg)
Holiday Placemaking Hut
Two locations (Holiday Market &
D:Hive)
Estimated number of participants:
800+
Number of zip codes represented:
166
![Page 36: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/36.jpg)
Home Zip Code –Market Hut Participants
![Page 37: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/37.jpg)
Results
![Page 38: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/38.jpg)
Top Specific Requests
Dog Park (48)
Food Trucks (28)
Bike Trails (25)
Buskers/Year round events (19)
Public restrooms (15)
Neon lights (14)
Basketball Courts (11)
![Page 39: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/39.jpg)
Other Results…
Increased awareness of project (&
D:Hive)
People feel involved, engaged
A lot of excitement (and
expectation) created
Popular ideas tested and
confirmed
Specific people and groups who
can do things identified
Partners brought on board
![Page 40: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/40.jpg)
Select workshop sites
Reserve meeting space
Set date, time,
agenda
Select and invite
participants
Organize equipment
5. Prepare for the Place Evaluation
Workshop
![Page 41: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/41.jpg)
5. Prepare for the Place Evaluation
Workshop
![Page 42: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/42.jpg)
6. The Placemaking Workshop: Place Evaluation Game/
Preparing
![Page 43: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/43.jpg)
6. The Placemaking Workshop: Place Evaluation Game/
Preparing
![Page 44: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/44.jpg)
Introduction
Self-Introductions
Objectives and Agenda
Power Point Presentation
Place Evaluation Game
Reporting Back
Closing Remarks/Next Steps
Compile & distribute a summary
of results
6. The Placemaking Workshop: Place Evaluation Game Process
![Page 45: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/45.jpg)
![Page 46: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/46.jpg)
6. The Placemaking Workshop: Place Evaluation Game/
Reporting Results
![Page 47: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/47.jpg)
6. The Placemaking Workshop: Place Evaluation Game/
Reporting Results
![Page 48: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/48.jpg)
7. Share Workshop Findings
![Page 49: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/49.jpg)
A Step by Step
Guide
Translating the Program into Design
![Page 50: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/50.jpg)
10. Create a Short Report and
Presentation
9. Develop a Visual Concept Plan
11. Implement Short-Term Actions
12. Develop a Long-Term Design,
Action and Management Plan
13. Assess Results and Replicate
8. Translate the Ideas into Action with a
Working Group
Next Steps
![Page 51: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/51.jpg)
Step 8. Translate the Ideas into Action with a Working
Group
Form a Working Group
• Develop a Vision Statement
• Prioritize ideas for improvement
• Develop a draft place program
• Draw a bubble diagram of activities
• Identify things you need to know more
about
– Follow up surveys, analysis and
meetings?
– Outreach to new partners?
• Create a Short-term Action Plan
![Page 52: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/52.jpg)
Step 8. Translate the Ideas into Action with a Working
Group
![Page 53: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/53.jpg)
![Page 54: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/54.jpg)
![Page 55: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/55.jpg)
Stakeholder Interviews
• Bethany CC
• Camden
• Cameron Management
• COH/PWE
• COH/Planning
• COH/Sustainability
• Crowne Plaza River Oaks
• Gateway to Care
• Girl Scouts
• Gunda Corp
• HCC-SW
• HGAC
• HPARD
• Houston Tomorrow
• KPC
• Lamar HS
• Madison Place
• Mayor's Office
• Metro
• Playworks
• Red Cross
• St. John the Divine
• SCA
• UK TIRZ 19
• Upper Kirby Board Members
• Upper Kirby YMCA
• Volunteer Houston
• ZCA
![Page 56: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/56.jpg)
VISION STATEMENT
• The Upper Kirby Civic Center will
become an active, dynamic, lively
community gathering space that is a
physical and programmatic center of
the Upper Kirby neighborhood,
reflecting its values, culture,
interests, and diversity. It will
be place that features all that the
area’s civic institutions have to offer – education, art, culture, fun, community, conservation,
public service, and economic
opportunity.
![Page 57: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/57.jpg)
GOALS:
Create a sense of place and identity for both the
Upper Kirby neighborhood and for downtown.
Connect the existing area civic uses and services.
Provide active green space.
Help the Civic Center reach-out like an octopus
building thematic, programmatic and physical links
amongst themselves and with their neighbors.
Link important business services and resources to the
space and expand economic opportunities.
Celebrate the cultures and traditions of the community.
