HIGHWAY PROGRAM FY 2018-2019 SORTED BY PARISH FOR LEGISLATIVE REVIEW AND APPROVAL This public document is published at a total cost of $3.25. 205 copies of this public document were published in this second printing at a cost of $666.25. The total cost of all printings of this document including reprints is $828.75. This document was published by the Louisiana Department of Transportation reproduction unit, 1201 Capitol Access Road, Baton Rouge, LA 70802. This material was printed in accordance with standards for printing by state agencies established in R.S. 43.31.

Upload: phamnhu

Post on 29-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

HIGHWAY PROGRAM

FY 2018-2019

SORTED BY PARISH

FOR LEGISLATIVE REVIEW

AND APPROVAL

This public document is published at a total cost of $3.25. 205 copies of this public document were published in this second printing at a cost of $666.25. The total cost of all printings of this document including reprints is $828.75. This document was published by the Louisiana

Department of Transportation reproduction unit, 1201 Capitol Access Road, Baton Rouge, LA 70802. This material was printed in accordance

with standards for printing by state agencies established in R.S. 43.31.

Page 2: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority
Page 3: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

INTRODUCTION

1. R.S. 48:229.1, 230 states that “the Department shall provide the Legislature and public with this program which shall list projects to be constructed in the ensuing fiscal year”… that considers the “anticipated revenues to be appropriated by the legislature.” The Department shall also provide the Legislature a list of projects “which are in various stages of planning and preparation.”

2. In compliance with this statute, the attached Highway Program identifies the

projects that are scheduled for construction letting in FY 2018-19. These are denoted as being in Stage 4. Projects being developed in the other stages are also included in the document.

3. There are many projects remaining to be let prior to the end of the current

fiscal year, FY 2017-18. For informational purposes, these projects are also listed in this document. In the event any of these projects cannot be let as planned, they will become part of the FY 2018-19 construction program, and will be let as soon as practicable in that fiscal year.

4. The one year construction program and the list of other projects in various

stages are combined into this document which is called the Highway Priority Program or Highway Program. These projects are also submitted to the Federal Highway Administration along with the Transit Program. The two programs together are referred to as the State Transportation Improvement Program (STIP). The Public Hearings held each year in each Highway District fulfill both the State and Federal requirements for public involvement regarding these programs.

5. DOTD has based this preliminary Highway Program on anticipated revenues.

If funding above the expected amount is made available, funding may be used on projects listed in Stages 0, 1, 2, or 3.

6. In the event all of the projects listed for letting in FY 2018-19 cannot be let to

construction due to funding issues or unforeseen problems encountered in the pre-construction process, the affected project(s) will be let as soon as practicable in the following year and other projects listed in Stages 0, 1, 2, or 3 may be advanced into FY 2018-19.

7. Construction estimates are for informational purposes only and are subject to

change.

Page 4: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD’s Project Delivery Process

Elected Officials

MPO

Long Range Plan

Districts

Public

STAGE 0: Feasibility

One Year

STAGE 1: Planning / Environmental

One to Two Years

STAGE 2: Funding

Project Prioritization

Indefinite Period STAGE 3: Final Design Process

One to Three Years

STAGE 4: Letting

One Year

STAGE 5: Construction

One to Three Years

Feasibility Analysis of

the Proposed Project Reject

Detailed Planning and

Environmental Analysis

Funding Allocation for

Design & Construction

Development of Final

Plans & Specifications

Bid Letting Process

Construction of Project

STAGE 6: Operation

Indefinite Period

On-going Monitoring

of Operation &

Maintenance

Page 5: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

PRESERVATION/ NON-INTERSTATE (PAVEMENT) 35.5

NON-INTERSTATE (PAVEMENT) (NHS) 35.5

SUSTAINABILITY NON-INTERSTATE (PAVEMENT) (non-federal aid) 48.4

ROAD PREVENTIVE MAINTENANCE 7.5

INTERSTATE (PAVEMENT) 33.9

BRIDGE (ON SYSTEM) 120.0

BRIDGE (OFF SYSTEM) 20.0

SUB-TOTAL 300.8

ITS (regular & earmarks) 11.0

OPERATIONS TRAFFIC CONTROL DEVICES 14.8

ROADWAY FLOODING 3.7

WEIGH STATIONS 5.1

TRANSPORTATION SYSTEMS MANAGEMENT 7.4

INTERSTATE LIGHTING 2.1

REST AREAS 8.4

ACCESS MANAGEMENT 8.1

FERRIES/MAJOR REPAIRS 3.5

MOVABLE BRIDGE PREVENTIVE MAINTENANCE 1.9

ADA PROGRAM 0.0

SUB-TOTAL 66.0

SAFETY HWY. PROGRAM 50.0

RR CROSSING UPGRADES & SEPARATIONS 8.2

SUB-TOTAL 58.2

CAPACITY REGULAR PROGRAM 5.0

CORRIDOR UPGRADE 101.9

SUB-TOTAL 106.9

TRANSPORTATION ALTERNATIVES PROJECTS 7.6

MISC.

URBAN SYSTEMS, CONGESTION MITIGATION & AIR QUALITY, LOCAL ROAD

SAFETY PROGRAM, SAFE ROUTES TO SCHOOLS, URBAN TRANSIT,

DEMAND MANAGEMENT 80.3

FED EARMARKS (DEMO,...) 30.5

OTHER (BONDS, TOLLS, LOCAL ) 15.3

INTERMODAL CONNECTOR 0.0

ROAD TRANSFER 25.0

SUB-TOTAL 158.7

GRAND TOTAL 690.6

Subject to funding availability.

TENTATIVE FY 18-19 BUDGET PARTITION

(COSTS IN MILLION DOLLARS)

CONSTRUCTION

PROPOSEDCATEGORY SUB-CATEGORY

Page 6: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

FUNDING TYPES FEDERAL

NHPP (NATIONAL HIGHWAY PERFORMANCE PROGRAM)

STP (SURFACE TRANSPORTATION PROGRAM) STP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,

LAFAYETTE) STP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,

MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) STPFLEX (FLEXIBLE) STP<5K (RURAL AREAS) FBROFF (OFF SYSTEM BRIDGE MAP 21)

TAP (TRANSPORTATION ALTERNATIVES PROGRAM) TAP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,

LAFAYETTE) TAP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,

MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) TAPFLEX (FLEXIBLE) TAP<5K (RURAL AREAS)

HSIP, HSIPPEN, SR2S, HRRR, SATRANS (SAFETY FUNDS, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, SAFETY TRANSFER)

RAIL HE, RAIL PD (ELIMINATIONS OF HAZARDS AT RAILWAY-HIGHWAY CROSSINGS)

CM (CONGESTION MITIGATION AIR QUALITY – EAST BATON ROUGE, WEST BATON ROUGE, LIVINGSTON, ASCENSION, AND IBERVILLE)

DEMO (FEDERAL DEMONSTRATION AND HIGH PRIORITY PROJECTS – DEFINED BY U.S. CONGRESS)

ER (FEDERAL EMERGENCY RELIEF PROGRAM FUNDING)

FEMA (FEDERAL EMERGENCY MANAGEMENT AGENCY FUNDS)

STATE / LOCAL

NFA (STATE TRANSPORTATION FUNDS FOR NON-FEDERAL AID ROUTES)

NFABOND (STATE BONDS FOR NON-FEDERAL AID ROUTES)

STCASH (STATE TRANSPORTATON TRUST FUNDS FOR STATE FUNDED CONSTRUCTION)

TIME (TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT)

STBONDS (STATE GENERAL OBLIGATION BONDS)

STGEN (STATE GENERAL FUNDS CASH)

TOLLS

LOCAL (FUNDS PROVIDED BY LOCAL GOVERNMENT)

OTHER (OTHER SOURCE NOT LISTED)

NFI (NO FUNDING IDENTIFIED)

Page 7: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

Statewide prioritization process for the Highway Priority Program beginning FY2017-2018 According to Louisiana Revised Statute 48:229.1.A the construction projects included in the Highway Priority Program should accomplish the following: Goal 1: Preserve/Sustain the System (1) Brings the state highway system into a good state of repair and optimizes the usage and efficiency of existing transportation facilities. Prospective Outcome 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.1.6, 3.2.1

Goal 2: Operate the System (3) Supports resiliency in the transportation system, including safe evacuation of populations when necessitated by catastrophic events such as hurricanes and floods. Prospective Outcome 3.2.1

(7) Encourages innovation and the use of technology. Prospective Outcome 3.2.1

Goal 3: Improve the Safety of the System (2) Improves safety for motorized and non-motorized highway users and communities. Prospective Outcome 3.2.1, 3.2.2, 3.2.3

Goal 4: Expand the System (4) Increases accessibility for people, goods, and services. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 (5) Fosters diverse economic development and job growth, international and domestic commerce, and tourism. Prospective Outcome 3.2.1, 3.2.5, 3.2.6 Goal 5: Improve Quality of Life (6) Fosters multimodalism, promotes a variety of transportation and travel options, and encourages intermodal connectivity. Prospective Outcome 3.2.1 (8) Protects the environment, reduces emissions, and improves public health and quality of life. Prospective Outcome 3.2.1

Per R.S. 48:229.1.C, the following factors must be considered when selecting projects for inclusion in the Highway Priority Program: (1) The condition of the roads, streets, and structures making up the state highway system and the relative urgency of the improvements considering in their order of general needs. (2) The type and volume of traffic on a particular segment of roadway, highway, or bridge. (3) The crash records for a particular segment of roadway, highway, or bridge. (4) The technical difficulties in the preparation of plans and the procurement of rights-of-way for a particular segment of roadway, highway, or bridge. (5) Whether unforeseeable emergencies such as floods have created an immediate need for improvement or reconstruction. (6) Whether capacity improvements are warranted due to population or traffic volume increases in specific geographic areas. (7) Whether or not the highway or bridge is or will be on an evacuation route utilized to evacuate large populations due to catastrophic events such as hurricanes or flooding. (8) Whether the improvement to or addition of a highway or bridge will benefit the economic development potential of the state.

Page 8: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

In accordance with R.S. 48:229.1.D, projects must be screened to determine whether they are consistent with the most recent Statewide Transportation Plan and warrant inclusion in the Program. Per R.S. 48:229.1.E, the Department shall identify and report prospective outcomes of each program. The Department shall evaluate the actual outcomes of each program and establish revised prospective outcomes of each program on a biennial basis. 3.1.1. Prospective Outcome: To effectively sustain and improve the Interstate Highway System so that 97% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 98.5% Expected percent fair or better on June 30, 2018 = 97% or more Outcome Achieved:

3.1.2. Prospective Outcome: To effectively maintain and improve the National Highway System so that 95% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 91.7% Expected percent fair or better on June 30, 2018 = 95% or more Outcome Achieved: 3.1.3. Prospective Outcome: To effectively maintain and improve the Highways of Statewide Significance so that 90% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 95.81% Expected percent fair or better on June 30, 2018 = 90% or more Outcome Achieved:

3.1.4. Prospective Outcome: To effectively maintain and improve the Regional Highway System so that 70% of the system pavement stays in fair or better condition each fiscal year. Percent fair or better as of June 30, 2016 = 89.41% Expected percent fair or better on June 30, 2018 = 70% or more Outcome Achieved:

3.1.5. Prospective Outcome: To sustain the condition and safety of Louisiana’s On-System (State-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 9.5% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved:

3.1.6. Prospective Outcome: To sustain the condition and safety of Louisiana’s Off-System (Locally-owned) bridges so that deck area of structurally deficient bridges constitutes not more than 10% of the deck area of all bridges. Percent deck area structurally deficient as of June 30, 2016 = 8.7% Expected percent fair or better on June 30, 2018 = 10% or less Outcome Achieved:

Page 9: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

3.2.1. Prospective Outcome: Implement an average of three percent of the Louisiana Statewide Transportation Plan each fiscal year. Cumulative percent of Plan implemented as of June 30, 2016 = 3.3% Expected cumulative percent of Plan implemented on June 30, 2018 = 9% Outcome Achieved: 3.2.2. Prospective Outcome: To reduce the total number of fatalities on Louisiana public roads by six percent each calendar year through 2030. Expected number of fatalities in 2015 = 845 Actual number of fatalities in 2015 = 752 Expected number of fatalities in 2017 = 767 Actual number of fatalities in 2017 = Percent reduction = Outcome Achieved: 3.2.3. Prospective Outcome: To achieve at least a 25 % reduction in fatal and non-fatal crashes at selected crash locations through the implementation of safety improvements each year. Average percent reduction in crash rates at all safety improvement project locations = 23.8% Expected percent reduction in fatal and non-fatal crash rates from safety improvements = 25% or greater Outcome Achieved: 3.2.5. Prospective Outcome: Maintain 90% or greater of the Interstate Highway System in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 88% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved: 3.2.6. Prospective Outcome: Maintain 90% or greater of the National Highway System (NHS) in uncongested conditions each fiscal year. Percent uncongested as of June 30, 2016 = 97% Expected percent uncongested on June 30, 2018 = 90% or more Outcome Achieved:

Page 10: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority
Page 11: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

4 – SCHEDULED FOR LETTING

Per RS 48:229.1, the following is the list of “…projects to be

constructed in the ensuing fiscal year…”

Per RS 48:231.A(6), “When this final construction program

is communicated to the legislature for funding for the

coming fiscal year, any project which the legislature

determines is not in the proper order of priority in

accordance with the factors stated in R.S. 48:229 may be

deleted by the legislature. However, the legislature shall not

add any projects to this final construction program, nor

shall the legislature make substitutions for projects which

have been removed.”

Page 12: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority
Page 13: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011541

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 FBROFF 1,008 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 17-18

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

NATION ROAD BRIDGE/ COULEE

ACADIA

H.011323

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 RAIL HE 725 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

CONSTRUCT A NEW RR XING BETWEEN TWO XINGS THAT WILL CLOSELUKE, SHAWN Remrks:

Typ Imp:714-01-0120

Project:Prj Mgr:

NIGHTHAWK/SPAN TRL:BNSF RR XINGS(ACADIA)

H.011829

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA I-10 450-04 STPFLEX 2,500 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19ACADIA LA 100 211-01 LOCAL 75 ROAD TRANSFER

WIDENING, CLASS II BASE, BASE REHAB, AND ASPHALT OVERLAY.MCMILLAN, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

IMP@LA13 & LA100 & I-10 ACC.RD (CROWLEY)

H.011922

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 STP<5K 1,179 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19

PATCH, WIDEN, BASE REHAB, ASPHALT OVERLAY, DRAIN., & RELATEDMCMILLAN, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1112 - LA 13 (ROAD TRANSFER IMP.)

H.012790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 35 207-07 STPFLEX 20 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

PREEMPTING 767-852Y WITH ADJACENT TRAFFIC SIGNAL.LUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 35: BNSF PREEMPTION (RAYNE)

H.012968

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 370 801-28 NFA 2,533 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 370: LA 91 - LA 3070

H.002077

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN LA 383 197-04 NFA 2,568 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCH AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 383:JEFFERSON DAVIS P/L-LAKEVIEW LOOP

ALLEN

H.009298

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN 000-02 SR2S 262 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19ALLEN 000-02 SR2S 41 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALK IMPROVMENTS, MARKED CROSSINGSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

TOWN OF OBERLIN SIDEWALKS

Page 1 - 1 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 14: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011314

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 22 266-01 HSIPPEN 4,450 SAFETY 4-SCHEDULED IN CURRENT FY 17-18ASCENSION LA 70 426-03 HSIPPEN 755 SAFETY ASCENSION LA 22 266-01 NHPP 219 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

IMPROVE THE SAFETY OF LA 22 USING ACCESS MGMENT (J-TURNS)TONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 22: NEAR I-10 GEOMETRIC IMPROV

ASCENSION

H.011451

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 22 266-01 STP>200K 2,414 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18ASCENSION LA 22 266-02 STP>200K 1,046 URBAN SYSTEMS

PATCH, MILL AND OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA 22 REHABILITATION

H.011490

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 30 414-03 CM 609 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 17-18ASCENSION LA 30 414-03 NHPP 800 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

CONSTRUCT LEFT TURN LANESGARY, VERTIE Remrks:

Typ Imp:USE LOCAL AS MATCH FOR CMAQ; USE TTF AS MATCH FOR TSM

Project:Prj Mgr:

LA 30:TURN [email protected] & S.HODGESON

H.010074

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 3089 426-01 RAIL HE 250 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

ROAD WORK AROUND CROSSING TO MAKE SAFERSHREWSBERRY,BILL Remrks:

Typ Imp:426-01-0026

Project:Prj Mgr:

UP (DONALDSONVILLE) LA 3089 SERVICE RD.

H.011540

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 FBROFF 345 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

BABIN ROAD / BAYOU NARCISSE

H.012078

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 429 264-04 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD EB AND WB LEFT TURN LANES ON LA 429THOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 429: IMPROVEMENTS AT LA 431

H.012903

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 70 426-01 HSIPPEN 1,167 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

RCUT WITH BULB-OUTS, ACCELERATION LANES, AND SNAKE ISLANDKELLEY, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: RCUT AT LA 3120

H.011767

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION 000-04 FBROFF 643 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 17-18

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:USE TTF AS MATCH

Project:Prj Mgr:

BAYOU CRAB ROAD BRIDGE

ASSUMPTION

Page 1 - 2 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 15: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010443

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 308 407-07 HSIPPEN 1,356 SAFETY 4-SCHEDULED FOR LETTING FY 18-19ASSUMPTION LA 308 407-08 HSIPPEN 746 SAFETY ASSUMPTION LA 308 407-07 SATRANS 12 SAFETY ASSUMPTION LA 308 407-08 SATRANS 2 SAFETY

REALIGN CURVE AND ADD SHOULDERSGARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308: CURVE REALIGN AND SHOULDERS

H.011522

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 652 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

AVOYELLES 000-05 FBROFF 720 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

FAITH BAPTIST MISSION & BILL BELT ROADS

AVOYELLES

H.012143

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 451 374-02 NFA 4,194 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCHING, COLD PLANING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 451: LA 114 TO P LABORDE ROAD

H.012922

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 1188 805-28 NFA 915 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1188: LA 115 TO LA 114

H.012432

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD 000-06 RAIL PD 200 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

RR SIGNALIZATIONSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

FOURTH ST: KCS RR XING (DERIDDER)

BEAUREGARD

H.013068

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 171 024-05 RAIL PD 215 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL RR CANTILEVERS AND BETTER CIRCUITRYSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

US 171:KCS RR XING CANTILEVERS(DERIDDER)

H.013262

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 190 028-03 NHPP 5,990 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: LA 111 - US 171

H.009508

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 2 083-04 STPFLEX 2,682 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

ASHPALT OVERLAY, DRAINAGE, PAVEMENT STRIPING, & RELATED WORSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: CANEY CREEK BRIDGE TO WEBSTER P/L

BOSSIER

Page 1 - 3 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 16: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012170

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 14,927 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 17-18

ASPHALTIC PAVEMENT MILLING AND RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: I-220 TO US 80 OVERPASS

H.012271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 RAIL PD 20 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

CONNECT TRAFFIC SIGNAL AND WARNING DEVICES FOR PREEMPTION.LUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

OLD PLN DLING RD.: UP PREEMPT (BENTON)

H.011436

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

EXTEND EXIT RAMPSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: EB EXIT RAMP AT LA 3105 EXTENSION

H.011484

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER US 80 001-03 NHPP 18,613 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BOSSIER US 80 001-03 DEMO 10,075 DEMO / HIGH PRIORITY

CLEANING AND PAINTING, AND STRUCTURAL REPAIRS.CAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

US80: RED RIVER BR TEXAS ST REHAB (HB)

H.011726

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 STP>200K 14,158 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

NEW ALIGNMENTOLIVIER, NICHOLAS Remrks:

Typ Imp:ENTITY WILL PROVIDE MATCH

Project:Prj Mgr:

SWAN LAKE RD (FLAT RIVER TO CROUCH RD)

H.012013

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 STP>200K 5,600 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

MAJOR WIDENINGLEBAS, MELISSA Remrks:

