Historical Review of Dual and Multiple Completions. By Joe Dunn Clegg. History. Early Days (1859 to 1900) Spindletop & East Texas: RRC & Proration After WW II: Commingling & Dual Approval The 1950’s & 60’s: Hard times : Duals + The 1960’s: Computers and Offshore - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/1.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 1
Historical Review of Dual and Multiple Completions
By
Joe Dunn Clegg
![Page 2: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/2.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 2
History Early Days (1859 to 1900) Spindletop & East Texas: RRC & Proration After WW II: Commingling & Dual Approval The 1950’s & 60’s: Hard times : Duals + The 1960’s: Computers and Offshore The Good Years: 1970 to 1984 Reality and Profitability Using the Best Technology
![Page 3: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/3.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 3
Multiple Zones
One zone: Only single possible Two or more zones: Development Plan
Needed--How best to produce reserves. Aggie approach: Singles & Plug-Back Well for each zone (expensive) Mix of singles, duals, multiples and
…..recompletions.
![Page 4: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/4.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 4
Multiple Zones Objective: to make more production with less initial
costs & less operating expenditures .…make more money
Applicable for only limited rates in certain environments….. 2”x 2” for < 1000 bpd x 1000 bpd
Avoid large mismatches in depth and pressure ….… depths < 10%; gradients < 10%
Review potential operating problems/costs Key often a long flowing life Dual artificial lift & workovers usually a problem
$
![Page 5: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/5.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 5
Annulus-TubingDualforflowing wells
PackerLeakageTests?
![Page 6: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/6.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 6
Flow CouplingCross-over
Packer
Tubing
Flow CouplingLanding Nipple
Blast JointPolished Nipple
Packer
No-Go Nipple
Perforations
Annulus-TubingDual withCross-Over
![Page 7: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/7.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 7
Fad in the 1960’s
Work-Overs?
Secondary Recovery?
Unitization?
Little OperatingCost Data Available
CourtesyOtis
![Page 8: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/8.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 8
Multiple“Tubingless”Completion
Exxon Special
![Page 9: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/9.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 9
ConcentricDualCompletionTubing
UpperZone
LowerZones
OK forFlowingZonesi.e. Gas Wells
![Page 10: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/10.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 10
DualParallelGas-Lift
Survivedthe testof time
11
![Page 11: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/11.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 11
DualParallelGas-Liftw/concentrictbg. string
x Lift Gas
Lower ZoneProduction
o
Upper Zone ProductionNormal gas injection
12
![Page 12: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/12.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 12
W/GasInjection
String&
SpecialCrossover
9 5/8”Csg
3 1/2” OD Tbg w/
1.9” OD Tbg
(Hydraulic)
(Permanent)
x
X XProposed DualParallelGas-Lift
13
![Page 13: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/13.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 13
ThreeTubing StringDual Gas-Lift
Rigid<90’
(Hydraulic)
(Hydraulic)
(Permanent)
Outz & Osmus
Casing Size?
![Page 14: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/14.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 14
Circulating SleeveUpper PumpSealLower Pump
Sucker-rod string
Upper Zone ProductionUpper Zone GasLower Zone Production
Liquid & Gas
Upper Zone
Lower Zone
Dual Rod Pumping: One Beam Unit
o
Schematic
![Page 15: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/15.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 15
Head to HeadDual BeamRod Pumps
![Page 16: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/16.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 16
Triple Beam Rod Pumps
![Page 17: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/17.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 17
Head to Head Dual For Triple Units Single Dual Head
![Page 18: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/18.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 18
9 5/8” Csg
Lower Zone Power Fluid
All Production +Power Fluid
Upper ZonePower Fluid
Dual Hydraulic
Lower Zone
Upper Zone
CommingledProduction
![Page 19: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/19.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 19
Dual Hydraulic Pumping: No vents
Production lower pump +all power fluid
Production upper zone
Power fluid for upper pump
Power fluid for lower pump
LP
UP
![Page 20: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/20.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 20oo
oo
Upper ZonePump
Perforations
Packer
Lower Zone PumpLower Zone
HypotheticalDual ESPInstallation
UpperZone
Feasible but notPractical
![Page 21: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/21.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 21
Multilateral Dual
Upper Zone Lateral
Lower Zone OpposedMultilateral
![Page 22: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/22.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 22
MultipleCompletion:
CommingledZones OneTubing String
![Page 23: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/23.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 23
My Conclusions Singles or Commingling Preferred Duals are profitable for selected cases Multiples (>2) are seldom justified over well life
except for flowing wells Most successful high rate (> 200 BPD) artificial
lift: ...Gas Lift Savings on drilling costs are often lost due to
higher operating costs, higher workover costs and lost reserves
Multiple completions increase stress
![Page 24: Historical Review of Dual and Multiple Completions](https://reader036.vdocuments.us/reader036/viewer/2022062322/56814724550346895db45d8d/html5/thumbnails/24.jpg)
2004 Gas-Lift Workshop
Joe Dunn Clegg 24
Duals Singles Multiples
The Winner
Special Cases Flowing Wells