key plan - bbmp saction details pdf/adtp... · 2020. 12. 16. · for dumping garbage within the...

1
UserDefinedMetric (1110.00 x 800.00MM) N EXISTING (To be demolished) EXISTING (To be retained) PROPOSED WORK (COVERAGE AREA) ABUTTING ROAD PLOT BOUNDARY COLOR INDEX 1 1390191293-28-01-2020 04-17-50$_$PETROL BUNK OWN_SIGN ARC_SIGN M/S.MULTILUBES PEENYA INDUSTRIAL AREA,3RD PHASE,LAGGERE VILLAGE,YESHWANTAPURA HOBLI,BANGALORE. DHANANJAYA KN 1st Foor, Rajatadri Complex, Near RTO Office ,Ullal, Bengaluru-56 BCC/BL-3.6/E-4374/2018-19 This is a system generated drawing as per the soft copy submitted by the Architect/ License Engineer ASSISTANT DIRECTOR OF TOWN PLANNING ( ________ ) BHRUHAT BENGALURU MAHANAGARA PALIKE Validity of this approval is two years from the date of issue. The plans are approved in accordance with the acceptance for approval by the Joint Commissioner ( _______ ) on date: _______________ vide lp number: ________________________________________ subject to terms and conditions laid down along with this building plan approval. AUTH_SIGN AREA STATEMENT (BBMP) AREA STATEMENT (BBMP) AREA STATEMENT (BBMP) AREA STATEMENT (BBMP) VERSION NO.: 1.0.11 VERSION NO.: 1.0.11 VERSION NO.: 1.0.11 VERSION NO.: 1.0.11 VERSION DATE: 01/11/2018 VERSION DATE: 01/11/2018 VERSION DATE: 01/11/2018 VERSION DATE: 01/11/2018 PROJECT DETAIL: PROJECT DETAIL: PROJECT DETAIL: PROJECT DETAIL: Authority: BBMP Authority: BBMP Authority: BBMP Authority: BBMP Plot Use: Commercial Plot Use: Commercial Plot Use: Commercial Plot Use: Commercial Inward_No: BBMP/Ad.Com./DSH/0230/19-20 Inward_No: Inward_No: Inward_No: Plot SubUse: Fuel Stations Plot SubUse: Fuel Stations Plot SubUse: Fuel Stations Plot SubUse: Fuel Stations Application Type: General Application Type: General Application Type: General Application Type: General Land Use Zone: Residential (Main) Land Use Zone: Residential (Main) Land Use Zone: Residential (Main) Land Use Zone: Residential (Main) Proposal Type: Building Permission Proposal Type: Building Permission Proposal Type: Building Permission Proposal Type: Building Permission Plot/Sub Plot No.: 160 Plot/Sub Plot No.: 160 Plot/Sub Plot No.: 160 Plot/Sub Plot No.: 160 Nature of Sanction: New Nature of Sanction: New Nature of Sanction: New Nature of Sanction: New Khata No. (As per Khata Extract): 160 Location: Ring-II Location: Ring-II Location: Ring-II Location: Ring-II Locality / Street of the property: PEENYA INDUSTRIAL AREA,3RD PHASE,LAGGERE VILLAGE,YESHWANTAPURA HOBLI,BANGALORE. Locality / Street of the property: PEENYA INDUSTRIAL AREA,3RD Locality / Street of the property: PEENYA INDUSTRIAL AREA,3RD Locality / Street of the property: PEENYA INDUSTRIAL AREA,3RD Building Line Specified as per Z.R: NA Building Line Specified as per Z.R: NA Building Line Specified as per Z.R: NA Building Line Specified as per Z.R: NA Zone: Dasarahalli Zone: Dasarahalli Zone: Dasarahalli Zone: Dasarahalli Ward: Ward-041 Ward: Ward-041 Ward: Ward-041 Ward: Ward-041 Planning District: 214-Peenya Planning District: 214-Peenya Planning District: 214-Peenya Planning District: 214-Peenya AREA DETAILS: AREA DETAILS: AREA DETAILS: AREA DETAILS: SQ.MT. SQ.MT. SQ.MT. SQ.MT. AREA OF PLOT (Minimum) AREA OF PLOT (Minimum) AREA OF PLOT (Minimum) AREA OF PLOT (Minimum) (A) (A) (A) (A) 731.04 731.04 731.04 731.04 Deduction for NetPlot Area Deduction for NetPlot Area Deduction for NetPlot Area Deduction for NetPlot Area Road Widening Area Road Widening Area Road Widening Area Road Widening Area 84.74 84.74 84.74 84.74 Total Total Total Total 84.74 84.74 84.74 84.74 NET AREA OF PLOT NET AREA OF PLOT NET AREA OF PLOT NET AREA OF PLOT (A-Deductions) (A-Deductions) (A-Deductions) (A-Deductions) 646.30 646.30 646.30 646.30 COVERAGE CHECK COVERAGE CHECK COVERAGE CHECK COVERAGE CHECK Permissible Coverage area (65.00 %) Permissible Coverage area (65.00 %) Permissible Coverage area (65.00 %) Permissible Coverage area (65.00 %) 420.10 420.10 420.10 420.10 Proposed Coverage Area (45.5 %) Proposed Coverage Area (45.5 %) Proposed Coverage Area (45.5 %) Proposed Coverage Area (45.5 %) 294.05 294.05 294.05 294.05 Achieved Net coverage area ( 45.5 % ) Achieved Net coverage area ( 45.5 % ) Achieved Net coverage area ( 45.5 % ) Achieved Net coverage area ( 45.5 % ) 294.05 294.05 294.05 294.05 Balance coverage area left ( 19.5 % ) Balance coverage area left ( 19.5 % ) Balance coverage area left ( 19.5 % ) Balance coverage area left ( 19.5 % ) 126.05 126.05 126.05 126.05 FAR CHECK FAR CHECK FAR CHECK FAR CHECK Permissible F.A.R. as per zoning regulation 2015 ( 1.75 ) Permissible F.A.R. as per zoning regulation 2015 ( 1.75 ) Permissible F.A.R. as per zoning regulation 2015 ( 1.75 ) Permissible F.A.R. as per zoning regulation 2015 ( 1.75 ) 1279.32 1279.32 1279.32 1279.32 Additional F.A.R within Ring I and II ( for amalgamated plot - ) Additional F.A.R within Ring I and II ( for amalgamated plot - ) Additional F.A.R within Ring I and II ( for amalgamated plot - ) Additional F.A.R within Ring I and II ( for amalgamated plot - ) 0.00 0.00 0.00 0.00 Allowable TDR Area (60% of Perm.FAR ) Allowable TDR Area (60% of Perm.FAR ) Allowable TDR Area (60% of Perm.FAR ) Allowable TDR Area (60% of Perm.FAR ) 0.00 0.00 0.00 0.00 Premium FAR for Plot within Impact Zone ( - ) Premium FAR for Plot within Impact Zone ( - ) Premium FAR for Plot within Impact Zone ( - ) Premium FAR for Plot within Impact Zone ( - ) 0.00 0.00 0.00 0.00 Total Perm. FAR area ( 1.75 ) Total Perm. FAR area ( 1.75 ) Total Perm. FAR area ( 1.75 ) Total Perm. FAR area ( 1.75 ) 1279.32 1279.32 1279.32 1279.32 Commercial FAR (100.00% ) Commercial FAR (100.00% ) Commercial FAR (100.00% ) Commercial FAR (100.00% ) 211.09 211.09 211.09 211.09 Proposed FAR Area Proposed FAR Area Proposed FAR Area Proposed FAR Area 211.09 211.09 211.09 211.09 Achieved Net FAR Area ( 0.29 ) Achieved Net FAR Area ( 0.29 ) Achieved Net FAR Area ( 0.29 ) Achieved Net FAR Area ( 0.29 ) 211.09 211.09 211.09 211.09 Balance FAR Area ( 1.46 ) Balance FAR Area ( 1.46 ) Balance FAR Area ( 1.46 ) Balance FAR Area ( 1.46 ) 1068.23 1068.23 1068.23 1068.23 BUILT UP AREA CHECK BUILT UP AREA CHECK BUILT UP AREA CHECK BUILT UP AREA CHECK Proposed BuiltUp Area Proposed BuiltUp Area Proposed BuiltUp Area Proposed BuiltUp Area 294.05 294.05 294.05 294.05 Achieved BuiltUp Area Achieved BuiltUp Area Achieved BuiltUp Area Achieved BuiltUp Area 294.05 294.05 294.05 294.05 Approval Date : 01/29/2020 8:11:35 PM Payment Details Sr No. Challan Number Receipt Number Amount (INR) Payment Mode Transaction Number Payment Date Remark 1 BBMP/26875/CH/19-20 BBMP/26875/CH/19-20 1750 Online 9357099229 11/15/2019 2:00:28 PM - No. Head Amount (INR) Remark 1 Scrutiny Fee 1750 - Approval Condition : This Plan Sanction is issued subject to the following conditions : 1.Sanction is accorded for the Commercial Building at 160 , PEENYA INDUSTRIAL AREA,3RD PHASE,LAGGERE VILLAGE,YESHWANTAPURA HOBLI,BANGALORE., Bangalore. a).Consist of 1Ground + 0 only. 2.Sanction is accorded for Commercial use only. The use of the building shall not be deviated to any other use. 3.82.96 area reserved for car parking shall not be converted for any other purpose. 