Move Illinois Program
TAKE CARE OF EXISTING SYSTEM NEEDS
ILLINOIS ROUTE 53/120 EXTENSION
JANE ADDAMS MEMORIAL TOLLWAY
(I-90)
ELGIN O’HARE WEST BYPASS
I-294/I-57 INTERCHANGE
ILLIANA EXPRESSWAY
![Page 3: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/3.jpg)
3
Tollway Construction Contracts 101
} Webinar purpose } Presenters } Materials covered } Materials not covered } Questions and answers
![Page 4: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/4.jpg)
4
How To Do Business with the Tollway
} Getting started with construction contracts } Accessing required documents } Understanding bid process and contract documents } Submitting your bid
![Page 5: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/5.jpg)
5 5
Goods and Services
} Opportunities posted at www.purchase.state.il.us } Illinois Procurement Bulletin (IPB)
![Page 6: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/6.jpg)
6 6
Bid Letting Schedule
![Page 7: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/7.jpg)
7
Tollway Contract Process Timeline
Springfield Notice to proceed/construction begins
BID OPENING
Prior to Bid Opening After Bid Opening
Advertisement of Bids Duration: 2-6 weeks
Pre-Bid Meeting
Contract Addenda/Addendum Up to 5 days before bid
Tollway Board Approval Duration: Up to 30 days
Conditional Notice of Award Duration: 2-4 weeks
Procurement Policy Board Duration 4-6 weeks
![Page 8: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/8.jpg)
8 8
Notification of IPB Bid Opportunities
} Email notifications www.purchase.state.il.us
![Page 9: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/9.jpg)
9
Tollway Bid Opportunities and Resources
} www.illinoistollway.com/doing-business
![Page 10: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/10.jpg)
10 10
Locating the Documents
Online access–www.illinoistollwayplanroom.com
Accurate Repro 630-428-4433
Ask for “Plan Room”
There is no charge to view some of the source documents, but there is a charge to print contract documents for bidding purposes
![Page 11: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/11.jpg)
11
Register to Access Documents
} www.illinoistollwayplanroom.com
![Page 12: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/12.jpg)
12
Inside the Plan Room
![Page 13: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/13.jpg)
13
Inside the Plan Room
![Page 14: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/14.jpg)
14
Pay Items List (P-Pages)
![Page 15: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/15.jpg)
15
Prequalification–Registration and Authorization
} Illinois Department of Transportation
} www.dot.state.il.us/const/ prequalapp.html
} 217-782-3413
Prequalification must be maintained each year. The State of Illinois has requirements that must
be met or updated on a regular schedule.
![Page 16: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/16.jpg)
16
Multi-project Labor Agreement
} Contractors and subcontractors must be signatory } Bargaining agreements must be filed with Tollway } Wage stipulations require: § Union employees § Pay prevailing union wages
![Page 17: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/17.jpg)
17
Diversity and Strategic Development Increasing economic opportunity § Minority-owned
§ Women-owned
§ Disadvantaged businesses
§ Historically under-employed individuals
![Page 18: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/18.jpg)
18 18
Current Diversity Efforts
} Focus Groups } Unbundling efforts § Contracts under $5 million
} Communicate Opportunities § Email alerts
} Community outreach § Plans and specifications to assist
agencies § Networking events
![Page 19: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/19.jpg)
19
Recognized DBE Certifications
![Page 20: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/20.jpg)
20
Certification Assist Agencies } Alliance of Business Leaders & Entrepreneurs
(ABLE) } Federation of Women Contractors } American Brotherhood of Contractors Business
Development Center } Asian American Institute } Association of Asian Construction Enterprises } Black Contractors United } Chatham Business Association Small Business
Development, Inc. } National Association of Women Business
Owners } Rainbow/PUSH Coalition } Suburban Minority Contractors Association } Uptown Center Hull House } Women Construction Owners & Executives } Women’s Business Development Center
} Chicago Area Gay & Lesbian Chamber of Commerce
} Chicago Minority Supplier Development Council, Inc.
