honeywell parts management

5
October 31, 2016 HONEYWELL PARTS MANAGEMENT

Upload: others

Post on 01-Jul-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HONEYWELL PARTS MANAGEMENT

October 31, 2016HONEYWELL PARTS MANAGEMENT

Page 2: HONEYWELL PARTS MANAGEMENT

Progress Toward Commonality• History for Honeywell

- One Policy for Mechanical Parts Management for Honeywell - On Parts Management Plan for Mechanical Parts- One Preferred Parts Index (PPI)

A common tool for picking parts for all three CAD tools (NX, ProE and Catia) All new model requests are approved by a core group of people and are stored in the tool

(aClass) A common tool for source files (Teamcenter) A BOM checker for NX (one being developed for ProE) All new designs go through an eReview All changes to existing designs are reviewed for part status and possible replacements

- Turbo influence Review of head types for hardware for standardizing

Page 3: HONEYWELL PARTS MANAGEMENT

Parts – Selection Tool (Top Level Categories)

Top Level Categories

Page 4: HONEYWELL PARTS MANAGEMENT

Parts – Selection Tool (Continued)

Sub Categories

Search Window

Page 5: HONEYWELL PARTS MANAGEMENT

Part Classification Results and Ratings