4.Development charges towards increasing the capacity of water supply, sanitary and power main has to be paid to BWSSB and BESCOM if any. 5.Necessary ducts for running telephone cables, cubicles at ground level for postal services & space for dumping garbage within the premises shall be provided. 6.The applicant shall INSURE all workmen involved in the construction work against any accident / untoward incidents arising during the time of construction. 7.The applicant shall not stock any building materials / debris on footpath or on roads or on drains. The debris shall be removed and transported to near by dumping yard. 8.The applicant shall maintain during construction such barricading as considered necessary to prevent dust, debris & other materials endangering the safety of people / structures etc. in & around the site. 9.The applicant shall plant at least two trees in the premises. 10.Permission shall be obtained from forest department for cutting trees before the commencement of the work. 11.License and approved plans shall be posted in a conspicuous place of the licensed premises. The building license and the copies of sanctioned plans with specifications shall be mounted on a frame and displayed and they shall be made available during inspections. 12.If any owner / builder contravenes the provisions of Building Bye-laws and rules in force, the Architect / Engineer / Supervisor will be informed by the Authority in the first instance, warned in the second instance and cancel the registration if the same is repeated for the third time. 13.Technical personnel, applicant or owner as the case may be shall strictly adhere to the duties and responsibilities specified in Schedule - IV (Bye-law No. 3.6) under sub section IV-8 (e) to (k). 14.The building shall be constructed under the supervision of a registered structural engineer. 15.On completion of foundation or footings before erection of walls on the foundation and in the case of columnar structure before erecting the columns "COMMENCEMENT CERTIFICATE" shall be obtained. 16.The building should not be occupied without obtaining "OCCUPANCY CERTIFICATE" from the competent authority. 17.Drinking water supplied by BWSSB should not be used for the construction activity of the building. 18.The applicant shall ensure that the Rain Water Harvesting Structures are provided & maintained in good repair for storage of water for non potable purposes or recharge of ground water at all times having a minimum total capacity mentioned in the Bye-law 32(a). 19.If any owner / builder contravenes the provisions of Building Bye-laws and rules in force, the authority will inform the same to the concerned registered Architect / Engineers / Supervisor in the first instance, warn in the second instance and cancel the registration of the professional if the same is repeated for the third time. 20.The Builder / Contractor / Professional responsible for supervision of work shall not shall not materially and structurally deviate the construction from the sanctioned plan, without previous approval of the authority. They shall explain to the owner s about the risk involved in contravention of the provisions of the Act, Rules, Bye-laws, Zoning Regulations, Standing Orders and Policy Orders of the BBMP. 21.In case of any false information, misrepresentation of facts, or pending court cases, the plan sanction is deemed cancelled. Special Condition as per Labour Department of Government of Karnataka vide ADDENDUM (HosadaagiHoodike) Letter No. LD/95/LET/2013, dated: 01-04-2013 : 1.Registration of Applicant / Builder / Owner / Contractor and the construction workers working in the construction site with the "Karnataka Building and Other Construction workers Welfare Board"should be strictly adhered to. 2.The Applicant / Builder / Owner / Contractor should submit the Registration of establishment and list of construction workers engaged at the time of issue of Commencement Certificate. A copy of the same shall also be submitted to the concerned local Engineer in order to inspect the establishment and ensure the registration of establishment and workers working at construction site or work place. 3.The Applicant / Builder / Owner / Contractor shall also inform the changes if any of the list of workers engaged by him. At any point of time No Applicant / Builder / Owner / Contractor shall engage a construction worker in his site or work place who is not registered with the "Karnataka Building and Other Construction workers Welfare Board". Note : 1.Accommodation shall be provided for setting up of schools for imparting education to the children o f construction workers in the labour camps / construction sites. 2.List of children of workers shall be furnished by the builder / contractor to the Labour Department which is mandatory. 3.Employment of child labour in the construction activities strictly prohibited. 4.Obtaining NOC from the Labour Department before commencing the construction work is a must. 5.BBMP will not be responsible for any dispute that may arise in respect of property in question. 6.In case if the documents submitted in respect of property in question is found to be false or fabricated, the plan sanctioned stands cancelled automatically and legal action will be initiated. Block Name Block Use Block SubUse Block Structure Block Land Use Category A1 (BUNK) Commercial Fuel Stations Bldg upto 11.5 mt. Ht. R Block Name Type SubUse Area (Sq.mt.) Units Car Reqd. Prop. Reqd./Unit Reqd. Prop. Total : - - - - 0 6 Vehicle Type Reqd. Achieved No. Area (Sq.mt.) No. Area (Sq.mt.) Car - - 6 82.50 Total Car - - 6 82.50 Other Parking - - - 0.46 Total 0.00 82.96 Block No. of Same Bldg Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Parking Commercial A1 (BUNK) 1 294.05 82.96 211.09 211.09 Grand Total: 1 294.05 82.96 211.09 211.09 Floor Name Total Built Up Area (Sq.mt.) Deductions (Area in Sq.mt.) Proposed FAR Area (Sq.mt.) Total FAR Area (Sq.mt.) Parking Commercial Ground Floor 82.96 211.09 211.09 Total: 294.05 82.96 211.09 211.09 Total Number of Same Blocks : 1 Total: 294.05 82.96 211.09 211.09 BLOCK NAME NAME LENGTH HEIGHT NOS A1 (BUNK) D1 1.00 2.10 01 BLOCK NAME NAME NOS A1 (BUNK) W1 1.80 1.20 06 FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of Tenement GROUND FLOOR PLAN SPLIT TENEMENT SHOP 18.74 18.74 1 1 Total: - - 18.74 18.74 1 1 4.0 2.6 19.5 28.7 30.0 31.8 SITE PLAN SCALE 1:150 KEY PLAN SCALE 1:750 3.1 3.0 27.0 2.3 3.1 3.2 28.7 4.0 2.4 3.2 6.8 2.4 294.05

