Ian M. Ainslie, AIA Portfolio American Energy – Utica, Field Office Project Chesapeake Buildings 25 and 26 Oklahoma River Race Course Windscreen Chesapeake Building 15 Chesapeake Building 28 Chesapeake Lake Chesapeake Building 18 Ainslie Residence UNCG Dining Hall Renovation UNCG Honors Classroom NCANG – ASE Facility UNCC Center City Building CPCC Health Careers Building NCANG – ATC Training, RAPCON, and Storage Facility UNCG Aycock Auditorium Renovation CPCC Harris Conference Center

Upload: ian-ainslie

Post on 22-Jan-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ima portfolio 2015 Press Quality

Ian M. Ainslie, AIA

Portfolio

American Energy – Utica,Field Office Project

Chesapeake Buildings 25 and 26

Oklahoma River Race Course Windscreen

Chesapeake Building 15

Chesapeake Building 28

Chesapeake Lake

Chesapeake Building 18

Ainslie Residence

UNCG Dining Hall Renovation

UNCG Honors Classroom

NCANG – ASE Facility

UNCC Center City Building

CPCC Health Careers Building

NCANG – ATC Training, RAPCON, and Storage Facility

UNCG Aycock Auditorium Renovation

CPCC Harris Conference Center

Page 2: ima portfolio 2015 Press Quality

American Energy – Utica, Field Office ComplexCambridge, Ohio

Elliott + Associates Architects

Project Architect

Completion 2015

Office Building 31,000sfShop Building 5,000sfLaydown Yard 5 acres

$ undisclosed

Page 3: ima portfolio 2015 Press Quality
Page 4: ima portfolio 2015 Press Quality
Page 5: ima portfolio 2015 Press Quality
Page 6: ima portfolio 2015 Press Quality

ChesapeakeBuildings 25 and 26Oklahoma City, OklahomaElliott + Associates Architects

Project Architect

Completion 2014

Central Plant 49,273sfData Center 55,277sf

Total 104,550sf

$ undisclosed

Page 7: ima portfolio 2015 Press Quality
Page 8: ima portfolio 2015 Press Quality
Page 9: ima portfolio 2015 Press Quality

Oklahoma RiverRace Course WindscreenOklahoma City, OklahomaElliott + Associates Architects

Project Architect

Unbuilt 2013

40ft tall, 600m long

$3,500,000

The windscreen on the south bank of the Oklahoma River, in the Boathouse District of Oklahoma City, is designed to make the wind conditions more equitable for rowing, kayak, and canoe races in all lanes across the width of the river. The initial project would affect the final 500m of the race course with later phases to protect the entire 2,000m course.

Page 10: ima portfolio 2015 Press Quality
Page 11: ima portfolio 2015 Press Quality

ChesapeakeBuilding 15Oklahoma City, OklahomaElliott + Associates Architects

Architect

Completion 2013

Office Building 252,000sf

$ undisclosed

Although my involvement in this project was limited to the final month of construction documents during my first month at Elliott + Associates Architects, the architectural vocabulary is representative of the vocabulary used in the design of two unbuilt projects on the Chesapeake Energy Campus in Oklahoma City. Building 28 was taken into construction documents and Building 18 was taken into design development with both making use of a similar language to create a cohesive campus environment for Chesapeake Energy.

Page 12: ima portfolio 2015 Press Quality

ChesapeakeBuilding 28Oklahoma City, OklahomaElliott + Associates Architects

Project Architect

Unbuilt 2013

Office Building 251,839sfFitness 159,670sfWellness 61,957sfRestaurant 21,620sfBandshell 8,417sfDaycare 2,652sfStore 1,658sf

Total 507,813sf

Elec. Equip. Enclosure 7,231sf

Athletic Fields 2.75 acresAmphitheater 2.00 acresConcessions 2,538sf

Lake (completed) 3.00 acresBoat Storage 1,603sfLake Equip. Enclosure 350sf

Total Site 12 acres

$ undisclosed

Page 13: ima portfolio 2015 Press Quality

Basement 2

Level 3

Basement 1

Level 4

Level 1

Level 5

Level 2

Page 14: ima portfolio 2015 Press Quality
Page 15: ima portfolio 2015 Press Quality

Chesapeake LakeOklahoma City, Oklahoma

Elliott + Associates Architects

Project Architect

Completion 2015

3 acres

$ undisclosed

Close coordination with civil engineers was required to completely integrate the design of the retention lake with Building 28, which was intended to wrap around the lake.