} Chicago Urban League } Cosmopolitan Chamber of Commerce } Federation of Women Contractors } Hispanic American Construction Industry
Association } Illinois Hispanic Chamber of Commerce } Chicago Women in Trades (CWIT) } Coalition for United Community
Labor Force } Englewood Black Chamber of Commerce } South Shore Chamber, Incorporated } United Neighborhood Organization (UNO) } National Organization of Minority
Engineers
www.cityofchicago.org
![Page 21: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/21.jpg)
21
Diversity and Strategic Development
} Disadvantaged Business Enterprise (DBE) } Equal Employment Opportunity (EEO) Program } Earned Credit Program (ECP)
![Page 22: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/22.jpg)
22
Disadvantaged Business Enterprise (DBE)
The DBE program includes DBE/MBE/WBE
} DBE contract goals } Utilization plans and certifications } Reviews contractors’ DBE payments } Tracks and compiles actual DBE participation data § Form 2114 § Form 0003
![Page 23: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/23.jpg)
23
Equal Employment Opportunity Program
Monitoring and Reporting
} Weekly certified payroll reports § Achieve established EEO goals
(19.6 percent minority/6.9 percent female)
} Periodic site visits § Confirm presence of reported workforce
} Referrals § Assistance meeting workforce goals–referrals
![Page 24: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/24.jpg)
24
Earned Credit Program
} Rewards initiative } Bid credits
} Diversify and expand the pool of individuals doing business with the Illinois Tollway } [email protected]
Example: Operating Engineer
$39.75 hourly wage
2,080 hours/year
$82,680 yearly wages
50% ECP percentage
$41,340 ECP credit
![Page 25: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/25.jpg)
25
Definition and Types of Bonds
} Contract Bonds § Bid Bonds-guarantees bid reliability § Performance Bonds–secure the contractor’s performance § Payment Bonds–secure payment of labor and materials
![Page 26: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/26.jpg)
26
Indemnification
} Claims arising from the work under the contract } Expenses incurred in the defense of Tollway claims
or suits
To the fullest extent permitted by law, the Contractor shall indemnify and save harmless the Tollway, its directors, officers, employees, agents and its Consulting Engineer, and the State of Illinois from any and all claims, suits, actions, costs and fees of every nature or description, arising from, growing out of, or connected with the work to be performed under this Contract.
![Page 27: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/27.jpg)
27 27
Scope of Insurances Contractor and Subcontractor* } Commercial General Liability } Business Automobile Liability } Worker’s Compensation Insurance } Excess/Umbrella Liability } Builder’s Risk Insurance } Railroad Insurance (as required) } Other special insurance (as required) * limits of coverage for subcontractors will be determined by contractor
![Page 28: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/28.jpg)
28 28
Minimum Limits of Liability
} Commercial General Liability § Not less than $1 million per occurrence and $2 million annual
general aggregate § Endorsed on a per-project basis § Coverage maintained for two years minimum
![Page 29: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/29.jpg)
29 29
Minimum Limits of Liability
} Commercial General Liability } Business Automobile Liability § Minimum of $1 million combined single limit per occurrence
![Page 30: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/30.jpg)
30 30
Minimum Limits of Liability
} Commercial General Liability } Business Automobile Liability } Worker’s Compensation § Illinois State required statutory limits § $1 million per accident employer’s liability
![Page 31: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/31.jpg)
31 31
Minimum Limits of Liability
} Commercial General Liability } Business Automobile Liability } Worker’s Compensation } Excess/Umbrella Liability § Not less than $25 million per occurrence and in annual
aggregate
![Page 32: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/32.jpg)
32 32
Minimum Limits of Liability
} Commercial General Liability } Business Automobile Liability } Worker’s Compensation } Excess/Umbrella Liability } Builder’s Risk Insurance § Contractor obtains for term of contract § Must meet General Provisions requirements § Policy limit equal to original contract award amount
![Page 33: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/33.jpg)
33 33
Starting the Bid Process
} Understand the bid documents § “Bid what is in the contract”
} Engineering contract documents § Plans (including Standards) § Contract Requirement Book(s) § Tollway specifications § IDOT specifications § Manuals included in contract § Addenda
![Page 34: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/34.jpg)
34
Engineering Contract Documents
} Contract plans