Upload: others

Post on 17-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KEY PLAN - BBMP Saction Details PDF/ADTP... · 2020. 12. 16. · for dumping garbage within the premises shall be provided. 6.The applicant shall INSURE all workmen involved in the

UserDefinedMetric (1110.00 x 800.00MM)

N

EXISTING (To be demolished)EXISTING (To be retained)PROPOSED WORK (COVERAGE AREA)ABUTTING ROADPLOT BOUNDARY

COLOR INDEX

1

1390191293-28-01-202004-17-50$_$PETROLBUNK

OWN_SIGN

ARC_SIGN

M/S.MULTILUBES PEENYA INDUSTRIAL AREA,3RDPHASE,LAGGERE VILLAGE,YESHWANTAPURAHOBLI,BANGALORE.

DHANANJAYA KN 1st Foor, Rajatadri Complex, Near RTO Office ,Ullal, Bengaluru-56 BCC/BL-3.6/E-4374/2018-19

This is a system generated drawing as per the soft copy submitted by the Architect/ License Engineer

ASSISTANT DIRECTOR OF TOWN PLANNING ( ________ )

BHRUHAT BENGALURU MAHANAGARA PALIKE

Validity of this approval is two years from the date of issue.

The plans are approved in accordance with the acceptance for approval bythe Joint Commissioner ( _______ ) on date: _______________ videlp number: ________________________________________ subject toterms and conditions laid down along with this building plan approval.

AUTH_SIGN

AREA STATEMENT (BBMP)AREA STATEMENT (BBMP)AREA STATEMENT (BBMP)AREA STATEMENT (BBMP) VERSION NO.: 1.0.11VERSION NO.: 1.0.11VERSION NO.: 1.0.11VERSION NO.: 1.0.11VERSION DATE: 01/11/2018VERSION DATE: 01/11/2018VERSION DATE: 01/11/2018VERSION DATE: 01/11/2018

PROJECT DETAIL:PROJECT DETAIL:PROJECT DETAIL:PROJECT DETAIL:Authority: BBMPAuthority: BBMPAuthority: BBMPAuthority: BBMP Plot Use: CommercialPlot Use: CommercialPlot Use: CommercialPlot Use: CommercialInward_No:BBMP/Ad.Com./DSH/0230/19-20Inward_No:Inward_No:Inward_No: Plot SubUse: Fuel StationsPlot SubUse: Fuel StationsPlot SubUse: Fuel StationsPlot SubUse: Fuel Stations

