hub whitepaper daikin-vrv-2p
TRANSCRIPT
Daikin VRV Two Pipe White Paper June 2019 of 1 10
automationWhite Paper Daikin VRV Two Pipe
How to Improve Thermal Comfort in Buildings using Daikin VRV Two Pipe Systems
Daikin VRV Two Pipe White Paper June 2019 of 2 10
Introduction
Heat Recovery VRV system designs using design tools such as computational fluid dynamics modelling is the gold standard for providing thermal comfort in buildings where a design requires more than a single thermal zone. Unfortunately budget restrictions often result in a pragmatic approach where a level of thermal comfort across a larger number of rooms is more desirable than a high level of thermal comfort in a lower number of rooms. Often Daikin VRV two pipe systems are implemented in designs that have budget restrictions.
This White Paper evaluates how changes to the control strategy of a Daikin VRV two pipe system can improve comfort outcomes and shift the performance closer to a three pipe system with minimal impact on the project budget.
Assessing Thermal Comfort
Thermal comfort is vital at home, at school, as well as at the office. Designing an air conditioning system that provides the best possible thermal comfort outcome for the nominated budget has always been a challenge for HVAC professionals. To evaluate how a change in control strategy can improve the comfort outcome for a Daikin VRV two pipe system, first we have to understand the parameters that impact on thermal comfort.
1. Ambient temperature (room temperature)2. Relative humidity (RH)3. Air movement4. Air quality5. Mean radiant temperature
Daikin VRV Two Pipe White Paper June 2019 of 3 10
The Science of Compromise
This White Paper examines how a HUB Automation proprietary control strategy can impact on the performance gap between designs utilising Daikin VRV two pipe systems in place of heat recovery VRV. At the time of publication of this white paper, data was not available on the performance of heat recovery VRV within the buildings that make up the case study.
The case study was completed on an existing school with many years of operation using Daikin VRV two pipe systems. Daikin VRV two pipe was selected to allow the school to provide some comfort to more blocks, more students and more teachers within the budget restrictions compared with Daikin VRV heat recovery.
Additional features such as fault harvesting and notification, real time cloud and local system diagnostics, after hours run timer, whole of site graphical user interface, and improved energy performance were included in the control system upgrade but do not form part of the evaluation process for thermal comfort enhancement.
Daikin VRV Two Pipe White Paper June 2019 of 4 10
Daikin VRV Mode Master - Strategy
Daikin VRV two pipe systems utilise the same series of room controllers as one-plus-one split units and VRV heat recovery. This creates a problem for the Daikin control strategy in that all indoor units connected to a two pipe outdoor unit must share the same operating mode. Part of the initialisation and commissioning procedure is for an indoor unit to be designated as a “Mode Master”. The designated mode master indoor unit then dictates the operating mode of the outdoor unit and all other indoor units.
Inadequacies - Daikin VRV Mode Master Control Strategy
A significant shortfall of the “Mode Master” approach to selecting the most appropriate operating mode of the outdoor unit is that a single thermal zone determines the operation of all thermal zones. The ratio of perimeter walls to floor area, the aspect and size of windows, the changing number of people or their activity level within non-master thermal zones are excluded from the mode selection algorithm.
Daikin VRV Two Pipe White Paper June 2019 of 5 10
Solution - Daikin VRV Mode Master
By removing system wide mode selection from the Daikin internal control strategy a more sophisticated approach can be adopted. Each individual thermal zone can generate a cooling and a heating demand. Individual indoor unit capacities are included in the set up process of the controller allowing the control system to correctly identify the demand in kW for each thermal zone. The demand can then be aggregated and a mode selected based on a contribution from all thermal zones.
Daikin VRV - Hunting and Overshooting
Daikin VRV two pipe systems continue to provide corrective action for an additional 0.5℃ after the temperature error is corrected. By shifting the setpoint for each thermal zone to the end of the proportional band the need for a wide deadband is removed for all thermal zones. This adjustment is required to achieve proportional system wide mode selection. Failing to implement this component of the control strategy results in hunting and overshoot.
Case Study: Sheldon College, Brisbane, Queensland, Australia 4157
Block ID Thermal Zones
System kW
Main System Type Other System Types Notes
AS 4 50 Daikin VRV 2P None
JA 6 79 Daikin VRV 2P None
JB 6 79 Daikin VRV 2P None
JC 7 101 Daikin VRV 2P None
JD 7 79 Daikin VRV 2P None
JE 6 79 Daikin VRV 2P None
MA 3 72 Daikin VRV 2P 1 x Actron
MB 12 79 Daikin VRV 2P None
MC 8 56 Daikin VRV 2P None
MD 10 45 Daikin VRV 2P None
PA 3 39 Daikin VRV 2P 2 x Daikin Multi
SA & SB 12 125 Daikin VRV 2P None Daikin iTouch with ClimateHub
SC 8 73 Daikin VRV 2P None Daikin iTouch with ClimateHub
SLC 9 190 Daikin VRV 2P 3 x Actron
SI 2 40 Daikin VRV 2P None
Stadium 1 240 Dunn Air None Event and sports mode included
Daikin VRV Two Pipe White Paper June 2019 of 6 10
Scope of Study
Sheldon College has a series of existing blocks that are mostly serviced by Daikin VRV two pipe systems. A small percentage of blocks had other systems from multiple manufacturers. After a consultation period the following objectives were confirmed:1. Improve thermal comfort in thermal zones not designated as Mode
Master.2. Automate the system mode change over so that the maintenance team
does not have to attend the block to make changes manually.3. Provide an after hours run function so that systems are not inadvertently
left running for long periods.4. Provide a graphical user interface at network level so that the college
administration and maintenance teams could observe and evaluate system performance.
