hosur road sbi of koramangla 18th main road … saction details pdf/jdtp south/2020-21/3.pdfblock...

1
UserDefinedMetric (1800.00 x 910.00MM) SHEET NO : 1 DRAWING TITLE : SITE PLAN PROJECT TITLE : PLAN FOR PROPOSED ADDITIONS TO EXISTING ONCOLOGY BUILDING & BLOCK-3, UNITS OFHOPE BUILDING AND MODIFIED PLAN TO BLOCK-4, WARD BUILDING AT MUNICIPAL NO. NEW. 141/2,INDUSTRIAL LAYOUT, KORAMANGALA (PID NO-67-3-141/2) OLD WARD NO.67, (NEW WARD NO.151), BANGALORE. : OWN_SIGN ARC_SIGN CBCI Society for medical education rep by Paul Parathazham Vianney House, St, John's national Acadamy of health sciences, sarjapura road, Bangalore. Ganesh N #4/2, 8th main, 6th cross, S.R. Nagar, Bangalore E-4289/17-18 This is a system generated drawing as per the soft copy submitted by the Architect/ License Engineer AREA STATEMENT (BBMP) VERSION NO.: 1.0.11 VERSION DATE: 01/11/2018 PROJECT DETAIL: Authority: BBMP Plot Use: Medical Inward_No: BBMP/Addl.Dir/JD SOUTH/0054/18-19 Plot SubUse: Hospital Application Type: General Land Use Zone: Public and Semi Public Proposal Type: Building Permission Plot/Sub Plot No.: 141/2 Nature of Sanction: Modify Khata No. (As per Khata Extract): 141/2 Location: Ring-II Locality / Street of the property: Industrial layout, Koramangala, Bangalore. Building Line Specified as per Z.R: NA Zone: South Ward: Ward-151 Planning District: 208-Koramangala AREA DETAILS: SQ.MT. AREA OF PLOT (Minimum) (A) 295154.47 Deduction for NetPlot Area Road Widening Area 7634.05 Total 7634.05 NET AREA OF PLOT (A-Deductions) 287520.41 COVERAGE CHECK Permissible Coverage area (45.00 %) 129384.18 Proposed Coverage Area (2.84 %) 8174.98 Existing coverage area to be retained ( 18.84 % ) 54169.51 Achieved Net coverage area ( 21.68 % ) 62344.49 Balance coverage area left ( 23.32 % ) 67039.69 FAR CHECK Permissible F.A.R. as per zoning regulation 2015 ( 3.25 ) 959252.00 Additional F.A.R within Ring I and II ( for amalgamated plot - ) 0.00 Allowable TDR Area (60% of Perm.FAR ) 0.00 Premium FAR for Plot within Impact Zone ( - ) 0.00 Total Perm. FAR area ( 3.25 ) 959252.00 Special FAR (82.53% ) 39167.57 Existing Special FAR (% ) 8156.29 Proposed FAR Area 47459.37 Existing FAR Area 154640.70 Achieved Net FAR Area ( 0.68 ) 202100.06 Balance FAR Area ( 2.57 ) 757151.94 BUILT UP AREA CHECK Proposed BuiltUp Area 51052.02 Existing BUA Area 8593.90 Existing BUA Area for Existing Structure 157740.58 Substructure Area Add in BUA (Layout Lvl) 15.22 Achieved BuiltUp Area 208807.82 Color Notes EXISTING (To be demolished) EXISTING (To be retained) PROPOSED WORK (COVERAGE AREA) ABUTTING ROAD PLOT BOUNDARY COLOR INDEX Block USE/SUBUSE Details Block Name Block Use Block SubUse Block Structure Block Land Use Category 32 (HOSTEL BUILDING) Public and Semi Public Hospital Highrise P-SP3 1 (ONCOLOCY BUILDING) Medical Hospital Highrise C3 3 (UNIT OF HOPE BUILDING) Medical Hospital Highrise C3 4 (WARD BUILDING) Medical Hospital Highrise C3 Required Parking(Table 7a) Block Name Type SubUse Area (Sq.mt.) Units Car Reqd. Prop. Reqd./Unit Reqd. Prop. 32 (HOSTEL BUILDING) Public and Semi Public Hospital > 0 100 6576.12 1 66 - 1 (ONCOLOCY BUILDING) Educational Tutorial Centre > 0 150 4926.66 1 33 - Medical Hospital > 0 100 3687.25 1 37 - 3 (UNIT OF HOPE BUILDING) Educational Tutorial Centre > 0 150 3229.62 1 22 - Medical Hospital > 0 100 1588.34 1 16 - 4 (WARD BUILDING) Medical Hospital > 0 100 27315.86 1 273 - Total : - - - - 447 2222 Parking Check (Table 7b) Vehicle Type Reqd. Achieved No. Area (Sq.mt.) No. Area (Sq.mt.) Car 447 6146.25 2222 30545.80 Visitor's Car Parking 41 563.75 0 0.00 Total Car 488 6710.00 2222 30545.80 TwoWheeler - 660.00 0 0.00 Other Parking - - - 0.00 Total 7370.00 30545.80 FAR &Tenement Details Block No. of Same Bldg Gross Built Up Area (Sq.mt.) Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Existing Built Up Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Existing FAR Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Cutout StairCase Lift Lift Machine Void Medical Public and Semi Public 32 (HOSTEL BUILDING) 1 8142.19 0.00 8142.19 0.00 8142.19 97.61 29.70 3.35 1435.41 0.00 0.00 6576.12 6576.12 1 (ONCOLOCY BUILDING) 1 9443.52 125.70 9317.82 5245.38 4072.45 87.66 197.47 28.21 360.45 4926.66 3687.25 0.00 8644.03 3 (UNIT OF HOPE BUILDING) 1 5173.57 119.14 5054.43 3348.52 1705.91 44.66 86.85 7.38 97.56 3229.62 1588.34 0.00 4817.98 4 (WARD BUILDING) 1 31289.83 2752.25 28537.58 0.00 28537.58 199.55 210.30 7.46 699.02 0.00 27315.86 0.00 27421.25 Grand Total: 4 54049.11 2997.09 51052.02 8593.90 42458.13 429.48 524.32 46.40 2592.44 8156.29 32591.45 6576.12 47459.38 Existing Block Details Name Use SubUse Type Structure Height Floor No FAR Area BUA Area ST. JOHN MEDICAL COLLEGE & HOSPITAL W-1 Public and Semi Public Research Institutions Building Highrise 17.95 7 154640.70 157740.58 Block Name Built Up Area (Sq. Mt.) FAR Area (Sq. Mt.) ST. JOHN MEDICAL COLLEGE & HOSPITAL W-1 157740.58 154640.70 Total: 157740.58 154640.70 Block :1 (ONCOLOCY BUILDING) Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Existing Built Up Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Existing FAR Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Cutout StairCase Lift Lift Machine Void Medical Terrace Floor 145.98 0.00 145.98 0.00 145.98 87.66 0.00 28.21 0.00 0.00 0.00 30.11 Sixth Floor 1329.42 20.23 1309.19 0.00 1309.19 0.00 28.21 0.00 51.50 0.00 1229.48 1229.48 Fifth Floor 1329.42 20.23 1309.19 0.00 1309.19 0.00 28.21 0.00 51.32 0.00 1229.66 1229.66 Fourth Floor 1329.40 21.31 1308.09 0.00 1308.09 0.00 28.21 0.00 51.76 0.00 1228.12 1228.12 Third Floor 1329.42 20.23 1309.19 1309.19 0.00 0.00 28.21 0.00 51.40 1229.58 0.00 1229.58 Second Floor 1329.40 21.31 1308.09 1308.09 0.00 0.00 28.21 0.00 51.35 1228.53 0.00 1228.53 First Floor 1329.39 21.31 1308.08 1308.09 0.00 0.00 28.21 0.00 51.72 1228.15 0.00 1228.15 Ground Floor 1321.09 1.08 1320.01 1320.01 0.00 0.00 28.21 0.00 51.40 1240.40 0.00 1240.40 Total: 9443.52 125.70 9317.82 5245.38 4072.45 87.66 197.47 28.21 360.45 4926.66 3687.25 8644.03 Total Number of Same Blocks : 1 Total: 9443.52 125.70 9317.82 5245.38 4072.45 87.66 197.47 28.21 360.45 4926.66 3687.25 8644.03 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 1 (ONCOLOCY BUILDING) D2 0.75 2.10 77 1 (ONCOLOCY BUILDING) D1 0.75 2.10 01 1 (ONCOLOCY BUILDING) D1 0.90 2.10 62 1 (ONCOLOCY BUILDING) D1 1.10 2.10 36 1 (ONCOLOCY BUILDING) MD 1.10 2.10 07 1 (ONCOLOCY BUILDING) MD 1.20 2.10 02 1 (ONCOLOCY BUILDING) D3 1.50 2.10 57 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 1 (ONCOLOCY BUILDING) V 1.00 0.90 75 1 (ONCOLOCY BUILDING) V 1.00 2.10 13 1 (ONCOLOCY BUILDING) W2 1.50 2.10 111 1 (ONCOLOCY BUILDING) W9 1.55 2.10 03 1 (ONCOLOCY BUILDING) W2 1.89 2.10 01 1 (ONCOLOCY BUILDING) W2 1.92 2.10 01 1 (ONCOLOCY BUILDING) W10 2.00 2.10 24 1 (ONCOLOCY BUILDING) W2 2.28 2.10 01 1 (ONCOLOCY BUILDING) W2 2.40 2.10 01 1 (ONCOLOCY BUILDING) V2 2.50 0.90 07 1 (ONCOLOCY BUILDING) W3 2.50 2.10 56 1 (ONCOLOCY BUILDING) W2 2.76 2.10 01 1 (ONCOLOCY BUILDING) W2 2.78 2.10 01 1 (ONCOLOCY BUILDING) W 3.00 2.10 15 1 (ONCOLOCY BUILDING) W2 3.01 2.10 01 1 (ONCOLOCY BUILDING) W2 3.24 2.10 01 1 (ONCOLOCY BUILDING) W2 3.39 2.10 01 1 (ONCOLOCY BUILDING) W2 3.51 2.10 01 UnitBUA Table for Block :1 (ONCOLOCY BUILDING) FLOOR Name UnitBUA Type Entity Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement GROUND FLOOR PLAN G-1 OTHER Existing 1240.40 1240.40 19 1 FIRST FLOOR PLAN F-1 OTHER Existing 1228.15 1228.15 22 1 SECOND FLOOR PLAN SE-1 OTHER Existing 1228.53 1228.53 19 1 THIRD FLOOR PLAN TH-2 OTHER Existing 1229.58 1229.58 53 1 FOURTH FLOOR PLAN FOU-1 OTHER Proposed 1228.12 1228.12 24 1 FIFTH FLOOR PLAN FIF-2 OTHER Proposed 1229.66 1229.66 53 1 SIXTH FLOOR PLAN SX-2 OTHER Proposed 1229.48 1229.48 45 1 Total: - - - 8613.92 8613.92 235 7 Block :3 (UNIT OF HOPE BUILDING) Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Existing Built Up Area (Sq.mt.) Proposed Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Existing FAR Area (Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Cutout StairCase Lift Lift Machine Void Medical Terrace Floor 58.13 0.00 58.13 0.00 58.13 44.66 6.09 7.38 0.00 0.00 0.00 0.00 Fifth Floor 840.96 17.07 823.89 0.00 823.89 0.00 13.46 0.00 16.26 0.00 794.17 794.17 Fourth Floor 840.96 17.07 823.89 0.00 823.89 0.00 13.46 0.00 16.26 0.00 794.17 794.17 Third Floor 858.38 18.37 840.01 840.01 0.00 0.00 13.46 0.00 16.26 810.29 0.00 810.29 Second Floor 858.38 24.07 834.31 834.31 0.00 0.00 13.46 0.00 16.26 804.59 0.00 804.59 First Floor 858.38 24.07 834.31 834.31 0.00 0.00 13.46 0.00 16.26 804.59 0.00 804.59 Ground Floor 858.38 18.49 839.89 839.89 0.00 0.00 13.46 0.00 16.26 810.17 0.00 810.17 Total: 5173.57 119.14 5054.43 3348.52 1705.91 44.66 86.85 7.38 97.56 3229.62 1588.34 4817.98 Total Number of Same Blocks : 1 Total: 5173.57 119.14 5054.43 3348.52 1705.91 44.66 86.85 7.38 97.56 3229.62 1588.34 4817.98 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 3 (UNIT OF HOPE BUILDING) D2 0.75 2.10 09 3 (UNIT OF HOPE BUILDING) D1 0.90 2.10 48 3 (UNIT OF HOPE BUILDING) D1 1.10 2.10 02 3 (UNIT OF HOPE BUILDING) MD 1.10 2.10 04 3 (UNIT OF HOPE BUILDING) MD 1.20 2.10 01 3 (UNIT OF HOPE BUILDING) D3 1.50 2.10 10 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 3 (UNIT OF HOPE BUILDING) V 0.91 0.90 03 3 (UNIT OF HOPE BUILDING) V 1.00 0.90 08 3 (UNIT OF HOPE BUILDING) W2 1.37 2.10 05 3 (UNIT OF HOPE BUILDING) W2 1.50 2.10 165 3 (UNIT OF HOPE BUILDING) W2 1.83 2.10 05 3 (UNIT OF HOPE BUILDING) V1 1.90 0.90 12 3 (UNIT OF HOPE BUILDING) W 3.00 2.10 01 UnitBUA Table for Block :3 (UNIT OF HOPE BUILDING) FLOOR Name UnitBUA Type Entity Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement GROUND FLOOR PLAN G-1 OTHER Existing 810.17 810.17 14 1 FIRST FLOOR PLAN F-1 OTHER Existing 804.59 804.59 13 1 SECOND FLOOR PLAN SE-1 OTHER Existing 804.59 804.59 13 1 THIRD FLOOR PLAN TH-1 OTHER Existing 810.29 810.29 6 1 FOURTH FLOOR PLAN FOU-1 OTHER Proposed 794.17 794.17 14 1 FIFTH FLOOR PLAN FIF-1 OTHER Proposed 794.17 794.17 10 1 Total: - - - 4817.98 4817.98 70 6 Block :4 (WARD BUILDING) Floor Name Gross Builtup Area Deductions From Gross BUA(Area in Sq.mt.) Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Cutout StairCase Lift Lift Machine Void Medical Terrace Floor 332.17 0.00 332.17 199.55 19.76 7.46 0.00 0.00 105.40 Sixth Floor 4439.94 394.85 4045.09 0.00 27.22 0.00 99.86 3918.01 3918.01 Fifth Floor 4439.95 394.86 4045.09 0.00 27.22 0.00 99.86 3918.01 3918.01 Fourth Floor 4447.95 394.86 4053.09 0.00 27.22 0.00 99.86 3926.01 3926.01 Third Floor 4404.93 391.93 4013.00 0.00 27.22 0.00 99.86 3885.92 3885.92 Second Floor 4404.93 391.93 4013.00 0.00 27.22 0.00 99.86 3885.92 3885.92 First Floor 4404.93 391.93 4013.00 0.00 27.22 0.00 99.86 3885.92 3885.92 Ground Floor 4415.03 391.89 4023.14 0.00 27.22 0.00 99.86 3896.06 3896.06 Total: 31289.83 2752.25 28537.58 199.55 210.30 7.46 699.02 27315.86 27421.25 Total Number of Same Blocks : 1 Total: 31289.83 2752.25 28537.58 199.55 210.30 7.46 699.02 27315.86 27421.25 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 4 (WARD BUILDING) D2 0.75 2.10 130 4 (WARD BUILDING) D1 0.90 2.10 117 4 (WARD BUILDING) MD 1.20 2.10 104 4 (WARD BUILDING) D3 1.50 2.10 90 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 4 (WARD BUILDING) V 1.00 0.90 126 4 (WARD BUILDING) W3 1.50 2.10 01 4 (WARD BUILDING) W9 1.55 2.10 04 4 (WARD BUILDING) V1 1.75 0.90 02 4 (WARD BUILDING) W10 2.00 2.10 61 4 (WARD BUILDING) V2 2.50 0.90 37 4 (WARD BUILDING) W3 2.50 2.10 84 4 (WARD BUILDING) W 3.00 2.10 351 UnitBUA Table for Block :4 (WARD BUILDING) FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement GROUND FLOOR PLAN G-1 OTHER 1237.47 1237.47 1 2 G-2 OTHER 1237.45 1237.45 1 FIRST FLOOR PLAN 1- TY-1,2,3 OTHER 1237.47 1237.47 20 2 2- TY-1,2,3 OTHER 1237.45 1237.45 20 SECOND FLOOR PLAN 1- TY-1,2,3 OTHER 1237.47 1237.47 20 2 2- TY-1,2,3 OTHER 1237.45 1237.45 20 THIRD FLOOR PLAN 1- TY-1,2,3 OTHER 1237.47 1237.47 20 2 2- TY-1,2,3 OTHER 1237.45 1237.45 20 FOURTH FLOOR PLAN FOU-1 OTHER 1275.64 1275.64 30 2 FOU-2 OTHER 1273.61 1273.61 36 FIFTH FLOOR PLAN FIF-1 OTHER 1270.59 1270.59 64 2 FIF-2 OTHER 1273.80 1273.80 29 SIXTH FLOOR PLAN SX-1 OTHER 1270.59 1270.59 64 2 SX-2 OTHER 1270.58 1270.58 62 Total: - - 17534.46 17534.46 407 14 Block :32 (HOSTEL BUILDING) Floor Name Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) StairCase Lift Lift Machine Void Public and Semi Public Terrace Floor 104.22 97.61 3.26 3.35 0.00 0.00 0.00 Third Floor 2016.56 0.00 6.61 0.00 376.70 1633.25 1633.25 Second Floor 2016.57 0.00 6.61 0.00 376.45 1633.51 1633.51 First Floor 2012.89 0.00 6.61 0.00 602.68 1403.60 1403.60 Ground Floor 1991.95 0.00 6.61 0.00 79.58 1905.76 1905.76 Total: 8142.19 97.61 29.70 3.35 1435.41 6576.12 6576.12 Total Number of Same Blocks : 1 Total: 8142.19 97.61 29.70 3.35 1435.41 6576.12 6576.12 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 32 (HOSTEL BUILDING) D1 0.90 2.10 93 32 (HOSTEL BUILDING) D3 1.10 2.10 20 SCHEDULE OF JOINERY: BLOCK NAME NAME LENGTH HEIGHT NOS 32 (HOSTEL BUILDING) V 1.00 0.90 08 32 (HOSTEL BUILDING) W2 1.26 2.10 46 32 (HOSTEL BUILDING) W3 1.27 2.10 42 32 (HOSTEL BUILDING) W2 1.29 2.10 89 UnitBUA Table for Block :32 (HOSTEL BUILDING) FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement GROUND FLOOR PLAN 1 OTHER 1905.76 1905.76 27 1 FIRST FLOOR PLAN 1 OTHER 1403.60 1403.60 26 1 SECOND FLOOR PLAN 1 OTHER 1633.51 1633.51 30 1 THIRD FLOOR PLAN 1 OTHER 1633.25 1633.25 30 1 Total: - - 6576.12 6576.12 113 4 BBMP/Addl.Dir/JD South/0054/18-19 (Modified Plan) This Plan Sanction is issued subject to the following conditions CBCI Society for medical education The Secretary St, John's national Academy of health sciences, , Bangalore Consisting of a) Additional 4th, 5th & 6th Floor Over Existing Block -1 Oncology Building b) Additional 4th & 5th Floor over Existing Block -3 Unit of Hope Building c) Modified Plan with Additional 4th, 5th & 6th Floor over the existing ward Building Block -4 GF+6UF Ward Building d)Newly Proposed Block -32 GF+3UF Hostel Building 1. Sanction is accorded for Allied uses of Hospital, Hostel & Medical College only. The use of the building shall not be deviated to any other use. 2. Surface area reserved for car parking shall not be converted for any other purpose. 3. Development charges towards increasing the capacity of water supply, sanitary and power main has to be paid to BWSSB and BESCOM if any. 4. Necessary ducts for running telephone cables, cubicles at ground level for postal services & space for dumping garbage within the premises shall be provided. 5. The applicant shall construct temporary toilets for the use of construction workers and it should be demolished after the construction. 6. The applicant shall INSURE all workmen involved in the construction work against any accident / untoward incidents arising during the time of construction. 7. The applicant shall not stock any building materials / debris on footpath or on roads or on drains. The debris shall be removed and transported to near by dumping yard. 8. The applicant / builder is prohibited from selling the setback area / open spaces and the common facility areas, which shall be accessible to all the tenants and occupants. 9. The applicant shall provide a space for locating the distribution transformers & associated equipment as per K.E.R.C (Es& D) code leaving 3.00 mts. from the building within the premises. 10. The applicant shall provide a separate room preferably 4.50 x 3.65 m in the premises of hospital for installation of telecom equipment and also to make provisions for telecom services as per Bye-law No. 25. 11. The applicant shall maintain during construction such barricading as considered necessary to prevent dust, debris & other materials endangering the safety of people / structures etc. in & around the site. 12. The applicant shall plant at least two trees in the premises. 13. Permission shall be obtained from forest department for cutting trees before the commencement of the work. 14. License and approved plans shall be posted in a conspicuous place of the licensed premises. The building license and the copies of sanctioned plans with specifications shall be mounted on a frame and displayed and they shall be made available during inspections. 15. If any owner / builder contravenes the provisions of Building Bye-laws and rules in force, the Architect / Engineer / Supervisor will be informed by the Authority in the first instance, warned in the second instance and cancel the registration if the same is repeated for the third time. 16. Technical personnel, applicant or owner as the case may be shall strictly adhere to the duties and responsibilities specified in Schedule - IV (Bye-law No. 3.6) under sub section IV-8 (e) to (k). 17. The building shall be constructed under the supervision of a registered structural engineer. 18. On completion of foundation or footings before erection of walls on the foundation and in the case of columnar structure before erecting the columns “COMMENCEMENT CERTIFICATE” shall be obtained. 19. Construction or reconstruction of the building should be completed before the expiry of five years from the date of issue of license & within one month after its completion shall apply for permission to occupy the building. 20. The building should not be occupied without obtaining “OCCUPANCY CERTIFICATE” from the competent authority. 21. Drinking water supplied by BWSSB should not be used for the construction activity of the building. 22. The applicant shall ensure that the Rain Water Harvesting Structures are provided & maintained in good repair for storage of water for non-potable purposes or recharge of ground water at all times having a minimum total capacity mentioned in the Bye-law 32(a). 23. The building shall be designed and constructed adopting the norms prescribed in National Building Code and in the “Criteria for earthquake resistant design of structures” bearing No. IS 1893-2002 published by the Bureau of Indian Standards making the building resistant to earthquake. 24. The applicant should provide solar water heaters as per table 17 of Bye-law No. 29 for the building. 25. Facilities for physically handicapped persons prescribed in schedule XI (Bye laws - 31) of Building bye-laws 2003 shall be ensured. 26. The applicant shall provide at least one common toilet in the ground floor for the use of the visitors / servants / drivers and security men and also entrance shall be approached through a ramp for the Physically Handicapped persons together with the stepped entry. 27. The Occupancy Certificate will be considered only after ensuring that the provisions of conditions vide Sl. No. 23, 24, 25 & 26 are provided in the building. 28. The applicant shall ensure that no inconvenience is caused to the neighbours in the vicinity of construction and that the construction activities shall stop before 10.00 PM and shall not resume the work earlier than 7.00 AM to avoid hindrance during late hours and early morning hours. 29. Garbage originating from Apartments / Commercial buildings shall be segregated into organic and inorganic waste and should be processed in the Recycling processing unit200 k.gcapacity installed at site for its re-use / disposal (Applicable for Residential units of 50 and above and 5000 Sqm and above built up area for Commercial building). 30. The structures shall be designed for structural stability and safety to ensure for soil stabilization during the course of excavation for safe design for retaining walls and super structure for the safety of the structure as well as neighboring property, public roads and footpaths, and besides ensuring safety of workman and general public by erecting safe barricades. 31. Sufficient two wheeler parking shall be provided as per requirement. 32. Traffic Management Plan shall be obtained from Traffic Management Consultant for all high rise structures which shall be got approved from the Competent Authority if necessary. . 33. The Owner / Association of highrise building shall obtain clearance certificate from Fire Force Department every Two years with due inspection by the department regarding working condition of Fire Safety Measures installed. The certificate should be produced to the Corporation and shall get the renewal of the permission issued once in Two years. 34. The Owner / Association of highrise building shall get the building inspected by empanelled agencies of the Fire Force Department to ensure that the equipments installed are in good and workable condition, and an affidavit to that effect shall be submitted to the Corporation and Fire Force Department every year. 35. The Owner / Association of highrise building shall obtain clearance certificate from the Electrical Inspectorate every Two years with due inspection by the Department regarding working condition of Electrical installation / Lifts etc., The certificate should be produced to the BBMP and shall get the renewal of the permission issued that once in Two years. 36. The Owner / Association of the highrise building shall conduct two mock - trials in the building, one before the onset of summer and another during the summer and assure complete safety in respect of fire hazards. 37. Payment of Ground Rent for construction carried out beyond the two years period of plan sanction shall be made to the corporation as per bye law no. 3.8 note(i) of Building Bye-law-2003. 38. The Builder / Contractor / Professional responsible for supervision of work shall not materially and structurally deviate the construction from the sanctioned plan, without prior approval of the authority. They shall explain to the owner s about the risk involved in contravention of the provisions of the Act, Rules, Bye-laws, Zoning Regulations, Standing Orders and Policy Orders of the BBMP. 39. The Construction or reconstruction of building shall be commenced within a period of two (2) years from date of issue of licence. Before the expiry of two years, the Owner / Developer shall give intimation to BBMP (Sanctioning Authority) of the intention to start work in the form prescribed in Schedule VI. Further, the Owner / Developer shall give intimation on completion of the foundation or footing of walls / columns of the foundation. Otherwise the plan sanction deemed cancelled. 40. In case of any false information, misrepresentation of facts, or pending court cases, the plan sanction is deemed cancelled. 41. The Applicant / Owner / Developer shall abide by the collection of solid waste and its segregation as per solid waste management bye-law 2016. 42. The applicant/owner/developer shall abide by sustainable construction and demolition waste management as per solid waste management bye-law 2016. 