Application Type: GeneralApplication Type: GeneralApplication Type: GeneralApplication Type: General Land Use Zone: Residential (Main)Land Use Zone: Residential (Main)Land Use Zone: Residential (Main)Land Use Zone: Residential (Main)Proposal Type: Building PermissionProposal Type: Building PermissionProposal Type: Building PermissionProposal Type: Building Permission Plot/Sub Plot No.: 160Plot/Sub Plot No.: 160Plot/Sub Plot No.: 160Plot/Sub Plot No.: 160Nature of Sanction: NewNature of Sanction: NewNature of Sanction: NewNature of Sanction: New Khata No. (As per Khata Extract): 160

Location: Ring-IILocation: Ring-IILocation: Ring-IILocation: Ring-II Locality / Street of the property: PEENYA INDUSTRIAL AREA,3RDPHASE,LAGGERE VILLAGE,YESHWANTAPURA HOBLI,BANGALORE.Locality / Street of the property: PEENYA INDUSTRIAL AREA,3RDLocality / Street of the property: PEENYA INDUSTRIAL AREA,3RDLocality / Street of the property: PEENYA INDUSTRIAL AREA,3RD

Building Line Specified as per Z.R: NABuilding Line Specified as per Z.R: NABuilding Line Specified as per Z.R: NABuilding Line Specified as per Z.R: NAZone: DasarahalliZone: DasarahalliZone: DasarahalliZone: DasarahalliWard: Ward-041Ward: Ward-041Ward: Ward-041Ward: Ward-041Planning District: 214-PeenyaPlanning District: 214-PeenyaPlanning District: 214-PeenyaPlanning District: 214-PeenyaAREA DETAILS:AREA DETAILS:AREA DETAILS:AREA DETAILS: SQ.MT.SQ.MT.SQ.MT.SQ.MT.

AREA OF PLOT (Minimum)AREA OF PLOT (Minimum)AREA OF PLOT (Minimum)AREA OF PLOT (Minimum) (A)(A)(A)(A) 731.04731.04731.04731.04Deduction for NetPlot AreaDeduction for NetPlot AreaDeduction for NetPlot AreaDeduction for NetPlot Area

Road Widening AreaRoad Widening AreaRoad Widening AreaRoad Widening Area 84.7484.7484.7484.74TotalTotalTotalTotal 84.7484.7484.7484.74

NET AREA OF PLOTNET AREA OF PLOTNET AREA OF PLOTNET AREA OF PLOT (A-Deductions)(A-Deductions)(A-Deductions)(A-Deductions) 646.30646.30646.30646.30COVERAGE CHECKCOVERAGE CHECKCOVERAGE CHECKCOVERAGE CHECK

Permissible Coverage area (65.00 %)Permissible Coverage area (65.00 %)Permissible Coverage area (65.00 %)Permissible Coverage area (65.00 %) 420.10420.10420.10420.10Proposed Coverage Area (45.5 %)Proposed Coverage Area (45.5 %)Proposed Coverage Area (45.5 %)Proposed Coverage Area (45.5 %) 294.05294.05294.05294.05Achieved Net coverage area ( 45.5 % )Achieved Net coverage area ( 45.5 % )Achieved Net coverage area ( 45.5 % )Achieved Net coverage area ( 45.5 % ) 294.05294.05294.05294.05Balance coverage area left ( 19.5 % )Balance coverage area left ( 19.5 % )Balance coverage area left ( 19.5 % )Balance coverage area left ( 19.5 % ) 126.05126.05126.05126.05

FAR CHECKFAR CHECKFAR CHECKFAR CHECKPermissible F.A.R. as per zoning regulation 2015 ( 1.75 )Permissible F.A.R. as per zoning regulation 2015 ( 1.75 )Permissible F.A.R. as per zoning regulation 2015 ( 1.75 )Permissible F.A.R. as per zoning regulation 2015 ( 1.75 ) 1279.321279.321279.321279.32Additional F.A.R within Ring I and II ( for amalgamated plot - )Additional F.A.R within Ring I and II ( for amalgamated plot - )Additional F.A.R within Ring I and II ( for amalgamated plot - )Additional F.A.R within Ring I and II ( for amalgamated plot - ) 0.000.000.000.00Allowable TDR Area (60% of Perm.FAR )Allowable TDR Area (60% of Perm.FAR )Allowable TDR Area (60% of Perm.FAR )Allowable TDR Area (60% of Perm.FAR ) 0.000.000.000.00Premium FAR for Plot within Impact Zone ( - )Premium FAR for Plot within Impact Zone ( - )Premium FAR for Plot within Impact Zone ( - )Premium FAR for Plot within Impact Zone ( - ) 0.000.000.000.00Total Perm. FAR area ( 1.75 )Total Perm. FAR area ( 1.75 )Total Perm. FAR area ( 1.75 )Total Perm. FAR area ( 1.75 ) 1279.321279.321279.321279.32Commercial FAR (100.00% )Commercial FAR (100.00% )Commercial FAR (100.00% )Commercial FAR (100.00% ) 211.09211.09211.09211.09Proposed FAR AreaProposed FAR AreaProposed FAR AreaProposed FAR Area 211.09211.09211.09211.09Achieved Net FAR Area ( 0.29 )Achieved Net FAR Area ( 0.29 )Achieved Net FAR Area ( 0.29 )Achieved Net FAR Area ( 0.29 ) 211.09211.09211.09211.09Balance FAR Area ( 1.46 )Balance FAR Area ( 1.46 )Balance FAR Area ( 1.46 )Balance FAR Area ( 1.46 ) 1068.231068.231068.231068.23

BUILT UP AREA CHECKBUILT UP AREA CHECKBUILT UP AREA CHECKBUILT UP AREA CHECKProposed BuiltUp AreaProposed BuiltUp AreaProposed BuiltUp AreaProposed BuiltUp Area 294.05294.05294.05294.05Achieved BuiltUp AreaAchieved BuiltUp AreaAchieved BuiltUp AreaAchieved BuiltUp Area 294.05294.05294.05294.05