![Page 35: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/35.jpg)
35 35
Engineering Contract Documents
Contract Requirements Book “Orange Book”
![Page 36: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/36.jpg)
36
Engineering Contract Documents Page A-1 (Project Summary ) Page
Sealed bid date
Pre-bid meeting
Contract start and completion dates
Description of work
How to obtain contract plans, special provisions, and
other contract documents
Contract questions, contract information, and deadline
dates
![Page 37: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/37.jpg)
37
Engineering Contract Documents
} Addenda
![Page 38: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/38.jpg)
38
Engineering Contract Documents
} Standard drawings
![Page 39: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/39.jpg)
39
Engineering Contract Documents
} Specifications
![Page 40: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/40.jpg)
40
Hierarchy of Contract Documents
Special Provisions
Plans
Tollway Supplemental Specifications
IDOT Recurring Special Provisions
IDOT Supplemental Specifications
Standard Specifications
![Page 41: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/41.jpg)
41
Engineering Contract Documents–Manuals
} Contractor’s Quality Program Manual
![Page 42: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/42.jpg)
42
Engineering Contract Documents–Manuals
} Roadway Traffic Control and Communications Manual
![Page 43: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/43.jpg)
43
Engineering Contract Documents–Manuals
} Lane Closure Reference Guide
![Page 44: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/44.jpg)
44
NPDES Permit ILR40
![Page 45: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/45.jpg)
45
Engineering Contract Documents–Manuals
} Erosion and Sediment Control, Landscape Design Criteria
![Page 46: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/46.jpg)
46 46
ESC Manual–Contractor Responsibilities
} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting
![Page 47: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/47.jpg)
47 47
ESC Manual–Contractor Responsibilities
} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC
inspections
![Page 48: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/48.jpg)
48 48
ESC Manual–Contractor Responsibilities
} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC
inspections } Identifying the need for ESC maintenance
![Page 49: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/49.jpg)
49 49
ESC Manual–Contractor Responsibilities
} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC
inspections } Identifying the need for ESC maintenance } Identifying the need for changes in the ESC plan
![Page 50: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/50.jpg)
50 50
ESC Manual–Contractor Responsibilities
} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC
inspections } Identifying the need for ESC maintenance } Identifying the need for changes in the ESC plan } Developing the Storm Water Pollution Prevention Plan
![Page 51: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/51.jpg)
51
Contract Warranty/Surety
} Warranty against defective work } All contract work items § Period of one year
} Surety Bond } Contractor Guarantee
![Page 52: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/52.jpg)
52
Contractor Warranty
} Special Provision } Contract Bid Pay Item } Maintenance Bond
![Page 53: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/53.jpg)
53
Manufacturer’s Warranty
} Warranty on specified systems and materials…for duration period specified
![Page 54: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/54.jpg)
54
Review
} Prequalification } Bonding, indemnification, insurance } DBE requirements } Contract documents
![Page 55: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/55.jpg)
55
Bid Submittal Requirements
Contractors } Submit Certification/Financial Disclosure forms
(conflicts of interest)
![Page 56: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/56.jpg)
56
Bid Submittal Requirements
Contractors } Submit financial and conflicts of interest } Delinquent debt certification
![Page 57: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/57.jpg)
57
Bid Submittal Requirements
Contractors } Submit financial and conflicts of interest } Delinquent debt certification } Re-certification for multi-year projects
![Page 58: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/58.jpg)
58
Bid Submittal Requirements
Contractors } Submit financial and conflicts of interest } Delinquent debt certification } Re-certification for multi-year projects } Copy of all subcontracts, values exceed $25,000
![Page 59: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/59.jpg)
59
Bid Submittal Requirements
Contractors } Submit financial and conflicts of interest } Delinquent debt certification } Re-certification for multi-year projects } Copy of all subcontracts, values exceed $25,000 } Subcontractor Agreement with Subcontractor
