how we cut the pie

3
How we cut the pie Futu re Need s % SDC Eligi ble Exis ting Need s 2006 Data Financing Tools Connection Fees Frontage Fees LIDs Bonds Grants ODOT Other Financing Tools SDCs Other

Upload: aliza

Post on 04-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

How we cut the pie. Financing Tools Connection Fees Frontage Fees LIDs Bonds Grants ODOT Other. Financing Tools SDCs Other. Future share of the pie. Maximum Allowable. Projects unfunded. Flexibility. SDC Fees. Projects funded. Adjust Fees – Public Hearing Council Action - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: How we cut the pie

How we cut the pie

Future Needs% SDC Eligible

Existing

Needs2006 Data

Financing Tools

Connection FeesFrontage FeesLIDsBondsGrantsODOTOther

Financing Tools

SDCsOther

Page 2: How we cut the pie

Future share of the pie

Flexibility

Projects funded

Projects unfunded

Maximum Allowable

SDC Fees

•Adjust Fees – Public Hearing Council Action•Adjust Funded Projects (Swap) – Council Action

Page 3: How we cut the pie

Growth Facilities

Flexibility

Projects funded

Projects unfunded

Maximum Allowable

SDC Fees

Implications = Prioritization•Projects < 100% SDC funded•Projects unfunded “incentives”•Target funded projects to specific areas

Developer

Builder

Policy & Procedures•Homebuilding•Commercial Development•Industrial Development