Approval Date : 01/29/2020 8:11:35 PM

Payment Details

Sr No. ChallanNumber

ReceiptNumber Amount (INR) Payment Mode Transaction

NumberPayment Date Remark

1 BBMP/26875/CH/19-20 BBMP/26875/CH/19-20 1750 Online 9357099229 11/15/20192:00:28 PM -

No. Head Amount (INR) Remark1 Scrutiny Fee 1750 -

Approval Condition :

This Plan Sanction is issued subject to the following conditions :

1.Sanction is accorded for the Commercial Building at 160 , PEENYA INDUSTRIAL AREA,3RD PHASE,LAGGERE VILLAGE,YESHWANTAPURA HOBLI,BANGALORE., Bangalore. a).Consist of 1Ground + 0 only.2.Sanction is accorded for Commercial use only. The use of the building shall not be deviated to any other use.3.82.96 area reserved for car parking shall not be converted for any other purpose.4.Development charges towards increasing the capacity of water supply, sanitary and power main has to be paid to BWSSB and BESCOM if any.5.Necessary ducts for running telephone cables, cubicles at ground level for postal services & space for dumping garbage within the premises shall be provided.6.The applicant shall INSURE all workmen involved in the construction work against any accident / untoward incidents arising during the time of construction.7.The applicant shall not stock any building materials / debris on footpath or on roads or on drains. The debris shall be removed and transported to near by dumping yard.8.The applicant shall maintain during construction such barricading as considered necessary to prevent dust, debris & other materials endangering the safety of people / structures etc. in & around the site.9.The applicant shall plant at least two trees in the premises.10.Permission shall be obtained from forest department for cutting trees before the commencement of the work.11.License and approved plans shall be posted in a conspicuous place of the licensed premises. The building license and the copies of sanctioned plans with specifications shall be mounted on a frame and displayed and they shall be made available during inspections.12.If any owner / builder contravenes the provisions of Building Bye-laws and rules in force, the Architect / Engineer / Supervisor will be informed by the Authority in the first instance, warned in the second instance and cancel the registration if the same is repeated for the third time.13.Technical personnel, applicant or owner as the case may be shall strictly adhere to the duties and responsibilities specified in Schedule - IV (Bye-law No. 3.6) under sub section IV-8 (e) to (k).14.The building shall be constructed under the supervision of a registered structural engineer.15.On completion of foundation or footings before erection of walls on the foundation and in the case of columnar structure before erecting the columns "COMMENCEMENT CERTIFICATE" shall be obtained.16.The building should not be occupied without obtaining "OCCUPANCY CERTIFICATE" from the competent authority.17.Drinking water supplied by BWSSB should not be used for the construction activity of the building.18.The applicant shall ensure that the Rain Water Harvesting Structures are provided & maintained in good repair for storage of water for non potable purposes or recharge of ground water at all times having a minimum total capacity mentioned in the Bye-law 32(a).19.If any owner / builder contravenes the provisions of Building Bye-laws and rules in force, the authority will inform the same to the concerned registered Architect / Engineers / Supervisor in the first instance, warn in the second instance and cancel the registration of the professional if the same is repeated for the third time.20.The Builder / Contractor / Professional responsible for supervision of work shall not shall not materially and structurally deviate the construction from the sanctioned plan, without previous approval of the authority. They shall explain to the owner s about the risk involved in contravention of the provisions of the Act, Rules, Bye-laws, Zoning Regulations, Standing Orders and Policy Orders of the BBMP.21.In case of any false information, misrepresentation of facts, or pending court cases, the plan sanction is deemed cancelled.

Special Condition as per Labour Department of Government of Karnataka vide ADDENDUM (HosadaagiHoodike) Letter No. LD/95/LET/2013, dated: 01-04-2013 :

1.Registration of Applicant / Builder / Owner / Contractor and the construction workers working in the construction site with the "Karnataka Building and Other Construction workers Welfare Board"should be strictly adhered to.2.The Applicant / Builder / Owner / Contractor should submit the Registration of establishment and list of construction workers engaged at the time of issue of Commencement Certificate. A copy of the same shall also be submitted to the concerned local Engineer in order to inspect the establishment and ensure the registration of establishment and workers working at construction site or work place.3.The Applicant / Builder / Owner / Contractor shall also inform the changes if any of the list of workers engaged by him.At any point of time No Applicant / Builder / Owner / Contractor shall engage a construction worker in his site or work place who is not registered with the "Karnataka Building and Other Construction workers Welfare Board".

Note :

1.Accommodation shall be provided for setting up of schools for imparting education to the children of construction workers in the labour camps / construction sites.2.List of children of workers shall be furnished by the builder / contractor to the Labour Department which is mandatory.3.Employment of child labour in the construction activities strictly prohibited.4.Obtaining NOC from the Labour Department before commencing the construction work is a must.5.BBMP will not be responsible for any dispute that may arise in respect of property in question.6.In case if the documents submitted in respect of property in question is found to be false or fabricated, the plan sanctioned stands cancelled automatically and legal action will be initiated.

Block Name Block Use Block SubUse Block StructureBlock Land UseCategory

A1 (BUNK) Commercial Fuel Stations Bldg upto 11.5 mt. Ht. R

BlockName Type SubUse

Area(Sq.mt.)

Units CarReqd. Prop. Reqd./Unit Reqd. Prop.

Total : - - - - 0 6

Vehicle Type Reqd. AchievedNo. Area (Sq.mt.) No. Area (Sq.mt.)

Car - - 6 82.50Total Car - - 6 82.50Other Parking - - - 0.46Total 0.00 82.96

Block No. of Same BldgDeductions (Area inSq.mt.)

Proposed FARArea (Sq.mt.) Total FAR Area

(Sq.mt.)Parking CommercialA1 (BUNK) 1 294.05 82.96 211.09 211.09

Grand Total: 1 294.05 82.96 211.09 211.09

Floor NameTotal Built Up Area(Sq.mt.)