Certification Disclosure
![Page 60: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/60.jpg)
60
Qualifications of Bidder
s
![Page 61: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/61.jpg)
61 61
Disqualifiers
Two Public Acts § PA 095-971 establishes certain registration requirements and
campaign contribution restrictions for state vendors and bidders
§ PA 096-795 makes significant revisions to the Illinois Procurement Code and places new requirements on vendors and bidder
![Page 62: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/62.jpg)
62
Bid Communication Requirements
![Page 63: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/63.jpg)
63
Disqualifiers
![Page 64: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/64.jpg)
64 64
} Two public acts § PA 096-795 makes significant revisions to the Illinois
Procurement Code and places new requirements on vendors and bidders
§ PA 095-971 establishes certain registration requirements and campaign contribution restrictions for state vendors and bidders
} Prohibited bidders and contractors } Omission of the following–Disclosures, Board of Elections,
Anticipated Subcontractors
Disqualifiers
![Page 65: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/65.jpg)
65
Subcontractor Considerations
} Subcontractor’s must be approved } Contractor’s self-performance must be more than 35% } Subcontractor cannot have delinquent debt } D/M/WBE firm must maintain valid certification
![Page 66: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/66.jpg)
66 66
Preparing a Bid
} Bid process and procedures } What’s included in a bid: § Administration § Contingencies § Safety § All inclusive (Expect no change orders) § Profit
![Page 67: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/67.jpg)
67
Pay Items List (P-Pages)
![Page 68: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/68.jpg)
68
Bid Question and Answer Opportunities
} Pre-bid meeting
![Page 69: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/69.jpg)
69
Bid Question and Answer Opportunities
} Pre-bid meeting } Other opportunities to ask questions
![Page 70: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/70.jpg)
70
Bid Question and Answer Opportunities } Pre-bid meeting } Other opportunities to ask questions } Community Resources for responding to bids § African American Contractors Association § Black Contractors United § Chicago Minority Supplier Developer Center § Chicago Urban League § Federation of Women Contractors § Hispanic American Construction Industry Association § Illinois Hispanic Chamber of Commerce § Latin American Chamber of Commerce § Rainbow Push Coalition § Rock Valley College/Procurement Technical Assistance Center § Suburban Minority Contractors Association
![Page 71: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/71.jpg)
71
Resources for Responding to Bids } ILLINOIS PTAC AT COLLEGE OF DUPAGE
Lisle, Illinois 630/942-2184
} ILLINOIS PTAC AT NORTH BUSINESS & INDUSTRIAL COUNCIL (NORBIC) Chicago, Illinois 773/594-9292
} ILLINOIS PTAC AT ILLINOIS HISPANIC CHAMBER OF COMMERCE (IHCC) Chicago, Illinois 312/492-9960 Provides services to all Illinois-based businesses and is not limited to Hispanic-owned businesses
} ILLINOIS PTAC AT WOMEN’S BUSINESS DEVELOPMENT CENTER (WBDC) Chicago, Illinois 312/853-3477 Provides services to all Illinois-based businesses and is not limited to women-owned businesses
} ILLINOIS PTAC AT COLLEGE OF LAKE COUNTY Grayslake, Illinois 847/543-2025
} ILLINOIS PTAC AT ROCK VALLEY COLLEGE Rockford, Illinois 815/921-2091
} ILLINOIS PTAC AT HEARTLAND PARTNERSHIP Peoria, Illinois 309-495-5907
} ILLINOIS PTAC AT BLACK HAWK COLLEGE Moline, Illinois 309/797-2806
www.ildceo.net
![Page 72: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/72.jpg)
72 72
Competency of Bidders
} Statement of experience and financial condition
![Page 73: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/73.jpg)
73 73
Competency of Bidders
} Statement of experience and financial condition } Sworn statement identifying key management and
supervisory personnel
![Page 74: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/74.jpg)
74 74
Competency of Bidders
} Statement of experience and financial condition } Sworn statement identifying key management and
supervisory personnel } Proposed subcontracted portions
![Page 75: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/75.jpg)
75 75
Competency of Bidders
} Statement of experience and financial condition } Key management and supervisory personnel } Proposed sublet portions } Value of uncompleted work
![Page 76: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/76.jpg)
76 76
Bidder’s Certificate of Eligibility
} The following conditions apply: } Financial rating: § Equal or exceed–total estimated project value
} Contractor appropriate work ratings § 50 percent minimum–estimated project cost
