ibl co 2 cooling control system development status 18.09.2013 lukasz zwalinski – ph/dt/di maciej...

30
IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Upload: tiara-piety

Post on 28-Mar-2015

220 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

IBL CO2 coolingcontrol system development status

18.09.2013

Lukasz Zwalinski – PH/DT/DIMaciej Ostrega – PH/DT/DI

Page 2: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Presentation overview Rack and boxes naming convention Construction status:

• Control cabinets• Accumulator Local box • Chilller control rack• Vacuum system rack

Cabling Software (PLC+SCADA+local touch screen) Power distribution

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Overview

Page 3: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Racks and boxes naming convention – USA15

USXUSA Seen from Geneva side

Accumulator unit A&B CO2 unit B300 Chiller unit B400 CO2 unit A100 Chiller unit A200 Control rack A&BVacuum control

AB

IBL A&B Accumulator control cabinet

FCTIR-00095

FCEE-00044 FCK-00136 FCK-00135 A=> FCTIR-00092B=> FCTIR-00093

FCUE-00011FCUE-00012

FCTIR-000096

Page 4: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Racks and boxes naming convention – UX15

UX15 sector 5 Z0

Transfer line

Junction boxA,C-side manifold box Vacuum line

Transfer line

FCTIR-000097

Page 5: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Racks and boxes naming convention

UX15 level 6 LAr area

FCTIR-000099 Signal

FCTIR-000100 Power

Page 6: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Construction status – control cabinets

•Cabling completed by Florian for rack A&B

•Preliminary I/O check performed by Michal and Marcin

(using PLC and SCADA interface + local touch screen)

•Racks returned to EN/CV for minor modification + FESTO installation

•Once correction completed + support frame ready, racks will be transported to USA15

•Ethernet Network in USA15 requested (installation planned on beginning of October)

Page 7: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Construction status – Accumulator Local box

Completed and ready to be assembled in Accumulator frame!

Cabling and assembly done by Kacper Kapusniak.

Electrical verification completed.

Page 8: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Construction status – chiller racks

•Model prepared by Dawid Patrzalek

•Electrical schematics completed by

Maciek

•Very soon ready for cabling by Florian

•Most of the components delivered

• We are waiting for FI and CARELs – to be

delivered with a chiller

• Chiller Functional Analysis will be prepared

as soon as possible by Maciek as additional

chapters of the existing IBL FA

Page 9: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Construction status – vacuum system

Model and assembly done by Dawid

Patrzalek with help of George Glonti.

•Electrical schemes under

verification

•Minor parts missing

•Ready for cabling

Page 10: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Construction status – vacuum system

Page 11: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Cabling

•Cabling is intensively proceeding

•All signal cables despite 1xNG8 and TC are pulled in between UX15 and

USA15

(cooling plant A&B and Vacuum system)

•All information transferred to ATLAS

•All power cables ordered and as soon as delivered it can be pulled

•Cable trays for USA15 delivered, should be very soon installed

George is following this task.

Page 12: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

PLC software

•We are already after several iterations of code generation

•I/Os generated and compiled

•Alarms group and CCC alarms implemented

•Value calculation implemented

•Dependent logic to be programmed in next weeks

Page 13: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

•Completed and linked for cooling plant A

and B

•Prepared by Michal, Marcin and Daniel

Page 14: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 15: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 16: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 17: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 18: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 19: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 20: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 21: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 22: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 23: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 24: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

SCADA HMI interfaces (PVSS)

Page 25: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Local touch screen – HMI

•Completed and linked for cooling plant A

and B

•Prepared by Michal, Marcin and Daniel

Page 26: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Local touch screen – HMI

Page 27: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Local touch screen – HMI

Page 28: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Local touch screen – HMI

Page 29: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Local touch screen – HMI

Page 30: IBL CO 2 cooling control system development status 18.09.2013 Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI

Lukasz Zwalinski IBL CO2 cooling construction status meeting 16th Sept. 2013

Local touch screen – HMI