Typ Imp:BOSSIER CITY PROVIDING MATCH

Project:Prj Mgr:

VIKING DR WIDENING (LA3105-SWAN LAKE RD)

H.013021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 RAIL HE 100 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL MEDIAN AT XINGSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

BENTON RD: KCS RR XING (BOSSIER CITY)

H.013186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 STPFLEX 1,300 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19

RECONSTRUCT ROAD WITH CURB & GUTTER DRAINAGE AND SIDEWALKUMEOZULU, JOE Remrks:

Typ Imp:

Project:Prj Mgr:

BOSSIER CITY RT: COLEMAN ST IMPROVEMENTS

H.013252

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER US 80 001-03 NHPP 4,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

MILL, PATCH AND OVERLAY WITH HMAC.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: TEXAS ST BRIDGE - INTERSTATE 220

Page 1 - 4 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 17: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011449

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 NHPP 2,325 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

4-SCHEDULED IN CURRENT FY 17-18

REST AREA RENOVATIONGUINN, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

GREENWOOD REST AREA RENOVATIONS

CADDO

H.012309

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 523 103-01 HSIP 60 SAFETY 4-SCHEDULED IN CURRENT FY 17-18

IMPROVING SIGHT DISTANCE AT INTERSECTION.STURDIVANT, PHILLIP Remrks:

Typ Imp:

Project:Prj Mgr:

LA 523: SIGHT DISTANCE AT STEWART DR

H.001623

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3049 079-01 NFA 1,060 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTMOORE, DARRELL Remrks:

Typ Imp:079-01-0034;USE NFA AS MATCH PHASES 1 TO 5

Project:Prj Mgr:

CREEK BRIDGE & IRISH BAYOU BRIDGE

H.006474

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 526 809-08 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 18-19

CADDO I-49 455-08 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

CADDO LA 3132 427-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

DEVELOP SEA FOR ITS EQUIPMENT DEPLOYMENTKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

SHREVEPORT IMMEDIATE ITS PHASE 2B

H.011112

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 053-08 RAIL PD 50 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

UPGRADE RR WARNING DEVICESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: UP RR XING (CADDO)

H.011733

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 80 001-02 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 18-19

SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

US 80 TRAFFIC CONTROL UPGRADES

H.012944

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 175 035-06 STPFLEX 302 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: DESOTO PL TO LA 1

H.013253

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 79 048-01 NHPP 3,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

MILL, PATCH AND OVERLAY WITH HMAC.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79: TEXAS STATE LINE - JCT US 80

Page 1 - 5 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 18: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013426

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 011-01 NHPP 675 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19

REHAB/REPLACE PIPE FROM US 71 TO GRIMMETT DRIVE.STURDIVANT, PHILLIP Remrks:

Typ Imp:

Project:Prj Mgr:

GRIMMETT DR PIPE REHAB

H.007130

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 5,759 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

WIDENINGBANKSTON, TANYA Remrks:

Typ Imp:742-10-0146;

Project:Prj Mgr:

JOHN STINE(MYRTLE SPRINGS - FOSTER)

CALCASIEU

H.007417

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 TAP<200K 831 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 17-18CALCASIEU 000-10 LOCAL 13 ENHANCEMENTS CALCASIEU 000-10 STPFLEX 36 ROAD TRANSFER CALCASIEU 000-10 LOCAL 8 ROAD TRANSFER

SIDEWALKS, LANDSCAPING AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:20% MATCH IS TOLL CREDITS AND COUNTS TOWARDS RT CREDIT

Project:Prj Mgr:

LAKE SHORE DRIVE MULTI-USE PATH

H.010916

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 NHPP 29,286 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 17-18

CALCASIEU I-210 450-30 NHPP 10,000 PRESERVATION - INTERSTATE

REHABILITATIOND'ANDREA, ARTUR Remrks:

Typ Imp:TOLL CREDITS AS MATCH

Project:Prj Mgr:

PRIEN LAKE RE-DECK & SAFETY IMPROVEMENTS

H.011837

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 520 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

COLD PLANE AND OVERLAY, PAVEMENT MARKINGSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SULPHUR PROVIDING MATCH

Project:Prj Mgr:

HAZEL STREET OVERLAY

H.012577

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 193-06 NHPP 599 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

APPLY AN OGFC TEST SECTIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: LA 3186 - 0.791 MI S I-210

H.012603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 031-04 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 17-18

MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:

Typ Imp:

Project:Prj Mgr:

ELLENDER BR BEARING AND SPAN LOCK REHAB.

H.012791

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 3063 810-25 STPFLEX 50 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

PREEMPTING 768-140B WITH ADJACENT TRAFFIC SIGNAL.LUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3063: UP PREEMPTION (VINTON)

Page 1 - 6 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 19: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012878

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

4-SCHEDULED IN CURRENT FY 17-18

RENOVATIONDUPUY, ROY Remrks:

Typ Imp:

Project:Prj Mgr:

TOOMEY NATURE WALK

H.013431

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 STPFLEX 197 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18CALCASIEU LA 378 810-12 STPFLEX 123 RAILROADS CALCASIEU LA 378 810-12 LOCAL 74 RAILROADS

REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RR

Project:Prj Mgr:

LA 378: KCS & UP RR XINGS (WESTLAKE)

H.000428

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 12 012-02 NHPP 20,183 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

CALCASIEU LA 12 012-02 DEMO 9,053 DEMO / HIGH PRIORITY CALCASIEU LA 12 012-02 DEMO 1,112 DEMO / HIGH PRIORITY

NEW BRIDGESTONEY, PATRICK Remrks:

Typ Imp:012-02-0036;6 BRIDGES

Project:Prj Mgr:

LA 12 BRIDGES

H.002059

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 385 195-04 HSIPPEN 754 SAFETY 4-SCHEDULED FOR LETTING FY 18-19CALCASIEU LA 384 382-05 NHPP 550 PRESERVATION - NON-INTERSTATE

ON NHS SYSTEM

CALCASIEU LA 384 382-05 HSIPPEN 1,081 SAFETY CALCASIEU 000-10 HSIPPEN 113 SAFETY

INTERSECTION IMPROVEMENTSLAI, QUANG Remrks:

Typ Imp:195-04-0029;INTR IMP.WIDEN LA 384&385 @MCNEESE

Project:Prj Mgr:

LA 384 @ LA 385

H.002075

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 383 197-02 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

PAVEMENT WIDENINGSPURLOCK, DLON Remrks:

Typ Imp:197-02-0023;ON GRANDFATHER LIST FOR FED FUNDS

Project:Prj Mgr:

PAVEMENT WIDENING-MP42.7-I-10 FR RD

H.007113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 580 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:742-10-0125; USE LOCAL AS MATCH

Project:Prj Mgr:

J.BENNETT JOHNSTON AVENUE

H.007122

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 1,582 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

SURFACE WIDENING AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:742-10-0136;

Project:Prj Mgr:

MYRTLE SPRINGS ROAD

H.007416

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 TAP<200K 426 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19CALCASIEU 000-10 LOCAL 106 ENHANCEMENTS

SIDEWALKS/BIKE PATHSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF LAKE CHARLES

Project:Prj Mgr:

1ST AVE PEDESTRIAN TRAIL

Page 1 - 7 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 20: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.009620

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 15,000 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENT, PAVEMENT REPLACMNT, MILL&OVERLAY & WIDBALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

I-10:WEST OF LA 108 TO 1-210 INTERCHANGE

H.010234

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 196-01 STPFLEX 2,150 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

PATCH, CP 2", 4" OVERLAY RDWY, AGGREGATE SHLDRSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: 0.15 MI S LOGNION RD - LA 101

H.010241

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 12 012-04 STPFLEX 1,430 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

PATCH, CP2", 4" OVERLAY RDWY, 2" PAVED SHOULDERSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 12: 0.63 MI NE AIRPORT DR - BUXTON CR

H.011196

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 HSIPPEN 229 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19CALCASIEU 000-10 HSIPPEN 25 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS, STRIPING AND SIGNINGRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

LAKE CHARLES SRTS PROJ. - BARBE ELEM.

H.011838

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 1,384 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SULPHUR PROVIDING MATCH

Project:Prj Mgr:

RUTH/HUNTINGTON OVERLAY

H.011839

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STP<200K 348 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SULPHUR PROVIDING MATCH

Project:Prj Mgr:

HENNING DR/WEEKLY RD OVERLAY

H.012053

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 STPFLEX 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD TURN LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378: SB RT TURN LANE @ PHILLIPS RD

H.012136

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 3112 810-29 NFA 480 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCH AND THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3112: I-10 SERVICE RD - US 90

H.012183

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 NHPP 6,000 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

4-SCHEDULED FOR LETTING FY 18-19

WEIGH STATION BUILDING & SCALE REPLACEMENTBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

I-10:TOOMEY EB WEIGH STATION REPLACEMENT

Page 1 - 8 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 21: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012787

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 RAIL PD 500 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL F/L'S, GATES, AND BELLSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

DOIRON & N CROCKER: UP RR XINGS(SULPHUR)

H.012928

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 031-06 STPFLEX 791 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

MICROSURFACESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 27: HIGH HOPE RD-RIGMAIDEN CEMETERYRD

H.013076

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 90 003-04 STPFLEX 1,877 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

INTERIM BRIDGE REPAIRSWINDMANN, ANDREW Remrks:

Typ Imp:HISTORIC BRIDGE IMPROVEMENT (HBI)

Project:Prj Mgr:

US90: I-10 OVERPASS INTERIM REPAIRS(HBI)

H.013233

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 3258 810-31 NFA 337 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCH, WIDEN AND THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3258: I-10 - LA 383

H.013430

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

RR SIGNAL WORKSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH PROVIDED BY SASOL

Project:Prj Mgr:

LA 378: UP RR CROSSING (WESTLAKE)

H.013450

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 810-27 REIMB 135 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19CALCASIEU LA 27 810-27 STPFLEX 15 PRESERVATION - BRIDGE (ON

SYSTEM)

CALCASIEU LA 27 810-27 REIMB 225 OTHER / MISCELLANEOUS CALCASIEU LA 27 810-27 STPFLEX 25 PRESERVATION - BRIDGE (ON

SYSTEM)

GIRDER REPLACEMENT/HEAT STRAIGHTENING AND FRP GIRDER REPAIPATTON, HEATHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 27: I-10 OVERPASS REPAIRS

H.011293

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 126 091-09 RAIL PD 50 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

RR SIGNAL PREEMPTIONLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 126: UP RR XING (GRAYSON)

CALDWELL

H.002650

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 506 345-03 FBROFF 6,266 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTTONEY, PATRICK Remrks:

Typ Imp:345-03-0029;3 BRIDGES;

Project:Prj Mgr:

CASTOR,CASTOR RELIEF & DRAIN BRIDGE

Page 1 - 9 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 22: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012598

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124 041-02 NFA 4,000 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 124: LA 8 - ENTERPRISE

CATAHOULA

H.012842

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124-P 143-03 NFA 8,149 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19CATAHOULA LA 3102 813-24 NFA 1,941 ROAD TRANSFER

NEW ROADWAY CONSTRUCTION/RE-CONSTRUCTION, BRIDGE REPLACEMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA3102 @ LARTO LAKE & LA124 EXT(SEG 2&3)

H.013273

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 8 039-04 STPFLEX 2,000 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

MITIGATION RELATED TO BANK EROSION AND BRIDGE PIER SCOURCAVALIER, STEPHANIE Remrks:

Typ Imp:OTHER FUNDS FROM USACE

Project:Prj Mgr:

LA 8: OUACHITA RIVER BRIDGE SCOUR REPAIR

H.012561

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 520 101-01 STPFLEX 317 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 17-18

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 520: US 79 TO LA 2ALT (NORTH SECTION)

CLAIBORNE

H.009505

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE US 79 027-06 STPFLEX 1,940 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

CLAIBORNE LA 2 070-02 STPFLEX 3,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

ASPHALT OVERLAY, DRAINAGE, PAVEMENT MARKING & RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79 & LA 2: RESURFACING

H.011896

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 9 072-02 STPFLEX 605 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

CLAIBORNE LA 9 072-02 REIMB 185 PRESERVATION - BRIDGE (ONSYSTEM)

APPLICATION OF CARBON FIBER POLYMER REINFORCEMENT (CFPR)D'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

LA 9: CORNEY LAKE BRIDGE REPAIR

H.006187

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA LA 15 177-04 HSIPPEN 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

LA 15 AT DEER PARK REALIGNMENTZIECKER, MATTHEW Remrks:

Typ Imp:177-04-0033

Project:Prj Mgr:

LA 15 @ DEER PARK (S OF LA 565 - LEVEE)

CONCORDIA

H.009587

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 84 026-02 NHPP 1,900 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 84: MISS. RIVER BR. - LA 3180

Page 1 - 10 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 23: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010460

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA LA 565 178-03 STPFLEX 1,305 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCH AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 565: LA 129 - LA 600

H.012293

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 5 049-01 STP<5K 5,887 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

BASE REHABILITATION AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 5: LOGANSPORT TO THOMAS ROAD

DESOTO

H.010817

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO 000-16 FBROFF 531 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

DESOTO 000-16 FBROFF 184 PRESERVATION - BRIDGE (OFFSYSTEM)

DESOTO 000-16 FBROFF 714 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

ROGERS FIELD AND MOUNCE ROAD BRIDGES

H.012976

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 481 299-02 STPFLEX 317 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

ASPHALT SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 481: PARISH ROAD 539 TO US 84

H.002822

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 30 414-01 CM 3,816 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18E BATON ROUGE 000-17 CM 2,763 URBAN SYSTEMS

INTERSECTION IMPROVEMENTMCMILLAN, RYAN Remrks:

Typ Imp:414-01-0036;SEE NOTES USE TTF AS MATCH FOR R/W ON LA 30 ONLY

Project:Prj Mgr:

NICHOLSON @ BRIGHTSIDE LANE

EAST BATON ROUGE

H.007440

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 1,812 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 17-18

SIDEWALKS, LANDSCAPING AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH 15% TOLL CREDITS & 5% LOCAL

Project:Prj Mgr:

NORTH BOULEVARD PEDESTRIAN IMPROVEMENT

H.009651

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 NHPP 5,300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

COLD PLANE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 61/190: GREENWELL ST - MISS RIVER BR

H.010585

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 17-18E BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A PED-BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

DOWNTOWN BATON ROUGE GREENWAY PH. 2

Page 1 - 11 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 24: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010649

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 DEMO 1,139 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 17-18E BATON ROUGE 000-17 STP>200K 816 URBAN SYSTEMS

SIGNAL MODIFICATIONSLEBAS, MELISSA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

EBR PARISHWIDE SIGNAL MODIFICATIONS

H.011261

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-02 HSIPPEN 1,700 SAFETY 4-SCHEDULED IN CURRENT FY 17-18

INTERSECTION IMPRS, MEDIAN MODS, OVERLAYREVIERE, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA427: S.ACADIAN TWY;PERKINS RD-LA73(BR)

H.011364

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 1,527 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

RECONSTRUCT AND REHABILITATELEBAS, MELISSA Remrks:

Typ Imp:EBR CITY-PARISH TO PROVIDE MATCH

Project:Prj Mgr:

GOODWOOD BLVD REHAB (LOBDELL - AIRLINE)

H.011682

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 30 414-01 STCASH 1,300 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 17-18E BATON ROUGE LA 30 414-01 STBONDS 961 ROAD TRANSFER

WIDEN, COLD PLANE AND OVERLAYLANDRY, COREY Remrks:

Typ Imp:LSU WILL LET PROJECT

Project:Prj Mgr:

LA 30: W CHIMES ST - LA 42

H.012233

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 8,300 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

NEW ALIGNMENT FROM ESSEN LANE TO LA 1248 (BLUEBONNET BLVD.)BRIGNAC, CHRISTINA Remrks:

Typ Imp:ENTITY WILL PROVIDE MATCH; SEE NOTES FOR FUNDING

Project:Prj Mgr:

LA 3064 TO LA 1248 PHASE 1

H.012912

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 NHPP 157 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 17-18

RAMP REPAIR, INCREASE TURN RADIUSMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-110: CONVENTION ST/FLORIDA ST RAMPS

H.013318

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 1248 258-33 STPFLEX 2,903 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 17-18

FULL / PARTIAL DEPTH PCCP PATCHING - MILL AND OVERLAYKELLEY, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1248: LA 30 - I-10 NORTH C OF A (RT)

H.013349

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-12 454-01 STCASH 60 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

BARRIER RAIL REPAIRHAMMACK, TERRI ROBISON Remrks:

Typ Imp:PROJECT FUNDED WITH OPERATING/MISCELLANEOUS REPAIR FUNDS.

Project:Prj Mgr:

I-12 WB: AT DRUSILLA EXIT

H.002301

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPFLEX 12,600 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19E BATON ROUGE 000-17 STP>200K 2,674 URBAN SYSTEMS E BATON ROUGE LA 37 254-02 STP>200K 982 URBAN SYSTEMS

WIDEN FROM 2 TO 5 LANESLEBAS, MELISSA Remrks:

Typ Imp:742-17-0118;ENV DOC. BY CITY

Project:Prj Mgr:

NORTH SHERWOOD FOREST DRIVE IMPROVEMEN

Page 1 - 12 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 25: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.002320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 3034 255-30 LOCAL 0 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19E BATON ROUGE LA 3034 255-30 STBONDS 9,310 OTHER / MISCELLANEOUS E BATON ROUGE LA 3034 255-30 STPFLEX 3,000 PRESERVATION - NON-INTERSTATE

ON STP SYSTEM

4 LN DIVIDED CONC HWY RAISED MEDIANJESCLARD, TREY Remrks:

Typ Imp:255-30-0014;GREEN LIGHT PROJ; PR NI PROJ INCLUDED SEE NOTES

Project:Prj Mgr:

SULLIVAN RD (WAX - HOOPER)

H.006499

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 445 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19E BATON ROUGE 000-17 HSIPPEN 70 SAFETY - SAFE ROUTES TO SCHOOLS

CONSTRUCTION OF BIKEPATH AND PURCHASE OF SPEED FEEDBACK SIRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

WESTDALE & BERNARD TERRACE SIDEWALKS

H.007160

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 6,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

TRAFFIC SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:

Typ Imp:742-17-0159;CHOCTAW @ CHIPPEWA ST. & N.CHOCTAW@

Project:Prj Mgr:

EBR COMPUTERIZED TRAFFIC SIGNAL, PH VB

H.010253

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 1248 258-33 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

REPLACE PUMP STATION FLOAT SYSTEMGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

BLUEBONNET BLVD. PUMP STAT. IMP LA 1248

H.010565

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-02 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

REPLACE/UPGRADE PUMPHOUSE COMPONENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

ACADIAN STREET PUMPING STATION

H.010869

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 256 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 18-19E BATON ROUGE 000-17 LOCAL 140 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEK.BUELL, SHAWN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

WARDS CREEK TRAIL - BLUEBONNET EXTENSION

H.011363

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 3,864 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

REHABILITATE AND RECONSTRUCTLEBAS, MELISSA Remrks:

Typ Imp:EBR CITY-PARISH TO PROVIDE MATCH

Project:Prj Mgr:

SHERWOOD (AIRLINE HWY TO OLD HAMMOND)

H.011496

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 233 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 18-19E BATON ROUGE LA 427 258-02 CM 233 CONGESTION MITIGATION

CONSTRUCT RIGHT TURN LANE ON NORTHBOUND QUAIL DR.LAI, QUANG Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

QUAIL DR: TURN LANE AT PERKINS (LA 427)

H.011842

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 3,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:EAST BATON ROUGE PROVIDING MATCH

Project:Prj Mgr:

CHOCTAW DRIVE PAVEMENT PRESERVATION

Page 1 - 13 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 26: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012276

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 019-02 HSIP 610 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

REPLACE UNRESTRICTED MEDIAN OPENINGS WITH FULL J-TURN DESIGBALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: J-TURNS AT THOMAS RD.

