Hunters Chase

2012- CapEx

Project description

Building 6 Foundation Repair

Swimming Pool Repair

Total Refurbish of Pool Furniture

Tennis Court Repairs

Asphalt Replacements - Manhole & Sidewalk Bldg. 11

lowest bid

$26,100.00

$14,900.00

$4,905.95

$5,200.00

$4,400.00

Ram Jack LLC

4122 Bennett Memorial Rd 101, Durham,NC 27705

O - (919) 309-9727 -(919)309-0627FOUNDATION REPAIR SYSTEMS

Directions:

Proposal Submitted To: Phone # and contact Info: Denise Date: September 9, 2011

Hunters Chase -Apartments Home: Ram Jack contact I Jonathan

Street: Office: 336-852-5094 Mobile: Phone Number (Mobile):

4600 Big Tree Way Billina Address 919-697-5112

City, State and Zip Code: City, State

Greensboro. NC 27409 E-mail :

Email

Ram Jack is pleased to submit this proposal based on this description and the attached terms and conditions for:

SCOPE OF WORK

The following scope of work was designed by Ron Bitler PE with RB Engineering.

Building #6 (A-K)

1. Excavate rear corner as shown to expose previously installed helical piers.

2. Install 26 Ram Jack Triple Helical Piers to stabilize foundation settlement.

** The price will be adjusted downward if existing piers are found and can be used.

3. Repoint cracks in brick vaneer.

All proposed work has been designed by a structural engineer from Engineered Foundation Solutions. The Rules and RegulationBoard of Professional Engineers and Land Surveyors require all foundation repairs and remediation to be undertaken inaccordance with a plan prepared by or under the supervision of a board certified professional engineer. ( Paragraph c 3 of 21 NCAC56.0701 Rules of Professional Conduct, Title 21 - Occupational Licensing Board and Commission, Chapter 56 - ProfessionalEngineers and Surveyors. )

The above described scope of work is approved by NC Licensed Engineer.

Ram Jack proposes to furnish labor and materials to complete the work based on this scope and the attached Terms and Conditions:

Proposal Price: $26,100.00

NOTE: Proposal will be withdrawn if not accepted within 30 days.

Acceptance: The proposal is satisfactory and is understood and accepted. (Client Initial

SCHEDULE - Work will be scheduled as soon as a signed copy of this proposal is returned and payment terms approved.

Page 1 of 2

Terms and ConditionsFOUNDATION REPAIR SYSTEMS

1. Payment schedule:

Payment due upon completion.

Notes:

All Cash accounts are due at job completion

Late fees of 1.5% monthly will accrue on all accounts after 30 days.

2. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices.

3. Ram Jack provides up to 40 feet of pier material for each pier location. Site geological conditions determines the completed pier depth.

Should site conditions require pier depths over 40 feet, the additional cumulative footage will be billed at $25.00 per lineal foot. If the pier

depth exceeds 40 feet, the Owner will be notified of the potential additional charges. There is no deduction for pier depths less than 40 feet.

4. The Owner releases Ram Jack from all responsibility for damages caused by pre-existing defects. Such defects may include, but are

not limited to, insufficient steel or cable reinforcement, insufficient or weak concrete, block or brick work, etc.

Disclaimer:

Ram Jack uses the finest methods and materials in the industry to repair foundations. However the ability to [completely] level or close cracks varies

from site to site. Generally foundation will not be lifted beyond a practical limit unless a waiver [for potential hidden] damages is signed by the Owner.

Lifts may also be hindered by cosmetic repairs to previously damaged areas or inaccessible construction debris, distorted internal structures, etc

Ram Jack exercises due diligence in performing all work. However, occasionally, cracks may develop in re-aligned concrete, brick, sheetrock, rock veneer

or other rigid materials during the course of the work. Ram Jack is not liable for any such damages. Piers should not be exposed to the weather after installation.

If any should become exposed, owner should contact Ram Jack immediately. Should rock, debris or over sized concrete footings be encountered

during the course of the work, the Owner will be notified and given a rough estimate of the additional costs associated with the removal.

