PROJECT MANAGEMENT
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 2/18
2
PROJECT MANAGEMENT
INTRODUCTION- EXAMPLE
�DELHI METRO PROJECT:244 KM OF METRO RAIL NETWORK. PHASE- I COSTING RS. 10,55 CR.
WOULD CARRY 21.8 LACSPASSENGER PER DAY, REDUCE 2500 BUSES I.E RS. 500 CR. FUEL
SAVING, LESS POLLUTION AND SAVING OF 20 LACS MAN HOUR PER DAY DUE TO RAPID
JOURNEY AS COMPARED JOURNEY BY ROAD TRANSPORT. THE ENTIRE PROJECT IS TO BE
COMPLETED IN TIME.
�THERMAL POWER STATION: A 500 MW THERMAL POWER STATION COSTING RS. 2000 CR.
WOULD HAVE TO BE COMPLETED TO ADD TO EVR INCREASING DEMAND-SUPPLY GAPS AND
HELP INDUSTRIALISATION OF THE COUNTRY.
�WATER SUPPLY PROJECTS: INSTALLATION OF WATER SUPPLY SCHEMES TO SUPPLY
DRINKING WATER TO REMOTE VILLAGES OF THE COUNTRY.
�IRRIGATION PROJECTS: A SYSTEM OF DAMS AND BARRAGES FOR STORING WATER AND
SUPPLY TO PERCHED LAND THROUGH OUT THE COUNTRY AND HELP IN INCREASING FOOD
PRODUCTION.
�DISTRIBUTION OF ELCTRIC POWER: A SYSTEM OF SUB-STATIONS AND TRANSMISSION LINEFOR DISTRIBUTION OF POWER.
�HEALTH CARE: A SYSTEM OF HOSPITALS AND HEALTH CARE CENTERS IN VILLAGES,
TOWNS AND DISTRICT HEAD QUARTERS.
�ROADS AND RAILWAYS, AIRPORTS, SEA PORTS««.A ROBUST INFRASTRUCTURE TO
SUPPORT INDUSTRIALISATION AND GROWTH OF THE COUNTRY«.
CONTD.
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 3/18
3
PROJECT MANAGEMENT
INTRODUCTION
�A PROJECT MAY BE DEFINED AS A SERIES OF RELATED JOBS, REQUIRING A
SIGNIFICANT PERIOD OF TIME TO PERFORM, USUALLY DIRECTED TOWARDS SOME
MAJOR OUTPUTS.�PROJECT MANAGEMENT MAY BE DEFINED AS PLANNING, DIRECTING AND
CONTROLLING RESOURCES (MEN, MATERIAL, MACHINES, MONEY) TO MEET THE
TECHNICAL, COST, TIME AND OTHER CONSTARINTS OF THE PROJECT.
�SUCCESSFULLY COMPLETED PROJECTS, APART FROM MEETING THE OBJECTIVES,
HELP ORGANISATIONS TO IMPROVE THEIR SYSTEMS AND CULTURE, DEVELOP
LEADERS AND TEAMS, BUILDS CREDIBILITY AND BRAND NAME IN THE MARKET.
�BADLY MANAGED PROJECTS ON THE OTHER HAND LEAD TO LOSS OF RESOURCES AND
IMAGE IN THE MARKET AND IN THE LONG RUN PUTS PRESSURE ON THE ECONOMY.
CONTD.
PROJECTS COULD BE:
�DERIVATIVE: INCREMENTAL CHANGES SUCH AS NEW PRODUCT PACKAGE PACKAGING
OR NO-FRILLS VERSION;
�BREAKTHROUGH: MAJOR CHANGES THAT CREATE ENTIRELY NEW PRODUCT;
�PLATFORM: FUNDAMENTAL CHANGES TO EXISTING PRODUCTS E.G. FROM
CONTRACTING TO BOT OR BOOT;
�RESEARCH AND DEVELOPMENT, AND ALLIANCE AND PARTNERSHIP.
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 4/18
4
PROJECT MANAGEMENT
INTRODUCTION
STARTSYSTEM
SPECN
MECH.
WORK
CIVIL
WORKDESIGN
MANUF.
PROCUREMNT.
TRIALS
ELECT.