H.012324

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 NHPP 7,000 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE AND OVERLAYTONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: FLORIDA BLVD - GREENWELL ST

H.012344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RAIL PD 1,250 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

RR ACTIVE WARNING DEVICESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

IC SEVERAL RR XINGS (BATON ROUGE)

H.012374

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-12 454-01 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 18-19

LIVINGSTON I-12 454-02 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

IMPROVE EXISTING RAMP METER SYSTEM TO ALLOW VARIABLE TIMING.KIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

I-12 RAMP METER UPGRADES

H.012442

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-12 454-01 HSIPPEN 2,000 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

REMOVE AND REPLACE EXISTING PAVEMENT MARKINGSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: PAVE MARK REPL AUDIBLE THERMO TEST

H.012469

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 190 007-10 NHPP 200 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

E BATON ROUGE US 190 007-10 OTHER 200 PRESERVATION - BRIDGE (ONSYSTEM)

NAVIGATIONAL LIGHTING SYSTEM REPLACEMENTGUIDRY, CHRIS Remrks:

Typ Imp:OTHER FUNDS ARE FROM RAILROAD

Project:Prj Mgr:

US 190: MRB - NAVIG LIGHT REPL (HBI)

H.012902

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 327 817-16 STPFLEX 730 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19

SAWCUT, PCC PATCHING, SIDEWALKS, CURBS AND RESTRIPEKELLEY, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 327: S. RIVER RD- LA 30

H.013114

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 FEMA 4,500 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19

EROSION CONTROL AND ROAD IMPROVEMENTSLANDRY, COREY Remrks:

Typ Imp:HMGP PROJECT

Project:Prj Mgr:

SOUTHERN UNIVERSITY EROSION/ROAD IMPROV

H.013449

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 STCASH 40 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19

DOWNSPOUT REPAIRHAMMACK, TERRI ROBISON Remrks:

Typ Imp:PROJECT FUNDED WITH OPERATING/MISCELLANEOUS REPAIR FUNDS

Project:Prj Mgr:

I-110 SB: DOWNSPOUT REPAIR @ LAUREL EXIT

Page 1 - 14 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 27: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012133

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 582 333-03 NFA 3,794 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

ASPHALT OVERLAY OVER IN PLACE CEMENT TREATED BASESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 582: BAYOU MACON - LA 134

EAST CARROLL

H.013456

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 959 819-18 STGEN 600 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

INSTALL DRAINAGE STRUCTURES AND REPAIR THE ROADWAY.NEYLAND, CODI Remrks:

Typ Imp:SECRETARY EMERGENCY LETTER DATED FEBRUARY 22, 2018

Project:Prj Mgr:

LA 959: EMERGENCY DRAINAGE REPAIR

EAST FELICIANA

H.010562

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA 000-19 FBROFF 853 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

E FELICIANA 000-19 FBROFF 451 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

BANK STREET & SINGLETARY STREET BRIDGES

H.012649

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 959 819-18 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

STABILIZE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 959: LA 67 - LA 63

H.012712

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 957 819-15 NFA 1,235 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 957: LA 412 - LA 955

H.012131

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 95 820-08 STPFLEX 6,265 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 17-18

STABILIZE BASE, ASPHALT OVERLAY, & RELATED WORK.MAY, BRIAN Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 95: LA 104 - LA 29

EVANGELINE

H.002101

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 104 202-01 STPFLEX 1,381 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:

Typ Imp:202-01-0019;

Project:Prj Mgr:

BAYOU DES CANNES BR NEAR VILLE PLATTE

H.010223

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 106 204-02 STPFLEX 4,060 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 106: LA 13 - US 167

Page 1 - 15 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 28: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012969

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 374 820-02 NFA 1,458 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 374: LA 13 - JCT LOCAL RD

H.012981

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 1161 820-29 STPFLEX 287 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

THIN ASPHALT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1161: BAYOU JOE MARCEL BR - LA 29

H.012350

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 128 170-02 STPFLEX 2,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

FRANKLIN LA 128 170-02 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

WIDEN & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 128: GILBERT - COMO

FRANKLIN

H.012550

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT LA 123 076-01 STPFLEX 480 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 17-18

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 123: LA 8 TO US 167

GRANT

H.012916

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT LA 158 822-12 NFA 1,718 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 158: US 71 TO VINEY RIDGE RD

H.011291

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 344 823-14 RAIL PD 250 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18IBERIA LA 677 823-15 RAIL PD 150 RAILROADS IBERIA 000-23 RAIL PD 100 RAILROADS

RR ACTIVE WARNINGSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

DALE, LA 677 &344:LDRR XINGS(NEW IBERIA)

IBERIA

H.009856

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 280 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19IBERIA 000-23 LOCAL 70 RAILROADS

INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0100

Project:Prj Mgr:

BNSF (NEW IBERIA) JULIA ST.

Page 1 - 16 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 29: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.009857

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 280 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19IBERIA 000-23 LOCAL 70 RAILROADS

INSTALL FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0101

Project:Prj Mgr:

BNSF (NEW IBERIA) IBERIA ST.

H.009860

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 1,644 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19IBERIA 000-23 LOCAL 411 RAILROADS

INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0102

Project:Prj Mgr:

BNSF SEVERAL RR XINGS (NEW IBERIA)

H.009861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL HE 889 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19IBERIA 000-23 LOCAL 311 RAILROADS

TRACK WORK FROM LA 14 TO FRENCH ST. (RAIL HE)SHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0105

Project:Prj Mgr:

BNSF (NEW IBERIA) LA 14/CENTER/FRENCH ST

H.009862

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL HE 50 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

REMOVE RAILROAD CROSSINGSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0108

Project:Prj Mgr:

BNSF (NEW IBERIA) CAROLINE ST.

H.009891

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 RAIL PD 280 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19IBERIA 000-23 LOCAL 70 RAILROADS

INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-23-0099

Project:Prj Mgr:

BNSF (NEW IBERIA) WEEKS ST.

H.010100

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 HSIPPEN 209 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19IBERIA 000-23 HSIPPEN 25 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALK CONSTRUCTION, MARKINGS,RICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

PESSON ELEMENTARY SIDEWALKS

H.010922

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 88 397-05 HSIP 3,254 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

REALIGN 2 CURVES ON LA 88 IN COTEAUDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:USE HSIP FUNDS

Project:Prj Mgr:

LA 88: REALIGN CURVES IN COTEAU

H.011026

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 182 004-04 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT, ROADWAY WORGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182 WB: LASALLE ST. - VINE ST.

H.011495

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 88 397-05 HSIP 3,840 SAFETY 4-SCHEDULED FOR LETTING FY 18-19IBERIA US 90 424-04 HSIP 960 SAFETY

ROUNDABOUTS, J-TURNS, U-TURNS, AND RELATED WORK.DOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: RAMPS @ LA 88 ROUNDABOUTS

Page 1 - 17 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 30: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011781

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 NHPP 838 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19IBERIA LA 87 823-26 STPFLEX 468 ROAD TRANSFER IBERIA LA 675 823-02 NHPP 1,773 OTHER / MISCELLANEOUS

COLD PLANE, PATCH, OVERLAY, AND RELATED WORK.DOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 675 & LA 87 IMP. IN NEW IBERIA (RT)

H.011989

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NHPP 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REHABILIATIONWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LDRR AND LA329 OVERPASS

H.012016

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 STP>200K 455 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF LOREAUVILLE PROVIDING MATCH

Project:Prj Mgr:

ED BROUSSARD RD. SIDEWALKS

H.012792

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 STP>200K 1,250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19IBERIA US 90 424-04 STP>200K 1,250 URBAN SYSTEMS

ROUNDABOUTBANKSTON, TANYA Remrks:

Typ Imp:IBERIA PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA 675 @ AIRPORT RD ROUNDABOUT

H.012456

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 77 219-01 OTHER 913 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18IBERVILLE LA 77 219-01 STCASH 494 OTHER / MISCELLANEOUS

REPAIR BAYOU PLAQUEMINE STREAM EROSION TO STABILIZE ROADWANICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 77 BANK REPAIR AT BAYOU PLAQUEMINE

IBERVILLE

H.009485

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 404 405-01 STPFLEX 2,579 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 404: BAYOU CHOCTAW BRIDGE

H.009762

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 TAP>200K 303 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19IBERVILLE 000-24 LOCAL 101 ENHANCEMENTS

SIDEWALKS & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

ENTERPRISE BLVD MULTI-USE PATH

H.012235

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 SR2S 290 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19IBERVILLE 000-24 SR2S 25 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS, DRAINAGE, STRIPING, AND RELATED ACTIVITIESRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

WHITE CASTLE SIDEWALKS

Page 1 - 18 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 31: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012604

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 77 219-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED FOR LETTING FY 18-19

MOVABLE BRIDGE MACHINERY REPAIRS, HYDRAULIC REPAIRSMICHIELS, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 77: GROSSE TETE BR HYD REPAIRS (HBI)

H.012789

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 74 264-01 STPFLEX 20 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

PREEMPTING 302-964M WITH ADJACENT TRAFFIC SIGNAL.LUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 74: IC RR PREEMPTION (ST. GABRIEL)

H.012851

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RAIL PD 1,250 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19IBERVILLE 000-24 RAIL HE 1,350 RAILROADS IBERVILLE LA 75 824-02 RAIL HE 200 RAILROADS IBERVILLE LA 3066 230-01 RAIL PD 300 RAILROADS IBERVILLE LA 77 219-01 RAIL HE 100 RAILROADS

UPGRADE WARNINGS AND CLOSE SOME UP CROSSINGS IN PLAQUEMINSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

UP RR CORRIDOR (PLAQUEMINE)

H.013243

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 997 230-03 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED FOR LETTING FY 18-19

MOVABLE BRIDGE MACHINERY REPAIRSMICHIELS, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

BAYOU PIGEON PONTOON BR ELECTRIC WINCHE

H.013439

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE I-10 450-07 STCASH 0 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19IBERVILLE I-10 450-07 STGEN 35 OTHER / MISCELLANEOUS IBERVILLE I-10 450-07 REIMB 5 OTHER / MISCELLANEOUS

BRIDGE DECK REPAIRHAMMACK, TERRI ROBISON Remrks:

Typ Imp:PROJECT FUNDED WITH OPERATING/MISCELLANEOUS REPAIR FUNDS

Project:Prj Mgr:

I-10 WB: DECK REPAIR AT MP 139.2

H.013156

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 813-3 825-03 STPFLEX 200 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19

MILL AND OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 813-3: US 167 - HODGE CORP. LIMIT

JACKSON

H.006524

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 HSIPPEN 350 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 17-18JEFFERSON LA 23 826-46 HSIPPEN 75 SAFETY - SAFE ROUTES TO SCHOOLS JEFFERSON LA 428 826-47 HSIPPEN 65 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS, CROSSWALKS, SIGNS, ETC.MORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

GRETNA SIDEWALKS AND SAFETY IMPROVEMENT

JEFFERSON

Page 1 - 19 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 32: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011311

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 STGEN 2,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

WIDEN RDWY FOR NEW TURN LANE; CONVERT EX. TL INTO THRU LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90B: ELEV WB EXPY - JUNG BLVD

H.012161

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 611-1 826-17 STPFLEX 433 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 17-18

INSTALLATION OF DRAINAGE STRUCTURES.GOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 611-1: HIGHWAY DR. - ARNOULT RD.

H.012239

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 18 063-03 STP>200K 188 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18JEFFERSON LA 18 063-03 LOCAL 113 URBAN SYSTEMS

NEW RR SURFACESHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM UP RR

Project:Prj Mgr:

LA 18: UP RR XING (WESTWEGO) - 797875M

H.012477

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 HSIPPEN 179 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 17-18

SIGNS & PAVEMENT MARKINGSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

KENNER SIGNS & PAVEMENT MARKINGS

H.012741

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NHPP 2,108 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 17-18

COLD PLANE & 2" OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 S SERV RD: GREEN ACRES-ORLEANS P/L

H.013240

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 006-30 NHPP 230 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 17-18

REMOVE AND REPLACE DRAINAGE STRUCUTURES TO IMPROVE DRAINAGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 48: OAKS AVE. - CHRIS LAUR AVE.

H.013417

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 STCASH 160 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18ORLEANS US 90-Z 283-08 STCASH 80 OTHER / MISCELLANEOUS

CLEAN CATCH BASINSROONEY, BRITTANY Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED 8/31/17

Project:Prj Mgr:

D02 DROP INLET CLEANING US 90 (WB EXPY)

H.013435

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 611-9 826-04 STPFLEX 50 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

CONNECT CROSSING WITH TRAFFIC SIGNAL FOR PREEMPTION.LUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 611-9 @ FOCIS ST.: NS RR (METAIRIE)

H.002258

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 45 249-01 STPFLEX 1,425 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

JEFFERSON LA 560-4 826-10 NFA 225 PRESERVATION - NON-INTERSTATENFA

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:249-01-0056;

Project:Prj Mgr:

LA 45 & LA 560-4: MILL & OVERLAY

Page 1 - 20 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 33: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.004424

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 61 007-02 STP>200K 3,800 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19JEFFERSON LA 3152 826-03 STP>200K 500 URBAN SYSTEMS

LANDRY, COREY Remrks:

Typ Imp:USE TTF AS MATCH FOR PHASES 4 AND 6.

Project:Prj Mgr:

AIRLINE AT CLEARVIEW INTERSECTION IMPROV

H.007181

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 4,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

NEW ROADWAY AND ALIGNMENTLEBAS, MELISSA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

L&A ROAD IMPROVEMENTS

H.007208

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3017 826-11 STP>200K 1,537 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19JEFFERSON 000-26 STP>200K 13,040 URBAN SYSTEMS

NEW ROADWAY EXTENSIONLEBAS, MELISSA Remrks:

Typ Imp:742-26-0073;SEE NOTES.

Project:Prj Mgr:

HARVEY BLVD EXT(PETERS RD-MANHATTAN

H.007475

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 TAP>200K 440 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19JEFFERSON 000-26 LOCAL 254 ENHANCEMENTS

MULTI-USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH

Project:Prj Mgr:

JEFFERSON WB MISS RIVER LEVEE MUP, PH 3A

H.011339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL TRAFFIC SIGNALSLEBAS, MELISSA Remrks:

Typ Imp:

Project:Prj Mgr:

W ESPLANADE @ HOMESTEAD TRAFFIC SIGNAL

H.011731

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 5,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19JEFFERSON 000-26 LOCAL 5,500 URBAN SYSTEMS

BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:

Typ Imp:CITY OF KENNER PROVIDING MATCH

Project:Prj Mgr:

W. ESPLANADE BRIDGES @ DUNCAN CANAL

H.011795

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 6,275 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

CONCRETE REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

WESTWOOD DRIVE (WB EXPY TO LAPALCO)

H.011798

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

CONCRETE REHABILITATION WITH DRAINAGE IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

AIRLINE PARK BLVD (CAMPHOR - W NAPOLEON)

H.012236

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 SR2S 175 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19JEFFERSON 000-26 HSIPPEN 190 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS, SAFETY IMPROVEMENTS AND OTHER RELATED ACTIVITIESMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

NORTH KENNER PEDESTRIAN SAFETY IMPR

Page 1 - 21 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 34: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012610

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3134 429-02 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

CHANNELIZE THE LEFT TURN LANE ON LA 3134 AT BENT TREESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3134: CHANNELIZED LEFT AT BENT TREE

H.012744

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NHPP 1,500 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE & 2" OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 N SERV RD: WILLIAMS-ORLEANS P/L

H.012783

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 2,405 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

RESURFACING/REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH TO PROVIDE MATCH

Project:Prj Mgr:

WB VETERANS: SEVERN AVE - CLEARVIEW PKWY

H.013104

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 500 INTERMODAL CONNECTOR 4-SCHEDULED FOR LETTING FY 18-19

RELOCATE A FIRE STATION AND BUILD ADDITIONAL TURNING LANES.NICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

LOYOLA DR IMPROVEMENTS (I-10 - VETERANS)

H.013292

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 466 063-02 STPFLEX 47 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19JEFFERSON LA 466 063-02 LOCAL 7 RAILROADS

REPLACE RAILROAD CROSSING SURFACE.LUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 466: NOGC RR XING (GRETNA)

H.013339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90 006-02 STPFLEX 62 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19JEFFERSON US 90 006-02 LOCAL 37 RAILROADS

REPLACE RAILROAD CROSSING SURFACE.LUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RR

Project:Prj Mgr:

US 90: IC/NOPB RR XING (JEFFERSON)

H.012135

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS LA 383 197-03 NFA 832 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 17-18

CALCASIEU LA 383 197-02 NFA 430 PRESERVATION - NON-INTERSTATENFA

PATCH, COLD PLANE, & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:AC WITH NFA

Project:Prj Mgr:

LA 383: I-10 - LA 101

JEFFERSON DAVIS

H.012176

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS I-10 450-03 NHPP 13,698 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 17-18

OGFCSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LA 99 - ACADIA P/L

Page 1 - 22 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 35: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012310

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 RAIL PD 200 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18JEFF DAVIS 000-27 LOCAL 50 RAILROADS JEFF DAVIS LA 99 198-03 RAIL PD 160 RAILROADS JEFF DAVIS LA 99 198-03 LOCAL 40 RAILROADS

INSTALL & UPGRADE RR SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:714-27-0111

Project:Prj Mgr:

LA 99 & N ELMS ST: BNSF RR XINGS (WELSH)

H.006528

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 SR2S 198 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19JEFF DAVIS 000-27 SR2S 32 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALK CONSTRUCTION AND CROSSWALKSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

FENTON ELEMENTARY SIDEWALKS

H.010079

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 FBROFF 1,058 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

JEFF DAVIS 000-27 FBROFF 656 PRESERVATION - BRIDGE (OFFSYSTEM)

JEFF DAVIS 000-27 FBROFF 613 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:USE TOLL CREDITS AS MATCH

Project:Prj Mgr:

MOUTON RE/W DIVISION ST/POWELL RD BRDGS

H.012805

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS LA 102 827-17 STPFLEX 30 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

PREEMPTING 767-923T WITH ADJACENT TRAFFIC SIGNALLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 102: BNSF RR PREEMPTION (JENNINGS)

H.012984

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS LA 102 827-03 NFA 1,812 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

JEFF DAVIS LA 102 827-19 NFA 268 PRESERVATION - NON-INTERSTATENFA

PATCH AND THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 102: I-10 - LA 26

H.007233

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 500 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

PAVEMENT MARKINGSDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:742-28-0007;

Project:Prj Mgr:

LAFAYETTE MPO NON STATE PVT MARKING

LAFAYETTE

H.010870

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 RTP 128 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 17-18LAFAYETTE 000-28 LOCAL 12 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 8.2 PED-BIKE TRAIL.BUELL, SHAWN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

ATAKAPA-ISHAK BREAUX BRIDGE TRAIL

Page 1 - 23 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 36: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012287

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-49 455-01 HSIP 410 SAFETY 4-SCHEDULED IN CURRENT FY 17-18LAFAYETTE LA 98 391-02 HSIP 20 SAFETY

REMOVE RIGHT TURN FLARE; CONSTRUCT RIGHT TURN LANE AT INTER.DOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 NB EXIT RAMP AT LA 98

H.012781

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90-Y 004-34 RAIL PD 240 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18LAFAYETTE 000-28 RAIL PD 200 RAILROADS LAFAYETTE 000-28 RAIL HE 40 RAILROADS LAFAYETTE US 90-Y 004-34 LOCAL 60 RAILROADS LAFAYETTE 000-28 LOCAL 50 RAILROADS LAFAYETTE 000-28 LOCAL 10 RAILROADS

UPGRADE WARNING AT TWO AND CLOSE SPRING ST.SHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

BNSF SEVERAL RR XINGS (LAFAYETTE)

H.010557

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

LAJAUNIE RD / LATERAL 1 BAYOU ST. CLAIR

H.011748

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 731 828-21 STPFLEX 675 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19LAFAYETTE LA 731-S 828-47 STPFLEX 150 ROAD TRANSFER

ASPHALT OVERLAY AND RELATED WORK.DOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 731 & LA 731-S IMPROVEMENTS

H.011832

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 003-11 STP>200K 2,320 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAY WITH ISOLATED RECONSTRUCTION WHERE NECESSARYBANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: CAMERON ST. OVERLAY

H.011833

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 3,600 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SCOTT PROVIDING MATCH

Project:Prj Mgr:

ST. MARY STREET SIDEWALKS

H.011971

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 176 828-20 STPFLEX 277 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19LAFAYETTE 000-28 LOCAL 258 OTHER / MISCELLANEOUS LAFAYETTE LA 176 828-05 LOCAL 77 OTHER / MISCELLANEOUS

STREETSCAPE IMPROVEMENTS, COLD PLANE, OVERLAY, CONC. REHABBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 176: DT LFT ST. & SW. CONS. PHASE 3

H.012018

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 2,157 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19LAFAYETTE 000-28 STP>200K 1,213 URBAN SYSTEMS

FEASIBILITY STUDY (SYSTEMS ENGINEERING ANALYSIS)FILLASTRE, ANDRE Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T PROVIDING MATCH ON LOCAL ROA

Project:Prj Mgr:

LAFAYETTE ADAPTIVE SIGNAL IMPLEMENTATION

Page 1 - 24 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 37: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012286

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 339 828-12 STPFLEX 675 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE, PATCH, OVERLAY, AND RELATEDDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 339: 0.41 MI W LA 182 - LA 182

H.012304

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STPFLEX 3,568 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAY AND REHABILITATEBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH

Project:Prj Mgr:

LCG ROAD OVERLAY PROGRAM

H.012861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 348 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF CARENCRO WILL PROVIDE MATCH

Project:Prj Mgr:

PREJEAN ROAD PAVEMENT PRESERVATION

H.012864

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 94 080-03 STP>200K 522 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

CONSTRUCTION OF SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH

Project:Prj Mgr:

LA 94/CARMEL DRIVE SIDEWALKS

H.012980

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3073 828-39 NHPP 4,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3073: US 167 - LA 3095

H.013333

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 89-1 216-03 STPFLEX 150 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19LAFAYETTE LA 89-1 216-03 LOCAL 90 RAILROADS

REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 89-1: BNSF RR XING (LAFAYETTE)

H.006546

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 495 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED IN CURRENT FY 17-18

TRAFFIC SIGNAL UPGRADES AT AN INTERSECTIONRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSECTION UPGRADE N CANAL & 7TH ST

LAFOURCHE

H.009664

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 20 065-05 STPFLEX 1,404 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

TERREBONNE LA 20 065-04 NHPP 173 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PAVESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 20: LA 648 - JACKSON ST.