AUTHORIZATION:

Acceptance of this agreement forms a Contract between Client and Ram Jack as defined in the Scope, Terms & Conditions and Pricing

Client Signature and date Ram Jack, Signature and date

Page 2 of 2

PROPOSED WORK:

1. EXCAVATE TO DETERMINE EXISTING UNDERGROUND PIER LOCATIONS.2. STABILIZE THE REAR PERIMETER FOUNDATION WALL BY INSTALLING OR ADJUSTING 26 UNDERGROUND HELICAL PILE SUPPORTS. PER PLAN.3. IMPROVE THE SITE & ROOF DRAINAGE - INSTALL REAR GUTTER / DOWNSPOUT AND TIE DOWNSPOUTS TO A TIGHT LINE DRAIN, (ttca4. REPOINT THE MASONRY CRACKS WITH MORTAR AND MONITOR ON AN ANNUAL BASIS.

LEGEND:

INSTALL(OR ADJUST) UNDERGROUND HELICALFOUNDATION SUPPORT PILES [26 TOTAL]

Building #6

Ron Bittler, PEMB Engineering, Inc.

168 Quade DriveGary, NC 27513(919)677-9662

HH' '

PLAN VIEW OF PROPOSED FOUNDATION REPAIRS

USE A STANDARD HELICAL PILE SPACING OF 6-FOOT ON CENTERCONTRACTOR MAY ADJUST SPACING TO AVOID UTILITIES.

PROPOSED REPAIRS

HUNTERS APARTMENTSBUILDING *6GREENSBORO, NORTH CAROLINA

RB ENGINEERING, INC. (C-24SS)RON BITTLER, P.E. 08/2S/11

f

LEADING THE WAY , && Quade Drjve

Structural Engineering Firm Gary, North Carolina 27513ENGINEERING NC License No. C-2499 www.rbengineering.com

Phone: 919-677-9662 /Cell: 919-280-2695 / 'Fax: 919-677-9663 E-mail: rbillkrfaii-bengineering.com

Ms. Emily Goodman CPM, ARM - Regional Property Manager August 29,2011CORE Realty Holding Management, Inc.E-mail: egoodmanfgjcrhmi.com

Subject: Summary of Visual Observations - existing multi-unit residential buildingHunter Chase Apartments in Greensboro, North CarolinaBuilding #6

File No.: RB-112117

Dear Emily:

At your request, RB Engineering, Inc. is pleased to provide the following summary engineering letterconcerning our recent site observations at the subject residential building. We performed our site visit onAugust 26, 2011 and were asked to inspect the building in order to evaluate the general structural conditionof the foundation system in regards to the exterior cracking that has occurred and to provide a foundationrepair plan.

FINDINGS

For the purpose of this report, all directions are given from the perspective of an individual standing in frontof and facing the front of the respective building. No material testing, excavation, soil testing or destructiveinspection techniques were performed for the purpose of this report. A copy of the construction plans wasavailable on site for our review. We did not have access for interior inspections for the purpose of thisreport. We understand that a Raleigh based foundation repair contractor installed underground helical piersapproximately 8 years ago to stabilize a section of the back, left corner of the building which has continuedto move.

During our site inspection, we observed the following relevant information:

• The subject apartment building (building #6, Apartments A-K) is a two-story, timber-framed, multi-family residence with a building exterior comprised of both brick veneer and siding. The foundationsystem consists of a cast in place concrete floor slab with a continuous reinforced perimeter stemfoundation wall. The existing lot slopes from front to back at the subject building with a significantdrop off toward Big Tree Way at the rear of the building. No roof drainage was present along therear of the building and the existing roof gutters and downspouts along the sides of the buildingoutlet near the base of the building.

• Moderate to severe differential settlement was observed toward the rear of the building. Exteriordisturbances consisted of brick veneer cracking (both horizontal and vertical cracking), brick veneerseparations at windows, and separations between the brick veneer and trim indicating that the brickveneer has rotated. Flashing has been temporarily installed at the second floor elevation to preventwater intrusion where the brick has reportedly separated between 1 and 2 inches. Using a surveyor'slevel, relative exterior elevations were measured along mortar joints in the exterior brick veneer andrevealed that there was between !/2-inch and P/i-inch vertical misalignment from front to back withup to 2!/4-inch vertical misalignment measured along the rear exterior walls.

