Page 1: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDT(St. Louis River/Interlake/Duluth (St. Louis River/Interlake/Duluth

Tar)Tar) Superfund Site Superfund SiteUpdateUpdate

December 1, 2010December 1, 2010

Page 2: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

• SLRIDT Site Remediation SLRIDT Site Remediation Activities (2006-2009)Activities (2006-2009)

• 2010 Tallas Island Winter 2010 Tallas Island Winter DredgingDredging

• 2010 Construction Activities 2010 Construction Activities • 2011 Construction Activities2011 Construction Activities

Page 3: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSite Remediation 2006Site Remediation 2006

Page 4: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSite Remediation 2007Site Remediation 2007

Page 5: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSite Remediation 2008Site Remediation 2008

Page 6: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSite Remediation 2009Site Remediation 2009

Page 7: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDT2010 Tallas Island Mitigation – Winter 2010 Tallas Island Mitigation – Winter

WorkWork

Page 8: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDT2010 Tallas Island Mitigation – Winter 2010 Tallas Island Mitigation – Winter

WorkWork

Page 9: HTAC 12 01-10 SLRIDT Update

Tallas Island Winter DredgingTallas Island Winter Dredging

Page 10: HTAC 12 01-10 SLRIDT Update

Tallas Island Winter DredgingTallas Island Winter Dredging

Page 11: HTAC 12 01-10 SLRIDT Update

Tallas Island Winter DredgingTallas Island Winter Dredging

Page 12: HTAC 12 01-10 SLRIDT Update

Segregation of Vegetative Root Mass from Ice

Tallas Island Winter DredgingTallas Island Winter Dredging

Page 13: HTAC 12 01-10 SLRIDT Update

Tallas Island Winter DredgingTallas Island Winter Dredging

Page 14: HTAC 12 01-10 SLRIDT Update

Tallas Island Winter DredgingTallas Island Winter Dredging

Page 15: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Tallas Island Winter Work

Page 16: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 17: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 18: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSite Remediation 2010Site Remediation 2010

Page 19: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

2010 Completed Construction Activities

• Installation of Residential Docks in Stryker Bay

• Installation of Reactive Carbon Mat in CAD

• Environmental Media Placement-Above Water

• CAD Cap Sand Delivery from Local Borrow Source

• CAD Capping with Sand Removed From Stryker

Bay Surcharge and Local Borrow Sources

Page 20: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

2010 Completed Construction Activities • Tallas Island Compensatory Mitigation Project-Environmental

Media Dredging

• Environmental Media Placement-Below WaterStryker Bay

Slip 7Slip 6/CAD

• CAD End Dike Modifications

• Shoreline Buffer Zone and Habitat Restoration (MN Portion Only)

• Conduct Environmental Monitoring

Page 21: HTAC 12 01-10 SLRIDT Update

Residential Docks Installed in Stryker Bay

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 22: HTAC 12 01-10 SLRIDT Update

ACM Installation in the CAD

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 23: HTAC 12 01-10 SLRIDT Update

ACM Installation in the CAD

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 24: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

ACM Installation in the CAD

Page 25: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

ACM Installation in the CAD

Page 26: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

EM Placement on Slip 7 Mud Flats Sand Cap

Page 27: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Vegetative Growth from EM Placement onSlip 7 Mud Flats Sand Cap

Page 28: HTAC 12 01-10 SLRIDT Update

CAD Capping Sand Staged on Hallett Dock 6

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 29: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

CAD Capping Sand Staged on Hallett Dock 6

Page 30: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

CAD Capping Sand Conveyor System

Page 31: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

CAD Capping Sand Conveyor System

Page 32: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

CAD Capping Sand Spreader Barge

Page 33: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

CAD Capping Sand Spreader Barge

Page 34: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

CAD Capping Sand Survey Operations

Page 35: HTAC 12 01-10 SLRIDT Update

Daily Report for CAD capping sand placement

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 36: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Tallas Island Dredging Equipment

