HZMB-link project Hong Kong Zhuhai Macau Bridge link Hans de Wit & Dirk Jan Peters Tunnel Engineering Consultants NL

Upload: others

Post on 18-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

HZMB-link projectHong Kong Zhuhai Macau Bridge link

Hans de Wit & Dirk Jan Peters

Tunnel Engineering Consultants

NL

Page 2: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

• HZMB link project summary

• Elements of the work

• Role of TEC

• Transition islands

• Immersed tunnel

Page 3: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility
Page 4: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility
Page 5: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility
Page 6: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Project components

Page 7: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

HZMB link project characteristics

• Offshore part 30 km long

• Total investment 38 bn. RMB (app. € 4.5-5 bn.)

• Tunnel + islands app. 6.6 km

• 14 bn. RMB (app. € 1.75-2.1 bn.)

• Start construction: December 2010

• Official opening: October 2018

Page 8: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

The larger project

• Pearl River Delta

• Improvement of economic and social

integration between East and West shores

• Connection to main road

network Guangzhou and

Shenzhen

• Total length 50 km

• Investment approx. € 18 bn

Page 9: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

The larger project

• Tekst

• Tekst

Page 10: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Zhuhai Link Road

• Tunnel underneath Gongbei

border crossing

• Double Deck

• 3m diameter tubes / freezing

Page 11: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Artificial island Zhuhai/Macau

• 500ha

• For acces and border control procedures

Page 12: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Hong Kong Link Road

• Main link 30 km

Page 13: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Arificial island Hong Kong

Page 14: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Tuen Mun Chek Lap Kok tunnel link

• 5 km length

• Twin bored tunnel 17,6m

diameter

• Land reclamation 16 ha

Page 15: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Main bridge link

• 25 km length

• Cable stayed over secundary shipping lanes

• Connecting bridges (span 110/75 m)

Page 16: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Tunnel underneath main shipping lane

transition islands

Page 17: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Project organisation

– Client: HZMB Authority, consisting of:

• Ministry of Communication China (“Public Works”)

• Guandong Province

• Government of Hongkong

• Government of Macao

– Client consultant STTG JV

• Lead consultant / Bridges SMEDI (China)

• Tunnels / Artificial Islands TEC (The Netherlands)

• Bridges TY Lin (USA)

• Tunnels (local input) GMDI (China)

Task of Client consultant:

Design Review / Tender documents / Independent Parallel Analyses

Page 18: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Project organisation

– Designer :

• General / Lead designer HPDI (China)

• Bridges HPDI / Arup

• Immersed tunnel HPDI / COWI;

• C&C tunnel / Approaches STEDI (China);

• M&E HPDI

• Artificial islands 1st / 4th Harbor DI (China)

– Contractor :

• General / Lead contractor CCCC (China)

Page 19: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

TEC company profile

• Permanent joint venture of:

• Started with immersed tunneling Dutch river

crossings

• Later specialized in soft soil bored tunneling

• Involved in 80% of the immersed tunnel

projects worldwide (since 1990’s)

• Presently active in submerged floating tunnel

research and design

Page 20: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Amsterdam new underground metro line

Page 21: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Various immersed tunnel projects

Page 22: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility
Page 23: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

23 november 2017 23Bouwen in stijgend water

Hong Kong Zhuhai Macau Bridge China

Transition islands

Page 24: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Artificial islands and cut&cover tunnels

• Main dimensions

– Tunnel + approaches 163m(C&C)+382m(Open)

– Length islands app. 625 m

Page 25: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Island concepts

• Construction time (related to immersion)

• Weak soils on seadbed

Page 26: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Island concept design

• Tekst

• Tekst

Page 27: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Assembly at steel factory in Shanghai

Page 28: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Transport steel tubes

• Diameter 20 m, heigth 40 m

• Transport per ship from Shanghai

Page 29: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Arrival on site

• Tekst

• Tekst

Page 30: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Installation of tubes