RB ENGINEERING, INC.Hunters Chase Apartments - Building #64600 Big Tree Way, Greensboro

CONCLUSIONS

August 29, 2011RBFileNo.:RB-112117

The subject multi-family residential structure exhibits differential settlement related issues at the rear of thebuilding. Inadequate site and roof drainage have contributed to the differential settlement of the foundationsystem. Structural repairs are suggested to stabilize the building foundation system and we recommend thatthe foundation repair contractor work closely with a structural engineer during the repair process to ensurethat the implemented foundation repairs achieve their intended purpose. As requested, we have provided youwith a proposed foundation repair plan for the subject building.

• Repair recommendation - Excavate at the back, left corner of the building to verify the location ofany existing piers. Determine the existing pier locations and any warranty coverage for the existingpiers as many foundation repair companies carry a life of structure warranty. Install (or adjust) 26underground helical piers along the rear exterior to stabilize the foundation movement. Monitor thebuilding on a routine basis. Improve roof and site drainage to provide positive drainage away fromthe foundation.

Photo: brick veneer cracking

Limitations of Inspection

Photo: brick veneer separation Photo: building foundation plan

The opinions and comments contained in this report are based primarily on the observations of apparentperformance of the structure and the qualified knowledge and experience of this office. The conclusionsreached in this report are based upon the conditions observed at the time of the evaluation. No guarantee orwarranty as to future life or performance of any item evaluated is intended or implied.

Our services were provided in accordance with the standard of practice for structural engineering and withinthe limits imposed by scope, schedule, and budget. If you have any questions or if I can be of furtherassistance to you on this project, please contact me at (919) 677-9662.

Respectfully^submitted,ittUIIIMffe

Ronald P. Bittler, PEPresident / Structural EngineerRB Engineering, Inc.

I m

ALLSOUTHRENOVATIONS INC

BID PROPOSAL FORHunters Chase Apartments

Greensboro, NC

Submitted to: Core Realty GroupAttention: Ms. Denise SmithDate: 9/13/11

We hereby propose to furnish all the material and labor necessary for the completion of Pool Repair &Paint per the scope of work attached. Allsouth Renovations, Inc. proposes to furnish the labor, insurance,materials and supervision to complete the attached scope of work.

Quotation - $ 14,900.00

1. Re-grout and clean tile. (If tile is etched severely, cannot guarantee that it willclean well and brighten up)

2. Prep and paint pool with epoxy paint Zeron by Olympic Paints. Prep includes acidwashing pool and filling delaminated plaster areas with new plaster. Prime poolwith Gunzite Epoxy Primer by Olympic Paints.

Important Notes:1. If more than 20% of the old plaster has delaminated and has to be removed, there

will be additional charges for labor.2. Spa equalizers (VGB approved and NC Health Dept approved) will be installed3. Step & bench treads will have a black line painted on them similar to a tile line.

*Option- Pressure wash and paint pool only >$3800.00We do not recommend paint. It is bad to blister and peel if the water is not balanced. It also chalksbadly after a short time making the maintenance a little harder. If you ever want to re-plaster, youhave a more expensive prep after paint. You cannot plaster over paint without sand-blasting.

Provide all materials and labor to complete all renovations per above scope of work as permanufacturer. Any hidden damage or work other than listed will be considered additional work.Allsouth will warranty all workmanship for a period of one year.The scope of work for this project is attached and an Architectural Drawing will be provided upon requestfrom Owner at cost. All work will meet Industry standards and will be performed in accordance with thedrawings and specifications submitted for the above work. Proposal is subject to change after for thirtydays due to rising cost of freight and raw materials.

Proposal Submitted By:

Mark Brown- VP Operations Date

ALLSOUTH Renovations, Inc.* Office (336)847-7232 *Fax (336)731-3670

\\

Patio Options

11909 Straight-A-Way LaneRaleigh NC 27613(919)676-7660Tax ID #56-1677278

EstimateDATE

8/25/2011

ESTIMATE #

7570

NAME/ADDRESS

Hunter's ChaseAttn: Property Manager4600 Big Tree WayGreensboro NC 27409

ITEM

Lounge Refurbish

Chair Refurbish

Misc

Freight

Budget

DESCRIPTION

B U D G E T 2 0 1 2

TOTAL Refurbish/Repaint and Restrap of Lounge OFRVL100. Includes replacing adjusters and plastic feetinserts where needed ADD $1 8 for Cross weave