Page 16: ima portfolio 2015 Press Quality

ChesapeakeBuilding 18Oklahoma City, OklahomaElliott + Associates Architects

Project Architect

Unbuilt 2011

Office Building 303,000sf

$ undisclosed

Page 17: ima portfolio 2015 Press Quality

Level 5Level 2Level 1Basement

Page 18: ima portfolio 2015 Press Quality

Ainslie Residence

Ian M. Ainslie, Architect

Project Architect

Completion 2012

3,200sf

$ undisclosed

Page 19: ima portfolio 2015 Press Quality
Page 20: ima portfolio 2015 Press Quality

University of North Carolina at Greensboro Dining Hall Renovation

Gantt Huberman Architects

Project Architect

Completion 2014

Renovation 85,000sfAddition 38,000sf

Total 123,000sf

$29,000,000

Page 21: ima portfolio 2015 Press Quality

Existing Lower Level Floor Plan Existing Dining Level Floor Plan

Existing Section at Centerline

Renovated Lower Level Floor Plan Renovated Dining Level Floor Plan

Renovated Section at Centerline

Renovated ModelExisting Model

Page 22: ima portfolio 2015 Press Quality
Page 23: ima portfolio 2015 Press Quality

University of North Carolina at Greensboro Honors Classroom

Gantt Huberman Architects

Project Architect

Completion 2010

Renovation 1,400sf

$300,000

Page 24: ima portfolio 2015 Press Quality

North CarolinaAir National GuardASE Facility

Gantt Huberman Architects

Project Architect

Completion 2011

Shop Building 6,600sf

$1,200,000

Page 25: ima portfolio 2015 Press Quality

University of North Carolina at Charlotte Center City Building

Gantt Huberman Architects

Architect

Completion 2011

Academic Building 143,000sf

$50,000,000

Levels 10-12Levels 7-9Levels 4-6Level 1

Page 26: ima portfolio 2015 Press Quality
Page 27: ima portfolio 2015 Press Quality
Page 28: ima portfolio 2015 Press Quality
Page 29: ima portfolio 2015 Press Quality

Central Piedmont Community College Health Careers Building

Gantt Huberman Architects

Architect

Completion 2010

Addition 96,000sfRenovation 59,000sf

Total 155,000sf

$22,000,000

Level 4Level 1

Page 30: ima portfolio 2015 Press Quality
Page 31: ima portfolio 2015 Press Quality

North CarolinaAir National GuardATC Training, RAPCON, and Storage FacilityGantt Huberman Architects

Project Architect

Completion 2009

Office Addition 20,000sfOffice 2,000sfStorage 9,000sf

Total 31,000sf

$3,200,000

Page 32: ima portfolio 2015 Press Quality

University of North Carolina at Greensboro Aycock Auditorium RenovationGantt Huberman Architects

Completion 2008

Renovation 63,000sfAddition 2,000sf

Total 65,000sf

$18,000,000

Page 33: ima portfolio 2015 Press Quality

Existing Lower Level Existing Level 1 Existing Level 4Existing Level 3Existing Level 2

Renovated Lower Level Renovated Level 1 Renovated Level 4Renovated Level 3Renovated Level 2

Page 34: ima portfolio 2015 Press Quality
Page 35: ima portfolio 2015 Press Quality

Central Piedmont Community College Harris Conference CenterGantt Huberman Architects

Completion 2004

65,000sf

$7,000,000

Parking Level First Floor Second Floor