Page 37: HTAC 12 01-10 SLRIDT Update

Booster Pump For Transporting EM to SLRIDT Site

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 38: HTAC 12 01-10 SLRIDT Update

Spreader Barge Placing EM

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 39: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Tallas Island Completed Dredge Area-Knowlton Creek

Page 40: HTAC 12 01-10 SLRIDT Update

Shoreline Buffer Zone and Habitat Restoration Plan

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 41: HTAC 12 01-10 SLRIDT Update

EM Top Soil Stockpiling

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 42: HTAC 12 01-10 SLRIDT Update

SLRIDT SLRIDT Superfund Site UpdateSuperfund Site Update

Stryker Bay Buffer Zone Before Restoration

Page 43: HTAC 12 01-10 SLRIDT Update

SLRIDT SLRIDT Superfund Site UpdateSuperfund Site Update

Stryker Bay Buffer Zone During Restoration

Page 44: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Stryker Bay Buffer Zone Before Restoration

Page 45: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Stryker Bay Buffer Zone After Restoration

Page 46: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Stryker Bay Buffer Zone After Restoration

Page 47: HTAC 12 01-10 SLRIDT Update

59th Avenue Shoreline BufferZone Before Restoration

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 48: HTAC 12 01-10 SLRIDT Update

59th Avenue Shoreline Buffer Zone After Restoration

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 49: HTAC 12 01-10 SLRIDT Update

59th Avenue Shoreline Buffer Zone

(MN Portion Complete)

WIMN

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 50: HTAC 12 01-10 SLRIDT Update

Arrowhead Point Buffer Zone Before Restoration

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 51: HTAC 12 01-10 SLRIDT Update

Arrowhead Point Buffer Zone After Restoration

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 52: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula EM Placement

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 53: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula Restoration

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 54: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula Buffer ZoneBefore Restoration - (East Side of CAD)

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 55: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula Buffer Zone After Restoration - (East Side of CAD)

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 56: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula Buffer ZoneBefore Restoration - (East Side of CAD)

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 57: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula Buffer ZoneAfter Restoration - (East Side of CAD)

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 58: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula Buffer Zone During Restoration

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 59: HTAC 12 01-10 SLRIDT Update

54th Avenue Peninsula Buffer Zone After Restoration

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 60: HTAC 12 01-10 SLRIDT Update

CAD End Dike Prior to Removal

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 61: HTAC 12 01-10 SLRIDT Update

CAD End Dike Removal

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 62: HTAC 12 01-10 SLRIDT Update

CAD End Dike Removal

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 63: HTAC 12 01-10 SLRIDT Update

CAD End Dike Removal After Completion

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

Page 64: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

54th Avenue Peninsula Buffer Zone Before Restoration

Page 65: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

54th Avenue Peninsula Buffer Zone After Restoration

Page 66: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDTSuperfund Site UpdateSuperfund Site Update

2011 Construction Activities

• Shoreline Buffer Zone and Habitat Restoration-Wisconsin Portion

• Long-Term Monitoring Activities

Page 67: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDT Superfund Site Update - Next Steps Superfund Site Update - Next Steps

Long Term Monitoring Plan:

1. Cap Effectiveness

2. Cap Stability

3. Vegetation Establishment

4. Benthic Establishment

Next Five Year Review for entire site• Start in 2012 and end in 2013

Page 68: HTAC 12 01-10 SLRIDT Update

SLRIDTSLRIDT Superfund Site Update - Next Steps Superfund Site Update - Next Steps

Reports:1. Construction Completion Report March

2011• Summary of activities• As-built plans• Data

2. Annual Monitoring Report• Site Activity Summary• Monitoring Data

Page 69: HTAC 12 01-10 SLRIDT Update

Want More Information?Visit www.slridt.com or contact

Lisa Neitzel at [email protected]

Thank you!