I-15; SOUTH DAVIS IMPROVEMENTS DESIGN-BUILD PROJECT

Centerville City Council February 4, 2014

NATHAN PETERSON UDOT PROJECT MANAGER

PROJECT OVERVIEW MAP

N

N

Winning Proposal Includes • Express Lanes in both directions (US-89 entrance ramp in NSL

to Glovers Ln in Farmington) • Interchange and cross street improvements at 2600 South and

500 South • New structures at 2600 South, 1500 South, 500 South, and

400 North • Improve active transportation at 500 South, 400 North, and

Parrish Lane

PROJECT SCOPE

PARRISH LANE PEDESTRIAN STRUCTURE

PROJECT STATUS

• Design is underway • Construction anticipated to begin April 2014 • I-15 construction expected to complete December

2014 • Interchange and bridge construction will continue

through summer 2015

www.udot.utah.gov/i15southdavis 888-996-6624

[email protected] @UDOTRegionOne Utah DOT