WORKS &
CONTROLS
EXPSN.
PLAN
COMMERCIAL
PRODN.COMMISSNG.
A TYPICAL PROJECT FLOW DIAGRAM
FOUR PHASES
�CONCEPTUAL PHASE
�PLANNING PHASE
�IMPLEMENTATION &
CONTROL PHASE
�FEEDBACK
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 5/18
5
PROJECT MANAGEMENT
A FRAME WORK FOR PROJECT MANAGEMENT
CONTD.
PROJECT MONITORING &
CONTROL, POST PROJECT
APPRAISAL
WORK BREAKDOWNSTRUCTURE (WBS)
ORGANISATIONBREAKDOWN STRUCTURE
(OBS)
COST BREAKDOWN
STRUCTURE (CBS)
NETWORK REPRESENTATION& PLANNING
HOW WELL? WHAT?
WHO?
HOW MUCH?
WHEN?
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 6/18
6
PROJECT MANAGEMENT
STRUCTURING PROJECTS
�PURE PROJECT, WHERE A SELF-CONTAINED TEAM WORKS FULL TIME. THE PM HAS
FULL AUTHORITY, TEAM MEMBERS REPORT ONLY TO THE PM. IT SPEEDS UPCOMMUNICATION AND ENHANCES SPEED. MAY, HOWEVER, LEAD TO NARROW
MINDEDNESS AND IGNORING ORGANISATIONAL GOALS AS THE TEAM MAY DISSOLVED
AFTER THE PROJECT IS COMPLETED.
PRESIDENT
�FUNCTIONAL PROJECT, HOUSES THE PROJECT WITHIN THE FUNCTIONING DIVISION.
ALLOWS MOBILITY OF TEAM MEMBERS FROM ONE PROJECT TO ANOTHER IF REQUIRED,SHARING OF SPECIALITY / EXPERTISE. PROJECT AND CUSTOMER MAY NOT GET
ENOUGH ATTENTION IN ASPECTS NOT DIRECTLY RELATRED TO THE LEAD DIVISION.
MANFENGGR & D
P1 P1P1 P1P1P1 P1P1P1
CONTD.
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 7/18
7
PROJECT MANAGEMENT
STRUCTURING PROJECTS
�MATRIX PROJECT, ATTEMPTS TO BLEND PROPERTIES OF FUNCTIONAL ANDPURE PROJECT STRUCTURE. WHILE THE PM IS THE BOSS OF THE PROJECT,
THE FUNCTIONAL DEPARTMENTS KEEP TRACK AND COMES UP WITH BACK UP
AS AND WHEN NEEDED. WORKS BEST IF THE PROBLEMS OF
DUAL REPORTING ARE MANAGED LEADING TO POSITIVE RESULTS.
PRESIDENT
MANF.ENGG.R & D MARKTG
MNGR P 1
MNGR P 2
MNGR P 3
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 8/18
PROJECT MANAGEMENT
WBS-CBS-OBS
PROJECT
ELECTRICALMECHANICAL
CBS
WBS
OBS
INTEGRATIONDESIGN
A TYPICAL WORK
PACKAGE
EQUIPMENT
LABOUR
MATERIAL
TOTAL COSTDESIGN
PROCUREMENT
WORKS
FINANCE
COMPANY
CIVIL
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 9/18
9
PROJECT MANAGEMENT
WORK BREAKDOWN STRUCTURE (WBS)
�STATEMENT OF WORKS CONTAIN THE OBJECTIVES, A BRIEF STATEMENT ON
THE WORKS TO BE DONE, A PROPOSED SCHEDULE SPECIFYING THE START
AND COMPLETION DATES, PERFORMANCE MEASURES IN TERMS OF BUDGET,
MILE STONES, REPORTING SCHEDULES«..
�TASK IS A SUB-DIVISION OF A PROJECT. SUB-TASKS MAY BE FURTHER
MEANINGFUL SUB-DIVISION OF PROJECT FOR CLARITY AND ACTION. A WORKPACKAGE IS A GROUP OF ACTIVITIES COMBINED TO BE ASSIGNABLE TO A
SINGLE ORGANISATIONAL UNIT.
�PROJECT MILESTONES ARE INTERMEDIATE EVENTS OF SIGNIFICANCE E.G.