![Page 58: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/58.jpg)
Power of Ten
The Ten Places of Upper Kirby
• 1. Eastern Gateway Plaza
• 2. Western Gateway Plaza
• 3. Lexington Street Entrance and Wedding Garden
• 4. Splash Fountain
• 5. Terrace Garden Café/Community Room
• 6. Dog Park
• 7. Children’s Play Area
• 8. Teen Area
• 9. Flexible Performance Space/Sports Field/Lawn Game
Area
• 10. Adult Game Area
• 11. Community Garden
• 12. UKMD/Civic Center Building
![Page 59: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/59.jpg)
![Page 60: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/60.jpg)
Step 9. Develop a Visual Concept Plan
Create a Concept Plan
- shows short-term improvements
- shows long-term improvements
Sketch or Photo - Simulation
![Page 61: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/61.jpg)
![Page 62: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/62.jpg)
5. Terrace Garden Café • A destination restaurant
• Outdoor terrace for dining and dancing.
• Weather protected
• Constructed out of recycled or
reclaimed materials
• Includes a meeting room/large private
dining room available
• A Farm to Table themed restaurant could
be appropriate. Special food themed
events
• The restaurant would have a small
parking lot tucked behind it with ADA
accessible spaces.
• If it were designed as a two story
building, it could have a green roof to
allow the restaurant could grow its own
vegetables and herbs.
![Page 63: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/63.jpg)
![Page 64: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/64.jpg)
![Page 65: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/65.jpg)
Variables for Discussion
• Location/co-location of community
room and size
• Location and size of restaurant
(shown as 60’ x 32’ /2000 sq ft
• Retail along Richmond / market shed
• Garden expansion – what kind, in
which direction
• Water features: number, types,
locations
• Parking strategy
![Page 66: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/66.jpg)
10. Summarize the Results of the Working Group Meeting
into a Short Report and Presentation
Report and Presentation should include:
• Vision Statement
• Goals
• Recommendations based on:
– Placemaking Game
– Working Group Sessions
– Surveys
– Interviews / focus groups
• Diagrams and Concept Plans
• Photo Illustrations
• Potential Partners
![Page 67: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/67.jpg)
![Page 68: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/68.jpg)
![Page 69: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/69.jpg)
10. Summarize the Results of the Working Group Meeting
into a Short Report and Presentation
![Page 70: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/70.jpg)
10. Summarize the Results of the Working Group Meeting
into a Short Report and Presentation
![Page 71: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/71.jpg)
![Page 72: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/72.jpg)
Step 11. Implement Short-Term Experiments/LQC
Create Implementation teams – experts and
community
Start with New Activities that are Easy to
Organize
•Clean-up, painting, etc.
•Temporary Events
Monitor Implementation
Develop funding & management structure for
short term
![Page 73: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/73.jpg)
Campus Martius/Cadillac Square
LONG-TERM VISION
Detroit’s Town Square The center of a revitalized downtown, with a multitude of events all year long and a Central Market at Cadillac Square.
![Page 74: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/74.jpg)
![Page 75: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/75.jpg)
Campus Martius/ Cadillac Square Power of Ten
![Page 76: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/76.jpg)
Campus Martius/ Cadillac Square LONG-TERM
Market structure Outdoor dining Shake Shack
![Page 77: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/77.jpg)
![Page 78: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/78.jpg)
Campus Martius/ Cadillac Square LONG-TERM
![Page 79: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/79.jpg)
Campus Martius/ Cadillac Square LQC
Food Trucks
![Page 80: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/80.jpg)
Campus Martius/ Cadillac Square LQC
Beer Garden Prepared Food
Market Surf Lounge
![Page 81: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/81.jpg)
Campus Martius/ Cadillac Square LQC FOOD TRUCKS
![Page 82: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/82.jpg)
Campus Martius/ Cadillac Square MARKETS
![Page 83: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/83.jpg)
Campus Martius/ Cadillac Square SUMMER &WINTER BLAST EVENTS
![Page 84: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/84.jpg)
Campus Martius/ Cadillac Square Basket Ball Court (Monroe
Lot)
![Page 85: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/85.jpg)
2013 LQC Programs
Campus Martius
• Sunday evening music & theater:
weekly
• Sounds of Detroit: Friday
nights, bi-weekly
• Outdoor movies: bi-weekly,
Fridays
• Detroit Jazz Festival: 1x Labor
Day Weekend
• Classical Music series: weekly,
Saturdays
• Saturday children’s programs:
weekly
![Page 86: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/86.jpg)
Cadillac Square 2013 LQC Everyday, all year
• Marketplace
– Food Trucks (weekdays lunch)
– Prepared Food Market in tents and huts (weekdays
lunch)
– Farm Stand (once a week at lunch)
