Presentation overview Rack and boxes naming convention Construction status:
• Control cabinets• Accumulator Local box • Chilller control rack• Vacuum system rack
Cabling Software (PLC+SCADA+local touch screen) Power distribution
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Overview
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Racks and boxes naming convention – USA15
USXUSA Seen from Geneva side
Accumulator unit A&B CO2 unit B300 Chiller unit B400 CO2 unit A100 Chiller unit A200 Control rack A&BVacuum control
AB
IBL A&B Accumulator control cabinet
FCTIR-00095
FCEE-00044 FCK-00136 FCK-00135 A=> FCTIR-00092B=> FCTIR-00093
FCUE-00011FCUE-00012
FCTIR-000096
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Racks and boxes naming convention – UX15
UX15 sector 5 Z0
Transfer line
Junction boxA,C-side manifold box Vacuum line
Transfer line
FCTIR-000097
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Racks and boxes naming convention
UX15 level 6 LAr area
FCTIR-000099 Signal
FCTIR-000100 Power
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Construction status – control cabinets
•Cabling completed by Florian for rack A&B
•Preliminary I/O check performed by Michal and Marcin
(using PLC and SCADA interface + local touch screen)
•Racks returned to EN/CV for minor modification + FESTO installation
•Once correction completed + support frame ready, racks will be transported to USA15
•Ethernet Network in USA15 requested (installation planned on beginning of October)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Construction status – Accumulator Local box
Completed and ready to be assembled in Accumulator frame!
Cabling and assembly done by Kacper Kapusniak.
Electrical verification completed.
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Construction status – chiller racks
•Model prepared by Dawid Patrzalek
•Electrical schematics completed by
Maciek
•Very soon ready for cabling by Florian
•Most of the components delivered
• We are waiting for FI and CARELs – to be
delivered with a chiller
• Chiller Functional Analysis will be prepared
as soon as possible by Maciek as additional
chapters of the existing IBL FA
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Construction status – vacuum system
Model and assembly done by Dawid
Patrzalek with help of George Glonti.
•Electrical schemes under
verification
•Minor parts missing
•Ready for cabling
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Construction status – vacuum system
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Cabling
•Cabling is intensively proceeding
•All signal cables despite 1xNG8 and TC are pulled in between UX15 and
USA15
(cooling plant A&B and Vacuum system)
•All information transferred to ATLAS
•All power cables ordered and as soon as delivered it can be pulled
•Cable trays for USA15 delivered, should be very soon installed
George is following this task.
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
PLC software
•We are already after several iterations of code generation
•I/Os generated and compiled
•Alarms group and CCC alarms implemented
•Value calculation implemented
•Dependent logic to be programmed in next weeks
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
•Completed and linked for cooling plant A
and B
•Prepared by Michal, Marcin and Daniel
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
SCADA HMI interfaces (PVSS)
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Local touch screen – HMI
•Completed and linked for cooling plant A
and B
•Prepared by Michal, Marcin and Daniel
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Local touch screen – HMI
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Local touch screen – HMI
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Local touch screen – HMI
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Local touch screen – HMI
Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013
Local touch screen – HMI