How to Develop and Operate a Sustainment System
Objectives & PrinciplesScope
1. Define where in the process the confirmation is
required
3. Design a simple and appropriate
confirmation system
2. Define the confirmation
items, frequency and responsibility
Prerequisites
GateCheck
list
GateCheck
list
GateCheck
list
4. Install and operate the
confirmation system
GateCheck
listEnd
Start
NEXTMapBACK
© 2019 Rolls-Royce
3
Scope
This ‘How To’ will enable you to:
• Define, install and operate a process confirmation system suitable to the process and environment
NEXTMapBACK
© 2019 Rolls-Royce
4
Objective and Principles
1. Standards define how a process should be followed, or what condition an area (or item of equipment) should be in.
2. To ensure customer satisfaction it is necessary to confirm that standards are being followed and there is no drift in behaviours.
3. Confirmation allows a factual understanding of the actual status in comparison to the agreed defined standard.
4. Visual management of this process gives an understanding of the “status at a glance”, allowing quick management of the abnormality.
5. Process Confirmation Systems should be prioritised where there is the greatest business need and benefit
Sample Confirmation (Sustainment) Systems
NEXTMapBACK
© 2019 Rolls-Royce
5
Prerequisites
• Good understanding of the problem or activity to be checked
• A clear visual defined standard showing the ‘OK’ condition – this allows a problem to be clearly identified without misinterpretation
• A clear understanding by all using the standard (including support functions) on what the standard exactly means
• All users trained in the defined standard
Example: Standard and limits for pressureExample: Boundary Samples can show acceptable levels for defects
Example: Standard Operating Procedure
Sample
surface
finish
standard
NEXTMapBACK
© 2019 Rolls-Royce
6
1. Define where in the process the confirmation is required
Countermeasure existing known non-compliance (reactive use of the confirmation system)
• Review the history of non-conformances (reactive)
• Whenever systems or processes have failed, or standards have not been followed, review them for opportunities to
introduce a confirmation system
• Understand the customer perception
• Understand the facts / data of any issues that may have arisen
• Confirmation covers operational and transactional processes
Confirm adherence to a standard (pro-active use)
• Wherever there is a standard and there are factors that could affect the output, use of a confirmation to ensure
delivery to the standard
• Standard Operating Procedures (SOP) / Equipment asset care / Logistics processes
• Factors that could affect the output may include:
• New employees under training
• New or updated processes or standards
• An ability to comply with a standard
NEXTMapBACK
© 2019 Rolls-Royce
7
Gate checklist 1: Define where in the process the confirmation is required
Opportunities for either a reactive or pro active usage of a process confirmation
system have been confirmed
NEXTMapBACK
© 2019 Rolls-Royce
8
2. Define the confirmation items, frequency and responsibility
Define what the confirmation items are
• Decide on the nature of the confirmation items, considering whether it is as a result of reactive of proactive thinking:
• Reactive - customer concerns; supplier concerns; internal concerns
• Proactive – as a result of a need to continuously improve our standards
• Typical confirmation items might include:
• Implementation of countermeasures for quality issues and proactively where issues could occur in similar processes
• Process confirmation
- Adherence to the SOP, Manufacturing Instruction, or set-up method
• Safety issues – confirmation of countermeasure implementation and sustainability
• Workplace organisation (5S) status
• Equipment status
- Asset care activities have been completed
- Gauge calibration within date, or machine parameters and key process variables
• Visual Management – confirming that performance management information up to date and appropriate?
NEXTMapBACK
© 2019 Rolls-Royce
9
2. Define the confirmation items, frequency and responsibility
Define the standard
• For whatever is being checked, it is a requirement that a standard is available
• Without a standard, you do not know if you have a problem !
• Without a standard, you can not improve
Quality Standard
Standard Operating Procedure
5S Standard Asset Care Standard
NEXTMapBACK
© 2019 Rolls-Royce
10
2. Define the confirmation items, frequency and responsibility
Frequency on the confirmation check
• Distribute the checks evenly across the shifts / days / weeks, processes and areas at different levels of owners, eg.
• Things to consider when defining responsibility for the check include:
• The ability to differentiate between Good and No Good conditions
• Escalation process and hierarchy of responsibility and accountability
Dept. / Company Level Checks
Whole Area Checks
Area / Zone Checks
Local Team Checks
Process Confirmation
General Manager
Plant Leader
Team Coordinators
Members of the TeamAsset Confirmation
Safety Confirmation
Production Leaders
Shift Coaches
• Things to consider when defining the frequency of check:
• What happens if there is a failure or escape? (the consequence)
- Check frequency considering problem frequency to prevent escape
• How easy is the checking activity to complete? - Checks should be quick and simple
• Working patterns - Does it require confirmation every hour, shift, day or week?
• Accessibility to carry out a check - Does a process or machine need to be stopped?
NEXTMapBACK
© 2019 Rolls-Royce
11
2. Define the confirmation items, frequency and responsibility
Define the escalation process for non-conformance (when a problem is found)
• The following consideration points should be addressed:
• What happens if a non-conformance is found?
• What communication needs to occur, and in what manner (phone, e-mail, go-see)?