H.011516

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE US 90 005-07 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 17-18

RAISING ROADWAY ELEVATIONGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 90 @ LA 182

Page 1 - 25 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 38: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011552

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 307 829-15 STPFLEX 1,756 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 17-18

ASPHALT OVERLAY, PATCHING, GUARD RAIL, STRIPINGSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 307: LA 20 - LA 182

H.012347

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 316 412-02 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 17-18

LAFOURCHE LA 182 005-06 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

TERREBONNE LA 182 005-05 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

TERREBONNE LA 660 855-07 STPFLEX 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

ADD RIGHT TURN LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: RT TURN LANES AT LA 660 & LA 316

H.013134

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 3235 829-26 STPFLEX 180 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 17-18

INSTALL EMEG. GENERATOR AT LA 1 TOLL OPER. CSCRUNDELL, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1 TOLL CSC - EMERGENCY GENERATOR

H.013197

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 NHPP 103 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 17-18

MINOR BARRIER, DECK, SUPERSTRUCTURE REPAIRSRUNDELL, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

LA1 TOLL BRIDGE STRUCTURAL REPAIRS

H.013244

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 316 412-02 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 17-18

MOVABLE BRIDGE MACHINERY REPAIRSMICHIELS, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

BAYOU BLUE PONTOON BR ELECTRIC WINCHES

H.013302

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 17-18

LA-1 TRUST INDENTURE ANNUAL INSPECTIONRUNDELL, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

LA-1 TOLL BRIDGE 2017 INSPECTION

H.013384

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-02 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

ARMORING TEST SECTIONROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1 ARMORING: LA 3090 - 3.3 MILES EAST

Page 1 - 26 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 39: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.002794

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-90 FBROFF 1,421 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:

Typ Imp:407-90-0018; USE NFA AS MATCH

Project:Prj Mgr:

VALENTINE CANAL BR. NEAR RACELAND

H.008118

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 653 829-12 FBROFF 670 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:829-12-0021;

Project:Prj Mgr:

LA 653: BAYOU DUMAR BRIDGE REPLACEMENT

H.009320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 20 065-05 HSIP 4,618 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

5 LEGGED ROUNDABOUTBANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

ACADIAN ROAD ROUNDABOUT

H.010404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE US 90 005-07 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: 2.5 MI E LA 182 - ST CHARLES P/L

H.010408

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-05 NHPP 2,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

LAFOURCHE LA 1 064-06 NHPP 1,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: VALENTINE BR. - ELSON LN.

H.011665

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-90 HSIPPEN 832 SAFETY 4-SCHEDULED FOR LETTING FY 18-19LAFOURCHE LA 308 407-90 HSIPPEN 242 SAFETY

LA 308 REALIGNMENTMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308:BELLVIEW BRIDGE TO RITA BRIDGE

H.012479

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 185 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 18-19

ASPHALT OVERLAY, STRIPING, SIGNSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

AUDUBON AVE & ARDOYNE DR MINI-ROUNDABOU

H.012593

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-04 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD LEFT TURN LANE BY WIDENING ON LA 308 AT LA 648SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308: TURN LANE AT LA 648

H.012858

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 165 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 18-19

REMOVAL OF EXISTING STRIPING, INSTALLATION OF NEW STRIPINGMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CHOCTAW ROAD STRIPING

Page 1 - 27 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 40: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012989

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 182 005-07 STPFLEX 166 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

LAFOURCHE LA 182 005-07 NHPP 285 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ST CHARLES US 90 005-08 NHPP 388 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

JEFFERSON US 90 005-10 NHPP 320 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ST CHARLES US 90 005-09 NHPP 341 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

APPROACH SLAB LEVELING WITH ASPHALT CONCRETELACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02 APPROACH SLAB LEVELING

H.013377

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 182 005-07 STPFLEX 2,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

MILLING AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: LA 308 - US 90

H.011571

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 124 125-03 NFA 3,595 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 17-18

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA124: 0.7 MI W OF LA 506 - W JCT LA 126

LASALLE

H.013099

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 165 015-05 HSIP 1,750 SAFETY 4-SCHEDULED IN CURRENT FY 17-18

INTERSECTION IMPROVEMENT - INSTALL J-TURNSZIECKER, MATTHEW Remrks:

Typ Imp:

Project:Prj Mgr:

US 165 @ US 84: J-TURNS

H.009589

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 28 074-03 NHPP 1,604 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

ASPHALT CONCRETE OVERLAY OVER IN PLACE STABILIZATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 28: RAPIDES LINE - DIVERSION CANAL

H.009765

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE 000-30 TAP<5K 1,018 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19LASALLE 000-30 LOCAL 341 ENHANCEMENTS

MULTI-USE PATH W/LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

JENA: MULTI-MODAL CONNECTIVITY

H.012149

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 127 149-04 NFA 1,261 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 127: LA 776 - 1.4 MI. S. LA 460

Page 1 - 28 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 41: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012887

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 773 830-09 NFA 950 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

LASALLE LA 772 040-04 NFA 550 PRESERVATION - NON-INTERSTATENFA

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 772 & LA 773 OVERLAY

H.009871

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL F/L'S AND GATESSHREWSBERRY,BILL Remrks:

Typ Imp:714-31-0110

Project:Prj Mgr:

KCS(SIMSBORO) WOODLAND DR.

LINCOLN

H.010009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 507 308-04 FBROFF 3,247 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

REPLACEMENT OF SUPERSTRUCTUREBUCCI, MARK Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 507 OVER I-20 BRIDGE REHABILITATION

H.010056

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 FBROFF 1,058 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

EAVES ROAD & JEFFERSON AVENUE BRIDGES

H.010066

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 SR2S 250 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19

SIDEWALK IMPROVEMENT, TRAFFICE CALMING, SPEED REDUCTION IMPMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

I A LEWIS ELEM. SRTS SIDEWALK PROJECT

H.000464

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON US 190 013-06 HSIP 4,105 SAFETY 4-SCHEDULED IN CURRENT FY 17-18LIVINGSTON US 190 013-06 STBONDS 1,154 SAFETY LIVINGSTON US 190 013-06 LOCAL 468 SAFETY LIVINGSTON LA 1026 832-13 HSIP 500 SAFETY LIVINGSTON LA 1026 832-13 STBONDS 141 SAFETY

ROUNDABOUT AND TURN LANESPAINE, PEGGY JO Remrks:

Typ Imp:013-06-0052;

Project:Prj Mgr:

US 190 & LA 1026 (ROUNDABOUT)

LIVINGSTON

Page 1 - 29 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 42: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012749

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 3002 832-32 STPFLEX 216 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 17-18

W BATON ROUGE LA 1 050-07 STPFLEX 119 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

LIVINGSTON LA 447 268-01 STPFLEX 80 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

LIVINGSTON LA 1026 832-13 STPFLEX 99 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

ST JAMES LA 70 426-02 STPFLEX 61 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

ASCENSION LA 22 266-01 STPFLEX 61 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

ASCENSION LA 30 414-03 STPFLEX 99 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

ASCENSION LA 73 077-02 STPFLEX 80 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

E BATON ROUGE LA 42 258-01 STPFLEX 119 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

CONNECT TRAFFIC SIGNALS TO FIBER OPTIC NETWORKNICHOLS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

SIGNAL COMMUNICATIONS UPGRADE PHASE 1

H.013071

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 ER 190 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

REMOVE EXISTING BRIDGE & INSTALL BOX CULVERTS AND SURFACINGMCMILLAN, RYAN Remrks:

Typ Imp:MATCH FROM LOCAL ENTITY

Project:Prj Mgr:

N. RIVER ROAD - BRIDGE REPLACEMENT

H.004634

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 832-13 STBONDS 7,460 CAPACITY 4-SCHEDULED FOR LETTING FY 18-19

WIDENING (CONC PAVEMENT)PAINE, PEGGY JO Remrks:

Typ Imp:832-13-0019;700-32-0122 ENGINEERING ($800.000)

Project:Prj Mgr:

JUBAN RD WIDENING (I-12 - US 190)

H.010124

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 HSIP 929 SAFETY 4-SCHEDULED FOR LETTING FY 18-19LIVINGSTON LA 447 268-01 HSIP 220 SAFETY

ROUNDABOUTBALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: ROUNDABOUT @ LA 447

H.010383

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 441 270-03 STPFLEX 2,480 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 441: LA 442 - ST. HELENA PARISH LINE

H.011278

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 HSIP 3,836 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

MEDIAN CABLE BARRIER INSTALLATIONTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-12:MEDIAN CABLE BARRIER

Page 1 - 30 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 43: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011824

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STPFLEX 804 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

LIVINGSTON LA 1026 832-13 STPFLEX 2,753 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INTERSECTION IMPROVEMENTHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: ROUNDABOUT AT BUDDY ELLIS RD

H.011825

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STPFLEX 1,894 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19LIVINGSTON 000-32 STP>200K 671 URBAN SYSTEMS

BRIDGE REPLACEMENT AND OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

BUDDY ELLIS ROAD IMPROVEMENTS

H.011827

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 2,499 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH PROVIDING MATCH

Project:Prj Mgr:

DUNN ROAD IMPROVEMENTS

H.011828

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 2,265 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENT AND OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH PROVIDING MATCH

Project:Prj Mgr:

FORREST DELATTE ROAD IMPROVEMENTS

H.012308

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 DEMO 9,447 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 18-19

CONCRETE PAVEMENT, DRAINAGE, BRIDGE, SIDEWALKS, EARTHWORKMASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

COOK ROAD IMP: LA16 TO JUBAN CROSSING

H.012875

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

4-SCHEDULED FOR LETTING FY 18-19

PROVIDE NEW INTERSTATE LIGHTING SYSTEM.ARMENTOR, MICHAEL Remrks:

Typ Imp:ENTITY (CITY OF DENHAM SPRINGS) TO PROVIDE MATCH

Project:Prj Mgr:

I-12: LA 1026 (JUBAN RD) INTCHG LIGHTING

H.013179

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1064 832-26 STPFLEX 622 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

LIVINGSTON LA 1064 832-26 ER 1,023 OTHER / MISCELLANEOUS

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1064: LITTLE NATALBANY BR REPLACEMENT

H.013230

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-02 NHPP 250 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

MINOR REHAB PCCSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: COLTON CREEK TO LA 64

H.013246

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 64 273-03 NHPP 1,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

3" ASPHALT OVER ASPHALT PAVEMENT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 64: LA 1019 - LA 16

Page 1 - 31 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 44: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013133

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON LA 602-2 182-02 STPFLEX 1,063 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 17-18

BASE COURSE, ASPHALT, & DRAINAGE STRUCTURESHICKS, MELVIN Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 602-2: AIRPORT ROAD - US 80

MADISON

H.010038

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON 000-33 FBROFF 832 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

TENDAL NORTH RD / DRAIN TO TENSAS BAYOU

H.011446

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON 000-33 NHPP 9,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

4-SCHEDULED FOR LETTING FY 18-19

REST AREA RENOVATIONGUINN, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

MOUND REST AREA RENOVATIONS

H.012739

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-09 NHPP 8,500 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

MADISON I-20 451-09 OTHER 8,500 OTHER / MISCELLANEOUS

BRIDGE REHABILITATIOND'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 MRB AT VICKSBURG OVERLAY AND REHAB

H.012745

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 NHPP 1,127 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 18-19

REMOVE AND REPLACE CONCRETE PAVEMENTMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 DELTA SCALES PAVEMENT REHAB

H.010040

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE 000-34 FBROFF 589 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 17-18

MOREHOUSE 000-34 FBROFF 993 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

BUD ROAD & BONNE IDEE ROAD BRIDGES

MOREHOUSE

H.009538

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 165 016-05 STPFLEX 1,966 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: S LA 599 - N LA 599

H.012857

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 830-3 834-15 STPFLEX 25 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19MOREHOUSE LA 830-3 834-15 LOCAL 15 RAILROADS

REPLACE RAILROAD CROSSING SURFACELUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 830-3: ALM RR XING (BASTROP)

Page 1 - 32 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 45: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010357

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 153 088-01 STPFLEX 1,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

STABILIZED BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 153: JCT LA 9 - FIVE FORKS ROAD

NATCHITOCHES

H.012608

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 478 116-04 NFA 1,818 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 17-18

IN-PLACE BASE TREATMENT AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 478: LA 120 TO I-49

H.013152

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES I-49 455-06 NHPP 952 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 17-18

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: PAVEMENT MARKING REPLACEMENT IV

H.010943

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES 000-35 FBROFF 1,048 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

NATCHITOCHES 000-35 FBROFF 659 PRESERVATION - BRIDGE (OFFSYSTEM)

NATCHITOCHES 000-35 FBROFF 489 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTSPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

CLARK/GOOD HOPE/ROBELINE-PROVENCAL BRD

H.012196

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES I-49 455-06 HSIPPEN 5,729 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

INSTALL CABLE BARRIER SYSTEMRACHAL, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: CABLE BARRIERS NATCHITOCHES

H.012920

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1226 359-02 NFA 1,973 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

NATCHITOCHES LA 1227 835-19 NFA 214 PRESERVATION - NON-INTERSTATENFA

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1226 & LA 1227: US 84 - PLACID OIL RD

H.007271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 4,094 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18ORLEANS 000-36 LOCAL 1,362 URBAN SYSTEMS

RECONSTRUCT EXISTING 4 LANE DIVIDEDLEBAS, MELISSA Remrks:

Typ Imp:742-36-0135; USE LOCAL AS MATCH

Project:Prj Mgr:

CANAL BLVD (R.E. LEE - AMETHYST)

ORLEANS

Page 1 - 33 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 46: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.009354

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 RTP 89 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 17-18ORLEANS 000-36 LOCAL 11 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF BIKE LANES, A MULTI-USE PATH AND CROSSINGSBUELL, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

BROAD STREET CORRIDOR BIKEWAY

H.010331

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-90 STPFLEX 2,200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 17-18

RAISING ROADWAY GRADE TO CONSISTENT ELEVATION BY ADDING ASGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: FLOODWALL - CHEF PASS BRIDGE

H.011460

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 47 148-03 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 17-18

ORLEANS 000-36 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LA47 & 3021 INTERSEC IMPROV

H.011705

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 11 018-02 STPFLEX 26,035 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 17-18

(REHAB THE MOVABLE SPANS ON THE US 11 BRIDGE OVER LAKE PONT.BRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

US 11: LAKE PONTCH BR REHAB PH 2 (HBI)

H.012590

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-510 450-43 NHPP 6,831 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 17-18

COLD PLANE AND 2" OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-510: N END OF INTERCOASTAL BR - I-10

H.012601

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 1,473 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

4-SCHEDULED IN CURRENT FY 17-18

PROVIDE ROADWAY LIGHTINGARMENTOR, MICHAEL Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: READ BLVD INTERSTATE LIGHTING

H.012602

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 1,673 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

4-SCHEDULED IN CURRENT FY 17-18

PROVIDE ROADWAY LIGHTINGARMENTOR, MICHAEL Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: MORRISON RD INTERCHANGE LIGHTING

H.012742

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 1,877 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 17-18

COLD PLANE & 2" OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 N SERVICE RD: DWYER RD - PARIS RD

H.012830

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 STCASH 20 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

DECORATIVE LIGHTING REPAIRSROONEY, BRITTANY Remrks:

Typ Imp:LETTER BID IN THE DISTRICT

Project:Prj Mgr:

REPAIR DECORATIVE LIGHTS ON CCC BR 1&2

Page 1 - 34 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 47: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012876

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 NHPP 4,429 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 17-18

ORLEANS US 90 006-03 NHPP 1,074 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

PERMANENT SIGN REPLACEMENTNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z (I-10 - MAGNOLIA STREET)

H.013374

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 STGEN 250 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

ERECT TEMPORARY SUPPORTS FOR THE GIRDERS THAT WERE DAMAGJOHNSON, ENNIS Remrks:

Typ Imp:SECRETARY EMERGENCY LETTER DATED 11/16/2017.