Deductions (Area inSq.mt.)

Proposed FAR Area(Sq.mt.) Total FAR Area

(Sq.mt.)Parking CommercialGround Floor 82.96 211.09 211.09Total: 294.05 82.96 211.09 211.09Total Number of SameBlocks:

1

Total: 294.05 82.96 211.09 211.09

BLOCK NAME NAME LENGTH HEIGHT NOSA1 (BUNK) D1 1.00 2.10 01

BLOCK NAME NAME NOSA1 (BUNK) W1 1.80 1.20 06

FLOOR Name UnitBUA Type UnitBUA Area Carpet Area No. of Rooms No. of TenementGROUNDFLOOR PLAN

SPLITTENEMENT SHOP 18.74 18.74 1 1

Total: - - 18.74 18.74 1 1

4.0

2.6

19.5

28.7

30.0

31.8

SITE PLAN

SCALE 1:150

KEY PLAN

SCALE 1:750

3.1

3.0

27.0

2.3

3.1

3.2

28.7

4.0

2.4

3.2

6.8

2.4

294.05

AutoCAD SHX Text
1:100
AutoCAD SHX Text
ARCHITECT/ENGINEER /SUPERVISOR 'S SIGNATURE
AutoCAD SHX Text
OWNER / GPA HOLDER'S SIGNATURE
AutoCAD SHX Text
OWNER'S ADDRESS WITH ID NUMBER & CONTACT NUMBER :
AutoCAD SHX Text
DASARAHALLI
AutoCAD SHX Text
BBMP/Ad.Com./DSH/0230/19-20
AutoCAD SHX Text
DASARAHALLI
AutoCAD SHX Text
29/01/2020
AutoCAD SHX Text
Block USE/SUBUSE Details
AutoCAD SHX Text
Required Parking(Table 7a)
AutoCAD SHX Text
Parking Check (Table 7b)
AutoCAD SHX Text
FAR &Tenement Details
AutoCAD SHX Text
Block :A1 (BUNK)
AutoCAD SHX Text
SCHEDULE OF JOINERY:
AutoCAD SHX Text
SCHEDULE OF JOINERY:
AutoCAD SHX Text
UnitBUA Table for Block :A1 (BUNK)
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
8.0
AutoCAD SHX Text
3.0
AutoCAD SHX Text
%%UGROUND FLOOR PLAN
AutoCAD SHX Text
(SCALE-1:100)
AutoCAD SHX Text
HP
AutoCAD SHX Text
%%UFRONT ELEVATION OF SALES BUILDING
AutoCAD SHX Text
GL
AutoCAD SHX Text
RCC LINTEL IN 1:2:4 MIX
AutoCAD SHX Text
RCC BEAM IN 1:2:4 MIX
AutoCAD SHX Text
LATERITE MASONRY
AutoCAD SHX Text
SAND FILLING
AutoCAD SHX Text
R.C.C PLINTH BEAM
AutoCAD SHX Text
FOUNDATION DETAILS
AutoCAD SHX Text
AS SHOWN IN THE
AutoCAD SHX Text
%%USECTION AT - BB
AutoCAD SHX Text
2.85
AutoCAD SHX Text
WALL
AutoCAD SHX Text
STRUCTURAL DRAWING
AutoCAD SHX Text
IN 1:2:4 MIX
AutoCAD SHX Text
G/D
AutoCAD SHX Text
FG
AutoCAD SHX Text
R/S
AutoCAD SHX Text
D1
AutoCAD SHX Text
D1/V
AutoCAD SHX Text
WATER
AutoCAD SHX Text
1.8x1.0
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
2.5x1.2
AutoCAD SHX Text
DSM
AutoCAD SHX Text
TOI.
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
1.52x1.8
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
2.5x2.7
AutoCAD SHX Text
SALES
AutoCAD SHX Text
0.90m WIDE WALK WAY
AutoCAD SHX Text
D1/V
AutoCAD SHX Text
W
AutoCAD SHX Text
1.2x1.2
AutoCAD SHX Text
TOI.
AutoCAD SHX Text
1.2x1.2
AutoCAD SHX Text
SAND FILLING
AutoCAD SHX Text
%%C1.95M
AutoCAD SHX Text
16 KL
AutoCAD SHX Text
U/G TANK
AutoCAD SHX Text
1.95
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.9
AutoCAD SHX Text
1.95
AutoCAD SHX Text
%%UCROSS SECTION
AutoCAD SHX Text
%%ULONGITUDINAL SECTION
AutoCAD SHX Text
SHELL PLATE
AutoCAD SHX Text
THICKNESS 6MM
AutoCAD SHX Text
16 KL U/G TANK
AutoCAD SHX Text
SAND FILLING
AutoCAD SHX Text
5.59
AutoCAD SHX Text
END PLATE
AutoCAD SHX Text
WITH STIFFENER
AutoCAD SHX Text
THICK 10MM
AutoCAD SHX Text
DRIVE AWAY
AutoCAD SHX Text
LEVEL
AutoCAD SHX Text
%%C40mm VENT PIPES 4.0M HIGH COVERED
AutoCAD SHX Text
WITH 2 LAYERS OF NON-CORRODING METAL WIRE
AutoCAD SHX Text
%%U16 KL U/G TANK
AutoCAD SHX Text
300mm THICK
AutoCAD SHX Text
RCC STRIP RAFT
AutoCAD SHX Text
%%UScale 1:100
AutoCAD SHX Text
GAUGE WITH 11 MESHES PER LINEAR CM AT 4M HIGH
AutoCAD SHX Text
MASONRY
AutoCAD SHX Text
WALL IN CM.
AutoCAD SHX Text
RCC DECK
AutoCAD SHX Text
SLAB 1:2:4 MIX
AutoCAD SHX Text
0.45
AutoCAD SHX Text
0.45
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.45
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.45