• Who needs to communicate the issue or status of resolving the problem?
• Who needs to be communicated to – who in the organisation needs to know?
• In what period of time should the communication be made
(e.g. within 10-minutes, etc.)
• What should happen once the communication has occurred?
- What feedback should be given to the person who raised the issue, etc.
• What information is required before a process can be restarted if it has been stopped as a result of an issue
• Make a simple process flow chart to explain the steps in the escalation process, who is responsible and over what time period each action is required
NEXTMapBACK
© 2019 Rolls-Royce
12
Gate checklist 2: Define the confirmation items, frequency and responsibility
The confirmation check items have been agreed, based on real factual data
The standards have been defined for each confirmation check – they are clear and
easily understood and are not open to interpretation
The frequency of the check, along with responsibility for the check has been agreed
A simple escalation process has been defined
NEXTMapBACK
© 2019 Rolls-Royce
13
3. Design a simple and appropriate confirmation system
• Any system should be:• Visual – understand the status of confirmation checks
“at a glance”• Simple – quick to use - anyone should be able to
understand how it operates• Owned – clear ownership and accountability is
required• Maintainable – it must be easily self-maintained with
minimum documentation, or reliance on outside personnel to make graphs and status reports, etc.
• Manually updated paper systems are better than those generated on a PC requiring a printer and other person to generate documentation
• Don’t over-complicate with too many forms to update
• Flexible – quick to adjust to suit changing requirements (frequency, additional new check items, customer incidents, etc.)
NEXTMapBACK
© 2019 Rolls-Royce
14
3. Design a simple and appropriate confirmation system
Generate a concept for the conformation system
• Make a basic conceptual system to see how it will operate – keep it dynamic / flexible• Obtain buy-in from the users on the concept
Eg. Visually Management using ‘T’ cards Eg. Visually Management using task cards
Daily,
Weekly,
Fortnightly,
Monthly,
Yearly tasks
Person
rota
NEXTMapBACK
© 2019 Rolls-Royce
15
3. Design a simple and appropriate confirmation system
Make the confirmation system
• Ensure all charts and documents within the system show• Document owner• Document filename• Document location (on electronic system)• Frequency of update
• Check that the process has a primary and back-up owner (for absence cover)
• Incorporate time into standard diaries for checks to be completed
NEXTMapBACK
© 2019 Rolls-Royce
16
Gate checklist 3: Design a simple and appropriate confirmation system
The principles of visibility, simplicity and flexibility have been understood
A concept showing how the system will operate in a simple manner has been
generated
The system is simple, visible, and has defined ownership
NEXTMapBACK
© 2019 Rolls-Royce
17
4. Install and operate the confirmation system
Make a plan for introducing the system
• Don’t just go and put a system in place, plan carefully – follow Plan-Do-Check-Act
• Engage and involve the right people in setting up the system• Ensure they have a good awareness and understanding• Involve the end-users• Brief the teams in the progress of the project at each step
• Gain commitment from key stake holders
Pilot activity
Review
Roll-out
PLAN
DOCHECK
ACT
NEXTMapBACK
© 2019 Rolls-Royce
18
4. Install and operate the confirmation system
Put the confirmation system in place
• Train all the users and support people in the correct use of the system – the standard !
• Provide close support during start-up and support reviews. GO-LOOK-SEE.
• Have clear roles and accountabilities• System Owner:
• Agrees responsibilities, adds / removes confirmation items, provides summary reports, chairs regular reviews of the system & countermeasure status
• Checks that all confirmation activities completed, attends regular reviews, agrees addition / removal of items, ensures corrective action completed quickly (time-bound)
• Confirmation Owner:• “Does” the checks, follows the “system” process, records the result
• Keep a simple record showing who has been trainedin the use of the system
NEXTMapBACK
© 2019 Rolls-Royce
19
4. Install and operate the confirmation system
Operate the maintain the system
% C
hecks
Co
mp
lete
an
d
OK
Time
Target
Actual
• Is the current situation what was expected?• Involve the whole team in a review and gather feedback on performance and issues to resolve• After a period of time operating the system to the agreed process, ask some simple questions:• Can the system be simplified for the user, without increasing the time needed to do the confirmation
activities?• How can the process be made more robust?• Is it possible to make the process, or confirmation result even more visible?• How would improving the review of issues have a positive impact on the overall system?• Is the frequency of the review of issues suitable for the nature of the issues raised?• Are there new items to be added to / removed from the system?
• Check that the system is flexible enough to ‘respond’ to on-going non-conformance and customer satisfaction issues
• Remember though, before implementing improvements, to follow the PDCA cycle
NEXTMapBACK
© 2019 Rolls-Royce
20
Gate checklist 4: Install and operate the confirmation system
The purpose of the system has been clearly communicated with all users or involved support
people
A visible plan is available and has been communicated, showing the actions, timing, and
ownership of key items for putting the system in place
Key Performance Indicators have been agreed so that everyone is aware of how success
(performance) will be measured
The users have been trained to the same standard, and the system is fully in place
Key Performance Indicators (KPIs) are reviewed to see actual status against a target condition – is
the result what you expected?
Team review session held to generate improvement ideas