Project:Prj Mgr:

I-10 EAST FIRE DAMAGE TEMP BRIDGE REPAIR

H.013378

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 600 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 17-18

FIRE DAMAGE REPAIRGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: I-10 N.O. FIRE DAMAGE REPAIR

H.013419

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 STCASH 267 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18ORLEANS I-610 450-34 STCASH 41 OTHER / MISCELLANEOUS

CLEAN CATCH BASINSROONEY, BRITTANY Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED 8/31/17

Project:Prj Mgr:

D02 DROP INLET CLEANING I-10 & I-610

H.007273

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 3,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:742-36-0137; USE LOCAL AS MATCH

Project:Prj Mgr:

MAGAZINE ST (BROADWAY TO EAST DRIVE)

H.007517

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 TAP>200K 208 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19ORLEANS US 90 006-03 TAP>200K 3 ENHANCEMENTS ORLEANS LA 46 046-02 TAP>200K 6 ENHANCEMENTS

INSTALLATION OF BIKE RACKS AND RELATED WORKMASTIN, CATHERINE Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF NEW ORLEANS

Project:Prj Mgr:

NEW ORLEANS BIKE RACK INSTALLATION PROJE

H.010872

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 RTP 146 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 18-19ORLEANS 000-36 LOCAL 30 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 2.3 MILES OF BIKE LANE.BUELL, SHAWN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

EARHART CORRIDOR BIKEWAY LINKAGE

Page 1 - 35 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 48: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011649

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-90 NHPP 625 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 18-19

ORLEANS I-610 450-34 NHPP 625 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ORLEANS LA 3021 419-01 NHPP 625 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ORLEANS 000-36 STPFLEX 625 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

CORRIDOR IMPROVEMENT STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-610, US 90 & LA3021 CORRIDOR IMPROVE

H.012371

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 2,206 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

REHABILITATION ASPHALT OVERLAY AND ADA CURB WORKLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH TO PROVIDE THE MATCH

Project:Prj Mgr:

MARCONI DRIVE: CITY PARK AVE - I-610

H.012743

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 1,300 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE & 2" OVERLAYMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 S SERVICE RD: MORRISON RD-PARIS RD

H.012956

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 39 046-31 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED FOR LETTING FY 18-19

MECHANICAL REHAB OF SPAN LIFT MACHINERYMICHIELS, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: JUDGE SEEBER BR MECH REHAB

H.007288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 4,295 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

PATCH, COLD PLANE, AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:742-37-0015

Project:Prj Mgr:

MONTGOMERY ST (LA 34 - I-20)

OUACHITA

H.011106

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 17-18OUACHITA 000-37 LOCAL 14 RECREATIONAL TRAILS PROGRAM

CONST. OF 10' X 1,000' BOARDWALK ALONG THE RIVERFRONTBUELL, SHAWN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

SOUTH GRAND STREET TRAIL

H.011725

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 166 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:WEST MONROE WILL PROVIDE MATCH

Project:Prj Mgr:

4TH STREET REHABILITATION

H.011747

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 282 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY WILL PROVIDE MATCH

Project:Prj Mgr:

EDWARDS RD (LA 3033 - PINE RIDGE ROAD)

Page 1 - 36 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 49: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011783

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 1,401 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY PROVIDING MATCH

Project:Prj Mgr:

PARKER RD (MOORE RD - GARRETT RD)

H.012522

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 34 067-09 STPFLEX 0 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18OUACHITA LA 34 067-09 LOCAL 0 RAILROADS OUACHITA LA 34 067-09 STPFLEX 20 RAILROADS

PREEMPTIONLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 34: KCS RR XING (WEST MONROE)

H.013040

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 17-18OUACHITA 000-37 LOCAL 169 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 6,445' LONG BY 6' WIDE WALKING TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

TRENTON NATURE TRAIL

H.013463

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA I-20 451-06 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

BRIDGE RAIL REPAIRHICKS, MELVIN Remrks:

Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED.

Project:Prj Mgr:

I-20: YOUNG'S BAYOU BRIDGE RAIL REPAIR

H.008221

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 134 837-06 STPFLEX 3,500 CAPACITY 4-SCHEDULED FOR LETTING FY 18-19OUACHITA 000-37 STPFLEX 1,500 CAPACITY

REALIGN THE INTERSECTION OF LA 134 & US 165GARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 134 IMPROVEMENTS AT US 165

H.010698

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL F/L'S & GATES AT UP RIVERBARGE ST. CROSSINGSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

RIVERBARGE ST: UP RR XING (MONROE)

H.011724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 208 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

REHABILITATION, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:WEST MONROE WILL PROVIDE MATCH

Project:Prj Mgr:

COLEMAN AVENUE REHABILITATION

H.011739

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 165 015-31 STP<200K 337 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

LIGHTINGBANKSTON, TANYA Remrks:

Typ Imp:CITY OF MONROE WILL PROVIDE MATCH

Project:Prj Mgr:

US 165 SOUTH LIGHTING

H.011745

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 460 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY WILL PROVIDE MATCH

Project:Prj Mgr:

SANDAL STREET (LA 3033 - LA 34)

Page 1 - 37 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 50: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011784

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 1,828 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

MILL, PATCH AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:OUACHITA PARISH POLICE JURY PROVIDING MATCH

Project:Prj Mgr:

STUBBS VINSON RD(LA 139 - US 80)

H.011895

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 HSIP 95 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 18-19

INSTALL GAURD RAILMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CITY OF MONROE GUARD RAIL INSTALLATION

H.012405

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA I-20 451-06 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

CONCRETE PAVEMENT SLIP LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: 5TH STREET RAMP IMPROVEMENTS

H.012438

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STPFLEX 300 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19OUACHITA 000-37 RAIL HE 0 RAILROADS

INSTALL RR SIGNALSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

DESIARD/ELYSIAN FIELDS: ALM RR (MONROE)

H.012439

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19OUACHITA 000-37 STPFLEX 250 RAILROADS OUACHITA LA 151 317-01 RAIL PD 300 RAILROADS

RR SIGNALIZATION. POSSIBLE GEOMETRIC WORK AT CALHOUN RDSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 151 & CALHOUN RD: KCS XINGS(CALHOUN)

H.012705

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 144 319-05 NFA 908 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 144: JACKSON PARISH LINE - LA 151

H.012852

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA I-20 451-06 HSIP 450 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

CONCRETE PAVING, SIGNAL WORK, SIGN RELOCATION.BALLMER, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 WB OFF RAMP @ LA 617 (THOMAS ROAD)

H.010724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE 000-39 FBROFF 1,309 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

PECAN ISLAND ROAD BRIDGE OVER THE CHENAL

POINTE COUPEE

H.011881

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE 000-39 RAIL PD 2,328 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL FLASHING LIGHTS AND GATESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

KCS (NEW ROADS) CORRIDOR

Page 1 - 38 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 51: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.002672

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 1208-3 368-03 STPFLEX 1,209 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 17-18

RAPIDES 000-40 STPFLEX 704 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

INTERSECTION IMPROVEMENTBANKSTON, TANYA Remrks:

Typ Imp:368-03-0030

Project:Prj Mgr:

JACKSON(LA 1208-3) @HORSESHOE ROUNDABOU

RAPIDES

H.009299

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 SR2S 793 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 17-18RAPIDES 000-40 SR2S 75 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALK CONSTRUCTION, MARKINGS, ADA IMPROVEMENTSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

CITY OF ALEXANDRIA SIDEWALKS

H.012195

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 HSIPPEN 5,151 SAFETY 4-SCHEDULED IN CURRENT FY 17-18AVOYELLES I-49 455-04 HSIPPEN 841 SAFETY EVANGELINE I-49 455-92 HSIPPEN 72 SAFETY

INSTALL CABLE BARRIER SYSTEM.RACHAL, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: CABLE BARRIERS AVOYELLES & RAPIDES

H.012559

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 STP<200K 550 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

PATCHING, COLD PLANNING AND RESURFACINGBANKSTON, TANYA Remrks:

Typ Imp:CITY OF ALEXANDRIA PROVIDING MATCH

Project:Prj Mgr:

INDUSTRIAL PARK SITE ROAD RECONSTRUCTION

H.013288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 107 142-04 STPFLEX 68 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18RAPIDES LA 107 142-04 LOCAL 41 RAILROADS

REPLACE RAILROAD CROSSING SURFACE.LUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 107: KCS RR XING (PINEVILLE)

H.008263

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 3144 840-34 HSIP 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

ROUNDABOUTRACHAL, JASON Remrks:

Typ Imp:840-34-0008;

Project:Prj Mgr:

LA 3144/SUSEK DRIVE ROUNDABOUT

H.009723

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 TAP<5K 388 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19

SIDEWALKS AND REALTED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

WOODWORTH SIDEWALK IMPROVEMENTS PH 3

H.009852

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 TAP<200K 625 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19

SIDEWALK W/LIGHTING & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

MASONIC DRIVE CORRIDOR ENHANCEMENT, PH 3

Page 1 - 39 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 52: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010355

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 113 140-03 STPFLEX 1,679 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: LA 112 - CALCASIEU RIVER

H.011194

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165-X 015-01 HSIPPEN 150 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19RAPIDES US 165-X 015-01 HSIPPEN 18 SAFETY - SAFE ROUTES TO SCHOOLS RAPIDES 000-40 HSIPPEN 47 SAFETY - SAFE ROUTES TO SCHOOLS RAPIDES 000-40 HSIPPEN 6 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS, SIGNING AND STRIPINGRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

PINEVILLE ELEMENTARY SIDEWALKS

H.011505

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-09 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 18-19

RAPIDES US 71 008-30 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

RAPIDES US 71 840-43 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

RAPIDES US 165 015-30 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

RAPIDES US 165 015-02 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

THIS PROJECT INCLUDES INSTALLING CCTVS AND DMSS.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ALEXANDRIA ITS PHASE 3

H.011660

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 3225 840-36 HSIPPEN 1,120 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

CONSTRUCTION OF TURN LANES ON LA 3225 AT LA 623RACHAL, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3225: TURN LANES AT LA 623

H.012547

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-30 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: 230' N OF ANDREWS ST TO LA 498

H.012963

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-30 NHPP 100 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

RAPIDES US 167 023-01 NHPP 300 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 623 149-01 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 3100 840-29 STPFLEX 200 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 3100-S 840-40 STPFLEX 10 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

RAPIDES LA 1208-1 840-48 STPFLEX 700 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

PCCP PATCHING, JOINT AND CRACK SEAL, CURB REPAIRLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

CONCRETE PATCHING RAPIDES PARISH

Page 1 - 40 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 53: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013153

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 18-19

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: PAVEMENT MARKING REPLACEMENT V

H.013399

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 1203 369-02 STPFLEX 244 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

FLASHING LIGHTS & GATES AND CWT (CONSTANT WARNING TIME)SHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1203: UP RR CROSSING (RAPIDES)

H.013440

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 RAIL PD 500 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL FLASHING LIGHTS, GATES & BELLS AT POWELL & KARLA.SHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

POWELL & KARLA: UP RR XINGS (RAPIDES)

H.012435

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND 000-42 RAIL PD 270 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

RR SIGNALIZATIONSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

LEON RD: KCS RR XING (RICHLAND PARISH)

RICHLAND

H.010204

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND US 425 071-01 HSIP 1,200 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

INSTALL ROUNDABOUTJESCLARD, TREY Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: ROUNDABOUT @ JULIA & LOUISA

H.010395

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND US 425 071-01 NHPP 1,584 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

RICHLAND US 425 071-02 STPFLEX 56 PRESERVATION - NON-INTERSTATEON STP SYSTEM

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:TOLL CREDITS AS MATCH

Project:Prj Mgr:

US 425: JCT I-20 TO JCT US 80

H.010366

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 175 035-01 STPFLEX 2,456 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: 300' S OF SHIRWILLIS DR - LA 120

SABINE

H.011525

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE 000-43 FBROFF 330 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

SNEED ROAD / TORO CREEK

Page 1 - 41 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 54: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012551

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 191 432-01 STPFLEX 600 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 191: 0.65 MI N OF NELSON RD TO LA 476

H.011118

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 18-19ST BERNARD 000-44 LOCAL 44 RECREATIONAL TRAILS PROGRAM

CONST. OF 1600' OF LEVEE ACCESS RAMPS ALONG MS RIVER TRAILBUELL, SHAWN Remrks:

Typ Imp:CRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ST. BERNARD PARISH MRT TRAILHEADS

ST BERNARD

H.012305

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 FBROFF 439 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENT NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

VIRTUE STREET / GUICHARD CANAL

H.012612

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 39 046-32 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD RIGHT TURN LANE ON LA 39 AT DR MERAUX BLVDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: RIGHT TURN LANE @ DR MERAUX BLVD

H.012752

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 46 046-03 STP>200K 690 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19ST BERNARD 000-44 STP>200K 690 URBAN SYSTEMS

INTERSECTION IMPROVEMENTLEBAS, MELISSA Remrks:

Typ Imp:PORT OF ST. BERNARD AND DOTD WILL PROVIDE MATCH

Project:Prj Mgr:

LA 46 @ WEINBERGER RD INTERSECTION

H.012272

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 3060 845-18 RAIL PD 0 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18ST CHARLES LA 3060 845-18 STPFLEX 139 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

RIGHT TURN LANE; RAILROAD WARNING DEVICES AND PREEMPTIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3060: RIGHT TURN LANE AT US 90

ST CHARLES

H.012552

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 3160 845-21 STPFLEX 400 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED IN CURRENT FY 17-18

THIN LIFT OVERLAY AND NEW STRIPING AND MARKERSLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3160: LA 3127 TO LA 18

H.013241

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 631 845-06 STPFLEX 137 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED IN CURRENT FY 17-18

RAISING ROADWAY GRADE BY ADDING ASPHALT.GOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 631 AT CAJUN PARADIS

Page 1 - 42 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 55: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013432

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-38 REIMB 175 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

REMOVE ASPHALT PAVEMENT, INSTALL CONCRETE, ADD STRIPINGROONEY, BRITTANY Remrks:

Typ Imp:THIS IS A REIMBURSEMENT PROJECT.

Project:Prj Mgr:

I-310: CONCRETE PATCH AT SB MM 9

H.013462

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-10 450-14 STCASH 85 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

REMOVE AND REPLACE DAMAGED PORTIONS OF CONCRETE BRIDGE RGAUDET, COREY Remrks:

Typ Imp:PROJECT FUNDED WITH OPERATING/MISCELLANEOUS REPAIR FUNDS.

Project:Prj Mgr:

I-10 EAST BR RAIL REPAIRS AT M.P. 212.1

H.000320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES US 61 007-03 STP>200K 1,400 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19ST CHARLES US 61 007-03 STP>200K 1,590 URBAN SYSTEMS ST CHARLES US 61 007-03 LOCAL 1,083 URBAN SYSTEMS ST CHARLES US 61 007-03 NHPP 636 PRESERVATION - NON-INTERSTATE

ON NHS SYSTEM

JEFFERSON US 61 007-02 NHPP 637 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL AND OVERLAYGAUDET, COREY Remrks:

Typ Imp:007-03-0060;

Project:Prj Mgr:

US 61: RR OVERPASS - LA 50

H.009763

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES 000-45 TAP>200K 1,264 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19

MULTI-USE PATH & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

ST CHARLES EBANK LEVEE MU PATH, PHASE 6

H.012600

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 18 063-05 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD LEFT TURN LANE ON LA 18 AT LA 3060SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 18: LEFT TURN LANE @ LA 3060

H.012766

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 628 845-02 STPFLEX 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD RIGHT TURN LANE ON LA 628 AT US 61SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 628: RIGHT TURN LANE AT US 61

H.012836

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 3127 428-03 STPFLEX 330 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD RIGHT TURN LANE ON LA 3127 AT LA 3141SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3127: RIGHT TURN LANE AT LA 3141

H.010382

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 441 260-09 STPFLEX 4,932 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED IN CURRENT FY 17-18

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 441: LA 16 - LA 10

ST HELENA

Page 1 - 43 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 56: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.002407

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 63 262-30 STPFLEX 1,611 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

NEW BRIDGEWINDMANN, ANDREW Remrks:

Typ Imp:262-30-0008;

Project:Prj Mgr:

LA 63: PIGEON CREEK BRIDGE

H.009282

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN 000-48 SR2S 410 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED FOR LETTING FY 18-19ST JOHN 000-48 HSIPPEN 60 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS,MARKINGS,SIGNALS,EDUCATION&ENCOURAGEMENT ACTIVMORVANT, MARK Remrks:

Typ Imp:ST. JOHN THE BAPTIST PH.LAPLACE ELEMENTARY

Project:Prj Mgr:

ST. JOHN THE BAPTIST PARISH SIDEWALKS

ST JOHN

H.010076

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN 000-48 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

RAILROAD SIGNALIZATIONSHREWSBERRY,BILL Remrks:

Typ Imp:714-48-0001

Project:Prj Mgr:

IC (RESERVE) W. 19TH ST.

H.011515

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 44 256-01 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 44: PALM ST & BEECH ST DRAINAGE

H.012580

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 44 256-02 STPFLEX 440 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

THIN LIFT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 44: LA 54 - ST. JAMES P/L

H.012983

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 640 848-01 STPFLEX 289 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

THIN LIFT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 640: LA 18 - LA 3127

H.013157

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN I-55 452-01 NHPP 900 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 18-19

TANGIPAHOA I-55 452-90 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

PAVEMENT MARKING REPLACEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-55: PAVEMENT MARKING REPLACEMENT I

Page 1 - 44 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 57: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011511

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 NHPP 740 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 17-18

POINTE COUPEE US 190 008-03 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

POINTE COUPEE US 190 008-02 NHPP 700 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

W BATON ROUGE US 190 008-01 NHPP 2,520 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

DEPLOY ITS EQUIPMENT AND COMMUNICATIONSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 ITS DEPLOYMENT

ST LANDRY

H.011550

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY I-49 455-02 NHPP 6,000 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 18-19

CONCRETE REMOVAL & REPLACEMENT, STONE BASE, SHLDER UNDERDDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: LA 93 OPASS(0.31 MI S - 0.37 MI N)

H.012585

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 347 081-01 NFA 3,200 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE, BASE REHABILITATION, OVERLAY, AND RELATED WORK.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 347: LA 740 - 1.35 MI S LA 31

H.013291

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 STPFLEX 346 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

JUDSON WALSH DRIVE OVER DRAINAGE BAYOU

H.009456

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 347 056-04 HSIP 2,134 SAFETY 4-SCHEDULED IN CURRENT FY 17-18

INSTALL ROUNDABOUTBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 347: ROUNDABOUT @ MELANCON RD.

ST MARTIN

H.012860

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 31 080-04 STP>200K 295 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18NOT ASSIGNED 056-30 STP>200K 295 URBAN SYSTEMS NOT ASSIGNED 850-32 STP>200K 10 URBAN SYSTEMS

OVERLAY AND TURN LANE#MULTIVALUE Remrks:

Typ Imp:STATE WILL PROVIDE MATCH

Project:Prj Mgr:

LA31: PAVEMENT PRESERVATION & TURN LANE

H.013131

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN I-10 450-06 STCASH 50 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

REPAIR DAMAGED CONCRETE BARRIERDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED

Project:Prj Mgr:

I-10@BUTTELAROSE BARRIER RAIL REPAIR(EB)

Page 1 - 45 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 58: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010601

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN I-10 450-06 NHPP 38,571 CORRIDOR 4-SCHEDULED FOR LETTING FY 18-19ST MARTIN I-10 450-06 NHPP 19,386 CORRIDOR ST MARTIN I-10 450-06 NHPP 43,882 CORRIDOR

INTERSTATE WIDENING AND REHABILITATIONOLIVIER, NICHOLAS Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LA 328 TO LA 347

H.011485

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 336-1 056-04 NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

CLEANING AND PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA336-1: BAYOU TECHE BRIDGE REHAB (HBI)

H.012863

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 STP>200K 1,364 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:ST. MARTIN PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

CYPRESS ISLAND HWY PAVEMENT PRESERVATIO

H.010829

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 18-19ST MARY 000-51 LOCAL 38 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF MULTI-USE TRAILHEADS.BUELL, SHAWN Remrks:

Typ Imp:NATIONAL RECREATIONAL TRAILS PROJECT

Project:Prj Mgr:

ST. MARY PARISH BAYOU TECHE TRAILHEADS

ST MARY

H.011494

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 NHPP 29,000 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS.GUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: ATCHAFALAYA RIVER BRIDGE REHAB

H.011937

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 HSIPPEN 550 SAFETY 4-SCHEDULED FOR LETTING FY 18-19ASSUMPTION US 90 424-06 HSIPPEN 440 SAFETY

MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: CABLE BARRIER IN ASSUMP & ST MARY

H.012911

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 NHPP 175 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

REMOVE MEDIAN CROSSOVERSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90:MEDIAN XOVER REM IN ST MARY PAR

H.010184

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 59 281-03 TAP<200K 1,489 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 17-18ST TAMMANY LA 59 281-03 HSIP 2,238 SAFETY ST TAMMANY 000-52 HSIP 291 SAFETY

REALIGN CURVE & PROVIDE A TUNNEL FOR TAMMANY TRACE CROSSINUMEOZULU, JOE Remrks:

Typ Imp:ENG & R/W BY ST TAMMANY PARISH

Project:Prj Mgr:

LA 59: CURVE REALIGN AND TUNNEL AT TRACE

ST TAMMANY

Page 1 - 46 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 59: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010982

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 25 059-02 STPFLEX 1,275 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 17-18

ST TAMMANY LA 25 059-02 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

ST TAMMANY LA 25 059-02 STPFLEX 117 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

WIDENING & RE-STRIPING FOR CENTER TURN LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 25: JACKSON ST. - HAY HOLLOW RD.