43. The Applicant / Owners / Developers shall make necessary provision to charge electrical vehicles. 44. The Applicant / Owner / Developer shall plant one tree for a) sites measuring 180 Sqm upto 240 Sqm b) minimum of two trees for sites measuring with more than 240 Sqm. c) One tree for every 240 Sq.m of FAR area as part thereof in case of Apartment / group housing / multi dwelling unit/development plan. 45. The applicant Should abide for the condition as per the under taking given to submit relinquishment deed of road widening portion area 7634.39 sqmtr before obtaining Occupancy Certificate. 46. The applicant Should abide by the final orders of the Hon'ble High court with WP No 1966 /2020 (LB-BMP) Dt: 29-01-2020 towards the Payment of ground rent & GST, & 50% of License and scrutiny fees, Security Deposit Rs 75/- Sqmt & Labour Cess Special Condition as per Labour Department of Government of Karnataka vide ADDENDUM (HosadaagiHoodike) Letter No. LD/95/LET/2013, dated: 01-04-2013 1. Registration of Applicant / Builder / Owner / Contractor and the construction workers working in the construction site with the “Karnataka Building and Other Construction workers Welfare Board “should be strictly adhered to . 2. The Applicant / Builder / Owner / Contractor should submit the Registration of establishment and list of construction workers engaged at the time of issue of Commencement Certificate. A copy of the same shall also be submitted to the concerned local Engineer in order to inspect the establishment and ensure the registration of establishment and workers working at construction site or work place. 3. The Applicant / Builder / Owner / Contractor shall also inform the changes if any of the list of workers engaged by him. 4. At any point of time No Applicant / Builder / Owner / Contractor shall engage a construction worker in his site or work place who is not registered with the “Karnataka Building and Other Construction workers Welfare Board” Note: 1. Accommodation shall be provided for setting up of schools for imparting education to the children of construction workers in the labour camps / construction sites. 2. List of children of workers shall be furnished by the builder / contractor to the Labour Department which is mandatory. 3. Employment of child labour in the construction activities strictly prohibited. 4. Obtaining NOC from the Labour Department before commencing the construction work is a must. 5. BBMP will not be responsible for any dispute that may arise in respect of property in question. 6. In case if the documents submitted in respect of property in question is found to be false or fabricated, the plan sanctioned stands cancelled automatically and legal action will be initiated. II. NOC Details III. The Applicant has paid the fees vide Online Receipt No. BBMP/0848/CH/20-21 dated: 30-05-2020 for the following:- 1. License Fees : 67,43,755.00 2. Betterment Charges a) For Building : 2,63,958.00 b) For Site : 0 4. Security Deposit : 6,59,895.00 5. Plan copy charges / Compound Wall Fees : 2,58,000.00 6. Lake Fess : 73,78,862.00 7. 1% Service Charge on Labour Cess to be paid to BBMP : 47,995.00 Total : 1,53,52,465 Say Rs: 1,53,53,000/- (One Crore Fifty Three lakhs Fifty Three thousand only) SL. No. Name of the Statutory Department Reference No. & Date Conditions Imposed 1 Fire Force Department GBC(1)/337/2017 Date: 26-09-2018 All the conditions imposed in the letter issued by the statutory Body should be adhered to. 2 Airport Authority of India / HAL BANG/SOUTH/B/110617/254581 Date: 27-11-2017 3 BESCOM EE/KMLD/AEE(O)/JE-2/14-15/1365-66 Date: 21-06-2014 4 KSPCB PCB/250/BMW/Reg No 146340 /2018 /H-598 Date: 21-08-2018 5 SEIAA SEIAA 134 CON 2016 Date: 25-01-2017 6 BSNL AGM(TP)/S-6/Vol-61/2017-18/12 Date: 20-12-2017 7 BWSSB BWSSB/EIC/CE(M)/ACE(M)-IV/DCE(M)II/TAC(M)-III/ 5182/2019-2020 Date: 23-12-2019 TRANSFORMER DG ROOM SHED DG YARD PORTICO PORTICO Water Tank Sub Station AC Room Chimney Generator TOILET Shop Rest House Pump House Shed SHED SUMP BASKET BALL GROUND STATUE Petrol Bunk Shed FOOD COURT 630.93m Median TO SARJAPURA TO MADIVALA TO KORAMANGALA TO SILK BOARD TO FORUM MALL Asphalted DRIVE WAY ASPHALTED ROAD Shed GENERATOR SHED Asphalted Road Pond STEPS YARD SUMP SHED BASKET POST PUMP HOUSE 29.0249 TO TAVAREKERE HOSUR ROAD EXI/:- ANIMAL HOUSE 39.7486 36.1739 8.38 8.3 10.75 11.1 10.36 10.41 22.99 5.8 5.89 4.8 6.96 9.97 PARKING-8(40 CARS) PARKING-2(38 CARS) PARKING-4(23 CARS) 246 365 204 203 222 39 75 40 01 529 549 510 165 183 146 164 245 223 PARKING-6(112 CARS) 473 472 455 419 418 489 AMBULANCE AMBULANCE 110 76 184 PARKING-3(39 CARS) PARKING-5(120 CARS) 391 436 437 454 530 PARKING-01(145 CARS) ENTRY ENTRY ENTRY ENTRY ENTRY ENTRY Martha Hostel TANK TANK TANK TANK SUMP GENERATOR PARKING-18( 18 CARS) AHU-04 AHU-03 8.5454 DRIVE WAY DRIVE WAY DRIVE WAY DRIVE WAY DRIVE WAY EXI/:-ST. JOHN MEDICAL COLLEGE & G.F+3 UPPER FLOOR BLOCK 02 OLD HOSPITAL (G+5) BLOCK 04 MODIFIED WARD BUILDING G.F.+6 UPPER FLOOR PLAN H.T /:- OF THE BUILDING - 24.95M EXISTING GF+3UF ONCOLOGY BUILDING G.F.+6 UPPER FLOOR PLAN H.T /:- OF THE BUILDING - 24.35M COVERED @4th to 6th FLOOR COVERED @4th to 6th FLOOR SITE PLAN HOSPITAL BUILDING H.T OF THE BUILDING -14.95M (WING -1A,B,D,&F) EXI/:- OLD HOSPITAL BUILDING G.F+3 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -1C&F) OLD HOSPITAL DIETARY BUILDING G.FLOOR ONLY H.T OF THE BUILDING - 5.36M (WING -1G) EXI/:-CAFETERIA BUILDING G.F+2 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING-27) EXI/:-NIRMALA HOSTEL G.F+3 UPPER FLOOR H.T OF THE BUILDING -14.95M (WING -14) EXI/:-HOSPITAL ANNEX G.F+3 UPPER FLOOR H.T OF THE BUILDING -14.95M (WING -13) EXI/:- LAUNDRY BUILDING G.F+3 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING-29) EXI/:-PG & PARAMEDICS & LADIES RESIDENCE BUILDING G.F+3 UPPER FLOOR H.T OF THE BUILDING -14.95M (WING-26) EXI/:- NURSES RESIDENCE BUILDING G.F+3 UPPER FLOOR H.T OF THE BUILDING -14.95M (WING-25) EXI/:-HOSPITAL ANNEX BUILDING G.F+3 UPPER FLOOR H.T OF THE BUILDING -14.95M (WING-20) AUDITORIUM BUILDING G.F+1 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -4) EXI/:- ST JOHNS (GUEST HOUSE) BUILDING G.F+ UPPER FLOOR H.T OF THE BUILDING -3.50M (WING -19) EXI/:- WARD BLOCK G.F+2 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -18) EXI/:- RESEARCH CENTER BUILDING (WING -18) SUMP G.F+2 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -9) POST OFFICE BUILDING EXI/:- BANK OF BARODA AND G.F+1 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -22 EXI/:- OFFICE BUILDING G.F+2 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -23 & 23A) EXI/:- CLASS ROOM AUDITORIUM AUDITORIUM BUILDING G.F+1 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -21) G.F+2 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -7& 8) EXI/:- GORETTI HOSTEL & ALPHONSA HOSTEL BUILDING G.F+2 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -6) EXI/:- ADDITION TO COLLEGE OF NURSING BUILDING EXI/:-ST JOSEPHS HOSTEL BUILDING G.F+2 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -3) G.F+2 UPPER FLOOR H.T OF THE (WING -5) EXI/:-MARIA HOSTEL BUILDING -11.48M G.F+3 UPPER FLOOR H.T OF THE BUILDING -14.95M (WING -10) EXI/:- ROBERT KOCH BHAVAN BUILDING G.F+1 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -11) CENTRE BUILDING EXI/:- ZABLOCKI LEARNING EXI/:-SGOLDEN JUBILEE BUILDING G.F+3 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING -28) MANAGEMENT BUILDING G.F+1 UPPER FLOOR H.T OF THE BUILDING -11.48M (WING-31) EXI/:-ENGINEERING&FACILITY EXI/:- WASTE SEGREGATION G.F+ UPPER FLOOR H.T OF THE BUILDING -11.48M (WING-32) EXI/:- VIANNEY HOUSE & G.F+2 UPPER FLOOR (WING -2A&B) DIRECTORS OFFICE BUILDING EXI/:-MAINTENANCE G.F+2 UPPER FLOOR H.T OF THE BUILDING -14.95M (WING -16) PROPOSED 4th, 5th & 6th UPPER FLOORS EXISTING GF+3UF BLOCK-3, UNIT OF HOPE BUILDING G.F.+5 UPPER FLOOR PLAN H.T /:- OF THE BUILDING - 21.45M PROPOSED 4th & 5th UPPER FLOORS 9.01 9.01 BLOCK - 32 PROPOSED HOSTEL BUILDING G.F+3 UPPER FLOOR PLAN H.T /:- OF THE BUILDING - 14.40M 9.05 7.88 15.18 29.24 12.71 21.29 36.94 6.46 17.12 Asphalted Road 40.48 36.32 34.82 24.91 31.3 45.28 51.25 42.26 38.67 24.02 15.8 39.38 12.65 64.84 51.85 80.73 76.47 23.47 29.19 7.5 24.96 33.66 36.18 10.72 14.43 38.43 62.63 6.6 171.94 16.1408 63.4 10.92 30.2 47.89 47.2 73.24 26 5.95 14.11 19.69 44.2264 67.34 64.9 33.64 BLOCK-1 34.5 15.75 6.75 22.5 34.5 17.25 22.5 5.25 17.25 22.5 5.25 1.ROAD WIDENING AREA = 3387.08smt PROPOSED TO BE WIDENED 45.00M EXISTING 31.50M WIDE ROAD PROPOSED TO BE WIDENED 45.00M EXISTING 34.50M WIDE ROAD 31.5 C/LINE OF ROAD C/LINE OF ROAD C/LINE OF ROAD C/LINE OF ROAD 3.50M WIDE DRIVEWAY PARKING -64X9=576 cars 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY PARKING =475 cars 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 6.00M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY 3.50M WIDE DRIVEWAY PARKING =316 cars 3.50M WIDE DRIVEWAY PARKING =90 cars 3.50M WIDE DRIVEWAY PARKING =72 cars 3.50M WIDE DRIVEWAY PARKING =81 cars 3.50M WIDE DRIVEWAY PARKING =50 cars 2.4 FOYER & GRIEVING ROOM, G+6(E1) Asphalted DRIVE WAY Asphalted DRIVE WAY Asphalted DRIVE WAY Transformer 17.1001 15.27 ENTRY 14.6 2. ROAD WIDENING AREA=4247.31smt 348.26m 264.88m 120.10m 53.68m 215.15m 135.68m 77.76m 651.50 m TREE TREE TREE TREE TREE TREE TREE TREE TREE TREE TREE TREE TREE TREE TREE TREE RWH PIT RWH PIT RWH PIT RWH PIT EXISTING STAFF CHANGE ROOMS (G) .15 HOSPITAL (WING -15) CANTEEN (G) .12 EXISTING PORTICO PORTICO Validity of this approval is two years from the date of issue. vide lp number :BBMP/Addl.Dir/JDSOUTH/0054/18-19 subject to terms and conditions laid down along with this modified building plan approval. The modified plans are Approved in accordance with the acceptance for approval by the commissioner on date: 04-01-2020 . NORTH KEY PLAN (N.T.S) S W E N STADIA HOSUR ROAD HOSUR ROAD HOSUR ROAD HOSUR ROAD 6TH CROSS ROAD 5TH CROSS ROAD 4TH CROSS ROAD 3RD CROSS ROAD 2ND CROSS ROAD 16TH A MAIN ROAD 18TH MAIN ROAD 18TH MAIN ROAD 100 FEET ROAD SARJAPUR MAIN ROAD SARJAPUR MAIN ROAD * ST ANTHONY'S FRIARY CHURCH * TRICON INFOTECH PVT.LTD *HP PETROL PUMP * ST.JOHNS MEDICAL COLLAGE GROUND * INDIAN INSTITUTE OF ASTROPHYSICS * GREENWOOD HIGH PRE SCHOOL * SRI VENKATESHWARA HOSPITAL * SBI OF KORAMANGLA SITE IN QUESTION 3000mmØ 40mm GRAVEL FILLING UP TO 300mm 65mm GRAVEL FILLING UP TO 300mm BRICK BAT OF SIZE 50MM TO 80MM RCC PRECAST RING OF CAMPACTED EARTH FILLING 50mmØ HOLES 2 NOS. ON OPPOSITE DIRECTION AT 300mm APART 150mmØ PVC PIPE WITH PERFORATED HOLES 6000mm TOP SLAB OF 150mm THICK 230mm THICK BRICK WALL BUILT IN CM 1:6 SECTION AT X X EXTERNAL RAIN WATER SOAK PIT PLAN OF SOAK PIT COMPACTED EARTH SURFACE 3000mmØ x 50mm THICK x 300mm DEPTH 75 3000mmØ X X CRUSHED STONE 150mmØ HUME PIPE RCC PRECAST RINGS WITH 50mmØ HOLES ALONG DIA (8NOS) 50mmØ HOLES ALONG DIA (8NOS) 3000mmØ x 50mm THICK x 300mm DEPTH 2000mm 75mm THICK IN PCC 1:5:10 VARIES 150mmØ HUME PIPE (OUTLET AS PER DRG) (INLET AS PER DRG) 6 KGF/CM 2 OR TYPE-B FILLING UP TO 300mm RCC 1:2:4 TOP COVER SLAB WITH 10MMØ TOR BARS AT 100MM C/C BOTH WAYS. RCC 1:2:4 PRECAST TOP COVER SLAB 600MM WIDE WITH 10MMØ TOR BARS AT 100MM C/C BOTH WAYS. 100mm RAIN WATER SOAK PIT DETAIL (1.20 M DIA X 6M DEEP) SCALE : N Name : B G RAGHAVENDRA PRASAD Designation : Joint Director Town Planning (JDTP) Organization : BBMP Date : 25-Jun-2020 14: 53:51

