implementation of construction project with detailed contract documents r1
TRANSCRIPT
Implementation ofConstruction Project with
Detailed Contract Documents
Soe Minn SettMyanmar Transitional Platform1 March 2014
UMFCCI, Yangon
Key Team Player in following airport projects:-Changi Airport (Singapore)Sembawang Airbase (Singapore)Seletar Airport (Singapore)New Phu Quoc International Project (Vietnam)Can Tho International Airport (Vietnam)Buon Ma Thout Airport (Vietnam)Benazir Bhutto International Airport (Islamabad, Pakistan)Naypyitaw Airport (Myanmar)Melbourne Airport (Australia)Hambantota International Airport (Sri Lanka)
Soe Minn SettB.E (Civil), M.Sc (Transportation Engineering)
3
1) LEGAL FRAME WORK
2) FORM OF CONTRACT
3) RESULT OF DETAILED CONTRACT
DOCUMENTS
CONTENT
Myanmar Transitional Platform
4
Ref: Imperial Gazetteer of India, v. 9, p. 213.
LEGAL FRAME WORK
BRITISH BURMA MUNICIPAL ACT, 1874
BURMA MUNICIPAL ACT, 1884
Ref: “A Collection of The Acts published by the Governor General of India in Council in the year 1885”
Myanmar Transitional Platform
5
LEGAL FRAME WORK
Rangoon City Municipal Act (1922)
Rangoon City Municipal Act (1956)
Myanmar Transitional Platform
6
Yangon City Development CommitteeLEGAL FRAME WORK
Myanmar Transitional Platform
7
CURRENT PRACTICE
City Development Committee
Myanmar Transitional Platform
8
CURRENT PRACTICE
Ministry of Construction
Myanmar Transitional Platform
9
Contract LawLEGAL FRAME WORK
- Myanmar Contract Act, 1872
(formerly known as “Indian Contract Act”)
- Sale of Goods Act, 1930Same as Australian, English, Hong Kong and Singapore law.
three major differences:
(i) Consideration may be given by a person who is not a person to the
contract;
(ii) Past consideration (that is, payment/performance prior to entering into the
contract) is valid consideration
(iii) Consideration is not presumed in the case of a contract under seal.
Myanmar Transitional Platform
10
LEGAL FRAME WORK
Typical Contract Agreement Document (Private Sector Project)
-Contract agreements were drafted on Stamp paper and signed by both parties.
-May witness by Lawyers
-Mentioned payment term
-General description of project deliverable (Eg. 8 stories R.C building, 20’ x 50’ Warehouse Steel Structure building etc)SPECIME
N
Myanmar Transitional Platform
11
LEGAL FRAME WORK
SPECIMEN
SPECIMEN
Typical Contract Agreement Document (Private Sector Project)
SPECIMEN
Myanmar Transitional Platform
12
LEGAL FRAME WORK
SPECIMEN
Typical Contract Agreement Document (Government Sector Project)
Myanmar Transitional Platform
13
LEGAL FRAME WORK
Myanmar Transitional Platform
Photo Courtesy : Swe Oo’s Facebook PUBLIC share
14
FORM OF CONTRACT
PRINCIPAL STAGES OF CONSTRUCTION PROCESS
14
Project Brief
Decision to Build
Evaluation &
AwardCompletion & Maintenance
Design Drawing
sTender Documentation-Conditions of Contract-Drawings-BQs-Specifications
Tender Invitation
Construction Works
Letter of Intent/Awar
d
Contract Documents
Myanmar Transitional Platform
15
FORM OF CONTRACT
Standard form of Contract Documents
1. Articles of Agreement
2. Conditions of Contract (regulate to practice)
3. Plans and Drawings
4. Bill of Quantities
5. Specification (recommend to practice)
Myanmar Transitional Platform
16
Common Standard Form of Condition of Contract Joint Contracts Tribunal (JCT)
International Federation of Consulting Engineers (FIDIC)
NEC Engineering and Construction Contract (NEC)
Singapore Institute of Architect (SIA)
Association of Consultant Architects (ACA)
Public Sector Standard Conditions of Contract for Construction Works (PSSCOC)
Master Format (Construction Specification Institute, CSI)
FORM OF CONTRACT
Myanmar Transitional Platform
17
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
18
Common Standard Form of Condition of Contract
FORM OF CONTRACT
19
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
20
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
21
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
22
PSSCOCPublic Sector Standard Conditions of Contract for Construction Works
1. Definitions and Interpretation
2 . Superintending Officer and
Superintending Officer's Representative
3. Contract Documents
4. General Obligations of the Contractor
5. Sub-Surface and Ground Conditions
6. Permanent Works Designed by the
Contractor
7. Notices and Fees
8. Setting Out
9. Programme for the Works
10. Quality in Construction
11. Administration
12. Possession of Site And
Commencement Of Works
13. Suspension
14. Time for Completion
15. Expediting Progress of Works
16. Liquidated Damages
17. Substantial Completion
18. Defects
19. Variations to the Works
20. Valuation of Variations
21. Measurement
22. Claims for Loss and Expense
23. Procedure for Claims
24. Construction Equipment
Temporary Works Materials and
Goods
25. General Responsibilities
26. Indemnity Provisions
27. Insurance for Personal Injury, Work
Injury Compensation and Property
Damage
28. Insurance of the Works
29. Damage to Property of Employer or
Government
30. Assignment and Subcontracting
31. Termination by The Employer
32. Progress Payments and Final Account
33. Fluctuations
34. Final Completion Certificate
35. Settlement of Disputes
36. Recovery by the Employer
37. Governing Law & Notices
FORM OF CONTRACT
Myanmar Transitional Platform
23
Technical SpecificationSpecifications
FORM OF CONTRACT
Myanmar Transitional Platform
24
Technical SpecificationSpecifications
FORM OF CONTRACT
Myanmar Transitional Platform
25
SpecificationsSpecification Format
- National Building Specification Format (UK Based System)
- Master Format (Construction Specification Institute, CSI)
(US Based System)
- PWD/CPG General Specification
FORM OF CONTRACT
Myanmar Transitional Platform
26
SpecificationsParticular Requirement
FORM OF CONTRACT
NBS Master Format
Myanmar Transitional Platform
27
Technical SpecificationSpecifications
FORM OF CONTRACT
NBS Master Format
Myanmar Transitional Platform
28
Publish Standard Condition of Contract by relevant Authorities
(for Public and Private Sectors)
Regulate to practice the published Standard Condition of Contract
Practice to include Detailed Specification(Consultants, License Engineers, Professional Engineers)
RECOMMENDATION
Myanmar Transitional Platform
29
Clear understanding of respective responsible of each party
(Benefit to both Employer and Employee)
Prevent ambiguity and un-necessary Arbitration at Court (lost time and money)
Property is “General Public Investment”(Contribute GDP)
Preparation for “Next Generation of Construction Industrial”
(Set up the industrial practice and standard to prevent from Nasty International Contractor who want to take advantages on lack of industrialise inexperience)
RESULT OF PRACTICING DETAILED CONTRACT DOCUMENT
Myanmar Transitional Platform