H.010994

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 NHPP 8,229 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 17-18

MILL, OVERLAY, GUARDRAIL AND PAVEMENT MARKINGSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: BAYOU LACOMBE - NORTHSHORE BLVD.

H.011030

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 59 281-03 HSIP 1,678 SAFETY 4-SCHEDULED IN CURRENT FY 17-18ST TAMMANY 000-52 HSIP 313 SAFETY ST TAMMANY LA 59 281-03 LOCAL 7 OTHER / MISCELLANEOUS ST TAMMANY 000-52 LOCAL 7 OTHER / MISCELLANEOUS

CONSTRUCT ROUNDABOUTUMEOZULU, JOE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 59:ROUNDABOUT @ LONESOME RD.

H.011138

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 HSIPPEN 391 SAFETY - SAFE ROUTES TO SCHOOLS 4-SCHEDULED IN CURRENT FY 17-18

SIDEWALKS, DRAINAGE, STRIPING AND SIGNAGEMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

COVINGTON SIDEWALKS & OTHER SAFETY IMPR

H.012945

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 433 852-21 STPFLEX 650 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 17-18

GRID DECK REPLACEMENTMICHIELS, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 433: BAYOU BONFOUCA GRID DECK REPL

H.012947

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-07 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 17-18

WIRE ROPE REPLACEMENTLAMBERT, JARRETT Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: WEST PEARL BR WIRE ROPE REPL

H.013082

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

4-SCHEDULED IN CURRENT FY 17-18

FEASIBILITY TO STUDY SIDEWALK INSTALLATIONMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

BOOTLEGGER ROAD SHARED USE PATH

H.000506

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 261-06 STP<200K 5,900 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

WIDENING AND DRAINAGE IMPROVEMENTBANKSTON, TANYA Remrks:

Typ Imp:013-12-0060;

Project:Prj Mgr:

LA 22 (DALWILL BLVD - US 190)

Page 1 - 47 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 60: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.002446

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 40 269-07 STPFLEX 2,445 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

TANGIPAHOA LA 40 269-06 STPFLEX 815 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGEBUCCI, MARK Remrks:

Typ Imp:269-07-0012;

Project:Prj Mgr:

LA 40: TCHEFUNCTE RIVER BRIDGE

H.009460

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 HSIPPEN 400 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 18-19

SIGNAGEMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

ST. TAMMANY PARISH SIGNING & STRIPING

H.010375

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1077 852-03 STPFLEX 2,484 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1077: LA 21 - U.S. 190

H.011024

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-10 450-18 NHPP 1,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

ST TAMMANY I-10 450-18 HSIPPEN 3,000 SAFETY ST TAMMANY I-10 450-18 NHPP 10,000 PRESERVATION - INTERSTATE

CABLE BARRIERS, LIGHTING, OVERLAY, RAMP RAISINGLANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: MED PROTECT, OAK HARBOR LIGHT/RAMP

H.011216

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 HSIPPEN 60 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 18-19

PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12 LOCAL ROADS.MORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CITY OF SLIDELL PAVEMENT MARKINGS

H.011260

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190-X 013-10 HSIP 600 SAFETY 4-SCHEDULED FOR LETTING FY 18-19ST TAMMANY 000-52 HSIP 600 SAFETY

ROUNDABOUT CONSTRUCTIONBRANTON, JENNIFER Remrks:

Typ Imp:

Project:Prj Mgr:

US 190B @ JEFFERSON AVE. ROUNDABOUT

H.011855

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 638 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19ST TAMMANY 000-52 LOCAL 241 ENHANCEMENTS

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF MANDEVILLE

Project:Prj Mgr:

MANDEVILLE: W CAUSEWAY APPROACH PATH

H.011921

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 STPFLEX 1,554 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

HWY 41 SPUR BRIDGE / GUM CREEK

H.011933

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-11 HSIPPEN 4,100 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

MEDIAN PROTECTION-CABLE BARRIER, CONCRETE AND GUARDRAILTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 MEDIAN BARRIER

Page 1 - 48 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 61: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012474

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 HSIPPEN 318 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 18-19

INSTALLATION OF GUARDRAILS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

ST. TAMMANY GUARDRAILS

H.013229

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 030-31 NHPP 1,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

3" ASPHALT OVER ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: 190 B JCT.- LA 25

H.013237

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190-Y 013-13 STPFLEX 840 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

MILL, FULL DEPTH PATCHING, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190B: HOOVER DR. TO US 190

H.013314

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 21 059-01 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

ASPHALT MILL AND 3" OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 21: 13TH AVE TO US190B

H.010645

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 38 263-04 STPFLEX 1,500 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

RAILROAD SIGNALS AND SURFACE WORKSHREWSBERRY,BILL Remrks:

Typ Imp:SEE NOTES FOR FUNDING. STBONDS AVAILABLE FOR MATCH

Project:Prj Mgr:

IC(KENTWOOD) LA 38 RR X-ING IN KENTWOOD

TANGIPAHOA

H.010991

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA I-12 454-03 NHPP 5,778 PRESERVATION - INTERSTATE 4-SCHEDULED IN CURRENT FY 17-18TANGIPAHOA US 51-X 853-36 NHPP 13 PRESERVATION - NON-INTERSTATE

ON STP SYSTEM

MILL, OVERLAY AND PAVEMENT MARKINGSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: LIVINGSTON P/L - US 51 BUS OPASS

H.011439

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-03 STP<200K 2,646 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 17-18

MILL, OVERLAY, RESTRIPE TO PROVIDE TWO-WAY LEFT TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 22: YELLOW WATER RIVER - I-55

H.012191

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 445 278-01 STPFLEX 1,758 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

TANGIPAHOA LA 445 278-01 DEMO 285 DEMO / HIGH PRIORITY TANGIPAHOA LA 445 278-01 DEMO 299 DEMO / HIGH PRIORITY

IN-PLACE BASE STABILIZATION, ASPHALT OVERLAY &TURN LANE WIDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 445: S END I-12 OVERPASS - US 190

H.013052

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 442 269-05 ER 4,293 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:DIR# LA-2016-2-105-012

Project:Prj Mgr:

LA 442: TANGIPAHOA RIVER BR REPLACEMENT

Page 1 - 49 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 62: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013077

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA I-55 452-90 STCASH 250 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

SEWER FACILITY REPAIRSBERNER, DARRICK Remrks:

Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED

Project:Prj Mgr:

I-55 REST AREA SEWER FACILITY REPAIR

H.013146

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-04 STPFLEX 93 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18TANGIPAHOA LA 22 261-04 LOCAL 70 OTHER / MISCELLANEOUS ST TAMMANY LA 22 261-05 STPFLEX 88 OTHER / MISCELLANEOUS

OVERLAY AND STRIPING FOR TURN LANESTASSIN, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 22: E. SAM ARNOLD LOOP - MITCHAM RD

H.010702

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 RAIL PD 600 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL F/L'S & GATES AT SEVERAL IC CROSSINGS IN HAMMONDSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

IC SEVERAL RR XINGS (HAMMOND)

H.011025

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 40 415-02 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 40: NATALBANY RIVER TO I-55

H.011512

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-05 STPFLEX 50 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 51 @ SYCAMORE ST AMITE CITY DRAINAGE

H.011519

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 1063 853-34 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

4-SCHEDULED FOR LETTING FY 18-19

ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1063: GLENDALE DR - US 51 DRAINAGE

H.011527

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 FBROFF 615 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

TANGIPAHOA 000-53 FBROFF 466 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

RANDALL / VITRANO ROAD BRIDGES

H.012154

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 38 263-04 STPFLEX 1,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 38: US 51 - LA 1054

H.012874

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA I-55 452-90 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

4-SCHEDULED FOR LETTING FY 18-19

PROVIDE ROADWAY LIGHTINGFUNG, AGNES Remrks:

Typ Imp:

Project:Prj Mgr:

I-55: LA 22 INTERSTATE LIGHTING

Page 1 - 50 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 63: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012938

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 38 263-03 STPFLEX 345 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

THIN LIFT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 38:ST HELENA P/L-I-55 COA

H.013183

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 16 047-01 STPFLEX 791 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

TANGIPAHOA LA 16 047-01 ER 2,242 OTHER / MISCELLANEOUS

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: TANGIPAHOA RIVER BR REPLACEMENT

H.013260

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA I-55 452-90 NHPP 500 PRESERVATION - INTERSTATE 4-SCHEDULED FOR LETTING FY 18-19

SLOPE FAILURE REPAIRMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-55: .2 MILE S US 190 OVP SLOPE REPAIR

H.013266

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-04 NHPP 172 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

TANGIPAHOA US 51-X 853-36 NHPP 132 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

TANGIPAHOA LA 3234 853-40 NHPP 209 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

TANGIPAHOA US 190 013-08 NHPP 155 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

TANGIPAHOA US 190 013-09 NHPP 81 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MINOR REHABSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 51, 51-X, 190, LA 3234: CONC SPOT REP

H.013334

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 16 047-01 STPFLEX 62 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19TANGIPAHOA LA 16 047-01 LOCAL 37 RAILROADS

REPLACE RAILROAD CROSSING SURFACE.LUKE, SHAWN Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

LA 16: IC RR XING (AMITE)

H.012521

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS 000-54 RTP 90 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 17-18

RESTORE 2.5 MILES OF ATV TRAIL AND INSTALL. DRAIN INFRASTRCTBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

BIG LAKE WMA MOON MULLINS ATV TRAIL

TENSAS

H.008411

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 660 855-07 STP<200K 1,578 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED IN CURRENT FY 17-18

BRIDGE REPLACEMENTBRIGNAC, CHRISTINA Remrks:

Typ Imp:855-07-0010;

Project:Prj Mgr:

BAYOU TERREBONNE BR (LA 660)

TERREBONNE

Page 1 - 51 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 64: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012377

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE US 90 424-07 HSIPPEN 1,524 SAFETY 4-SCHEDULED IN CURRENT FY 17-18LAFOURCHE US 90 424-08 HSIPPEN 2,123 SAFETY

INSTALLATION OF MEDIAN CABLE BARRIERROBERT, JOSEPH Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: MEDIAN CABLE BARRIER

H.013317

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 STCASH 40 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

BRIDGE JOINT REPAIRGAUDET, COREY Remrks:

Typ Imp:OPERATING/MISCELLANEOUS REPAIR FUNDS WILL BE USED.

Project:Prj Mgr:

HOUMA TWIN SPAN BR EXP. JOINT RPR

H.013437

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3011 855-13 STCASH 45 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

GRADING, MILLING AND ASPHALT PAVINGBRASSET, DAVID Remrks:

Typ Imp:PROJECT FUNDED WITH OPERATING/MISCELLANEOUS REPAIR FUNDS.

Project:Prj Mgr:

LA 3011 EMERGENCY ASPHALT PAVING

H.007603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-04 TAP<200K 226 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19TERREBONNE LA 24 065-04 LOCAL 41 ENHANCEMENTS

SIDEWALKS AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

LA 24 SIDEWALKS

H.009766

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-04 TAP<200K 573 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19

SIDEWALKS, SUBSURFACE DRAINAGE & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

WPARK AVE: ROYCE ST-MARIETTA PL SIDEWALK

H.010412

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 57 246-01 STPFLEX 1,750 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 57: THOMPSON RD - CEDAR GROVE RD

H.010890

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 182 005-05 STPFLEX 1,051 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

TERREBONNE 000-55 STPFLEX 442 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ADD ROUNDABOUTHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: ROUNDABOUT AT HOLLYWOOD RD

H.011159

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 FBROFF 585 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENT - NO ADDED CAPACITYPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

CAROLL STREET BRIDGE/ BAYOU BLACK

Page 1 - 52 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 65: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.011187

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-04 STPFLEX 2 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 18-19

TERREBONNE LA 3040 065-30 STPFLEX 1 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

TERREBONNE LA 24 065-91 STPFLEX 1 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

LAFOURCHE LA 1 064-06 STPFLEX 2 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNAL TIMINGHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02H: SIGNAL TIMING

H.012337

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STP<200K 263 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

NEW SIDEWALKBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH PROVIDING MATCH

Project:Prj Mgr:

PROSPECT BLVD SIDEWALKS

H.012338

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STP<200K 368 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19

NEW SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH PROVIDING THE MATCH

Project:Prj Mgr:

CIVIC CENTER SIDEWALKS

H.012339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-04 STP<200K 781 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 18-19TERREBONNE LA 182 005-05 STP<200K 319 URBAN SYSTEMS

SIDEWALK REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA 24 SIDEWALK REHAB

H.012609

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 182 005-05 STPFLEX 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

ADD RIGHT TURN LANE BY WIDENING ON LA 182 AT LA 24SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: RIGHT TURN LANE AT LA 24

H.012949

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 315 245-90 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED FOR LETTING FY 18-19

MOVABLE BRIDGE MACHINERY REPAIRSLAMBERT, JARRETT Remrks:

Typ Imp:

Project:Prj Mgr:

DULARGE BR LOCK BAR REHABILITATION

H.012957

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED FOR LETTING FY 18-19

ELECTRICAL REHABRODY, WALTER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 24: PRESQUE ISLE BR ELEC REHAB

Page 1 - 53 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 66: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013322

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3040 065-30 0 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

FEASIBILITY STUDYMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3040 FEASIBILITY STUDY (HOUMA,LA)

H.012605

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 82 207-01 STPFLEX 297 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

4-SCHEDULED IN CURRENT FY 17-18

ELECTRICAL AND HYDRAULIC REPAIRSRODY, WALTER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 82: LITTLE PRAIRIE BR ELEC REP (HBI)

VERMILION

H.009792

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 35 207-03 TAP<5K 284 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 18-19VERMILION LA 35 207-03 TAP<5K 286 ENHANCEMENTS VERMILION LA 35 207-03 LOCAL 0 ENHANCEMENTS

SIDEWALKS W/ LANDSCAPING, SUBSURFACE DRAINAGE & RELATED WOMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

LA 35: KAPLAN SIDEWALKS, PHASES I & II

H.010353

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION US 167 080-01 HSIP 300 SAFETY 4-SCHEDULED FOR LETTING FY 18-19LAFAYETTE US 167 080-02 HSIP 9,300 SAFETY

ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNSDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: ACCESS MANAGEMENT (LFT TURN LNS)

H.010867

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION 000-57 FBROFF 502 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

VERMILION 000-57 FBROFF 759 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

JUDE & PLACIDE ROAD BRIDGES

H.011582

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 92 213-03 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 92: N JCT LA 700 - LA 343

H.011789

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 14 055-30 HSIPPEN 425 SAFETY 4-SCHEDULED FOR LETTING FY 18-19

INSTALL A RIGHT TURN LANE ON THE WB APPROACHDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14 BYP: RIGHT TURN LANE AT US 167

H.012081

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 338 398-01 STPFLEX 700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

PAVEMENT WIDENING FOR TURN LANE, ASPH OVERLAY&DRAINAGE STSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 338 @ LA 14-BYPASS

Page 1 - 54 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 67: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012921

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 335 396-02 STPFLEX 1,447 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

THIN LIFT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 335: THIN OVERLAYS

H.011588

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 121 029-04 STPFLEX 7,778 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

IN-PLACE TREATED SUBGRADE, BASE STABILIZATION AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 121: LA 28 - RAPIDES PL

VERNON

H.013332

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 FEMA 700 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

REPAIR DAMAGE TO LAKE VERNON DAM FROM HURRICANE HARVEY.KNIGHT, EDWARD Remrks:

Typ Imp:

Project:Prj Mgr:

LAKE VERNON DAM REPAIR

H.011909

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON US 171 024-06 NHPP 1,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

VERNON 000-58 STPFLEX 1,030 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INTERSECTION IMPROVEMENTHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDABOUT: US 171 AT BOONE ST.

H.013019

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL FLASHING LIGHTS, GATES & BELLSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

DAVIS LN: KCS RR XING (ROSEPINE)

H.010381

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 436 859-08 NFA 3,809 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

COLD PLANE, BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 436: MONROE CREEK RD - N. JCT. LA 21

WASHINGTON

H.013441

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 38 263-06 ER 750 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19

EMBANKMENT REPAIRCAVALIER, STEPHANIE Remrks:

Typ Imp:PROJECT'S WORK COVERED UNDER DDIR# LA-2016-2-117-002.

Project:Prj Mgr:

LA 38: SILVER CREEK SCOUR REPAIR

H.011539

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER 000-60 FBROFF 816 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED IN CURRENT FY 17-18

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

PERCY BURNS ROAD / LITTLE CROOKED CREEK

WEBSTER

Page 1 - 55 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 68: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 532 860-07 FBROFF 3,517 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 532 OVER I-20 BRIDGE REPLACEMENT

H.012049

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER I-20 451-03 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED FOR LETTING FY 18-19

EXTENDING DECELERATION LANE AT HIGHWAY EXITSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: WB EXIT RAMP EXTENSION AT MINDEN

H.012873

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER 000-60 RAIL HE 50 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

REMOVE CROSSING AND ITS ROAD APPROACHESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

OLD US 80: LAS RR XING (WEBSTER)

H.010075

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 RAIL PD 1,200 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

RAILROAD SIGNALIZATIONSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

UP (ADDIS) SEVERAL RR-X-INGS

W BATON ROUGE

H.011788

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 FBROFF 191 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 17-18W BATON ROUGE 000-61 LOCAL 0 OTHER / MISCELLANEOUS W BATON ROUGE 000-61 FBROFF 553 PRESERVATION - BRIDGE (OFF

SYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:TTF AS MATCH TO RT PORTION & PTTF AS MATCH TO PR BO PORTION

Project:Prj Mgr:

OAK STREET / OVER POYDRAS BAYOU

H.012077

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 986 228-07 STPFLEX 61 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

4-SCHEDULED IN CURRENT FY 17-18

ADD WB RIGHT TURN LANE ON LA 986MAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 986: IMPROVEMENTS AT LA 415

H.012240

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 STPFLEX 553 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18W BATON ROUGE LA 1 050-07 LOCAL 0 RAILROADS W BATON ROUGE LA 1 050-07 STPFLEX 107 RAILROADS

REMOVE RAILROAD CROSSING SURFACE; OVERLAY SPURLUKE, SHAWN Remrks:

Typ Imp:USE TTF AS MATCH FOR THE SPUR OVERLAY; SEE NOTES FOR INFO

Project:Prj Mgr:

LA 1:UP/INDUSTRY ABANDONED RR XINGS(WBR)

H.011558

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 CM 374 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 18-19

CONSTRUCT ACADIAN TRAILHANKS, ANNA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

ACADIAN TRAIL (WEST BATON ROUGE)

Page 1 - 56 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 69: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012082

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NHPP 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

BRIDGE REPAIRSDELATTE, BRIAN Remrks:

Typ Imp:HISTORIC BRIDGE IMPROVEMENT (HBI)

Project:Prj Mgr:

LA 1: PORT ALLEN BR INT REPAIRS (HBI)

H.012212

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 18-19W BATON ROUGE 000-61 LOCAL 59 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1055' CONCRETE TRAIL & 800 SQ.FT. OVERLOOKBUELL, SHAWN Remrks:

Typ Imp:CRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WEST BATON ROUGE MUSEUM LEVEE TRAIL

H.012323

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 990 861-15 NFA 525 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 18-19

MILL, PATCH, OVERLAY, AND DRAINAGEGARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA990: 6TH-ED LEJEUNE (OVERLAY-DRAINAGE)

H.012395

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 013-01 NHPP 3,188 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

4-SCHEDULED FOR LETTING FY 18-19

W BATON ROUGE LA 415 013-01 STPFLEX 133 PRESERVATION - NON-INTERSTATEON STP SYSTEM

W BATON ROUGE US 190 008-01 NHPP 1,085 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

W BATON ROUGE LA 415 861-22 NHPP 95 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL, OVERLAY AND PCCP REHABSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 415 & US 190: OVERLAY & PATCHING

H.012834

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 989-2 861-08 CM 431 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 18-19

CONSTRUCT TRAILMUSA, ELNUR Remrks:

Typ Imp:ENTITY PROVIDES THE MATCH

Project:Prj Mgr:

JOLIET TRAIL (BRUSLY)