DESIGN COMPLETION, PRODUCTION OF PROTOTYPE«..
�WORK BREAKDOWN STRUCTURE DEFINES THE HIERARCHY OF PROJECT
TASKS, SUB-TASKS AND WORK PACKAGES
CONTD.
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 10/18
10
PROJECT MANAGEMENT
WORK BREAKDOWN STRUCTURE (WBS)
CONTD.
LEVEL
PROJECT 1
PROGRAM
PROJECT 2
TASK 1.1 TASK 1.2
SUB-TASK 1.1.1 SUB-TASK 1.1.2
1
WORK PACKAGE 1.1.1.1 WORK PACKAGE 1.1.1.1
2
3
4
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 11/18
11
PROJECT MANAGEMENT
WORK BREAKDOWN STRUCTURE (WBS) - EXAMPLE
NEW PRODUCT DEVELOPMENT
LEVEL ACTIVITYNO.
ACTIVITY DESCRIPTION
1 2 3 4
X 1 DEVELOPMENT OF A TOY GUN IN THE AGE GROUP 5 ± 12 YEARS
X `1.1 MARKET SURVEY
X 1.1.1 FOR AGE GROUP 5 ± 8 YEARSX 1.1.1.1 FEEDBACK ON OLD PRODUCT IN THE MARKET
X 1.1.1.2 PREFERENCE ON NEW FEATURES
X 1.2.1 FOR AGE GROUP 8 ± 10 YEARS
X 1.2.1.1 FEEDBACK ON OLD PRODUCT IN THE MARKET
X 1.2.1.2 PREFERENCE ON NEW FEATURES
X 1.3.1 FOR AGE GROUP 8 ± 10 YEARS
X 1.3.1.1 FEEDBACK ON OLD PRODUCT IN THE MARKET
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 12/18
12
PROJECT MANAGEMENT
PROJECT CONTROL CHARTS-GANTT CHART OR BAR CHART
TENDER NOTICE RECD
TENDER SUBMITTED
NEGOTIATIONS
ORDER RECEIVED
DESIGN
1ST PROTOTYPE
APPROVAL
APPROVAL
ACTIVITY
PROGRESS
MILESTONES
THE CHART, NAMED AFTER HENRY L. GANTT, SHOWING BOTH THE AMOUNT OF TIME INVOLVED AND
THE SEQUENCE IN WHICH THE ACTIVITIES CAN BE PERFORMED.
MONTHSACTIVITY
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 13/18
13
PROJECT MANAGEMENT
NETWORK PLANNING MODELS ± CONVENTIONS & TERMINOLOGY
A
B
A
BACTIVITY ON NODE (AON)
ACTIVITY ON ARROW (AOA)
�ACTIVITY : TASKS, WHICH MUST BE COMPLETED. HAVE START AND FINISHTIMES. CONSUME RESOURCES, YEILD RESULTS.
�EVENT: OUTCOME OF ONE OR A SET OF ACTIVITIES.
�CRITICAL PATH: LONGEST PATH OF INTRRELATED ACTIVITIES. DELAYING
ANY ACTIVITY ON THE CRITICAL PATH DELAYS THE POJECT COMPLETION.
CONTD.
ES = EF =
ES =
EF =LS =
EF =
LF =LS =
CASTFNDN.
4
CASTFNDN.
43 4
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 14/18
14
PROJECT MANAGEMENT
NETWORK PLANNING MODELS
�OPTIMISTIC TIME (t0) : AN ESTIMATE OF TIME, MAY BE UNDER
IDEAL CONDITIONS.
�PESSIMISTIC TIME (tp) : AN ESTIMATE OF TIME, MAY BE UNDER
MOST ADVERSE CONDITIONS.
�MOST LIKELY TIME (tm) : THE BEST GUESS, BASED ON PAST
DATA, A REALISTIC ESTIMATE.
�EXPECTED TIME (te) : THE MEAN ACTIVITY TIME OF THE
OPTIMISTIC, PESSIMISTIC AND MOST LIKELY TIME.
te = (t0 + 4 * tm + tp ) / 6
CONTD.