AutoCAD SHX Text
COVER
AutoCAD SHX Text
%%C40mm DIP PIPE
AutoCAD SHX Text
%%C75mm FILL PIPE
AutoCAD SHX Text
%%C40mm SUCTION PIPE
AutoCAD SHX Text
%%C600mm MAN HOLE
AutoCAD SHX Text
FILL & DIP PIPES COVERED WITH
AutoCAD SHX Text
AIR TIGHT THREADED BRASS CAPS
AutoCAD SHX Text
%%UTANK FABRICATIONS ARE CONFIRMING TO IS : 10987
AutoCAD SHX Text
4.0
AutoCAD SHX Text
SAND FILLING
AutoCAD SHX Text
%%C2.66m
AutoCAD SHX Text
35 KL
AutoCAD SHX Text
U/G TANK
AutoCAD SHX Text
2.66
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.9
AutoCAD SHX Text
2.66
AutoCAD SHX Text
%%UCROSS SECTION
AutoCAD SHX Text
%%ULONGITUDINAL SECTION
AutoCAD SHX Text
SHELL PLATE
AutoCAD SHX Text
THICKNESS 6MM
AutoCAD SHX Text
35 KL U/G TANK
AutoCAD SHX Text
SAND FILLING
AutoCAD SHX Text
6.75
AutoCAD SHX Text
END PLATE
AutoCAD SHX Text
WITH STIFFENER
AutoCAD SHX Text
THICK 10MM
AutoCAD SHX Text
DRIVE AWAY
AutoCAD SHX Text
LEVEL
AutoCAD SHX Text
%%C40mm VENT PIPES 4.0M HIGH COVERED
AutoCAD SHX Text
WITH 2 LAYERS OF NON-CORRODING METAL WIRE
AutoCAD SHX Text
%%U35 KL U/G TANK
AutoCAD SHX Text
300mm THICK
AutoCAD SHX Text
RCC STRIP RAFT
AutoCAD SHX Text
%%UScale 1:100
AutoCAD SHX Text
GAUGE WITH 11 MESHES PER LINEAR AT 4M HIGH
AutoCAD SHX Text
MASONRY
AutoCAD SHX Text
WALL IN CM.
AutoCAD SHX Text
RCC DECK
AutoCAD SHX Text
SLAB 1:2:4 MIX
AutoCAD SHX Text
0.45
AutoCAD SHX Text
0.45
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.45
AutoCAD SHX Text
0.6
AutoCAD SHX Text
0.45
AutoCAD SHX Text
COVER
AutoCAD SHX Text
%%C40mm DIP PIPE
AutoCAD SHX Text
%%C75mm FILL PIPE
AutoCAD SHX Text
%%C40mm SUCTION PIPE
AutoCAD SHX Text
%%C600mm MAN HOLE
AutoCAD SHX Text
FILL & DIP PIPES COVERED WITH
AutoCAD SHX Text
AIR TIGHT THREADED BRASS CAPS
AutoCAD SHX Text
%%UTANK FABRICATIONS ARE CONFIRMING TO IS : 10987
AutoCAD SHX Text
%%USECTION OF COMPOUND WALL DETAILS
AutoCAD SHX Text
0.075
AutoCAD SHX Text
PCC COPING 1:2:4
AutoCAD SHX Text
1.125
AutoCAD SHX Text
0.60
AutoCAD SHX Text
PRO.GROUND LVL
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
10Cm TK IN CM 1:4
AutoCAD SHX Text
PCC 1:4:8, USING 40MM METAL
AutoCAD SHX Text
RR MASONRY IN CM 1:6 MIX
AutoCAD SHX Text
BRICK PILLAR 2.5M INTERVELS
AutoCAD SHX Text
21x21CM SIZE
AutoCAD SHX Text
%%USERVICE AREA
AutoCAD SHX Text
SCALE- 1 : 20
AutoCAD SHX Text
%%UCROSS SECTION OF DRIVEWAY
AutoCAD SHX Text
150MM THK. G.S.B.
AutoCAD SHX Text
225MM THK. WBM
AutoCAD SHX Text
50MM THK. B.M.
AutoCAD SHX Text
SDBC 25MM THK.
AutoCAD SHX Text
50MM THK. SAND BED
AutoCAD SHX Text
150MM THK. WBM WITH
AutoCAD SHX Text
GRADE -3 METAL
AutoCAD SHX Text
150MM THK. SOALING
AutoCAD SHX Text
WITH GRADE -2 METAL
AutoCAD SHX Text
SCALE- 1 : 20
AutoCAD SHX Text
%%UCROSS SECTION PAVING FOR
AutoCAD SHX Text
80MM THK. CEMENT
AutoCAD SHX Text
PAVER BLOCK
AutoCAD SHX Text
%%UCROSS SECTION ON CANOPY
AutoCAD SHX Text
GL
AutoCAD SHX Text
GL
AutoCAD SHX Text
OF 15MC & 15A WIDE 6%%% ROOFING
AutoCAD SHX Text
5.50M
AutoCAD SHX Text
1.5
AutoCAD SHX Text
0.15
AutoCAD SHX Text
0.23
AutoCAD SHX Text
0.3
AutoCAD SHX Text
0.1
AutoCAD SHX Text
SAND
AutoCAD SHX Text
ROOFING STRUCTURAL MADE UP
AutoCAD SHX Text
SHEET & STEEL FALCEILING
AutoCAD SHX Text
15 MC BOLT TYPE COLUMN
AutoCAD SHX Text
450X450SQ RCC PEDESTAL
AutoCAD SHX Text
WITH
AutoCAD SHX Text
6 BOLTS OF 22%%C FOR
AutoCAD SHX Text
CANOPY COLUMN
AutoCAD SHX Text
PCC 1:1.5:3
AutoCAD SHX Text
PCC 1:4:8
AutoCAD SHX Text
%%USCALE 1:100
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.00
AutoCAD SHX Text
0.6M
AutoCAD SHX Text
PCC 1:4:8 FLOORING
AutoCAD SHX Text
SAND
AutoCAD SHX Text
PLINTH BEAM 0.23MX0.3M
AutoCAD SHX Text
PLINTH BEAM 0.23MX0.23M
AutoCAD SHX Text