H.013338

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 588 862-21 STCASH 177 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 17-18

PROVIDE $177,000 IN TTF FUNDS TO WEST CARROLL PARISHPORTER BETTS, CONNIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 588: WEST CARROLL RT

W CARROLL

H.013444

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA LA 66 251-02 STGEN 850 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

PIPE REPAIRSPALERMO, JOSEPH K. Remrks:

Typ Imp:SECRETARY'S EMERGENCY LETTER DATED 2/6/2018

Project:Prj Mgr:

LA 66 (ANGOLA RD):EMERGENCY PIPE REPAIRS

W FELICIANA

Page 1 - 57 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 70: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.010596

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 FBROFF 556 PRESERVATION - BRIDGE (OFFSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

W FELICIANA 000-63 FBROFF 836 PRESERVATION - BRIDGE (OFFSYSTEM)

W FELICIANA 000-63 FBROFF 757 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

PETERSON ROAD BRIDGES

H.012527

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 HSIPPEN 275 SAFETY - LOCAL ROADS SAFETY 4-SCHEDULED FOR LETTING FY 18-19

THERMOPLASTIC STRIPING AND SIGNSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

ROADWAY STRIPING AND SIGNS (W.FELICIANA)

H.013193

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA US 61 019-04 NHPP 2,789 PRESERVATION - BRIDGE (ONSYSTEM)

4-SCHEDULED FOR LETTING FY 18-19

W FELICIANA US 61 019-04 ER 3,505 OTHER / MISCELLANEOUS W FELICIANA US 61 019-04 NHPP 650 PRESERVATION - BRIDGE (ON

SYSTEM)

BRIDGE REPLACEMENT AND HELPER BENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: THOMPSON CREEK BR REPLACEMENT

H.010081

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 156 092-03 STPFLEX 5,140 PRESERVATION - NON-INTERSTATEON STP SYSTEM

4-SCHEDULED IN CURRENT FY 17-18

IN-PLACE CEMENT AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 156 IMPROVEMENTS (CALVIN TO US 167)

WINN

H.012146

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 1228 864-04 NFA 1,510 PRESERVATION - NON-INTERSTATENFA

4-SCHEDULED FOR LETTING FY 18-19

PATCHING, COLD PLANING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:AC WITH NFA

Project:Prj Mgr:

LA 1228: LA 34 TO US 84

H.013249

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STCASH 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CLEAN CATCH BASINSCALDWELL, SHANE Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED ON 8/31/17

Project:Prj Mgr:

EMERGENCY CATCH BASIN CLEANING (D02)

DISTRICT 02

H.013278

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 4,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED FOR LETTING FY 18-19

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02BC FLASHING YELLOW ARROW PART 1

Page 1 - 58 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 71: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013393

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 STCASH 124 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CATCH BASIN & PIPE CLEANINGCALDWELL, SHANE Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED 8/31/17

Project:Prj Mgr:

DIST. 03 CATCH BASIN & PIPE CLEANING

DISTRICT 03

H.013228

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STCASH 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CLEANING EXISTING CATCH BASINS AND PIPES.CALDWELL, SHANE Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED ON 8/31/17

Project:Prj Mgr:

EMERGENCY CATCH BASIN CLEANING (DIST 04)

DISTRICT 04

H.013219

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 STCASH 300 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CATCH BASIN CLEANINGCALDWELL, SHANE Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED 8/31/17

Project:Prj Mgr:

EMERGENCY CATCH BASIN CLEANING (DIST 05)

DISTRICT 05

H.012661

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 STPFLEX 5,340 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

4-SCHEDULED IN CURRENT FY 17-18

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 07 FLASHING YELLOW ARROW UPGRADE

DISTRICT 07

H.013238

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 STCASH 200 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CLEANING EXISTING CATCH BASINS AND PIPESCORMIER, CLAYTON Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED ON 8/31/17

Project:Prj Mgr:

EMERGENCY CATCH BASIN CLEANING DIST 07

H.013248

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 STCASH 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CLEAN EXISTING CATCH BASINSCALDWELL, SHANE Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED ON 8/31/17

Project:Prj Mgr:

DIST. 08 EMERGENCY CATCH BASIN CLEANING

DISTRICT 08

H.013223

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 STCASH 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

EMERGENCY CATCH BASIN CLEAINGFREE, KEN Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED ON 8/31/17

Project:Prj Mgr:

EMERGENCY CATCH BASIN CLEANING DIST. 58

DISTRICT 58

H.013216

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 STCASH 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CATCH BASIN CLEANINGDONMYER, TODD Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED ON 8/31/17

Project:Prj Mgr:

EMERGENCY CATCH BASIN CLEANING (DIST 61)

DISTRICT 61

Page 1 - 59 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 72: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013455

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 STCASH 283 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CATCH BASIN AND SCUPPER DRAIN CLEANINGDONMYER, TODD Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED 8/31/17

Project:Prj Mgr:

DISTRICT 61:CATCH BASIN & DRAIN CLEANING

H.013096

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 FEMA 798 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 18-19

RETROFIT EXISTING WINDOWS TO 21 BUILDINGS IN DISTRICT 61NEYLAND, CODI Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 HURRICANE PROTECTION SCREENS

H.013016

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 SATRANS 154 SAFETY 4-SCHEDULED IN CURRENT FY 17-18

REPLACE FLOOD DAMAGED MESSAGE BOARDSLATINO, VINCENT Remrks:

Typ Imp:

Project:Prj Mgr:

DMS & SPEED TRAILER REPL. DIST. 61/62

DISTRICT 62

H.013218

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STCASH 500 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 17-18

CLEANING EXISTING PIPES AND CATCH BASINSCALDWELL, SHANE Remrks:

Typ Imp:SECRETARY APPROVAL LETTER DATED AND APPROVED ON 8/31/17

Project:Prj Mgr:

EMERGENCY CATCH BASIN CLEANING D62

H.012650

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 1,900 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

4-SCHEDULED FOR LETTING FY 18-19

LIVINGSTON I-12 454-02 NHPP 300 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

TANGIPAHOA I-55 452-90 NHPP 60 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

DISTRICT-WIDE REPAIRS TO VARIOUS BRIDGES.TULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 -DISTRICTWIDE BRIDGE REPAIRS

H.010689

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 FB DISCR 200 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 17-18

TECHNOLOGY IMPROVEMENTS TO FERRY VESSELS & TERMINAL LANDISIBLEY, STEVEN Remrks:

Typ Imp:2012 FHWA FBD AWARD TRANSFERRED TO FTA

Project:Prj Mgr:

CCC FERRY VESSEL: TERM/LAND TECH UPGRADE

STATEWIDE

H.010691

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 FB DISCR 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 17-18

DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWERSIBLEY, STEVEN Remrks:

Typ Imp:FUNDS TRANSFERRED FROM FHWA TO FTA

Project:Prj Mgr:

MV STUMPF: DRY-DOCK: 5 YR EXAM & REPOWER

H.010694

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 FB DISCR 430 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 17-18

STATEWIDE 000-99 OTHER 0 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

MODIFICATION, INSTALLATION LANDING BARGE,CONVERSION TO FERRSIBLEY, STEVEN Remrks:

Typ Imp:FB DISCR FLEXED TO FTA THEREFORE NOT AUTH THROUGH FHWA

Project:Prj Mgr:

INSTALL AND MODIFY BARGES AND FERRIES

Page 1 - 60 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 73: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.012164

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 OTHER 700 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

4-SCHEDULED IN CURRENT FY 17-18

VIRTUAL WEIGH STATION INSTALLATIONMCCOY, JANET Remrks:

Typ Imp:

Project:Prj Mgr:

STATE WIDE VIRTUAL WEIGH STATION

H.012182

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

4-SCHEDULED IN CURRENT FY 17-18

CALCASIEU 000-10 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

WEIGH STATION LIGHTINGMCCOY, JANET Remrks:

Typ Imp:

Project:Prj Mgr:

STATEWIDE WEIGH STATION LIGHTING

H.012811

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 RAILROADS 4-SCHEDULED IN CURRENT FY 17-18

RR SAFETY DATA UPKEEP & SYSTEM TO COORDINATE WITH RR'S & FRASHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

STATEWIDE DOTD RR INVENTORY 2018-2022

H.012847

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED IN CURRENT FY 17-18

STATEWIDE 000-99 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

STATEWIDE 000-99 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

STATEWIDE 000-99 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

STATEWIDE 000-99 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

REAL-TIME TRAFFIC DATA SERVICES RFPSOLLIE, CARRYN Remrks:

Typ Imp:

Project:Prj Mgr:

REAL-TIME TRAFFIC DATA SERVICES

H.012959

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STCASH 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED IN CURRENT FY 17-18

CONSTRUCT NEW FERRY LANDING BARGESIBLEY, STEVEN Remrks:

Typ Imp:

Project:Prj Mgr:

CONSTRUCT NEW LANDING BARGE (PLAQ WB)

H.012692

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STCASH 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED FOR LETTING FY 18-19

DRYDOCK FOR USCG EXAM AND OTHER MAINTENANCE & REPAIRSMILLET, WALTER Remrks:

Typ Imp:

Project:Prj Mgr:

MV CAMERON II: REPOWER & USCG EXAM 2019

H.012770

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 RAIL PD 200 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL CBA'S AT PASSIVE PUBLIC LDRR XINGSSHREWSBERRY,BILL Remrks:

Typ Imp:714-99-0009

Project:Prj Mgr:

LDRR CBA PROJECT (DISTRICTS 02, 03, 61)

H.012846

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 18-19

DEVELOP PERFORMANCE MEASURE PLAN TO GATHER AND REPORT DASOLLIE, CARRYN Remrks:

Typ Imp:

Project:Prj Mgr:

ITS PERFORMANCE MEASURE PLAN DEVELOPME

Page 1 - 61 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 74: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 20194-SCHEDULED FOR LETTING

H.013060

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 RAIL PD 150 RAILROADS 4-SCHEDULED FOR LETTING FY 18-19

INSTALL CROSSBUCK ASSEMBLIES AT PASSIVE PUBLIC CROSSINGSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

AKDN RR CBA PROJECT (DISTRICTS 03 & 08)

H.013164

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 5,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

4-SCHEDULED FOR LETTING FY 18-19

THIS PROJECT WILL ACQUIRE A NEW TOLL SYSTEMRUNDELL, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

STATEWIDE TOLL SYSTEM

H.013263

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STCASH 300 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

4-SCHEDULED FOR LETTING FY 18-19

DRYDOCK FOR USCG EXAM AND OTHER MAINTENANCE & REPAIRSMILLET, WALTER Remrks:

Typ Imp:

Project:Prj Mgr:

BARGE305-035:DRYDOCK FOR USCG EXAM(2019)

Page 1 - 62 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 75: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

PROJECTS IN DEVELOPMENT

Per RS 48:230, the following is “…an additional list of

projects proposed to be commenced within the ensuing four

years which are in various stages of planning and

preparation. This list shall be subject to change by the

department until the department finally approves each

project for construction.”

Page 76: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority
Page 77: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.002123

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 35 207-07 TAP<200K 434 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

MEEK, STEPHEN Remrks:

Typ Imp:207-07-0028

Project:Prj Mgr:

RAYNE SIDEWALKS, PH. III

ACADIA

H.007369

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA US 90 003-10 TAP<200K 265 ENHANCEMENTS 3-DESIGN/DEVELOPMENTACADIA LA 35 207-07 TAP<200K 155 ENHANCEMENTS

CONCRETE WALKS AND DRIVES AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:744-01-0013

Project:Prj Mgr:

RAYNE SIDEWALKS, PH. II

H.009628

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 92 385-04 STPFLEX 1,520 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

VERMILION LA 92 385-05 STPFLEX 150 PRESERVATION - NON-INTERSTATEON STP SYSTEM

ASPHALT CONCRETE OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA92:LA 13 - 0.108 MI E OF VERMILION P/L

H.010962

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA I-10 450-04 HSIP 4,041 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE I-10 450-05 HSIP 1,478 SAFETY

INSTALL MEDIAN CABLE BARRIERDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CABLE BARRIER (LAFAYETTE/ACADIA)

H.012021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA US 90 003-10 TAP<200K 459 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK IMPROVEMENTSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF RAYNE.

Project:Prj Mgr:

US 90: ADAMS AVE SW IMPROVEMENTS, PH IV

H.012024

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 TAP<200K 761 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK IMPROVEMENTSMEEK, STEPHEN Remrks:

Typ Imp:LOCAL MATCH PROVIDED BY THE CITY OF CROWLEY

Project:Prj Mgr:

CROWLEY: PARKERSON AVE SW IMPROVEMENTS

H.012174

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA I-10 450-04 NHPP 14,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTLAFAYETTE I-10 450-05 NHPP 6,000 PRESERVATION - INTERSTATE

OGFC, APPROACH SLAB & EMBANKMENT SLIDE REPAIR & RELATED.THOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: JEFF PL - I-49 (OGFC/SLAB REPAIR)

H.012917

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 754 394-01 NFA 1,465 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 754: LA 95 - ST LANDRY P/L

H.012919

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 100 211-30 NFA 4,390 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 100: LA 97 - LA 91

Page 2 - 1 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 78: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012923

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 91 801-11 STPFLEX 1,006 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ACADIA LA 91 211-04 STPFLEX 559 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ACADIA LA 91 211-03 STPFLEX 671 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

THIN ASPHALT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 91: LA 3067 - W JCT ST LANDRY PL

H.013195

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 98 210-04 HSIP 1,042 SAFETY 3-DESIGN/DEVELOPMENTACADIA LA 98 210-04 STPFLEX 1,500 PRESERVATION - NON-INTERSTATE

NFA

ACADIA LA 98 210-04 STPFLEX 1,415 PRESERVATION - BRIDGE (ONSYSTEM)

BASE STABILIZATION, OVERLAY, AND CURVE REALIGNMENTMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 98 CURVE REALIGNMENT

H.010222

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 97 201-03 STPFLEX 4,130 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 97: LA 98 - LA 368

H.013363

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 1111 801-30 HSIPPEN 1,600 SAFETY 1-PLANNING/ENVIRONMENTALACADIA LA 1111 801-30 STPFLEX 900 ROAD TRANSFER

WIDEN LA 1111 TO ADD A CONTINUOUS TURN LANE.NUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1111 WIDENING: LA 13 - LA 1111-S

H.012039

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ALLEN LA 372 802-05 NFA 1,121 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 372: CREEK BRIDGE

ALLEN

H.000337

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION US 61 007-07 NHPP 1,700 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

E BATON ROUGE US 61 007-08 NHPP 10,300 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGESHERATH, ANANDA Remrks:

Typ Imp:007-07-0058;JT W/007-08-0040

Project:Prj Mgr:

US 61:BAYOU MANCHAC & FRANCOIS BRS.

ASCENSION

Page 2 - 2 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 79: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 30 414-03 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

3-DESIGN/DEVELOPMENT

ASCENSION I-10 450-11 STPFLEX 2,670 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ASCENSION 000-03 STPFLEX 2,660 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPSHARROUCH, JOSHUA Remrks:

Typ Imp:PROJECT DEPENDENT ON OUTCOME OF H.010572 CORRIDOR STUDY

Project:Prj Mgr:

LA 30 ROUNDABOUTS @ TANGER MALL & I-10

H.011577

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 18 063-10 STPFLEX 2,278 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ST JAMES LA 18 063-09 STPFLEX 222 PRESERVATION - NON-INTERSTATENFA

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 18: SUNSHINE BR - LA 3120

H.012934

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 936 803-22 NFA 2,500 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 936: W JCT LA 22 - E JCT LA 22

H.013458

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

ASCENSION 000-03 FBROFF 256 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT, NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

MANCHAC ACRES RD & H H WILSON RD BRIDGES

H.012057

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 431 267-02 STPFLEX 1,301 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 431:VILLAR CANAL AND DRAINAGE BRIDGES

H.012607

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 935 803-21 STPFLEX 1,272 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

ASCENSION LA 933 803-18 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 933, LA 935: BAYOU BRIDGES

H.012713

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 74 264-03 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASCENSION LA 74 264-02 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 74: IBERVILLE P/L - US 61

Page 2 - 3 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 80: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011160

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 73 077-02 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

CORRIDOR STUDY TO COLLECT DATA AND DEVELOP ALTERNATIVESMASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: LA 74 TO LA 621 CORRIDOR STUDY

H.012311

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION I-10 450-11 0 CAPACITY 0-FEASIBILITY/SCOPINGASCENSION LA 429 077-30 0 CAPACITY

STUDY FOR PROPOSED NEW CONNECTOR ROADZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 429 CONNECTOR (LA 30/LA 73 TO US 61)

H.010007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 STPFLEX 750 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

CLEANING & PAINTINGTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70:PIERRE PART BAY BR REHAB (HBI)

ASSUMPTION

H.012575

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 STPFLEX 6,502 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: LA 1 - LA 1015-1

H.012927

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 998 804-07 NFA 500 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MINOR OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 998: LA 1 - END CONTROL

H.011289

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 STPFLEX 15,280 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTALASSUMPTION LA 69 406-01 STPFLEX 1,063 OTHER / MISCELLANEOUS

CONSTRUCTION OF A DETOUR ROUTE FOR LA 70 IF NECESSARYNICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: DETOUR ROAD

H.013001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 308 407-08 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308: LA 70 - ASCENSION P/L

H.006016

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 654 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

LIL RIVER BRIDGE

AVOYELLES

Page 2 - 4 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 81: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.006017

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 312 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

M. BRYANT/ E. BRYANT ROAD BRIDGE OVER HO

H.007873

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 1176 805-09 FBROFF 2,375 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:805-09-0007;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

BAYOU BOEUF & TURNER CANAL BRIDGES

H.009497

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 106 204-04 STPFLEX 2,600 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 106: BAYOU BOEUF BRIDGE

H.011523

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 582 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

AVOYELLES 000-05 FBROFF 273 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

CARL HUNT & GERMAN BAYOU ROAD BRIDGES

H.011524

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 363 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

AVOYELLES 000-05 FBROFF 263 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

KATIE LANE & LEO MORROW ROAD BRIDGES

H.012998

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 1 052-30 STPFLEX 1,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

AVOYELLES LA 1 052-07 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

CONCRETE PAVEMENT REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: MOREAU ST - END FOUR LANE SECTION

H.013251

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 114 145-01 STPFLEX 408 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REPLACE EXISTING CROSS DRAINGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 114: X-DRAIN REPLACE WEST OF HESSMER

H.012542

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 114 145-01 STPFLEX 3,770 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

AVOYELLES LA 107 147-03 STPFLEX 1,902 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA114,LA107:BELLE DEAU & B JACK RL BRS

Page 2 - 5 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 82: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012545

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 454 370-01 STPFLEX 1,883 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 454: WIGGINS BAYOU BRIDGE

H.012556

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES US 71 008-07 STPFLEX 2,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, MILL, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: ST LANDRY P/L TO 740' S OF T&P RR

H.013143

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 FBROFF 869 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

CARBON PLANT ROAD OVER BOEUF BAYOU

H.009482

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 113 139-03 STPFLEX 950 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: JIM BURNEY BRANCH BRIDGE

BEAUREGARD

H.009615

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 26 028-04 STPFLEX 3,742 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

CP 2", OVERLAY 4", 2" SHLDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 26: US 171 - LA 1147

H.010244

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 113 139-04 STPFLEX 2,187 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: LA 26 - LA 112

H.010245

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 389 187-04 STPFLEX 7,117 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 389: MONROE WHITMAN RD - US 190

H.010246

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 112 188-02 STPFLEX 2,163 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, CP 2", WIDEN 2.5', OL 4"SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 112: LA 399 - LA 113

H.012948

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 109 377-02 NHPP 1,087 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

MICROSURFACESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 109: LA 389 - LA 27

Page 2 - 6 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 83: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013231

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 389 187-04 NFA 1,369 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH, WIDEN AND THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 389: MATTIE MEADOWS RD - HOOSIER RD

H.013257

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 190 028-02 NHPP 3,937 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: TEXAS S/L - LA 111