Equipment Schedule
Daikin VRV Two Pipe White Paper June 2019 of 7 10
Site Plan
MAI
N O
VAL
JD
AB
AC
6
4
53
MC
MD
AF
AS
11
10
9
8
7
2
1
MA
2
4
11
8
10
3
JBJA
SI
MB
JE
57
AG
3 5 6
89
101113
12
7
16 1514
2
1
SA
SL
AA
SB
AD
23
45
6
8 9 10
2
3
4
5
6
78
91011
1213
14
N
SC2
4
3
1
JL
121110987654321
BC
DE
FG
H
OP
A
SAC
SE
POOL
DEC
K
HO
RIZ
ON
S SPOR
TSOF
FICE
STUD
ENT E
NTRY
STAD
IUM
ADM
IN
FOY
ER
UP
BASK
ETBA
LL C
OURT
S
STAT
UN
IF
15
STAF
F &
STU
DEN
TC
AR P
ARK
AH
CE
IJ
K
151413 16
LSSW
121110987654321 151413 16
BC
DE
FG
HA
IJ
K
MAI
N O
VAL
TOP
OVA
L
TAYLOR ROAD
CR
ICKE
TN
ETS
PER
FOR
MIN
GAR
TS T
HEA
TRE
LIN
Q P
REC
INC
T(G
roun
d Fl
oor)
LALB
LCLD
1
5
4
36
7
1
2
2
4
57
32
1
5
27 14 1315 11
12 109
84 3 2
1
6
7
2
2221
34
2524
23
11
20
519
18144
43 42
4039
3738
3641
6
30
12
37
65
9
8
4
12
3
45
67
8
9
1011
23 4
56
7
23
45
67
8
24
5
68
101112
3
4
5
2
34
5
68
2
34
67
89
10
2111 12
1
1
23
4
5
6
8
30
31
27
5
3
1
16
7
6
5
14
89
10
1112
4
217 3
2019
18
2124
25
2
28 338
89
101112
34151821
2223 24
252627
2936
35
37
39
12 7 8 9 10
11
1215
1623
20
UC
54
3 2
67
AA
LIN
Q P
REC
INC
T(F
irst F
loor
)
OBS
ERVA
TIO
N
DECK
LALB
LCLD
Gro
unds
She
d(F
irst F
loor
)
Addi
tiona
l Bui
ldin
g Le
vels
32
Stad
ium
(Low
er F
loor
)
37
1
10
JD
AB
20
AC
JC
2
6
4
45
1312
1417
1816
15
19
3
MC
MD
AF
AS
11
10
9
8
762
1
PRES
CH
OO
L
MA
9
1
2
45
11
8
10
6
JBJA
SI
MB
JE
57
AG
3 5 6
1113
1216 15
14
2
SA
SL
SB
AD
1
23
45
67
8 9 10
2
3
4
5
6
78
91011
1213
14
N
SC2
4
3
1
JL
121110987654321
BC
DE
FG
H
OP
A
SAC
SE
POOL
DEC
K
HO
RIZ
ON
S SPOR
TSOF
FICE
STUD
ENT E
NTRY
STAD
IUM
ADM
IN
FOY
ER
UP
BASK
ETBA
LL C
OURT
S
STAT
UN
IF
15
STAF
F &
STU
DEN
TC
AR P
ARK
AH
CE
IJ
K
151413 16
WO
LSSW
121110987654321 151413 16
BC
DE
FG
HA
IJ
K
SHEL
DO
N C
OLL
EGE
2020
TOP
OVA
L
TAYLOR ROAD
CR
ICKE
TN
ETS
PER
FOR
MIN
GAR
TS T
HEA
TRE
LIN
Q P
REC
INC
T(G
roun
d Fl
oor)
LALB
LCLD
1
5
43
7
1
2
32
1
54 3 2
1
6
7
87
65
124
119
1014
1513
3
391
2716
17
2526
2423
22
2118
2019
48
228
2
2221
34
2524
23
2726
11
20
519
181
9
1312
1415
1617
35
68
41
68
3433 7
3132
6730
29
28
1
23
10 1819
2021
2
37
65
9
22 1124
8
16 1514
4
25
1317
1226
12
3
45
67
8
9
1011
12
3 4
56
78
12
34
56
7
8910
12
3
45
67
89
101112
12
3
4
56
7
12
45
6
78
9
2
319
56
78
9
10
2111 12
1514
171816
113
20
1
23
4
5
6
7
8 910
11
2928
27
1
23 4
5 67
8 910
1112
3
1
16
7
6
515 14
89
10
1112
13
4
217 3
2019
18
22
23
25
34 2
5
12
34
5
6
12
34
5
13
45
6
28
2
3 4
5
38
7 68
930
101112
13
2034
33
141516
17
1819
20
2223 24
252627
29
31
3635
37
39
12 3 4 5 6 7 24 8 9 10
11
1213 14
15
1617
23
2021 22 18 19
KI
UC
54
3 2
67
3433
AA
LIN
Q P
REC
INC
T(F
irst F
loor
)
OBS
ERVA
TIO
N
DECK
8
9 1011
12
13
14
2716
1718
1920
2122
23
2425
268
6
4 53
LALB
LCLD
Gro
unds
She
d(F
irst F
loor
)
Addi
tiona
l Bui
ldin
g Le
vels
3219
7170
907273
7475
76777879
108788
69
8584
8382
8180
6754 52
53
86
89
6861
6263
64
6560
5958
57 56 5566
49
Stad
ium
(Low
er F
loor
)
17
1
2
1
3
10
23
77
AA
Adm
inis
tratio
n(F
irst F
loor
)
Adm
inis
tratio
n(L
ower
Flo
or)
Juni
or le
arni
ng(G