Upload: others

Post on 08-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HOSUR ROAD SBI OF KORAMANGLA 18TH MAIN ROAD … Saction Details PDF/JDTP SOUTH/2020-21/3.pdfBLOCK NAME NAME LENGTH HEIGHT NOS 3 (UNIT OF HOPE BUILDING) D2 0.75 2.10 09 3 (UNIT OF HOPE

UserDefinedMetric (1800.00 x 910.00MM)SHEET NO :

1

DRAWING TITLE :SITE PLAN

PROJECT TITLE :

PLAN FOR PROPOSED ADDITIONS TO EXISTING ONCOLOGY BUILDING& BLOCK-3, UNITS OFHOPE BUILDING AND MODIFIED PLAN TOBLOCK-4, WARD BUILDING AT MUNICIPAL NO. NEW.141/2,INDUSTRIAL LAYOUT, KORAMANGALA (PID NO-67-3-141/2)OLD WARD NO.67, (NEW WARD NO.151), BANGALORE.

:

OWN_SIGN

ARC_SIGN

CBCI Society for medical education rep byPaul Parathazham Vianney House, St, John'snational Acadamy of health sciences, sarjapura road, Bangalore.

Ganesh N #4/2, 8th main, 6th cross, S.R.Nagar, Bangalore E-4289/17-18

This is a system generated drawing as per the soft copy submitted by the Architect/ License Engineer

AREA STATEMENT (BBMP) VERSION NO.: 1.0.11VERSION DATE: 01/11/2018

PROJECT DETAIL:Authority: BBMP Plot Use: MedicalInward_No: BBMP/Addl.Dir/JDSOUTH/0054/18-19

Plot SubUse: Hospital

Application Type: General Land Use Zone: Public and Semi PublicProposal Type: Building Permission Plot/Sub Plot No.: 141/2Nature of Sanction: Modify Khata No. (As per Khata Extract): 141/2Location: Ring-II Locality / Street of the property: Industrial layout, Koramangala, Bangalore.Building Line Specified as per Z.R: NAZone: SouthWard: Ward-151Planning District: 208-KoramangalaAREA DETAILS: SQ.MT.

