hypersim relay protection webinar
TRANSCRIPT
Challenges in Protection Relay
Testing for Tomorrow’s
Power Grid
Presented by: Étienne Leduc2013-11-20
22
34
GotoWebinar Control Panel
Click to ask a question.
Wait until your microphone is unmuted by the Presenter
Microphone Muted/Unmuted Status
Control Panel Hide Button
You can type a question anytime during the Webinar
33
34
Your Hosts
Presenter
Etienne Leduc
Application Specialist
OPAL-RT TECHNOLOGIES
Presenter
Dr. Innocent Kamwa
Scientific Coordinator for Smart Grid
Hydro-Quebec research institute (IREQ)
Scientific Adviser
Vincent Lapointe
R&D Director
OPAL-RT TECHNOLOGIES
44
34
Presentation Outline
55
34
Presentation Outline
66
34
OPAL-RT TECHNOLOGIES in Brief
Established in 1997
Strong R&D with 20% of turnover reinvested
Large and diversified customer base
One-stop-shop for model-based engineering simulators
Power Electronics
Power Systems
Automotive
Aerospace
Educational
Rapid Control Prototyping (RCP)
Hardware in the Loop (HIL)
MATLAB/Simulink Integration
77
34
Montreal, QC
Detroit, MI
Paris, FR
Bangalore, IN
Global Presence
7
41
88
34
Customers’ List (Partial)
Electric Utilities & Power Electronics
Opal-RT in Brief
99
34
Covers the complete spectrum of power system analysis & studies
ePOWERgrid Product Family
ePHASORsimReal-Time Transient
Stability Simulator10 ms time step
NEW
HYPERsimLarge Scale Power System
Simulation for Utilities & Manufacturers25 µs to 100 µs time step
NEW
eFPGAsimPower Electronics Simulation on FPGA1 µs to 100 ns time step
NEW
1 s(1 Hz)
10,000
2,000
1,000
500
100
10
0
10 ms(100 Hz)
50 µs(20 KHz)
10 µs(100 KHz)
1µs(1 MHz)
100 ns(10 MHz)
10 ns(100 MHz)
20,000
Period (frequency) of transient phenomena simulated
Number of
3-Phase
Buses
eMEGAsimPower System & Power Electronics Simulation
Based on Matlab/Simulink and SimPowerSystems10 µs to 100 µs time step
1010
34
Presentation Outline
1111
34
Live Demo
The live demo hasn’t been recorded and istherefore not part of this online document.
1212
34
Hardware overview: simulator OP5600, protective relay P444
Model: 500 kV transmission line
Analysis: overcurrent characterization and protection failure case
Behind the scene: how we got there
Live Demo Overview
1313
34
Live Demo Summary
0
10
20
30
40
50
60
1.75 2.00 2.25 2.50 2.75 3.00
Thre
sho
ld c
ross
ing
tim
e (m
s)
Secondary current (A)
Relay OC Characterization - Tests to Investigate
OvercurrentCharacteristic
Tripped
Did not Trip
1414
34
Presentation Outline
1515
34
Some HYPERSIM Features …
CT , PT models Virtual IED and relay library
Generator, transfo, line, motor, load
Power electronic converters
Rich model library
1616
34
Some HYPERSIM Features …
Import EMTP-RV network
Interface with Simulink controls
Broad spectrum of drivers and protocols
DNP3 C37.118 61850
MMS OPC
IRIG-B 1588 UserVersatility and Flexibility
Custom C-Code and library
User
1717
34
Some HYPERSIM Features …
Communication failure
Loss of packetsCorrupted dataData overflowetc. Fault and disturbance
Fault location, type and interception angle
Apparatus internal fault
Simultaneous events
1818
34
Some HYPERSIM Features …
TestViewScripts and macrosPlay back recorded data from fieldPerform Monte Carlo analysisGenerate reports automatically
Test Automation and DB
Intelligent data management
Various export format
COMTRADE
ScopeView Analysis
1919
34
Presentation Outline
2020
34
Increased number of relay
functionalities
New and more complex applications
Interoperability and new
communication protocols
DNP3 C37.118 61850
MMS OPC
New type of equipment and systems
MU PDC WAM
PMUOIT
New Challenges for Protection Relay Testing
GPS Synchronization
IRIG-B
1588 1PPS
2121
34
New Challenges for Protection Relay Testing:Security
2222
34
Consequences of a Protection System Failure
2323
34
Relay under testOmicron, Megger, Doble test
sets
Replay offline
simulation
Recorded data from field Limitations• Open loop• Fixed V/I and ramp up• No data alteration/loss
This is a good and proven method for most “traditional” and “easy” cases
The Traditional Relay Testing Approach…
2424
34
Relay under test
Real-Time
Simulator
Real-time simulators are used by advanced testing laboratories for complex cases and developing/testing new relay algorithms using new technologies…
Advantages• Closed loop• Detailed EMT simulation• Complex protection schemes• See effect of the relay on grid
…Enhanced by Using a Real-Time Simulator
2525
34
Presentation Outline
2626
34
Protection Relay Design Methodology
Industrialization process (Stages 4 and 5)
Proof of concept
IREQ real-timesimulator
2727
34
Predictive-Out-of-Step Protectionfor Hydro-Québec’s Grid
Loss of synchronism (RPS) acceptance tests
IREQ real-timesimulator
Proof of concept
2828
34
Wide-Area Control System (WACS) Vision
2929
34
WACS Simulation on HYPERSIM
Proof of concept
IREQ real-timesimulator
3030
34
Presentation Outline
3131
34
Our Protection-related Solution
SoftwareHYPERSIM : Both small and very large-scale models, automatic task mappingScopeView : analyse waveforms, compare with data acquired by external devicesTestView : automate test sequences, intelligent data management
HardwareStandard I/Os : great amount, many different typesDrivers and protocolsMapping box : to interface with high power signals
ServiceConsulting (model development with protection schemes)Customization : software/interface, drivers, I/OsR&D products developmentCommissioningTraining
3232
34
New compact, portable and large number of robust I/O channels
Compatible with RT-LAB, MATLAB, Simulink, RTW, Xilinx System Generator and LabVIEW
Open and optimized for power electronics
Price range: starting at $20K
New & Accessible Hardware : OP4500
3333
34
Next Webinar | Thursday, November 28
Introduction to ePHASORsim, features and Applications
Register now on our website: http://www.opal-rt.com/events/webinar-introduction-ephasorsim
Real-Time 2014 Conference | Montreal June 9 - 12
Email us for more details [email protected]
Visit our www.opal-rt.com to download our presentation
Upcoming Events
3434
34
Thank you for your attention
Questions?