roun
d Fl
oor)
GR
222120
1133
32
3130
2726
24 25
29
28
30
3132 33
34
35363738
394041
424344
45
464748
49
50
5152
53
54 5556
57585960
65
6667
6869
70
7172
73
7475 76
AA
Adm
inis
tratio
n(F
irst F
loor
)
Adm
inis
tratio
n(L
ower
Flo
or)
Juni
or le
arni
ng(G
roun
d Fl
oor)
GR
MS
11
23456
8
1112
56 7
9104
12 3
245 6
78
9
11
1516 17
1
1
38
1312
11910
SP1
2 3
PR
56
78
GYM
2122 23
2425
26
GR
CB
1
20
18
36
GA0
2
GA0
3
GA0
4
GA0
1
GA0
5
GA0
6
ICTM
KT
TEN
NIS
CO
UR
TSTE
NN
ISC
OU
RTS
CP0
1
CP0
2
CP0
3
CP0
4
CP0
5
CP0
6C
P07
CP0
8
CP0
9
GS0
1
121314
39
35
21
GS0
2
7
6
INTE
RN
AL U
SE O
NLY
1
PA
GS0
3
1415
18
16
14-0
1-20
20
Typical Block Control System Parts List (SB)
Item Description Item Code Manufacturer Qty Approximate Cost
ClimateHUB CH-VRT-D3NET HUB AUTOMATION 1 AU$600.00
D3NET Gateway DTA116A51 DAIKIN 1 AU$350.00
After Hours Switch Daikin BRC used to activate after-hours timer N/A
Installation Cost Not provided by HVAC Contractor N/A
Daikin VRV Two Pipe White Paper June 2019 of 8 10
Typical Block (SB)
Daikin VRV Two Pipe White Paper June 2019 of 9 10
Control System Network Architecture
Each ClimateHub includes field level expansion to the VRV communication gateways, smart sensors, touchpads, touchscreens, after hours switches and other digital or analogue expansion as required.
ClimateHub’s include a unique system for automatically configuring a network level human machine interface that links all HUB Automation products together as a central control and/or performance diagnostic point.
Unlike many BMS or BAS systems connecting between blocks does not require an independent BMS LAN line, on this case study the school IT department provided a switch port ID and a fixed IP address at each block.
Not Use
d On T
his Proj
ect
Not Use
d On T
his Proj
ect
Case Study Conclusion
Daikin VRV Two Pipe White Paper June 2019 of 10 10
Overview of Findings
• Trend point data clearly shows a dramatic decrease in temperature error in all non-mode master thermal zones.
• Trend point data shows no significant difference in mode master thermal zones if the system mode is set to cooling or heating. When compared with the Daikin automatic mode changeover setting the trend data clearly showed a decrease in temperature error.
• Reported thermal comfort dissatisfaction reduces considerably for all blocks.
• Labour hours were saved by the maintenance team each week due to the mode selection being automated, the after hours timer switching systems off automatically and the fault notification being sent to the HVAC contractor often before thermal comfort was disrupted.
More Detailed Analysis
A complete report detailing the actual data is available on request. It is required by the school that permission is granted to access real data and or live viewing of the school network level interface. A NDA and a Use Agreement needs to be signed and approved by Sheldon College prior to distribution.
Applications for higher level data should be made to: [email protected]