AREA OF PLOT (Minimum) (A) 295154.47Deduction for NetPlot Area

Road Widening Area 7634.05Total 7634.05

NET AREA OF PLOT (A-Deductions) 287520.41COVERAGE CHECK

Permissible Coverage area (45.00 %) 129384.18Proposed Coverage Area (2.84 %) 8174.98Existing coverage area to be retained ( 18.84 % ) 54169.51Achieved Net coverage area ( 21.68 % ) 62344.49Balance coverage area left ( 23.32 % ) 67039.69

FAR CHECKPermissible F.A.R. as per zoning regulation 2015 ( 3.25 ) 959252.00Additional F.A.R within Ring I and II ( for amalgamated plot - ) 0.00Allowable TDR Area (60% of Perm.FAR ) 0.00Premium FAR for Plot within Impact Zone ( - ) 0.00Total Perm. FAR area ( 3.25 ) 959252.00Special FAR (82.53% ) 39167.57Existing Special FAR (% ) 8156.29Proposed FAR Area 47459.37Existing FAR Area 154640.70Achieved Net FAR Area ( 0.68 ) 202100.06Balance FAR Area ( 2.57 ) 757151.94

BUILT UP AREA CHECKProposed BuiltUp Area 51052.02Existing BUA Area 8593.90Existing BUA Area for Existing Structure 157740.58Substructure Area Add in BUA (Layout Lvl) 15.22Achieved BuiltUp Area 208807.82

Color Notes

EXISTING (To be demolished)EXISTING (To be retained)PROPOSED WORK (COVERAGE AREA)ABUTTING ROADPLOT BOUNDARY

COLOR INDEX

Block USE/SUBUSE Details

Block Name Block Use Block SubUse Block StructureBlock Land UseCategory

32 (HOSTELBUILDING) Public and Semi Public Hospital Highrise P-SP3

1 (ONCOLOCYBUILDING) Medical Hospital Highrise C3

3 (UNIT OF HOPEBUILDING) Medical Hospital Highrise C3

4 (WARD BUILDING) Medical Hospital Highrise C3

Required Parking(Table 7a)

BlockName

Type SubUseArea(Sq.mt.)

Units CarReqd. Prop. Reqd./Unit Reqd. Prop.

32 (HOSTELBUILDING)

Public andSemi Public

Hospital > 0 100 6576.12 1 66 -

1(ONCOLOCYBUILDING)

Educational TutorialCentre > 0 150 4926.66 1 33 -

Medical Hospital > 0 100 3687.25 1 37 -3 (UNIT OFHOPEBUILDING)

Educational TutorialCentre > 0 150 3229.62 1 22 -

Medical Hospital > 0 100 1588.34 1 16 -4 (WARDBUILDING) Medical Hospital > 0 100 27315.86 1 273 -

Total : - - - - 447 2222

Parking Check (Table 7b)

Vehicle TypeReqd. Achieved

No. Area (Sq.mt.) No. Area (Sq.mt.)Car 447 6146.25 2222 30545.80Visitor's Car Parking 41 563.75 0 0.00Total Car 488 6710.00 2222 30545.80TwoWheeler - 660.00 0 0.00Other Parking - - - 0.00Total 7370.00 30545.80

FAR &Tenement Details

BlockNo. ofSameBldg

GrossBuiltUp Area(Sq.mt.)

DeductionsFromGrossBUA(AreainSq.mt.)

TotalBuilt UpArea(Sq.mt.)

ExistingBuilt UpArea(Sq.mt.)

ProposedBuiltUp Area(Sq.mt.)

Deductions (Area in Sq.mt.) ExistingFAR Area(Sq.mt.)

Proposed FARArea (Sq.mt.) Total

FAR Area(Sq.mt.)

Cutout StairCase Lift LiftMachine Void Medical

Publicand SemiPublic

32(HOSTELBUILDING)

1 8142.19 0.00 8142.19 0.00 8142.19 97.61 29.70 3.35 1435.41 0.00 0.00 6576.12 6576.12

1(ONCOLOCYBUILDING)

1 9443.52 125.70 9317.82 5245.38 4072.45 87.66 197.47 28.21 360.45 4926.66 3687.25 0.00 8644.03

3 (UNITOF HOPEBUILDING)

1 5173.57 119.14 5054.43 3348.52 1705.91 44.66 86.85 7.38 97.56 3229.62 1588.34 0.00 4817.98

4(WARDBUILDING)

1 31289.83 2752.25 28537.58 0.00 28537.58 199.55 210.30 7.46 699.02 0.00 27315.86 0.00 27421.25

GrandTotal: 4 54049.11 2997.09 51052.02 8593.90 42458.13 429.48 524.32 46.40 2592.44 8156.29 32591.45 6576.12 47459.38

Existing Block Details

Name Use SubUse Type Structure Height Floor No FAR Area BUA AreaST. JOHNMEDICALCOLLEGE& HOSPITALW-1

Public andSemi Public

ResearchInstitutions

Building Highrise 17.95 7 154640.70 157740.58

Block Name Built Up Area (Sq. Mt.) FAR Area (Sq. Mt.)ST. JOHN MEDICAL COLLEGE& HOSPITAL W-1 157740.58 154640.70

Total: 157740.58 154640.70

Block :1 (ONCOLOCY BUILDING)

FloorName

GrossBuiltupArea

DeductionsFromGrossBUA(AreainSq.mt.)

TotalBuilt UpArea(Sq.mt.)

ExistingBuilt UpArea(Sq.mt.)

ProposedBuilt UpArea(Sq.mt.)

Deductions (Area in Sq.mt.) ExistingFAR Area(Sq.mt.)

ProposedFAR Area(Sq.mt.)

Total FARArea(Sq.mt.)

Cutout StairCase Lift LiftMachine Void Medical

TerraceFloor 145.98 0.00 145.98 0.00 145.98 87.66 0.00 28.21 0.00 0.00 0.00 30.11SixthFloor 1329.42 20.23 1309.19 0.00 1309.19 0.00 28.21 0.00 51.50 0.00 1229.48 1229.48FifthFloor 1329.42 20.23 1309.19 0.00 1309.19 0.00 28.21 0.00 51.32 0.00 1229.66 1229.66FourthFloor 1329.40 21.31 1308.09 0.00 1308.09 0.00 28.21 0.00 51.76 0.00 1228.12 1228.12ThirdFloor 1329.42 20.23 1309.19 1309.19 0.00 0.00 28.21 0.00 51.40 1229.58 0.00 1229.58SecondFloor 1329.40 21.31 1308.09 1308.09 0.00 0.00 28.21 0.00 51.35 1228.53 0.00 1228.53FirstFloor 1329.39 21.31 1308.08 1308.09 0.00 0.00 28.21 0.00 51.72 1228.15 0.00 1228.15GroundFloor 1321.09 1.08 1320.01 1320.01 0.00 0.00 28.21 0.00 51.40 1240.40 0.00 1240.40

Total: 9443.52 125.70 9317.82 5245.38 4072.45 87.66 197.47 28.21 360.45 4926.66 3687.25 8644.03TotalNumber ofSameBlocks:

1

Total: 9443.52 125.70 9317.82 5245.38 4072.45 87.66 197.47 28.21 360.45 4926.66 3687.25 8644.03

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS1 (ONCOLOCYBUILDING) D2 0.75 2.10 77

1 (ONCOLOCYBUILDING) D1 0.75 2.10 01

1 (ONCOLOCYBUILDING) D1 0.90 2.10 62

1 (ONCOLOCYBUILDING) D1 1.10 2.10 36

1 (ONCOLOCYBUILDING) MD 1.10 2.10 07

1 (ONCOLOCYBUILDING) MD 1.20 2.10 02

1 (ONCOLOCYBUILDING) D3 1.50 2.10 57

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS1 (ONCOLOCYBUILDING) V 1.00 0.90 75

1 (ONCOLOCYBUILDING) V 1.00 2.10 13

1 (ONCOLOCYBUILDING) W2 1.50 2.10 111

1 (ONCOLOCYBUILDING) W9 1.55 2.10 03

1 (ONCOLOCYBUILDING) W2 1.89 2.10 01

1 (ONCOLOCYBUILDING) W2 1.92 2.10 01

1 (ONCOLOCYBUILDING) W10 2.00 2.10 24

1 (ONCOLOCYBUILDING) W2 2.28 2.10 01

1 (ONCOLOCYBUILDING) W2 2.40 2.10 01

1 (ONCOLOCYBUILDING) V2 2.50 0.90 07

1 (ONCOLOCYBUILDING) W3 2.50 2.10 56

1 (ONCOLOCYBUILDING) W2 2.76 2.10 01

1 (ONCOLOCYBUILDING) W2 2.78 2.10 01

1 (ONCOLOCYBUILDING) W 3.00 2.10 15

1 (ONCOLOCYBUILDING) W2 3.01 2.10 01

1 (ONCOLOCYBUILDING) W2 3.24 2.10 01

1 (ONCOLOCYBUILDING) W2 3.39 2.10 01

1 (ONCOLOCYBUILDING) W2 3.51 2.10 01

UnitBUA Table for Block :1 (ONCOLOCY BUILDING)

FLOOR Name UnitBUA Type Entity Type UnitBUA Area Carpet Area No. of Rooms No. ofTenement

GROUNDFLOOR PLAN G-1 OTHER Existing 1240.40 1240.40 19 1FIRST FLOORPLAN F-1 OTHER Existing 1228.15 1228.15 22 1SECONDFLOOR PLAN SE-1 OTHER Existing 1228.53 1228.53 19 1THIRD FLOORPLAN TH-2 OTHER Existing 1229.58 1229.58 53 1FOURTHFLOOR PLAN FOU-1 OTHER Proposed 1228.12 1228.12 24 1FIFTH FLOORPLAN FIF-2 OTHER Proposed 1229.66 1229.66 53 1SIXTH FLOORPLAN SX-2 OTHER Proposed 1229.48 1229.48 45 1

Total: - - - 8613.92 8613.92 235 7

Block :3 (UNIT OF HOPE BUILDING)

FloorName

GrossBuiltupArea

DeductionsFromGrossBUA(AreainSq.mt.)

TotalBuilt UpArea(Sq.mt.)

ExistingBuilt UpArea(Sq.mt.)

ProposedBuilt UpArea(Sq.mt.)

Deductions (Area in Sq.mt.) ExistingFAR Area(Sq.mt.)

ProposedFAR Area(Sq.mt.)

Total FARArea(Sq.mt.)