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 15/18
15
PROJECT MANAGEMENT
NETWORK PLANNING MODELS - TERMONOLOGY
�EXPECTED START TIME: EXPECTED START TIME FOR A NODE IS THE TIME EXPECTED TO
BE CONSUMED BEFORE AN ACTIVITY CAN START.
�EARLIEST START TIME : ACTIVITY IN QUESTION, CANNOT START EARLIER. MAXIMUM OF
ALL START TIMES OF PRECEEDING ACTIVITIES.
�EARLIEST FINISH TIME : EARLIEST START TIME + ACTIVITY DURATION.
�LATEST START TIME : LATEST TIME AN ACTIVITY CAN START WITHOUT DISRUPTING THE
SCHEDULE.
�LATEST FINISH TIME : LATEST START TIME + ACTIVITY DURATION.
�SLACK TIME OR FLOAT: AMOUNT OF TIME AN ACTIVITY CAN BE DELAYED BEYOND ITS
EARLIEST START TIME WITHOUT DISRUPTING THE SCHEDULE ± SLACK OR FLOAT =
LATEST START TIME ± EARLIEST START TIME.
CONTD.
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 16/18
PROJECT MANAGEMENT
NETWORK PLANNING MODELS - EXAMPLE
ACTIVITY DESCRIPTION IMMEDIATE PREDECESSOR DURATION (WEEKS)
A LEASE MALL - 20
B INTERIOR A 22
C SURVEY CUSTOMER - 15
D SURVEY MARKET C 20
E DECIDE MERCHANDISE E 5
F BUILD ORGANISATION D 18
G GET SUPPLIES B,E 13
1
2
3 4
5
6
A
B
C
D
E
F
G
LEASE MALL
INTERIOR
SURVEY CUSTOMER
SURVEY MARKET
DECIDE MERCHANDISE
BUILD ORGANISATION
GET SUPPLIES
20
22
15
20
5
18
130
2020 42
0
15
15 35
35
40
35
42
53
55
55
37
55
4242
42
37
371717
2
2020
0
ES EF
LS LF
TOTAL SLACK = LS ± ES = LF ± EFFREE SLACK = ES (EARLIEST SUCCESSOR) - EF
TS/FS
0/0
0/0
0/0
2/0
2/0
2/2
2/0
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 17/18
17
PROJECT MANAGEMENT
MANAGING RESOURCES
DEVELOP PROJECT
SCHEDULE
DOCUMENT PLANS/SCHEDULES
FEED
BACK
IMPLEMENT
REV I EW & UPDATE
LEARN I NG
COST WITHIN BUDGET ?
TIME WITHIN SCHEDULE ?
RESOURCES WITHIN CONTROL ?
SCHEDULE ACCEPTABLE ?
NO
NO
NO
NO
8/4/2019 Ibs Student Project Management
http://slidepdf.com/reader/full/ibs-student-project-management 18/18
18
PROJECT MANAGEMENT
TO SUMMARISE
�A PROJECT MAY BE DEFINED AS A SERIES OF RELATED JOBS,
REQUIRING A SIGNIFICANT PERIOD OF TIME TO PERFORM, USUALLYDIRECTED TOWARDS SOME MAJOR OUTPUTS.
�PROJECT MANAGEMENT MAY BE DEFINED AS PLANNING, DIRECTING
AND CONTROLLING RESOURCES (MEN, MATERIAL, MACHINES,
MONEY) TO MEET THE TECHNICAL, COST, TIME AND OTHER
CONSTARINTS OF THE PROJECT.�SUCCESSFULLY COMPLETED PROJECTSAPART FROM MEETING THE
OBJECTIVES, HELP ORGANISATIONS TO IMPROVE THEIR SYSTEMS
AND CULTURE, DEVELOP LEADERS AND TEAMS, BUILDS CREDIBILITY
AND BRAND NAME IN THE MARKET.
�BADLY MANAGED PROJECTS ON THE OTHER HAND LEAD TO LOSS OF
RESOURCES AND IMAGE IN THE MARKET AND IN THE LONG RUN PUTS
PRESSURE ON THE ECONOMY.
�PROJECT SCHEDULING,CRASHING, MONITORING.. ARE DONE WITH A
VIEW TO DIRECT AND CONTROL PROJECTS AND FRUITION.