![Page 77: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/77.jpg)
77 77
Proposal Requirements and Conditions
} Submit on Tollway furnished Proposal Form } Acceptance conditioned on bidder furnishing Contract
Bonds executed by a Surety } Proposal § Individual § Partnership § Corporation § Joint Venture
![Page 78: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/78.jpg)
78 78
Proposal Guaranty
} Mandatory inclusion in proposal } Guaranty in the amount equal to 5 percent of the total
proposal amount } Payable to the order of the Tollway § Bank draft § Cashier’s check § Certified check § Bid Bond
![Page 79: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/79.jpg)
79 79
Contractor
} Contractor § Meet prerequisites § Comply with all requirements § Secure bonding, indemnification and insurance § Prepare all documents
![Page 80: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/80.jpg)
80 80
Subcontractors “Tips”
} Select an area of focus
![Page 81: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/81.jpg)
81 81
Subcontractors “Tips”
} Select an area of focus } Know scope and quote all items
![Page 82: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/82.jpg)
82 82
Subcontractors “Tips”
} Select an area of focus } Know scope and quote all items } Understand DBE paperwork
![Page 83: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/83.jpg)
83 83
Subcontractors “Tips”
} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule
![Page 84: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/84.jpg)
84 84
Subcontractors “Tips”
} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions
![Page 85: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/85.jpg)
85 85
Subcontractors “Tips”
} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions } Attend the pre-bid meeting
![Page 86: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/86.jpg)
86 86
Subcontractors “Tips”
} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions } Attend the pre-bid meeting } Submit final questions
![Page 87: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/87.jpg)
87 87
Subcontractors “Tips”
} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions } Attend the pre-bid meeting } Submit final questions } Download a plan holders list
![Page 88: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/88.jpg)
88 88
Respond to Bid
} Sealed bids
![Page 89: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/89.jpg)
89 89
Respond to Bid
} Sealed bids } Lowest responsive and responsible bid awarded
![Page 90: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/90.jpg)
90 90
Respond to Bid
} Sealed bids } Lowest responsive and responsible bid awarded } You won the bid… Now what?
![Page 91: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/91.jpg)
91 91
Review
} Prequalification } Bonding, indemnification and insurance } DBE requirements } Contract documents } Final bid submittal } Sample Contract Requirement Book § also known as the “Orange Book”
![Page 92: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/92.jpg)
92 92
Disclaimer } The Illinois Tollway presents this webinar solely as a courtesy to the construction
contractor community. With respect to this presentation, the Tollway states the following: i. it contains only general information from the Tollway and is not directed at any individual
party (or parties), nor with respect to any particular solicitation for service to the Tollway;
ii. it is not intended to be relied upon, other than for general informational purposes, when submitting a response to a formal solicitation;
iii. it is not presented to impart legal advice to any party, and the Tollway recommends that any party consult its own attorney or other advisor(s) prior to submitting a bid;
iv. the laws, regulations and Tollway practices mentioned in this presentation are for informational purposes only, subject to change at any time, and may be interpreted or applied in manners differently than as presented herein; and
v. the Tollway assumes no duty to update any party, and therefore no party should expect to receive same, regarding any change or development in laws, regulations or Tollway practices.
} In addition to the foregoing, the Tollway specifically informs all parties that their participation in this webinar, or review of this presentation, shall have no bearing on or guarantee of award of future business from the Illinois Tollway.”
![Page 93: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/93.jpg)
THANK YOU THANK YOU
![Page 94: Illinois Tollway Construction Contracts 101](https://reader033.vdocuments.us/reader033/viewer/2022051204/627835d0684c2c263b5cb5e1/html5/thumbnails/94.jpg)
94
Helpful Resources } www.illinoistollway.com
} www.dot.state.il.us
} www.cityofchicago.org
} www.aptac-us.org
} www.ildceo.net
Illinois Tollway
Illinois Department of Transportation
City of Chicago
Association of Procurement Technical Assistance Centers
Illinois Department of Commerce and Economic Opportunity