Cutout StairCase Lift LiftMachine Void Medical

TerraceFloor 58.13 0.00 58.13 0.00 58.13 44.66 6.09 7.38 0.00 0.00 0.00 0.00FifthFloor 840.96 17.07 823.89 0.00 823.89 0.00 13.46 0.00 16.26 0.00 794.17 794.17FourthFloor 840.96 17.07 823.89 0.00 823.89 0.00 13.46 0.00 16.26 0.00 794.17 794.17ThirdFloor 858.38 18.37 840.01 840.01 0.00 0.00 13.46 0.00 16.26 810.29 0.00 810.29SecondFloor 858.38 24.07 834.31 834.31 0.00 0.00 13.46 0.00 16.26 804.59 0.00 804.59FirstFloor 858.38 24.07 834.31 834.31 0.00 0.00 13.46 0.00 16.26 804.59 0.00 804.59GroundFloor 858.38 18.49 839.89 839.89 0.00 0.00 13.46 0.00 16.26 810.17 0.00 810.17

Total: 5173.57 119.14 5054.43 3348.52 1705.91 44.66 86.85 7.38 97.56 3229.62 1588.34 4817.98TotalNumber ofSameBlocks:

1

Total: 5173.57 119.14 5054.43 3348.52 1705.91 44.66 86.85 7.38 97.56 3229.62 1588.34 4817.98

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS3 (UNIT OF HOPEBUILDING) D2 0.75 2.10 09

3 (UNIT OF HOPEBUILDING) D1 0.90 2.10 48

3 (UNIT OF HOPEBUILDING) D1 1.10 2.10 02

3 (UNIT OF HOPEBUILDING) MD 1.10 2.10 04

3 (UNIT OF HOPEBUILDING) MD 1.20 2.10 01

3 (UNIT OF HOPEBUILDING) D3 1.50 2.10 10

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS3 (UNIT OF HOPEBUILDING) V 0.91 0.90 03

3 (UNIT OF HOPEBUILDING) V 1.00 0.90 08

3 (UNIT OF HOPEBUILDING) W2 1.37 2.10 05

3 (UNIT OF HOPEBUILDING) W2 1.50 2.10 165

3 (UNIT OF HOPEBUILDING) W2 1.83 2.10 05

3 (UNIT OF HOPEBUILDING) V1 1.90 0.90 12

3 (UNIT OF HOPEBUILDING) W 3.00 2.10 01

UnitBUA Table for Block :3 (UNIT OF HOPE BUILDING)

FLOOR Name UnitBUA Type Entity Type UnitBUA Area Carpet Area No. of Rooms No. ofTenement

GROUNDFLOOR PLAN G-1 OTHER Existing 810.17 810.17 14 1FIRST FLOORPLAN F-1 OTHER Existing 804.59 804.59 13 1SECONDFLOOR PLAN SE-1 OTHER Existing 804.59 804.59 13 1THIRD FLOORPLAN TH-1 OTHER Existing 810.29 810.29 6 1FOURTHFLOOR PLAN FOU-1 OTHER Proposed 794.17 794.17 14 1FIFTH FLOORPLAN FIF-1 OTHER Proposed 794.17 794.17 10 1

Total: - - - 4817.98 4817.98 70 6

Block :4 (WARD BUILDING)

FloorName

GrossBuiltup Area

DeductionsFrom GrossBUA(Area inSq.mt.)

Total BuiltUp Area(Sq.mt.)

Deductions (Area in Sq.mt.)ProposedFAR Area(Sq.mt.)

Total FARArea(Sq.mt.)

Cutout StairCase Lift Lift Machine Void MedicalTerraceFloor 332.17 0.00 332.17 199.55 19.76 7.46 0.00 0.00 105.40

Sixth Floor 4439.94 394.85 4045.09 0.00 27.22 0.00 99.86 3918.01 3918.01Fifth Floor 4439.95 394.86 4045.09 0.00 27.22 0.00 99.86 3918.01 3918.01FourthFloor 4447.95 394.86 4053.09 0.00 27.22 0.00 99.86 3926.01 3926.01

Third Floor 4404.93 391.93 4013.00 0.00 27.22 0.00 99.86 3885.92 3885.92SecondFloor 4404.93 391.93 4013.00 0.00 27.22 0.00 99.86 3885.92 3885.92

First Floor 4404.93 391.93 4013.00 0.00 27.22 0.00 99.86 3885.92 3885.92GroundFloor 4415.03 391.89 4023.14 0.00 27.22 0.00 99.86 3896.06 3896.06

Total: 31289.83 2752.25 28537.58 199.55 210.30 7.46 699.02 27315.86 27421.25TotalNumber ofSameBlocks:

1

Total: 31289.83 2752.25 28537.58 199.55 210.30 7.46 699.02 27315.86 27421.25

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS4 (WARD BUILDING) D2 0.75 2.10 1304 (WARD BUILDING) D1 0.90 2.10 1174 (WARD BUILDING) MD 1.20 2.10 1044 (WARD BUILDING) D3 1.50 2.10 90

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS4 (WARD BUILDING) V 1.00 0.90 1264 (WARD BUILDING) W3 1.50 2.10 014 (WARD BUILDING) W9 1.55 2.10 044 (WARD BUILDING) V1 1.75 0.90 024 (WARD BUILDING) W10 2.00 2.10 614 (WARD BUILDING) V2 2.50 0.90 374 (WARD BUILDING) W3 2.50 2.10 844 (WARD BUILDING) W 3.00 2.10 351

UnitBUA Table for Block :4 (WARD BUILDING)

FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of TenementGROUNDFLOOR PLAN

G-1 OTHER 1237.47 1237.47 12

G-2 OTHER 1237.45 1237.45 1FIRST FLOORPLAN

1- TY-1,2,3 OTHER 1237.47 1237.47 2022- TY-1,2,3 OTHER 1237.45 1237.45 20

SECONDFLOOR PLAN

1- TY-1,2,3 OTHER 1237.47 1237.47 2022- TY-1,2,3 OTHER 1237.45 1237.45 20

THIRD FLOORPLAN

1- TY-1,2,3 OTHER 1237.47 1237.47 2022- TY-1,2,3 OTHER 1237.45 1237.45 20

FOURTH FLOORPLAN

FOU-1 OTHER 1275.64 1275.64 302

FOU-2 OTHER 1273.61 1273.61 36FIFTH FLOORPLAN

FIF-1 OTHER 1270.59 1270.59 642

FIF-2 OTHER 1273.80 1273.80 29SIXTH FLOORPLAN

SX-1 OTHER 1270.59 1270.59 642

SX-2 OTHER 1270.58 1270.58 62Total: - - 17534.46 17534.46 407 14

Block :32 (HOSTEL BUILDING)

Floor NameTotal Built UpArea (Sq.mt.)

Deductions (Area in Sq.mt.)Proposed FARArea(Sq.mt.) Total FAR

Area (Sq.mt.)StairCase Lift Lift Machine Void Public and

Semi PublicTerrace Floor 104.22 97.61 3.26 3.35 0.00 0.00 0.00Third Floor 2016.56 0.00 6.61 0.00 376.70 1633.25 1633.25Second Floor 2016.57 0.00 6.61 0.00 376.45 1633.51 1633.51First Floor 2012.89 0.00 6.61 0.00 602.68 1403.60 1403.60Ground Floor 1991.95 0.00 6.61 0.00 79.58 1905.76 1905.76Total: 8142.19 97.61 29.70 3.35 1435.41 6576.12 6576.12Total Numberof Same Blocks:

1

Total: 8142.19 97.61 29.70 3.35 1435.41 6576.12 6576.12

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS32 (HOSTELBUILDING) D1 0.90 2.10 93

32 (HOSTELBUILDING) D3 1.10 2.10 20

SCHEDULE OF JOINERY:

BLOCK NAME NAME LENGTH HEIGHT NOS32 (HOSTELBUILDING) V 1.00 0.90 08

32 (HOSTELBUILDING) W2 1.26 2.10 46

32 (HOSTELBUILDING) W3 1.27 2.10 42

32 (HOSTELBUILDING) W2 1.29 2.10 89

UnitBUA Table for Block :32 (HOSTEL BUILDING)

FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of TenementGROUNDFLOOR PLAN 1 OTHER 1905.76 1905.76 27 1FIRST FLOORPLAN 1 OTHER 1403.60 1403.60 26 1SECONDFLOOR PLAN 1 OTHER 1633.51 1633.51 30 1THIRD FLOORPLAN 1 OTHER 1633.25 1633.25 30 1

Total: - - 6576.12 6576.12 113 4

BBMP/Addl.Dir/JD South/0054/18-19 (Modified Plan)

This Plan Sanction is issued subject to the following conditions

CBCI Society for medical education The Secretary St, John's national Academy of health sciences,

, Bangalore Consisting of

a) Additional 4th, 5th & 6th Floor Over Existing Block -1 Oncology Building

b) Additional 4th & 5th Floor over Existing Block -3 Unit of Hope Building

c)Modified Plan with Additional 4th, 5th & 6th Floor over the existing ward Building Block -4 GF+6UF

Ward Building

d)Newly Proposed Block -32 GF+3UF Hostel Building

1. Sanction is accorded for Allied uses of Hospital, Hostel & Medical College only. The use of the

building shall not be deviated to any other use.

2. Surface area reserved for car parking shall not be converted for any other purpose.

3. Development charges towards increasing the capacity of water supply, sanitary and power main has to be

paid to BWSSB and BESCOM if any.

4. Necessary ducts for running telephone cables, cubicles at ground level for postal services & space for

dumping garbage within the premises shall be provided.

5. The applicant shall construct temporary toilets for the use of construction workers and it should be

demolished after the construction.

6. The applicant shall INSURE all workmen involved in the construction work against any accident /

untoward incidents arising during the time of construction.

7. The applicant shall not stock any building materials / debris on footpath or on roads or on drains. The

debris shall be removed and transported to near by dumping yard.

8. The applicant / builder is prohibited from selling the setback area / open spaces and the common

facility areas, which shall be accessible to all the tenants and occupants.

9. The applicant shall provide a space for locating the distribution transformers & associated equipment

as per K.E.R.C (Es& D) code leaving 3.00 mts. from the building within the premises.

10. The applicant shall provide a separate room preferably 4.50 x 3.65 m in the premises of hospital for

installation of telecom equipment and also to make provisions for telecom services as per Bye-law No. 25.

11. The applicant shall maintain during construction such barricading as considered necessary to prevent

dust, debris & other materials endangering the safety of people / structures etc. in & around the site.

12. The applicant shall plant at least two trees in the premises.

13. Permission shall be obtained from forest department for cutting trees before the commencement of

the work.

14. License and approved plans shall be posted in a conspicuous place of the licensed premises. The

building license and the copies of sanctioned plans with specifications shall be mounted on a frame and

displayed and they shall be made available during inspections.

15. If any owner / builder contravenes the provisions of Building Bye-laws and rules in force, the Architect

/ Engineer / Supervisor will be informed by the Authority in the first instance, warned in the second instance

and cancel the registration if the same is repeated for the third time.

16. Technical personnel, applicant or owner as the case may be shall strictly adhere to the duties and

responsibilities specified in Schedule - IV (Bye-law

No. 3.6) under sub section IV-8 (e) to (k).

17. The building shall be constructed under the supervision of a registered structural engineer.

18. On completion of foundation or footings before erection of walls on the foundation and in the case of

columnar structure before erecting the columns “COMMENCEMENT CERTIFICATE” shall be obtained.

19. Construction or reconstruction of the building should be completed before the expiry of five years from

the date of issue of license & within one month after its completion shall apply for permission to occupy the

building.

20. The building should not be occupied without obtaining “OCCUPANCY CERTIFICATE” from the

competent authority.

21. Drinking water supplied by BWSSB should not be used for the construction activity of the building.

22. The applicant shall ensure that the Rain Water Harvesting Structures are provided & maintained in

good repair for storage of water for non-potable purposes or recharge of ground water at all times having a

minimum total capacity mentioned in the Bye-law 32(a).

23. The building shall be designed and constructed adopting the norms prescribed in National Building

Code and in the “Criteria for earthquake resistant design of structures” bearing No. IS 1893-2002 published

by the Bureau of Indian Standards making the building resistant to earthquake.

24. The applicant should provide solar water heaters as per table 17 of Bye-law No. 29 for the building.

25. Facilities for physically handicapped persons prescribed in schedule XI (Bye laws - 31) of Building

bye-laws 2003 shall be ensured.

