hydrokinetic technologies technical and environmental ... · the wave dragon case erik friis-madsen...
TRANSCRIPT
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Hydrokinetic Technologies Technical and Environmental Issues Workshop
the Wave Dragon caseErik Friis-MadsenWave Dragon ApSCopenhagen, DK
H. C. Soerensen and Lars ChristensenSPOK/Wave Dragon ApS
Copenhagen, DK
Jens Peter KofoedHydraulics and Coastal Engineering
Aalborg University, DK
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Regions where wave energy is most feasible
1 TW 60o
30o
0o
30o
60o
The western wind belt with the wave energy density in kW/m
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Wave Energy Conversion Techniques
Buoy
Seabed
Wave Direction
Heaving Devices Rambøll, Denmark1:10 tests in open sea, 1:4 scale model (2.5 m diameter)OPT, USA, 2004
Teamwork Technology BV, The Netherlands2 MW pilot plant deployed 2004 in Portugal
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Buoyant segments
Seabed
Wave Direction
Pitching Devices
Pelamis, Ocean Power Delivery Ltd (OPD), ScotlandTank tests in small scales (1:80, 1:35, 1:20)Open sea tests 1:7 (2001), 1:1 (2004), 750 kW scheme
Wave Energy Conversion Techniques
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Air Column
Wells Turbine
Seabed
Concrete Structure
Air Flow
Generator
Wave Direction
Oscillating Water Column
400 kW (1998), Pico Island (Azores)Fully automated, full-scale testing facility
500 kW shoreline OWC (2000)Islay (Scotland)
Wave Energy Conversion Techniques
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Wave Energy Conversion Techniques
Wave direction
Kaplan Turbine
ReservoirGenerator
Seabed
Buoyancy
Overtopping Devices
Pilot plant deployed in ‘80s Sweden, Sea Power Intl., 15-year contract for 1.5 MW, Shetland.
Pilot plant 1:4½ deployed 2003 Denmark, Wave Dragon ApS, Prototype 1:1 planned by 2005 Wales, UK.
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Fixed wave energy devices
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Floating wave energy devices
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Tapchan
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
SSG (Seawave Slot Cone Generator)
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Wave Dragon principle
Turbine outlet
Reservoir
Waves overtopping the doubly curved ramp
The Wave Dragon is a slack-moored wave energy converter that can be deployed alone or in parks wherever a sufficient wave climate and a water
depth of more than 20 m is found.
Climate Power production24 kW/m 12 GWh/y/unit36 kW/m 20 GWh/y/unit48 kW/m 35 GWh/y/unit
Wave reflector
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Wave Dragon objectives
To develop Wave Dragon to a power plant unit of4 to 11 MW with a production price of 0.04 €/kWh
0,00
0,05
0,10
0,15
0,20
0,25
0,30
0,35
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
2005
€/kWh Wind
Wave
Source: EU Wave Net 2002 and Risø
Target year 2016
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
WD turbine Ø 340mm runner has been tested. The efficiency is very high (>90%) and the noise level is very low.
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
The Wave Dragon scale 1:4.5 prototype is deployed in a bird protection area (Ramsar)
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Nissum Bredning, DenmarkThe wave climate is – like the test rig - scale 1:4.5 of the North Sea.
2
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Remote control
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Marine growthMarine growth on structure and mooringlines below waterline: 5-10 cm
Marine growth in turbine draft tubes reduces PTO. Non-toxic antifouling tested.
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Wild life
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Cylinder gate turbines running
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
Power plant size
1 450 5 0 67 6 7
1 0 013 3
2 0 02 50
4 0 0
66 7
1 0 0 0
0
5 01 0 01 5 0
2 0 02 5 03 0 0
3 5 04 0 04 5 0
5 0 05 5 06 0 0
6 5 07 0 07 5 0
8 0 08 5 09 0 0
9 5 01 0 0 0
N o . o f u n its to fo rm a 100 M W p o w e r p lan t
Overtopping Wave DevicesWave Dragon ApS/Ltd
HWETTEI - WorkshopOctober 26-28, 2005, Washington, DC
The Wave Dragon Vision
Seen from 100 feet above sea level and at a distance of 3 miles
☺ One and a half year operational experience
☺ Wave energy absorption performance verified
☺ Offshore wave energy is a reality