i-35 sa ea public meeting presentation draft v1 · transportation programs office 1 15 16 total...
TRANSCRIPT
CONSTRUCTION STAFFING
Mario R. Jorge, P.E.
District Engineer
San Antonio District
October 11th , 2017
Previous Work Load Staffing Analysis
2
District Workload/Workforce Analysis report prepared internally in July 2014
and updated in August 2015 to include Prop 1 and 7 funding programs. This
report looked at all functional areas of district operations (ADM, TPD,
Construction and Operations and Maintenance). The report concluded that
we have a gap of 715 FTE’s for district operations.
District staffing analysis considering TxDOT portfolio performed by Mckinsey
in late 2015 early 2016 (See below). Report concluded by identifying a gap
of 1365 total employees with approximately 600 in construction
inspection. Assumption was a 50/50 split with in house and consultant
services.
STAFFING NEEDS (AVG $6.4 B LETTING FY 17-25)
3
CONSTRUCTION INSPECTION STAFFING ANALYSIS
4
Process and tasks included:
determining the work load per district
developing staffing needs
comparing them to previous staffing reports
balance out with CEI utilization
determining a reasonable percentage staffing with new FTE’s
Projected Work Load analysis
5
The following logic and math was used to determine the “Average
Baseline letting” for each district:
Proposed total planning target (FY 18 through 27) for each district for
Categories 1 through 12 was reduced by the top 2 funding years and
averaged over 8 years. This would remove spikes caused by large Cat
4 or 12 projects, which would most likely be CEI.
Projected Work Load Analysis (Example)
6
DistrictFY18-27 UTP Planning
Target High Year deduction2nd highest year
deductionUTP (Adjusted Planning
Targets) UTP 8 year annual avg.
BMT $ 890,280,000 $ 185,810,000 $ 184,380,000 $ 520,090,000 $ 65,011,250
SAT $ 2,584,840,000 $ 288,300,000 $ 283,380,000 $ 2,013,160,000 $ 251,645,000
YKM $ 1,377,890,000 $ 369,850,000 $ 300,370,000 $ 707,670,000 $ 88,458,750
Projected Work Load analysis
7
The following logic and math was used to determine the “Average
Baseline letting” for each district:
The accompanying MPO letting totals were averaged over 10 years
and added to the district average.
Statewide programs (Bridge and Traffic) were included in the baseline
letting calculation. Category 6 was based on the average of the
programmed 10 year plan obtained from BRG. Category 8 was
normalized across all districts ($10M per year).
Computation of Baseline Annual Letting per District
8
Construction Staffing Analysis
9
Construction inspection staffing needs were based on:
Metrics developed by CTR for FTW district consisting of payouts per
inspector per month,
Projected UTP work load adjusted by reducing for peaks or outliers
due to large projects (“Baseline letting), which would be managed by
CEI.
Methodology correlates lettings per year with average monthly pay-
outs which can then allow us to calculate the number of inspectors
needed using the CTR/FTW method.
Delta from Staffing required and current staffing to include posted
vacancies. (Snapshot in time directly from each district)
Arriving at a consistent staffing plan where districts can staff to handle
a minimum percentage of their “baseline” letting not including the
peaks due to the outlier large projects and/or year. (Metros at 50%
minimum, Urban/Rural at 80% minimum)
10
11
Baseline annual letting *
Baseline
inspector
needs
Current
inhouse
Inspector
staffing
Current
vacancies to be
filled
Additional
Inspector Needs
$ 5,132,688,990 1555 877 97 581
Staffing stablization (Example)
12
District Current staffing capacity
** Recommended construction
inspection staffing M(40-50%)
U/R(80%) Recommended staffing capacity
BMT 97% 0 97%
SAT 41% 12 50%
YKM 41% 17 80%
Final Authorization
13
Legislature authorized 313 additional employees for TxDOT
Based on our analysis, TxDOT administration allocated those employees to the
districts and divisions for the following functional titles:
Construction Inspectors
Project Managers
Portfolio Managers
Contract Specialists
Construction record keepers
Utility coordinators
Note: Metrics were recommended for the other functional titles based on
Baseline lettings previously described.
STAFFING ALLOCATIONS STATEWIDE
14
DD Name
FY 2017
Position
Allocations
Proposed
Additional
Position
Allocations
Proposed
Transfered
Positions
Proposed Total
Positions
PARIS 270 1 271
FORT WORTH 559 13 572
WICHITA FALLS 218 1 219
AMARILLO 344 14 358
LUBBOCK 344 2 346
ODESSA 264 19 283
SAN ANGELO 210 1 211
ABILENE 273 11 284
WACO 327 6 333
TYLER 301 3 304
LUFKIN 257 1 258
HOUSTON 1,093 43 1,136
YOAKUM 286 21 307
AUSTIN 529 12 541
SAN ANTONIO 562 25 587
CORPUS CHRISTI 435 20 455
BRYAN 298 2 300
DALLAS 862 25 887
ATLANTA 265 1 266
BEAUMONT 286 5 291
PHARR 307 29 336
LAREDO 230 13 243
BROWNWOOD 186 1 187
EL PASO 276 14 290
CHILDRESS 194 1 195
PROFESSIONAL PROCUREMENT 100 9 4 113
TRANSPORTATION PLANG & PROGRAM 141 1 142
RIGHT OF WAY 136 6 142
ENVIRONMENTAL AFFAIRS 79 79
CONSTRUCTION 176 5 181
MAINTENANCE 60 3 63
DESIGN 69 1 70
TRAFFIC OPERATIONS 165 1 166
BRIDGE 93 2 (2) 93
TRANSPORTATION PROGRAMS OFFICE 1 15 16
Total Engineering Operations 10,195 313 17 10,525