OFR VC100 TOTAL Refurbish/Repaint and Restrap ofDining Chair OFR VC100. Includes plastic feet insertswhere needed ADD $10.00 for Cross weave

Tax on materials only

Pick Up and Delivery

Due to the potential of next year's price increase allow fora 8% increase in this year's pricesSales Tax

QTY

44

3

PROJECT

COST

89.00

59.00

214.88

199.00

359.94

7.00%

TOTAL

3,916.00

177.00

214.88

199.00T

359. 94T

39.13

These figures are for budget purposes only. 2012 prices could be much lower, please call for

details. TOTAL $4,905.95

AJJLSOUTHRENOVATIONS INC

BID PROPOSAL FORHunters Chase Apartments

Greensboro, NC

Submitted to: Core Realty GroupAttention: Ms. Denise SmithDate: 8/31/11

We hereby propose to furnish all the material and labor necessary for the completion of Concrete withDrain @ Pool Deck per the scope of work attached. Allsouth Renovations, Inc. proposes to furnish thelabor, insurance, materials and supervision to complete the attached scope of work.

Quotation - $ 10,620.00

^ Cut out & install concrete apron approx 7'x8' around manhole @ entry > 1,100.00> Rebuild (2) walk bridges @ Bldg 2 > 1,200.00^ Prep & paint tennis court with Acrylic Sports coating/two coats > 2,200.00> R & R 30 retaining wall ties @ Bldg. 9(12 ties), 11(3 ties), 8(11 ties) & 4 @

tennis court > total of 30 ties > 3,000.00^ Bldg 11 - Add 52'x4' sidewalk & 9'x4' walk with drain box & pipe under

new walk to include curb cut approx 4' to relieve storm water > 1,800.00> Clean gutters out on all buildings/220 units > 1,320.00

Provide all materials and labor to complete all renovations per above scope of work as permanufacturer. Any hidden damage or work other than listed will be considered additional work.Allsouth will warranty all workmanship for a period of one year.The scope of work for this project is attached and an Architectural Drawing will be provided upon requestfrom Owner at cost. All work will meet Industry standards and will be performed in accordance with thedrawings and specifications submitted for the above work. Proposal is subject to change after for thirtydays due to rising cost of freight and raw materials.

Proposal Submitted By:Mark Brown- VP Operations 8/31/11

Proposal Accepted By:

Owner/Agent for Hunters Chase Date

• Sign & return via fax to (336)731-3670 to schedule work.

ALLSOUTH Renovations, Inc.* Office (336)847-7232 *Fax (336)731-3670

1

.

*V #'*&%&&&•'- «<•»

ALLSOUTHRENTOVA.TIONS INTC

BID PROPOSAL FORHunters Chase Apartments

Greensboro, NC

Submitted to: Core Realty GroupAttention: Ms. Denise SmithDate: 8/31/11

We hereby propose to furnish all the material and labor necessary for the completion of Concrete withDrain @ Pool Deck per the scope of work attached. Allsouth Renovations, Inc. proposes to furnish thelabor, insurance, materials and supervision to complete the attached scope of work.

Quotation - $ 10,620.00

^ Cut out & install concrete apron approx 7'x8' around manhole @ entry >- 1,100.00> Rebuild (2) walk bridges @ Bldg 2 > 1,200.00r* Prep & paint tennis court with Acrylic Sports coating/two coats > 2,200.00> R & R 30 retaining wall ties @ Bldg. 9(12 ties), 11(3 ties), 8(11 ties) & 4 @

tennis court > total of 30 ties > 3,000.00> Bldg 11 - Add 52'x4' sidewalk & 9'x4' walk with drain box & pipe under

new walk to include curb cut approx 4' to relieve storm water > 1,800.00> Clean gutters out on all buildings/220 units > 1,320.00

Provide all materials and labor to complete all renovations per above scope of work as permanufacturer. Any hidden damage or work other than listed will be considered additional work.Allsouth will warranty all workmanship for a period of one year.The scope of work for this project is attached and an Architectural Drawing will be provided upon requestfrom Owner at cost. All work will meet Industry standards and will be performed in accordance with thedrawings and specifications submitted for the above work. Proposal is subject to change after for thirtydays due to rising cost of freight and raw materials.

Proposal Submitted By:Mark Brown-VP Operations 8/31/11

Proposal Accepted By:

Owner/Agent for Hunters Chase Date

• Sign & return via fax to (336)731-3670 to schedule work.