26. The applicant shall provide at least one common toilet in the ground floor for the use of the visitors /

servants / drivers and security men and also entrance shall be approached through a ramp for the

Physically Handicapped persons together with the stepped entry.

27. The Occupancy Certificate will be considered only after ensuring that the provisions of conditions vide

Sl. No. 23, 24, 25 & 26 are provided in the building.

28. The applicant shall ensure that no inconvenience is caused to the neighbours in the vicinity of

construction and that the construction activities shall stop before 10.00 PM and shall not resume the work

earlier than 7.00 AM to avoid hindrance during late hours and early morning hours.

29. Garbage originating from Apartments / Commercial buildings shall be segregated into organic and

inorganic waste and should be processed in the Recycling processing unit200 k.gcapacity installed at site

for its re-use / disposal (Applicable for Residential units of 50 and above and 5000 Sqm and above built up

area for Commercial building).

30. The structures shall be designed for structural stability and safety to ensure for soil stabilization during

the course of excavation for safe design for retaining walls and super structure for the safety of the structure

as well as neighboring property, public roads and footpaths, and besides ensuring safety of workman and

general public by erecting safe barricades.

31. Sufficient two wheeler parking shall be provided as per requirement.

32. Traffic Management Plan shall be obtained from Traffic Management Consultant for all high rise

structures which shall be got approved from the Competent Authority if necessary. .

33. The Owner / Association of highrise building shall obtain clearance certificate from Fire Force

Department every Two years with due inspection by the department regarding working condition of Fire

Safety Measures installed. The certificate should be produced to the Corporation and shall get the renewal

of the permission issued once in Two years.

34. The Owner / Association of highrise building shall get the building inspected by empanelled agencies

of the Fire Force Department to ensure that the equipments installed are in good and workable condition,

and an affidavit to that effect shall be submitted to the Corporation and Fire Force Department every year.

35. The Owner / Association of highrise building shall obtain clearance certificate from the Electrical

Inspectorate every Two years with due inspection by the Department regarding working condition of

Electrical installation / Lifts etc., The certificate should be produced to the BBMP and shall get the renewal

of the permission issued that once in Two years.

36. The Owner / Association of the highrise building shall conduct two mock - trials in the building, one

before the onset of summer and another during the summer and assure complete safety in respect of fire

hazards.

37. Payment of Ground Rent for construction carried out beyond the two years period of plan sanction

shall be made to the corporation as per bye law no. 3.8 note(i) of Building Bye-law-2003.

38. The Builder / Contractor / Professional responsible for supervision of work shall not materially and

structurally deviate the construction from the sanctioned plan, without prior approval of the authority. They

shall explain to the owner s about the risk involved in contravention of the provisions of the Act, Rules,

Bye-laws, Zoning Regulations, Standing Orders and Policy Orders of the BBMP.

39. The Construction or reconstruction of building shall be commenced within a period of two (2) years

from date of issue of licence. Before the expiry of two years, the Owner / Developer shall give intimation to

BBMP (Sanctioning Authority) of the intention to start work in the form prescribed in Schedule VI. Further,

the Owner / Developer shall give intimation on completion of the foundation or footing of walls / columns of

the foundation. Otherwise the plan sanction deemed cancelled.

40. In case of any false information, misrepresentation of facts, or pending court cases, the plan sanction

is deemed cancelled.

41. The Applicant / Owner / Developer shall abide by the collection of solid waste and its segregation as

per solid waste management bye-law 2016.

42. The applicant/owner/developer shall abide by sustainable construction and demolition waste

management as per solid waste management bye-law 2016.

43. The Applicant / Owners / Developers shall make necessary provision to charge electrical vehicles.

44. The Applicant / Owner / Developer shall plant one tree for a) sites measuring 180 Sqm upto 240 Sqm

b) minimum of two trees for sites measuring with more than 240 Sqm. c) One tree for every 240 Sq.m of

FAR area as part thereof in case of Apartment / group housing / multi dwelling unit/development plan.

45. The applicant Should abide for the condition as per the under taking given to submit relinquishment

deed of road widening portion area 7634.39 sqmtr before obtaining Occupancy Certificate.

46. The applicant Should abide by the final orders of the Hon'ble High court with WP No 1966 /2020

(LB-BMP) Dt: 29-01-2020 towards the Payment of ground rent & GST, & 50% of License and scrutiny fees,

Security Deposit Rs 75/- Sqmt & Labour Cess

Special Condition as per Labour Department of Government of Karnataka vide ADDENDUM

(HosadaagiHoodike) Letter No. LD/95/LET/2013, dated: 01-04-2013

1. Registration of Applicant / Builder / Owner / Contractor and the construction workers working in the construction

site with the “Karnataka Building and Other Construction workers Welfare Board “should be strictly adhered to .

2. The Applicant / Builder / Owner / Contractor should submit the Registration of establishment and list of

construction workers engaged at the time of issue of Commencement Certificate. A copy of the same shall also be

submitted to the concerned local Engineer in order to inspect the establishment and ensure the registration of

establishment and workers working at construction site or work place.

3. The Applicant / Builder / Owner / Contractor shall also inform the changes if any of the list of workers engaged by

him.

4. At any point of time No Applicant / Builder / Owner / Contractor shall engage a construction worker in his site or

work place who is not registered with the “Karnataka Building and Other Construction workers Welfare Board”

Note:

1. Accommodation shall be provided for setting up of schools for imparting education to the children of construction

workers in the labour camps / construction sites.

2. List of children of workers shall be furnished by the builder / contractor to the Labour Department which is

mandatory.

3. Employment of child labour in the construction activities strictly prohibited.

4. Obtaining NOC from the Labour Department before commencing the construction work is a must.

5. BBMP will not be responsible for any dispute that may arise in respect of property in question.

6. In case if the documents submitted in respect of property in question is found to be false or fabricated, the plan

sanctioned stands cancelled automatically and legal action will be initiated.

II. NOC Details

III. The Applicant has paid the fees vide Online Receipt No. BBMP/0848/CH/20-21 dated: 30-05-2020 for thefollowing:-

1. License Fees : 67,43,755.00

2. Betterment Charges

a) For Building : 2,63,958.00

b) For Site : 0

4. Security Deposit : 6,59,895.00

5. Plan copy charges / Compound Wall Fees : 2,58,000.00

6. Lake Fess : 73,78,862.00

7. 1% Service Charge on Labour Cess

to be paid to BBMP : 47,995.00

Total : 1,53,52,465

Say Rs: 1,53,53,000/-

(One Crore Fifty Three lakhs Fifty Three thousand only)

SL.No.

Name of the StatutoryDepartment

Reference No. & Date Conditions Imposed

1 Fire Force Department GBC(1)/337/2017 Date: 26-09-2018

All the conditionsimposed in the letter

issued by the statutoryBody should be adhered

to.

2 Airport Authority of India / HAL BANG/SOUTH/B/110617/254581 Date: 27-11-2017

3 BESCOM EE/KMLD/AEE(O)/JE-2/14-15/1365-66 Date: 21-06-2014

4 KSPCB PCB/250/BMW/Reg No 146340 /2018 /H-598 Date: 21-08-2018

5 SEIAA SEIAA 134 CON 2016 Date: 25-01-2017

6 BSNL AGM(TP)/S-6/Vol-61/2017-18/12 Date: 20-12-2017

7 BWSSB BWSSB/EIC/CE(M)/ACE(M)-IV/DCE(M)II/TAC(M)-III/5182/2019-2020 Date: 23-12-2019

TRANSFORM

ER

DGROOM

SHED

DG

YA

RD

PORTICO

PORTICO

WaterTank

Sub

Station

AC

Room

Chim

ney

Generator

TOILET

ShopR

estHouse

Pump

House

Shed

SHED

SUMP

BASKET BALLGROUND

STATUE

Petrol

Bunk

Shed

FO

OD

CO

UR

T

630.93m

Median

TO

SA

RJA

PU

RA

TO MADIVALATO KORAMANGALA

TO SIL

K BOARD

TO F

OR

UM

MAL

L

Asphalted DRIVE WAY

ASPHALTED ROAD

Shed

GENERATORSHED

Asphalted R

oad

Pond

STEPS

YARD

SU

MP

SHED

BASKETPOST

PUMP

HOUSE

29.0249

TO TA

VA

RE

KE

RE

HOSUR RO

AD

EXI/:

- ANI

MAL

HO

USE

39.7486

36.1739

8.38

8.3

10.75

11.1

10.36

10.41

22.99

5.85.894.86.96

9.97

PARKIN

G-8

(40

CARS)

PARKIN

G-2

(38

CARS)

PARKIN

G-4

(23

CARS)

246

365

204

203

222

39

75

40

01

529

549

510

165

183

146

164

245

223

PARKIN

G-6

(11

2 C

ARS)

473

472

455

419

418

489

AM

BULA

NCE

AMBULANCE

110

76

184

PARKIN

G-3

(39

CARS)

PARKIN

G-5

(12

0 C

ARS)

391

436

437

454

530

PARKIN

G-0

1(1

45

CARS)

ENTR

YEN

TRY

ENTR

Y

EN

TR

Y

ENTRY

ENTRY

Martha

Hostel

TANK

TANK

TA

NK

TA

NK

SU

MP

GE

NE

RA

TO

R

PA

RK

ING

-18(

18

CA

RS

)

AHU-04

AHU-03

8.5454

DRIVE W

AY

DRIVE WAY

DRIVE WAY

DRIVE W

AY

DRIVE W

AY

EXI/:-ST. JOHN MEDICAL COLLEGE &

G.F+3 UPPER FLOOR

BLOCK 02

OLD HOSPITAL

(G+5)

BLOCK 04MODIFIED WARD BUILDINGG.F.+6 UPPER FLOOR PLAN

H.T /:- OF THE BUILDING - 24.95M

EXISTING GF+3UF ONCOLOGY BUILDING

G.F.+6 UPPER FLOOR PLANH.T /:- OF THE BUILDING - 24.35M

COVERED @

4th to 6th FLOO

R COVERED @

4th to 6th FLOOR

SITE PLAN

HOSPITAL BUILDING

H.T OF THE BUILDING -14.95M

(WING -1A,B,D,&F)

EXI/:- OLD HOSPITAL BUILDING

G.F+3 UPPER FLOOR

H.T OF THE BUILDING -11.48M

(WING -1C&F)

OLD HOSPITAL DIETARY BUILDING

G.FLOOR ONLY

H.T OF THE BUILDING - 5.36M

(WING -1G)

EXI/:-CAFETERIA BUILDING

G.F+2 UPPER FLOOR

H.T OF THE BUILDING -11.48M

(WING-27)

EXI/:-N

IRM

ALA H

OSTEL

G.F+3 U

PPER FLO

OR

H.T O

F TH

E BU

ILD

IN

G -14.95M

(W

IN

G -14)

EXI/:-H

OSPITAL AN

NEX

G.F+3 U

PPER FLO

OR

H.T O

F TH

E BU

ILD

IN

G -14.95M

(W

IN

G -13)

EXI/:- LAUNDRY BUILDING

G.F+3 UPPER FLOOR

H.T OF THE BUILDING -11.48M

(WING-29)

E

X

I

/

:

-

P

G

&

P

A

R

A

M

E

D

I

C

S

&

L

A

D

I

E

S

R

E

S

I

D

E

N

C

E

B

U

I

L

D

I

N

G

G

.

