FAKULTI KEJURUTERAAN KIMIA Hazard Identification Risk Assessment Risk Control (HIRARC)
Company: Fujitsu Component (Malaysia) Sdn. Bhd.Conducted by: Location: Parit Raja, Batu Pahat, Johor, Approved by: Date: Liason Officer: Date:
Hazard Identification Risk Analysis Risk Control Existing Risk Risk
No
1
2
3
4
5
6
7
8
Work Activity Making frame
Hazard
RaisinChemical
Which can cause/effect
INJURY
Control (if any) CYCLING PAD
Likelihood (1-5) 3 (refer Table 1)
Severity (1-5) 2 (refer table 2)
(Likelihood x severity) 3x2=6
Recommended Control Measures
Put if any
PIC (Due Date/status)
*Attach this form together with the list of participants
Reference:
Table 1: Likelihood of an occurrence LIKELIHOOD (L) EXAMPLE RATING Most likely The most likely result of the hazard/event being realized 5Possible Has a good chance of occuring at sometime in future 4Conceivable Might be occur at sometime in future 3Remote Has not been known to occur after many years 2Inconceivable Is practically impossible has never occured 1
Table 2: Severity of hazard Severity (S) Example Rating Catastrophic Numerous fatalities, irrecoverable property damage and productivity 5Approximately one single fatality major property damage if hazard is
Fatal Seroius Minor Negligible
realized Non-fatal injury, permanent disability Disabling but not permanent injury Minor abrasions, bruises, cuts, first aid type injury
4321
Table 3: Risk Assessment Risk Description Action 15-25 High A HIGH risk requires immediate action to control the hazard as detailed in the hierarchy of control. Actions taken must be documented on the risk assessment form including date for completion
5-12
1-4
Medium
Low
A MEDIUM risk requires a planned approach to controlling the hazard and applies temporary measure if required. Actions taken must be documented on the risk assessment form including date for completion A risk identified as LOW may be considered as acceptable and further reduction may not be necessary. However, if the risk can be resolved quickly and efficiently, control measures should be implemented and recorded