immediate planning in areas action plan€¦ · hazard assessment elements at risk (db)...

14
05/05/2015 1 Risk Assessment & Immediate Action Plan Planning in areas facing Natural Hazards Planning Of Environmentally Special Regions Dr Safaa Ghoneim Faculty Of Urban & Regional Planning Risk=V*H H = hazard & V = vulnerability 2 Risk Assessment

Upload: others

Post on 23-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

1

Risk Assessment

&

Immediate Action Plan Planning in areas

facing Natural Hazards

Planning Of Environmentally

Special Regions

Dr Safaa Ghoneim

Faculty Of Urban & Regional Planning

Risk=V*H

H = hazard & V = vulnerability

2

Risk Assessment

Page 2: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

2

1. Hazard assessment

2. Elements at risk (Db)

3. Vulnerability Assessment

4. Risk Assessment

Planning

Risk Assessment

1. Category/ Degree/intensity

2. Probability/Frequency: Highly Likely

3. Magnitude: Scale, Extent, …,

4. Warning Time: hours, days, …

5. Duration: hours, days, weeks,..

(H)…. Hazard Assessment

Scenario

Building History

Analysis

Page 3: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

3

Hazard analysis/matrix Flo

od

ing

(H

1)

Da

te

X

(Onset Speed

+

For-warnin

g +

Duration +

Intensity ) X Impact

(H)…. Hazard Assessment

1st 1980 Rapid 1 h 1 day 4 R 15 h, ….

2nd 1987 Rapid 30 min 2 day 4.5 R 30 h, ….

3rd 1992 v rapid 5 min 3days 6.5 R 450 h, 20d, …

---------------------------------------------------------------------------------- Scen.1 2016 ? ? ? ? ???????? Scen.2 2020 ? ? ? ? ????????

Scenario

Building

History

Analysis

Examples of Parameters to be considered in flooding:

• Elevation (topography)

• Catchment area /watershed,

• Slops,

• Expected SLR/

• Density of rains

• Types of soil

• …..

6

(H) … Hazard Assessment

Page 4: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

4

Individual Hazards Assessment

RISK

1 - High

2 - Medium CATEGORY Impossible Improbable Remote Occasional Probable Frequent

3 - Low Catastrophic

Critical

Marginal

Negligible

(H) … Hazard Assessment

Hazard analysis/matrix

Pro

bab

ility

X

(Onset

Speed

+

For-

warning +

Dura-

tion +

Inten-

sity ) X

Im-

pact

Risk #1

(H)…. Hazard Assessment

H1 Low Rapid Short ? days 7 R high

H2 high slow mid weeks 5 m high

Scenario

Building History

Analysis

Page 5: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

5

Hazard assessment

Elements at risk (Db)

Vulnerability

Assessment

Risk Assessment

Mitigation Plan

Risk Assessment

To identify the elements that can experience hazard.

Not only Physical Conditions, but Social characteristics determines Vulnerability to Natural Hazards

Elements at risk (Db)

Page 6: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

6

To identify the elements that can experience hazard.

Elements at risk (Db)

Page 7: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

7

Hazard assessment

Elements at risk (Db)

Vulnerability

Assessment

Risk Assessment

Mitigation Plan

Risk Assessment

Vulnerability is the conditions determined by physical, social, economic, and environmental factors or processes,

which increase the susceptibility of a community to the impact of hazards.

V Vulnerability Assessment

R=H*V

Page 8: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

8

V Vulnerability Assessment

Example of social

factors that should

be considered:

Age, gender,

ethnicity, income

and assets all play an

important role in the

ability to handle

crises such as natural

disasters,.. etc

Social Vulnerability Physical Vulnerability

V Vulnerability Assessment

Page 9: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

9

V Vulnerability Assessment

V Vulnerability Assessment

Page 10: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

10

V Vulnerability Assessment

V Vulnerability Assessment

Page 11: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

11

For each type (criteria design):

• Characteristics determining the element’s vulnerability

• Weights of these Characteristics

• Evaluate the existing & future conditions

V Vulnerability Assessment

V1

(b

uild

ing

s)

Ag

e

%

Ma

teri

al

%

Fou

nd

ati

on

%

……

%

,,,,,

%

We

igh

t

B1 150 92

B1 80 86

B3 20 56

Page 12: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

12

Risk Assessment

Hazard assessment

Elements at risk (Db)

Vulnerability

Assessment

Risk Assessment

Mitigation Plan

Page 13: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

13

Haiti

R=H*V

Recovery/

Short-term plan

Management

Preparedness

Action Plan

Management

Response/

Immediate

Action Plan

Mitigation/

Long-term plan

Role of Land use/physical Planning

26

Page 14: Immediate Planning in areas Action Plan€¦ · Hazard assessment Elements at risk (Db) Vulnerability Assessment Risk Assessment Mitigation Plan Risk Assessment Vulnerability is the

05/05/2015

14

Response Plan = Immediate action

• Aims to Minimise The Damage

• Includes: • Assessment of damage حصر الخسائر

• Assessment of needs تقذير االحتياج

• Resource analysis تحليل االمكانات

• Management actions قرارات ادارة االزمة

• Distribution &Allocation المكانيالتوزيع

• Transportation عمليات النقل

27

• Critical Facility: Facilities that are critical to the health and safety of the population and that are especially important following hazard events.

• Critical facilities include but are not limited to:

• Shelters,

• Police,

• Fire Stations, &

• Hospitals.

Response / Immediate action Plan