ifs general presentation 120315

36
Integrated Flow Solutions Welcomes

Upload: bill-marsh

Post on 14-Apr-2017

266 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: IFS General Presentation 120315

Integrated Flow Solutions

Welcomes

Page 2: IFS General Presentation 120315

•API Pump Manufacturing•Horizontal•Vertical•Multistage

16 week Lead Time!Mfg & Tested in the USA

THREE OPERATING DIVISIONS

Best Pump WorksIntegrated Flow Solutions Pump Works 610

•Pump Distribution•Pump Remanufacturing•Pump Repair•Pump Service

Rotating Equipment

•Modular Process Systems•Process Engineering•Coke Filtration Technology•Field Service

Engineered Solutions

2014 Sales $190MM+

B27 (a DXP Enterprises Company)

Page 3: IFS General Presentation 120315

WWW.IFSOLUTIONS.COM

Page 4: IFS General Presentation 120315

IFS TYLER, TX FACILITY125,000 Square Feet Under Roof on 7 Acres

100 Full Time Employees18 Overhead Cranes up to 26’ Hook Height

Page 5: IFS General Presentation 120315

SUMMARY OF CAPABILITIES Project Management – 3 Senior Project Managers Mechanical Engineering – 12 Mechanical Engineers Electrical/I&E Engineering – 4 Electrical Engineers Process Engineering - Using Aspen, Hysys (Static & Dynamic) Mechanical/Electrical Design – 10, 3-D AutoCAD 2010 stations Vendor Data – Document control department Quality Control – 4 Full time personnel QC Department Product Support – Parts, Service and Warranty

UL Listed Panel Shop

Page 6: IFS General Presentation 120315

PROCESS VALIDATION & STATIC SIMULATION

Page 7: IFS General Presentation 120315

PROCESS VALIDATION & DYNAMIC SIMULATION

Page 8: IFS General Presentation 120315

IFS SCHEDULINGTypical Project Schedule Includes

Over 100 Scheduled Events with Vendor Performance Included

Page 9: IFS General Presentation 120315

CERTIFICATIONS

Page 10: IFS General Presentation 120315

ASME PIPE AND VESSEL FABRICATION BAY

Page 11: IFS General Presentation 120315

RADIOGRAPHY BUNKER

Page 12: IFS General Presentation 120315

ENVIRONMENT CONTROLLED BLAST & PAINT FACILITIES

Page 13: IFS General Presentation 120315

HEAVY ASSEMBLY BAY (2) 25 TON CRANES

Page 14: IFS General Presentation 120315

TESTING & PROCESS VERIFICATION

Page 15: IFS General Presentation 120315

SEGREGATED PROJECT WAREHOUSING

Page 16: IFS General Presentation 120315

WORLD WIDE FIELD SERVICE

Page 17: IFS General Presentation 120315

SAMPLE OF WORLDWIDE COMPLETED

PROJECTS

Page 18: IFS General Presentation 120315

Offshore Gas Conditioning Package

Dragados/Pemex CA-LITORAL-A Platform/Fuel Gas Package

Page 19: IFS General Presentation 120315

Hot Oil/Fuel Gas System

Enbridge Energy/Olympus VCSE/Fuel Gas Package

Page 20: IFS General Presentation 120315

Ammonia Flow Control System

SCPPA/Canyon Power Plant/Ammonia Flow Control Unit

Page 21: IFS General Presentation 120315

Off-Shore Gas Conditioning Pkg.

PEMEX PB-KU-S Fuel Gas Conditioning System

Page 22: IFS General Presentation 120315

Off-Shore Gas Conditioning Pkg.

PEMEX-DRAGADOS PG-ZAAP-C Fuel Gas Conditioning System

Page 23: IFS General Presentation 120315

Off-Shore Gas Conditioning Pkg.

PEMEX-DRAGADOS AKAL-L Fuel Gas Conditioning System

Page 24: IFS General Presentation 120315

Off-Shore Gas Conditioning Pkg.

PEMEX PB-KU-M Fuel Gas Conditioning System

Page 25: IFS General Presentation 120315

Off-Shore Crude Oil Heating(2.1 MW)

Pemex/Takin Platform/Crude Oil Heating Package

Page 26: IFS General Presentation 120315

Multiple Skid IntegrationWater injection System

Shell/Gabon Early Production Facility/Water Injection Package

Page 27: IFS General Presentation 120315

Pipeline Gas Conditioning

El Paso Energy/Morrow Station/Fuel Gas Conditioning Package

Page 28: IFS General Presentation 120315

Pipeline Modular Systems

Colombia Gas Transmission/Delhi Compressor Station/Fuel Gas Conditioning Package

Page 29: IFS General Presentation 120315

Off-Shore Gas Conditioning System

Petrobras/PRA-1 Platform/Fuel Gas Conditioning Package

Page 30: IFS General Presentation 120315

Off-Shore Seal Gas Systems

BHP/Pyrenees FPSO/Seal Gas Package

Page 31: IFS General Presentation 120315

Chemical Injection

Chevron/Bengula Belize Platform/Chemcal Injection Packages

Page 32: IFS General Presentation 120315

FC SERIES COKE FILTRATION UNIT

Motiva Refinery/Port Arthur Texas Expansion/Coker Filtration Package

Page 33: IFS General Presentation 120315

Multiphase Pumping System

Petroamazonas/Panacocha Pump Station/Multiphase Pump Packages

Page 34: IFS General Presentation 120315

Crude Oil Pump Package

Perenco/Amazon Pump Station/Crude Oil Shipping Pump Packages

Page 35: IFS General Presentation 120315

Water Injection Package

BHP/Pyrenees FPSO/Water Injection Pump Packages

Page 36: IFS General Presentation 120315

Water Injection PackageEngine Drive (Natural Gas)

Chevron/Olero Creek Production Facility/Water Injection Pump Package