• Performances occasionally accompany market
• Close one street for the summer
• More tables and chairs on square
![Page 87: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/87.jpg)
2013 LQC Special Events
Cadillac Square
• Flea and Artisans’ Fair: Monthly (3x)
• Makers’ Faire: (1x w/ The Henry Ford)
• Neighborhoods’ Block Party: 1x
• Fashion Show: 1x
• Classic Car Show: 1x
• ProGolf Exhibit: 1x
• Octoberfest: 1x
• Basketball Exhibition: 1x (Monroe Lot)
• Carnival/Circus: 1 weekend (Monroe Lot)
All complementary to activities in Campus Martius and accompanied by food and music (small)
![Page 88: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/88.jpg)
Bringing Back
the Buffalo Waterfront
with Lighter, Quicker, Cheaper Experiments
![Page 89: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/89.jpg)
![Page 90: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/90.jpg)
![Page 91: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/91.jpg)
![Page 92: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/92.jpg)
![Page 93: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/93.jpg)
![Page 94: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/94.jpg)
![Page 95: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/95.jpg)
![Page 96: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/96.jpg)
![Page 97: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/97.jpg)
![Page 98: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/98.jpg)
![Page 99: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/99.jpg)
![Page 100: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/100.jpg)
![Page 101: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/101.jpg)
Step 12. Develop a Long-Term Design, Action, and
Management Plan
Design Plan
•Form a design team to work with designers
•Use report to guide new partners into
process
•Design Team should report to Working Group
(Client)
•Have regular progress meetings
•Use examples of other space to guide design
team
•Don’t be afraid to say “no” but look to
suggest alternatives
•Hold public meeting for comments before work
is finalized
Management Plan
• ID maintenance/management tasks
• ID the body to do them – city, neighborhood
group, local NGO, etc.
• Study current management and compare with
new demands
• ID funding sources
![Page 102: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/102.jpg)
Step 12. Develop a Long-Term Design, Action, and
Management Plan
To manage the longer term design work:
• Always refer back to the report (Step 10) to guide all new
partners brought into the process.
• Make the Working Group the “client” for the project, so that
the Design Team reports to them. Others may join the working
group who should share in decision making.
• Have regular progress meetings with the Working Group and
Design Team with specific timelines and products to be
reviewed.
• Use these meetings to conduct additional brainstorming with
the Working Group to address new issues.
• Continue to use examples of spaces or ideas that reflect
what people want to see.
• Don’t be afraid to say ‘no’ or ‘we don’t like that’ to the
architect or designers, but do suggest alternatives.
• Hold public meetings to present the work of the Design Team
before everything is “final” to allow for new ideas and to get
public reaction and changes.
• Build excitement about the proposed plan, using local press
to public pictures and plans.
![Page 103: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/103.jpg)
Design Plan Audit: Downtown
Houston Park
![Page 104: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/104.jpg)
![Page 105: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/105.jpg)
Step 13. Assess Results and Replicate
• What other places in the community need
to be improved?
• Who can fund planning and
implementation?
• Is there are need for a broader
“placemaking” organization?
• How can you work with other similar
projects in the region or the country?
![Page 106: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/106.jpg)
HOW CAN YOU USE PLACEMAKING IN YOUR OWN WORK?
1. For what specific projects, do you
think you can use the Placemaking
approach?
2. What do you think would be the
biggest challenges?
3. What are some quick wins/low-hanging
fruit?
![Page 107: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/107.jpg)
![Page 108: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/108.jpg)
Market Square District
Access & Linkages
A 5 minute
walk (1/4 mile)
from Market Sq
captures many
existing
destinations
and
redevelopmen
t opportunities
![Page 109: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/109.jpg)
![Page 110: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/110.jpg)
![Page 111: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/111.jpg)
![Page 112: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/112.jpg)
![Page 113: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/113.jpg)
![Page 114: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/114.jpg)
![Page 115: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/115.jpg)
![Page 116: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/116.jpg)
![Page 117: Implementing a Placemaking Project A Step by Step Guide · 2013. 3. 21. · 9. Develop a Visual Concept Plan 11. Implement Short-Term Actions 12. Develop a Long-Term Design, Action](https://reader036.vdocuments.us/reader036/viewer/2022071106/5fe0cb471dd82769686a6314/html5/thumbnails/117.jpg)