RCC COPING 1:2:4
AutoCAD SHX Text
RCC RAFT 1:2:4
AutoCAD SHX Text
PCC 1:4:8
AutoCAD SHX Text
SAND
AutoCAD SHX Text
%%UFOUNDATION DETAILS
AutoCAD SHX Text
0.3
AutoCAD SHX Text
0.3
AutoCAD SHX Text
0.23
AutoCAD SHX Text
0.38
AutoCAD SHX Text
0.62
AutoCAD SHX Text
0.62
AutoCAD SHX Text
0.90
AutoCAD SHX Text
%%USCALE 1:100
AutoCAD SHX Text
CC 1:2:4
AutoCAD SHX Text
0.15M TK.
AutoCAD SHX Text
P.C.C.BED IN 1:3:6 MIX
AutoCAD SHX Text
R.C.C. SLAB IN 1:2:4 MIX
AutoCAD SHX Text
R.R. MASONRY IN C.M.1:6
AutoCAD SHX Text
1.15
AutoCAD SHX Text
0.15
AutoCAD SHX Text
1.00
AutoCAD SHX Text
1.00
AutoCAD SHX Text
2.20
AutoCAD SHX Text
1.90
AutoCAD SHX Text
G/D
AutoCAD SHX Text
FG
AutoCAD SHX Text
R/S
AutoCAD SHX Text
D1
AutoCAD SHX Text
D1/V
AutoCAD SHX Text
WATER
AutoCAD SHX Text
1.8x1.0
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
2.5x1.2
AutoCAD SHX Text
DSM
AutoCAD SHX Text
TOI.
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
1.52x1.8
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
2.5x2.7
AutoCAD SHX Text
SALES
AutoCAD SHX Text
D1/V
AutoCAD SHX Text
W
AutoCAD SHX Text
1.2x1.2
AutoCAD SHX Text
TOI.
AutoCAD SHX Text
1.2x1.2
AutoCAD SHX Text
D
AutoCAD SHX Text
HSD
AutoCAD SHX Text
SB
AutoCAD SHX Text
2Nos.
AutoCAD SHX Text
FE -2Nos.
AutoCAD SHX Text
SB
AutoCAD SHX Text
2Nos.
AutoCAD SHX Text
FE -2Nos.
AutoCAD SHX Text
SB
AutoCAD SHX Text
2Nos.
AutoCAD SHX Text
FE -2Nos.
AutoCAD SHX Text
MS(Power)
AutoCAD SHX Text
MPD MS/
AutoCAD SHX Text
SB
AutoCAD SHX Text
2Nos.
AutoCAD SHX Text
FE -2Nos.
AutoCAD SHX Text
INGRESS
AutoCAD SHX Text
EGRESS
AutoCAD SHX Text
JALAHALLI
AutoCAD SHX Text
[3.0 Kms.]
AutoCAD SHX Text
D
AutoCAD SHX Text
SAMPLE ROOM
AutoCAD SHX Text
1.2x1.2
AutoCAD SHX Text
PROPOSED FUEL STATION AT SITE NO.160.
AutoCAD SHX Text
SURVEY No.149 & 151 OF LAGGERE VILLAGE,
AutoCAD SHX Text
YESWANTHPUR HOBLI, BANGALORE NORTH TALUK,
AutoCAD SHX Text
BANGALORE URBAN DISTRICT, KARNATAKA
AutoCAD SHX Text
STATE, PINCODE :- 560058.
AutoCAD SHX Text
NO PROTECTED AREA LYING WITHIN 100m RADIUS
AutoCAD SHX Text
LAGGARE
AutoCAD SHX Text
PUMP ISLAND
AutoCAD SHX Text
5.0m x 1.0m
AutoCAD SHX Text
0.3m HIGH
AutoCAD SHX Text
S
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
W
AutoCAD SHX Text
HSD
AutoCAD SHX Text
DUAL
AutoCAD SHX Text
HSD
AutoCAD SHX Text
DUAL
AutoCAD SHX Text
MS(Power)
AutoCAD SHX Text
MPD MS/
AutoCAD SHX Text
31.78
AutoCAD SHX Text
30.0
AutoCAD SHX Text
28.70
AutoCAD SHX Text
19.52
AutoCAD SHX Text
HPCL
AutoCAD SHX Text
SITE
AutoCAD SHX Text
100m 'R'
AutoCAD SHX Text
100m 'R'
AutoCAD SHX Text
100m 'R'
AutoCAD SHX Text
100m 'R'
AutoCAD SHX Text
GODOWN
AutoCAD SHX Text
GODOWN
AutoCAD SHX Text
GODOWN
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
GODOWN
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
INDUSTRIAL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
COMPLEX
AutoCAD SHX Text
COMPLEX
AutoCAD SHX Text
COMPLEX
AutoCAD SHX Text
COMPLEX
AutoCAD SHX Text
OUTER RING ROAD
AutoCAD SHX Text
[1.00 Kms.]
AutoCAD SHX Text
JALAHALLI
AutoCAD SHX Text
[3.00 Kms.]
AutoCAD SHX Text
VACANT LAND
AutoCAD SHX Text
(POLLUTION CONTROL ECOLOGICAL PARK)
AutoCAD SHX Text
VACANT LAND
AutoCAD SHX Text
VACANT LAND
AutoCAD SHX Text
VACANT LAND
AutoCAD SHX Text
COMPLEX
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
LAGGARE
AutoCAD SHX Text
28.00
AutoCAD SHX Text
29.70
AutoCAD SHX Text
12.00Mt WIDE Road
AutoCAD SHX Text
Existing 12.00Mt Road Widening to 18.00Mt
AutoCAD SHX Text
100' wide road connecting outer ring road & nh - 4 (Road Width 100' Wide) (Existing Road Width 100')
AutoCAD SHX Text
30.48Mt WIDE Road
AutoCAD SHX Text
3.00M ROADWIDENING