F

+

3

U

P

P

E

R

F

L

O

O

R

H

.

T

O

F

T

H

E

B

U

I

L

D

I

N

G

-

1

4

.

9

5

M

(

W

I

N

G

-

2

6

)

E

X

I

/

:

-

N

U

R

S

E

S

R

E

S

I

D

E

N

C

E

B

U

I

L

D

I

N

G

G

.

F

+

3

U

P

P

E

R

F

L

O

O

R

H

.

T

O

F

T

H

E

B

U

I

L

D

I

N

G

-

1

4

.

9

5

M

(

W

I

N

G

-

2

5

)

E

X

I

/

:

-

H

O

S

P

I

T

A

L

A

N

N

E

X

B

U

I

L

D

I

N

G

G

.

F

+

3

U

P

P

E

R

F

L

O

O

R

H

.

T

O

F

T

H

E

B

U

I

L

D

I

N

G

-

1

4

.

9

5

M

(

W

I

N

G

-

2

0

)

AUDITORIUM BUILDING

G.F+1 UPPER FLOOR

H.T OF THE BUILDING -11.48M

(WING -4)

EXI/:- ST JOHNS

(GUEST HOUSE) BUILDING

G.F+ UPPER FLOOR

H.T OF THE BUILDING -3.50M

(WING -19)

EXI/:- WARD BLOCK

G.F+2 UPPER FLOOR

H.T OF THE BUILDING -11.48M

(WING -18)

EXI/:- RESEARCH CENTER BUILDING

(WING -18)

SUMP

G.F+2 UPPER FLOORH.T OF THE BUILDING -11.48M

(WING -9)

POST OFFICE BUILDINGEXI/:- BANK OF BARODA AND

G.F+1 UPPER FLOORH.T OF THE BUILDING -11.48M

(WING -22

EXI/:- OFFICE BUILDINGG.F+2 UPPER FLOORH.T OF THE BUILDING -11.48M

(WING -23 & 23A)

EXI/:- CLASS ROOM AUDITORIUM AUDITORIUM BUILDING

G.F

+1 U

PPER

FLO

OR

H.T O

F THE

BUILD

ING

-11.48

M(W

ING

-21)

G.F+2 UPPER FLOORH.T OF THE BUILDING -11.48M

(WING -7& 8)

EXI/:- GORETTI HOSTEL & ALPHONSA HOSTEL BUILDING

G.F+2 UPPER FLOORH.T OF THE BUILDING -11.48M

(WING -6)

EXI/:- ADDITION TO COLLEGE OF NURSING BUILDING

EXI/:-ST JO

SEPH

S H

OSTEL BU

ILD

IN

G

G.F+2 U

PPER FLO

OR

H.T O

F TH

E BU

ILD

IN

G -11.48M

(W

IN

G -3)

G.F

+2 U

PP

ER

FLO

OR

H.T O

F TH

E

(W

IN

G -5)

EX

I/:-M

AR

IA H

OS

TEL

BU

ILD

IN

G -11.48M

G.F+3 UPPER FLOORH.T OF THE BUILDING -14.95M

(WING -10)

EXI/:- ROBERT KOCH BHAVAN BUILDING

G.F+1 UPPER FLOORH.T OF THE BUILDING -11.48M

(WING -11)

CENTRE BUILDINGEXI/:- ZABLOCKI LEARNING

EXI/:-SG

OLD

EN

JU

BILEE BU

ILD

IN

G

G.F+3 U

PPER FLO

OR

H.T O

F TH

E BU

ILD

IN

G -11.48M

(W

IN

G -28)

MANAGEMENT BUILDING

G.F+1 UPPER FLOOR

H.T OF THE BUILDING -11.48M

(WING-31)

EXI/:-ENGINEERING&FACILITY

EXI/:- W

ASTE SEG

REG

ATIO

N

G.F+ U

PPER FLO

OR

H.T O

F TH

E BU

ILD

IN

G -11.48M

(W

IN

G-32)

EXI/:- VIANNEY HOUSE &

G.F+2 UPPER FLOOR

(WING -2A&B)

DIRECTORS OFFICE BUILDING

EXI/:-M

AIN

TEN

AN

CE

G.F+2 U

PPER FLO

OR

H.T O

F TH

E BU

ILD

IN

G -14.95M

(W

IN

G -16)

PROPOSED 4th, 5th & 6th UPPER FLOORS

EXISTING GF+3UF BLOCK-3, UNIT OF HOPE BUILDING

G.F.+5 UPPER FLOOR PLANH.T /:- OF THE BUILDING - 21.45M

PROPOSED 4th & 5th UPPER FLOORS

9.01

9.01

BLOCK - 32

PROPOSED HOSTEL BUILDING

G.F+3 UPPER FLOOR PLAN

H.T /:- OF THE BUILDING - 14.40M

9.05

7.88

15.1829.24

12.71

21.29

36.94

6.46

17.12

Asphalted Road

40.48

36.3234.8224.91

31.345.28

51.25

42.26

38.67

24.0215.8

39.38

12.6564.84

51.85

80.73

76.47

23.47

29.19

7.5

24.96

33.66

36.18

10.7214.43

38.43

62.63

6.6

171.94

16.1408

63.4

10.92

30.2

47.89

47.2

73.24

26

5.95

14.1119.69

44.2264 67.34

64.9

33.64BLOCK-1

34.5

15.75

6.75

22.5

34.5

17.2522.5

5.25

17.2522.5

5.25

1.ROA

D W

IDEN

ING

AREA

= 33

87.08

smt

PROPOSED TO BE WIDENED 45.00M

EXISTING 31.50M WIDE ROAD

PR

OP

OS

ED

TO

BE

WID

EN

ED

45.

00M

EX

IST

ING

34.

50M

WID

E R

OA

D

31.5

C/LINE OF ROAD

C/LINE OF ROAD

C/L

INE

OF

RO

AD

C/L

INE

OF

RO

AD

3.5

0M

WID

E D

RIV

EW

AY

PARKING -64X9=576 cars

3.5

0M

WID

E D

RIV

EW

AY

3.5

0M

WID

E D

RIV

EW

AY

3.5

0M

WID

E D

RIV

EW

AY

3.5

0M

WID

E D

RIV

EW

AY

PARKING =475 cars

3.5

0M

WID

E D

RIV

EW

AY

3.5

0M

WID

E D

RIV

EW

AY

3.5

0M

WID

E D

RIV

EW

AY

3.5

0M

WID

E D

RIV

EW

AY

6.0

0M

WID

E D

RIV

EW

AY

3.5

0M

WID

E D

RIV

EW

AY

3.50M WIDE DRIVEWAY

3.50M WIDE DRIVEWAY

3.50M WIDE DRIVEWAY

3.50M WIDE DRIVEWAY

3.50M WIDE DRIVEWAY

PARKING =316 cars

3.50M WIDE DRIVEWAY

PARKING =90 cars

3.50

M W

IDE

DR

IVE

WA

Y

PARKING =72 cars

3.50

M W

IDE

DR

IVE

WA

Y

PARKING =81 cars

3.50

M W

IDE

DR

IVE

WA

Y

PA

RK

ING

=5

0 c

ars

2.4

FOYER & GRIEVING

ROOM, G+6(E1)

Asphalted DRIVE WAY

Asph

alted

DRIVE W

AY

Asphalted DRIVE WAY

Transformer

17.1001

15.27

ENTR

Y

14.6

2. ROAD WIDENING AREA=4247.31smt

348.26m

264.8

8m

120.10m

53.68m

215.15m

135.6

8m

77.76m

651.5

0m

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

TREE

RWHPIT

RWHPIT

RWHPIT

RWHPIT

EXISTING

STAFF CHANGE ROOMS (G) .15

HOSPITAL

(WING -15)

CANTEEN (G) .12

EXISTING

PORTICO

PORTICO

Validity of this approval is two years from the date of issue.

vide lp number :BBMP/Addl.Dir/JDSOUTH/0054/18-19 subject to terms andconditions laid down along with this modified building plan approval.

The modified plans are Approved in accordance with the acceptance forapproval by the commissioner on date: 04-01-2020 .

NORTH

KEY PLAN (N.T.S) S

W E

N

STADIA

HOSUR ROAD

HO

SUR

RO

AD

HO

SU

R R

OA

D

HO

SUR

RO

AD

6TH CROSS ROAD

5TH CROSS ROAD4TH CROSS ROAD3RD CROSS ROAD2ND CROSS ROAD

16TH

A M

AIN

RO

AD

18TH

MA

IN R

OA

D

18TH

MA

IN R

OA

D

100

FEE

T R

OA

D

SARJAPUR MAIN ROAD

SARJAPUR MAIN ROAD

*ST ANTHONY'S

FRIARY CHURCH

*TRICON INFOTECHPVT.LTD

*HP PETROL PUMP

*ST.JOHNS MEDICALCOLLAGE GROUND

*INDIAN INSTITUTEOF ASTROPHYSICS

*GREENWOOD HIGHPRE SCHOOL

*

SRI VEN

KATESHW

ARA

HO

SPITAL

*SBI OF KORAMANGLA

SITE IN QUESTION

3000mmØ40mm GRAVEL FILLING UP TO 300mm

65mm GRAVEL FILLING UP TO 300mm

BRICK BAT OF SIZE 50MM TO 80MM

RCC PRECAST RING OF

CAMPACTED EARTH FILLING

50mmØ HOLES 2 NOS. ON

OPPOSITE DIRECTION

AT 300mm APART

150mmØ PVC PIPE WITH

PERFORATED HOLES

6000

mm

TOP SLAB OF 150mm THICK

230mm THICK BRICK WALL BUILT IN CM 1:6

SECTION AT X X

EXTERNAL RAIN WATER SOAK PIT

PLAN OF SOAK PIT

COMPACTED EARTH SURFACE

3000mmØ x 50mm THICK x 300mm DEPTH

75

3000mmØ

X X

CRUSHED STONE

150mmØ HUME PIPE

RCC PRECAST RINGS WITH

50mmØ HOLES ALONG DIA (8NOS)

50mmØ HOLES ALONG DIA (8NOS)

3000mmØ x 50mm THICK x 300mm DEPTH

2000

mm

75mm THICK IN PCC 1:5:10

VA

RIE

S

150mmØ HUME PIPE

(OUTLET AS PER DRG)

(INLET AS PER DRG)

6 KGF/CM

2

OR TYPE-B

FILLING UP TO 300mm

RCC 1:2:4 TOP COVER SLAB WITH 10MMØ TOR BARS AT

100MM C/C BOTH WAYS.

RCC 1:2:4 PRECAST TOP COVER SLAB 600MM WIDE

WITH 10MMØ TOR BARS AT 100MM C/C BOTH WAYS.

100m

m

RAIN WATER SOAK PIT DETAIL (1.20 M DIA X 6M DEEP)

SCALE :

N

Name : B G RAGHAVENDRA PRASADDesignation : Joint Director Town Planning (JDTP)Organization : BBMPDate : 25-Jun-2020 14: 53:51