ALLSOUTH Renovations, Inc.* Office (336)847-7232 *Fax (336)731-3670

AlJLSOUTHRENOVATIONS INC

BID PROPOSAL FORHunters Chase Apartments

Greensboro, NC

Submitted to: Core Realty GroupAttention: Ms. Denise SmithDate: 8/31/11

We hereby propose to furnish all the material and labor necessary for the completion of Concrete withDrain @ Pool Deck per the scope of work attached. Allsouth Renovations, Inc. proposes to furnish thelabor, insurance, materials and supervision to complete the attached scope of work.

Quotation - S 10,620.00

^ Cut out & install concrete apron approx 7'x8' around manhole @ entry > ; 1,100.00> Rebuild (2) walk bridges @ Bldg 2 > 1,200.00^ Prep & paint tennis court with Acrylic Sports coating/two coats > 2,200.00> R & R 30 retaining wall ties @ Bldg. 9(12 ties), 11(3 ties), 8(11 ties) & 4 @

tennis court > total of 30 ties > 3,000.00> Bldg 11 - Add 52'x4' sidewalk & 9'x4' walk with drain box & pipe under

new walk to include curb cut approx 4' to relieve storm water > 1,800.00> Clean gutters out on all buildings/220 units > 1,320.00

Provide all materials and labor to complete all renovations per above scope of work as permanufacturer. Any hidden damage or work other than listed will be considered additional work.Allsouth will warranty all workmanship for a period of one year.The scope of work for this project is attached and an Architectural Drawing will be provided upon requestfrom Owner at cost. All work will meet Industry standards and will be performed in accordance with thedrawings and specifications submitted for the above work. Proposal is subject to change after for thirtydays due to rising cost of freight and raw materials.

Proposal Submitted By:Mark Brown- VP Operations 8/31/11

Proposal Accepted By:

Owner/Agent for Hunters Chase Date

• Sign & return via fax to (336)731-3670 to schedule work.

ALLSOUTH Renovations, Inc.* Office (336)847-7232 *Fax (336)731-3670

1

i- -'. - '*£& * ¥ -' i.' > j-i•=

'-t% •";•.' - HP ii *< ->v 'Ira

r^p*v#&:-f- '"' A/TiSi

V-

ALLSOUTHRENOVATIONS INC

BID PROPOSAL FORHunters Chase Apartments

Greensboro, NC

Submitted to: Core Realty GroupAttention: Ms. Denise SmithDate: 8/31/11

We hereby propose to furnish all the material and labor necessary for the completion of Concrete withDrain @ Pool Deck per the scope of work attached. Allsouth Renovations, Inc. proposes to furnish thelabor, insurance, materials and supervision to complete the attached scope of work.

Quotation - $ 10,620.00

^ Cut out & install concrete apron approx 7'x8' around manhole @ entry > 1,100.00> Rebuild (2) walk bridges @ Bldg 2 > 1,200.00^ Prep & paint tennis court with Acrylic Sports coating/two coats > 2,200.00> R & R 30 retaining wall ties @ Bldg. 9(12 ties), 11(3 ties), 8(11 ties) & 4 @

tennis court > total of 30 ties > . 3,000.00^ Bldg 11 - Add 52'x4' sidewalk & 9'x4' walk with drain box & pipe under

new walk to include curb cut approx 4' to relieve storm water > 1,800.00> Clean gutters out on all buildings/220 units > 1,320.00

Provide all materials and labor to complete all renovations per above scope of work as permanufacturer. Any hidden damage or work other than listed will be considered additional work.Allsouth will warranty all workmanship for a period of one year.The scope of work for this project is attached and an Architectural Drawing will be provided upon requestfrom Owner at cost. All work will meet Industry standards and will be performed in accordance with thedrawings and specifications submitted for the above work. Proposal is subject to change after for thirtydays due to rising cost of freight and raw materials.

Proposal Submitted By:Mark Brown- VP Operations 8/31/11

Proposal Accepted By:

Owner/Agent for Hunters Chase Date

• Sign & return via fax to (336)731-3670 to schedule work.

ALLSOUTH Renovations, Inc.* Office (336)847-7232 *Fax (336)731-3670

' • " • • - " '