• Installed in sea bed using 8 coupled

vibration blocks

Page 31: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Filling of tubes and installation of connection

elements

Page 32: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Tubes installed

ground improvement around island

Page 33: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Filling of the island and excavation of

receiving pit

Page 34: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Piled foundation of cut & cover tunnel

Page 35: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Cut & Cover tunnel under construction

• Tekst

• Tekst

Page 36: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Cut & Cover tunnel under construction

Page 37: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Structural section for connection with first

tunnel element

Page 38: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

After removal of steel tube wall

Page 39: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

East island and Cut & Cover tunnel under

construction

Page 40: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

East island nearing completion

including control & operations building

Page 41: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

23 november 2017 41Bouwen in stijgend water

Hong Kong Zhuhai Macau Bridge China

Immersed tunnel

Page 42: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Immersed Tunnel

• Tunnel length 6.8 km

• 2 x 3 lanes (38 x 11.4m)

• Immersed part 5.7km

• 33 elements (180/110/90 m) – 75.000 tons

• Tunnel roof 30 m under sea level

• Future deepening of channel for 300.000 tons

ships (until then 20 m ground cover)

Page 43: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Construction sequence (concreting afloat)

1.) Casting basin 2.) Steel box assemblage

3.) Transport 4.) High fluidity concrete placing works

Japan t

raditio

ns

Page 44: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

3. Full Sandwich(Replace all rebar by steel shell)

Japan t

raditio

ns

• Naha port tunnel, Japan

Page 45: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Traditional construction method

• Concrete tunnel elements

• Constructed in temporary dock / polder

Page 46: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Construction site tunnel elements

• Guishan Island at approx. 10 km from project location

• Factory based construction method

Page 47: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

‘Modern’ element production facility

• First applied for Oresund link (Sweden-Denmark)

• Picture HZMB facility

1. Assembly reinforcement cage

2. Casting

3. Concrete factory

4. Stock

5. Undeep part basin

6. Deep part basin

7. Floating dock gate

8. Sliding door

9. Supply materials

12

3

4

5

6

7

98

Page 48: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Overview production facility

Page 49: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Factory hall under construction

(formwork in foreground)

Page 50: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Assembly of reinforcement cage – phase 1

Page 51: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Sliding of reinforcement cage to phase 2

Page 52: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Assembly of reinforcement cage – phase 2

Page 53: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Assembly of reinforcement cage – phase 3

Page 54: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Full section casting

• After sliding reinforcement cage to casting location

and after installation of formwork

Page 55: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Removal of formwork

Page 56: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Tunnel pushed to undeep basin

Page 57: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Dock flooded to move elements to deep part

Page 58: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Tunnel elements in deep part of basin

Page 59: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Fitting out for transport to construction site

Page 60: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Towing out of tunnel element

Page 61: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Transport of tunnel element

Page 62: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Positioning of tunnel element

Page 63: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Immersion operation

Page 64: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

25

m

Closure Joint

• Located between E29 and E30

• Prefabricated and installed in one piece

• Steel shell- concrete combined structure

• Approx. 6,100 tons

• Hoisted and installed with specialized vessel

Page 65: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Steel shell-concrete combined closure joint

Page 66: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Hoisted and installed by 12,000 ton capacity

all direction rotation floating crane vessel

Page 67: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Closure joint installation

Page 68: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Fitting out of the tunnel

Page 69: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

Summary of project achievements

• Chinese – European cooperation and knowledge

building / exchange

• Island construction incl. wall

• Variety of soil improvement and foundation techniques

• Huge differences in tunnel soil coverage and semi

rigid section couplings

Page 70: HZMB-link project Main bridge link • 25 km length • Cable stayed over secundary shipping lanes ... • First applied for Oresund link (Sweden-Denmark) • Picture HZMB facility

23 november 2017 70Bouwen in stijgend water

Thank you for your attention