H.013259

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD US 171 024-05 NHPP 260 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: US 190 - 0.03 MI N WEST DR

H.012040

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 12 012-05 STPFLEX 2,252 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BEAUREGARD LA 27 031-09 STPFLEX 1,340 PRESERVATION - BRIDGE (ONSYSTEM)

BEAUREGARD LA 394 189-01 NFA 1,345 PRESERVATION - BRIDGE (ONSYSTEM)

BEAUREGARD LA 110 190-01 STPFLEX 1,237 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA12,LA27,LA394,LA110:COWPEN & CREEK BRS

H.012569

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BEAUREGARD LA 113 139-04 STPFLEX 1,600 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTALLEN, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: LITTLE SUGAR CREEK BRIDGE

H.001537

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 4 067-03 STPFLEX 1,310 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEYANG, LI Remrks:

Typ Imp:067-03-0014;

Project:Prj Mgr:

LA 4: BEE BRANCH BRIDGE

BIENVILLE

H.001707

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 507 090-05 FBROFF 1,178 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:090-05-0030;

Project:Prj Mgr:

LA 507: SALINE BAYOU RELIEF BRIDGE

H.010273

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 154 090-04 STPFLEX 1,450 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: EAST JCT LA 4 TO JCT LA 792

Page 2 - 7 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 84: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012050

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE I-20 451-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

LENGTHING HIGHWAY EXIT DECELERATION LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: WB EXIT RAMP EXTENSION AT ARCADIA

H.012942

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 797 807-05 NFA 1,032 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 797: LA 507 TO LINCOLN PL

H.013065

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE I-20 451-04 NHPP 523 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTCADDO I-20 451-01 NHPP 297 PRESERVATION - INTERSTATE BOSSIER I-20 451-02 NHPP 335 PRESERVATION - INTERSTATE WEBSTER I-20 451-03 NHPP 214 PRESERVATION - INTERSTATE

PORTLAND CEMENT CONCRETE PAVEMENT JOINT AND CRACK SEALINGTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20:DIST 04 PCC PAVEMENT REHABILITATION

H.012566

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 154 088-04 STPFLEX 358 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: LA 507 TO LA 793

H.012925

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 4 067-03 STPFLEX 560 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: CASTOR TO LUCKY

H.012961

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 154 090-03 STPFLEX 427 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: BOSSIER PL TO LA 4

H.012973

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 792 293-02 STPFLEX 360 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 792: LA 154 TO WEBSTER PL

H.013000

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BIENVILLE LA 516 294-04 NFA 2,406 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 516: US 371 TO LA 154

Page 2 - 8 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 85: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.000118

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER US 80 001-03 STPFLEX 3,064 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:

Typ Imp:001-03-0095;

Project:Prj Mgr:

BAYOU FIFI BRIDGE (HBI)

BOSSIER

H.003370

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 30,000 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENTBOSSIER I-220 451-31 NHPP 30,000 OTHER / MISCELLANEOUS BOSSIER 000-08 NHPP 30,000 OTHER / MISCELLANEOUS

LANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

I-220/1-20 INTERCHANGE IMP & BAFB ACCESS

H.007400

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 TAP>200K 434 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

NORTH BOSSIER SHARED USE TRAIL, PHASE II

H.011599

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 529 808-01 STPFLEX 2,900 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 529: LA 160 TO LA 2

H.012171

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-220 451-31 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

APPROACH SLAB REPLACEMENT AND PCC PAVEMENT PATCHINGTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-220: RED RIVER BRIDGE TO I-20

H.012889

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 23,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

PAVEMENT REHABILITATIONYANG, LI Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 REHAB (W OF LA 3 TO AIRLINE DR)

H.012913

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NHPP 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

EXTENDING EXISTING INTERSTATE EXIT LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-20 EB: EXIT RAMP EXTENSION AT LA 157

H.001779

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 511 102-03 NFI 135,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

REPLACEMENT\REHABILITATION (HBI)MASTIN, CATHERINE Remrks:

Typ Imp:102-03-0010;

Project:Prj Mgr:

JIMMIE DAVIS BRIDGE (LA 511) (HBI)

H.010605

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER US 71 010-06 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

CORRIDOR STUDYCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

US 71 CORRIDOR STUDY

Page 2 - 9 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 86: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012004

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER US 80 001-03 NHPP 4,415 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BIENVILLE US 80 001-06 STPFLEX 1,991 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSSANCHEZ, VICTOR Remrks:

Typ Imp:

Project:Prj Mgr:

US 80:CROWS CR & ALLIGATOR BAYOU BRIDGES

H.012537

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 154 090-01 STPFLEX 2,964 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: RED CHUTE BAYOU BRIDGE

H.012538

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 164 122-01 STPFLEX 2,921 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BOSSIER LA 164 122-01 STPFLEX 1,949 PRESERVATION - BRIDGE (ONSYSTEM)

BOSSIER LA 164 122-01 STPFLEX 2,192 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 164: BRIDGES

H.012638

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ACCESS MANAGEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3105: GREENACRES BLVD - LA 72 PHASE 2

H.012659

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ACCESS MANAGEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3105: GREENACRES BLVD - LA 72 PHASE 3

H.013129

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 FBROFF 2,340 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

LINTON ROAD OVER BLACK BAYOU RESERVOIR

H.011424

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 157 082-04 0 SAFETY 0-FEASIBILITY/SCOPINGBOSSIER LA 157 082-03 0 SAFETY

ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA157: BOOKER RD TO LA614 CORRIDOR STUDY

H.011428

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 0 SAFETY 0-FEASIBILITY/SCOPING

ACCESS MANAGEMENT AND SAFETY IMPROVEMENTCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA3105:GREENACRES TO LA72 CORRIDOR STUDY

Page 2 - 10 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 87: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.001166

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 045-01 STPFLEX 21,398 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:045-01-0029; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

CADDO LAKE BRIDGE (HBI)

CADDO

H.001661

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 530 085-01 FBROFF 2,356 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:085-01-0022;

Project:Prj Mgr:

BLACK BAYOU BRIDGE

H.007404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 530 809-14 TAP>200K 118 ENHANCEMENTS 3-DESIGN/DEVELOPMENTCADDO 000-09 TAP>200K 118 ENHANCEMENTS

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

OIL CITY SHARED USE PATH

H.010206

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3132 427-01 NHPP 1,183 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

3-DESIGN/DEVELOPMENT

CADDO LA 523 103-01 NHPP 1,147 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

EXTEND CONTROL OF ACCESS LA 3132 AT LA 523BRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3132 AT LA 523: EXTEND C OF A

H.010271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 045-01 STPFLEX 1,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

OVERLAY, SHOULDER STABILIZATION AND STRIPINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: SUNDOWN ROAD TO JCT LA 538

H.010279

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 173 094-02 STPFLEX 900 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 173: LA 1 TO US 71

H.010468

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 15,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PCCTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: WEST END HUDSON ST. BRIDGE TO I-49

H.010475

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 20,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PCCTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: MONKHOUSE TO W END OF HUDSON ST BR

Page 2 - 11 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 88: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011099

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 171 025-08 NHPP 64 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

BOSSIER LA 72 010-30 STPFLEX 10 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

CADDO US 71 053-09 NHPP 37 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

BOSSIER LA 3105 808-07 STPFLEX 42 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

CADDO LA 526 809-08 STPFLEX 37 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

BOSSIER LA 72 010-31 STPFLEX 10 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

IMPROVE SIGNAL TIMING FOR DISTRICT 04 CORRIDORSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 04 SIGNAL TIMING STUDIES PHASE 2

H.011420

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3132 427-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

EXTENDING ACCELERATION LANE FROM ENTRANCE RAMPSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3132: EB ENTRANCE LANE EXTENSION

H.011510

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

BOSSIER I-20 451-02 NHPP 100 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

DEPLOY ITS EQUIPMENT AND COMMUNICATIONS.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

SHREVEPORT ITS PHASE 4

H.011917

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-49 455-09 HSIPPEN 5,889 SAFETY 3-DESIGN/DEVELOPMENT

INSTALLING CABLE BARRIERALLEN, JEFFREY Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: LA 1 TO ARKANSAS S/L CABLE BARRIER

H.012316

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 NHPP 850 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

REPLACE SUPERSTRUCTUREBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: PEDESTRIAN OVERPASS REMOVAL

H.012930

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3049 079-01 NFA 310 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3049: COWHIDE BAYOU TO LA 530

Page 2 - 12 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 89: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013254

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 011-04 NHPP 7,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH AND OVERLAY WITH HMAC.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71 - JCT LA 2 - ARKANSAS STATE LINE

H.013420

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 HSIPPEN 2,250 SAFETY 3-DESIGN/DEVELOPMENTCADDO 000-09 STPFLEX 2,250 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 04 FLASHING YELLOW ARROW PART 1

H.000413

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 011-01 NHPP 2,800 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REHABWINDMANN, ANDREW Remrks:

Typ Imp:011-01-0054;STAGE 0 - FUTURE REHAB PROJECT

Project:Prj Mgr:

CROSS BAYOU BRIDGE REPLACEMENT

H.003915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

STAGE 0 AND ENVIRONMENTALBROUSSARD, DAN Remrks:

Typ Imp:USE STATE SURPLUS AS MATCH

Project:Prj Mgr:

I-49 INNER CITY CONNECTOR

H.009213

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3132 427-01 NFI 150,000 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

EXTENSION OF EXISTING ROADWAYUMEOZULU, JOE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3132 (INNER LOOP) EXTENSION

H.010286

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 538 078-04 STPFLEX 1,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 538: JCT US 71 TO LA 1

H.010288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 789 809-07 STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 789: PRESTON ROAD TO LA 169

H.010292

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 79 048-01 STPFLEX 1,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, ASPHALTIC OVERLAY, PAVEMENT STRIPINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79: TEXAS STATE LINE TO US 80

H.011094

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3094 025-08 NHPP 2,700 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

REPLACE SUPERSTRUCTURE, RAISE GRADE, ROADWAY & EMBANKMEND'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3094: HEARNE AV BR REHAB

Page 2 - 13 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 90: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 80 001-02 STPFLEX 3,567 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT/REHABILITATIONMUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

US80: KCS RR OVERPASS (HBI)

H.012006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 053-08 STPFLEX 2,785 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: PRAIRIE RIVER BRIDGE

H.012009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 053-09 NHPP 12,831 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTS/REHABILITATIONGAUDRY, CARL Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: MARKET ST BRIDGE OVER ICG RR(HBI)

H.012011

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 525 097-01 STPFLEX 2,545 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

CADDO LA 173 094-01 STPFLEX 1,225 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA525, LA173: BOGGY BAYOU AND CR BRIDGES

H.012932

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 789 809-07 STPFLEX 70 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALT SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 789: DESOTO PL TO PRESTON RD

H.012937

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 3049 079-01 NFA 1,122 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

CADDO LA 3049 079-01 STPFLEX 141 PRESERVATION - NON-INTERSTATEON STP SYSTEM

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3049: GRIMMIT DR TO GEORGE RD

H.012979

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 169 048-03 STPFLEX 448 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALT SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 169: LONGWOOD TO MOORINGSPORT

H.013034

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 80 001-01 STPFLEX 7,286 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: I-20 INTERCHANGE (GREENWOOD)

Page 2 - 14 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 91: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013315

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 STPENH 425 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SCENIC BYWAY VIEWING AREAMEEK, STEPHEN Remrks:

Typ Imp:CADDO PARISH WILL PROVIDE THE MATCH.

Project:Prj Mgr:

BOOM OR BUST SCENIC VIEWING AREA

H.013389

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 STPENH 346 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALCADDO LA 525 097-01 STPENH 5 ENHANCEMENTS

SIGNINGNUNES, BRIAN Remrks:

Typ Imp:CADDO PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

CADDO PARISH BICYCLIST AWARENESS SIGNAGE

H.012007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 1 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: KCS RAILROAD OVERPASS

H.012008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO US 71 053-09 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

HISTORIC BRIDGE PRESERVATION PRIORITY FEASIBILITY STUDYGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

US 71:ICG RAILROAD OVERPASS REHAB (HBI)

H.012027

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REPLACMENT OR REHABILITATION.GUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

I 20: MISSOURI PACIFIC RR OVERPASS

H.012028

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO I-20 451-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REHABILITATIONEVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

I 20:LAKE SHORE DRIVE/KCS OVERPASS REHAB

H.003184

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 24,000 CORRIDOR 3-DESIGN/DEVELOPMENTCALCASIEU I-10 450-91 NHPP 844 PRESERVATION - INTERSTATE CALCASIEU I-10 450-91 FREIGHT-HY 40,156 PRESERVATION - INTERSTATE

WIDEN TO 6 LANESJUDICE, ANDREW Remrks:

Typ Imp:450-91-0078;

Project:Prj Mgr:

I-10: TEXAS STATE LINE-E. OF COONE GULLY

CALCASIEU

H.005967

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 STGEN 2,500 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENTCALCASIEU 000-10 NHPP 10,000 INTERMODAL CONNECTOR CALCASIEU 000-10 DEMO 18,300 DEMO / HIGH PRIORITY

NEW ROAD & BRIDGEBRIGNAC, CHRISTINA Remrks:

Typ Imp:706-10-0001;TEA-21. STA 87.USE STGEN$ FOR ENG

Project:Prj Mgr:

NELSON RD EXT & BRIDGE

Page 2 - 15 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 92: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.009621

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 NHPP 3,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

OGFCMAY, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-210: W JCT I-10 - E JCT I-10

H.010865

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 HSIP 939 SAFETY 3-DESIGN/DEVELOPMENT

INSTALLATION OF CABLE BARRIER SYSTEM IN MEDIAN.LAI, QUANG Remrks:

Typ Imp:USE HSIP FUNDS

Project:Prj Mgr:

I-210: DISTRICT 07 CABLE BARRIER

H.011065

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 1138-2 810-06 STBONDS 6,000 CAPACITY 3-DESIGN/DEVELOPMENTCALCASIEU I-210 450-30 STBONDS 1,000 CAPACITY CALCASIEU I-210 450-30 LOCAL 7,800 CAPACITY

IMPROVEMENTS TO THE NELSON INTERCHANGEBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

NELSON INTERCHANGE IMPROVEMENTS

H.011500

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 NHPP 3,970 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

THIS PROJECT INCLUDES INSTALLING CAMERAS & DMSS ALONG I-210.KIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

LAKE CHARLES ITS PHASE 3

H.011509

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

THIS PROJECT WILL INSTALL DMSS AND CCTVS.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

LAKE CHARLES ITS PHASE 4

H.011546

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 FBROFF 454 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

NURSERY STREET / BUXTON CREEK

H.011802

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 TAP<200K 358 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CALCASIEU PARISH POLICE JURY

Project:Prj Mgr:

PINECONE DRIVE SIDEWALK

H.012108

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 383 197-02 STPFLEX 380 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

CALCASIEU I-10 450-91 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

ADD TURN LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 & LA 383:TURN LANE@ EB EXIT 43 RAMP

Page 2 - 16 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 93: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012238

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

INTERSECTION IMPROVEMENTSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378: INT IMPROVEMENT @ PHILLIPS RD

H.013344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 193-06 HSIP 613 SAFETY 3-DESIGN/DEVELOPMENTCALCASIEU LA 14 193-05 HSIP 613 SAFETY CALCASIEU LA 397 193-31 HSIP 613 SAFETY CALCASIEU 000-10 HSIP 613 SAFETY

INSTALL SINGLE LANE ROUNDABOUTCORMIER, CLAYTON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14 @ LA 397 ROUNDABOUT

H.000186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 90 003-04 NHPP 12,248 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:003-04-0064;

Project:Prj Mgr:

US 90 OVER I-10 RAMPS @ LOCKMOOR (HBI)

H.000425

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 12 012-01 STPFLEX 1,739 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

CALCASIEU 000-10 LOCAL 1,739 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGEMASTIN, CATHERINE Remrks:

Typ Imp:012-01-0004;JOINT PROJECT WITH TEXAS

Project:Prj Mgr:

LA 12 SABINE RIVER BRIDGE

H.003931

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NFI 0 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)

FEASIBILITY & ENVIRON. STUDYUMEOZULU, JOE Remrks:

Typ Imp:700-10-0115;INCL. UPRR GRADE SEPARATION

Project:Prj Mgr:

CALCASIEU RIVER BRIDGE (HBI)

H.009455

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-210 450-30 NHPP 3,400 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

CLEANING & PAINTINGTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-210 BRIDGE CLEANING & PAINTING

H.009613

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 193-06 STPFLEX 4,926 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PCCP RECONSTRUCTIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: MC NEESE ST - E. PRIEN LAKE RD

H.010000

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 171 024-01 NHPP 1,700 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

US171:CALCASIEU RVR BR REHAB (HBI)

Page 2 - 17 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 94: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 031-04 STPFLEX 1,800 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

1-PLANNING/ENVIRONMENTAL

CLEANING & PAINTING & MISC. REPAIRSTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

LA27 ICWW ELLENDERS BRIDGE CLEAN & PAINT

H.012041

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 109 187-01 STPFLEX 1,220 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTPATTON, HEATHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 109: GULLY BRIDGE

H.012083

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU I-10 450-91 NHPP 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE INTERIM REPAIRSCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CALCASIEU RIVER BRIDGE INT REPAIRS

H.012589

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 27 810-19 STPFLEX 3,903 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, CP AND OLSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 108: I-10 - LA 1256

H.011242

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 384 382-05 0 SAFETY 0-FEASIBILITY/SCOPING

TBD BY FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 384 (BIG LAKE RD TO MCNEESE ST)

H.012042

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 384 382-04 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF BRIDGE REPLACEMENTBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 384: ICWW BLACK BAYOU MOVABLE BRIDGE

H.012043

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378:W FORK CALCASIEU RIV REHAB (HBI)

H.012632

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU US 171 024-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

TRAFFIC STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: MLK BLVD TRAFFIC STUDY

H.012685

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 385 195-04 HSIPPEN 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 385 RYAN ST. FEASIBILITY STUDY

Page 2 - 18 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 95: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.001557

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 4 068-04 HSIPPEN 3,700 SAFETY 3-DESIGN/DEVELOPMENT

WIDENING & O'LAY W/CURVE REALIGN.ZIECKER, MATTHEW Remrks:

Typ Imp:068-04-0030;

Project:Prj Mgr:

LA 4: BANKS SPRINGS - JCT. US 165

CALDWELL

H.012599

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 851 811-10 NFA 2,000 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 851: LA 126 - LA 849

H.012988

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 133 171-01 STPFLEX 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 133: HEBERT - VESTIL LANE

H.013202

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL US 165 015-07 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: COLUMBIA - 7 MILES NORTH

H.009602

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL LA 557 159-02 STPFLEX 1,276 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

MICROSURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 557: LA 4 - OUACHITA LINE

H.013027

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALDWELL 000-11 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALCALDWELL 000-11 LOCAL 522 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 3600' LONG BY 5' WIDE ASPHALT TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

SHERMAN LAKE TRAILS

H.011545

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON 000-12 FBROFF 345 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

LITTLE CHENIER RD / LITTLE CHENIER BAYOU

CAMERON

H.012568

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 27 031-03 STPFLEX 1,627 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:

Project:Prj Mgr:

LA 27: KELSO BAYOU MOVABLE BR REHAB

Page 2 - 19 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 96: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013232

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 384 195-01 NFA 1,793 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH AND THIN OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 384: LA 27 - LA 385

H.009470

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 82 194-02 STPFLEX 11,161 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - MOVEABLE BRIDGEBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 82: SUPERIOR CANAL BRIDGE (HBI)

H.012508

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON 000-12 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 1-PLANNING/ENVIRONMENTAL

GUARDRAIL REPAIR/REPLACE/INSTALLATION FEASIBILITY STUDYRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

PARISH WIDE GUARDRAIL (CAMERON)

H.012044

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CAMERON LA 384 195-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA384:ICWW GR LAKE PONTOON MB REHAB (HBI

H.001140

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124 041-03 FBROFF 2,047 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBALLMER, SARAH Remrks:

Typ Imp:041-03-0025; USE NFA AS MATCH

Project:Prj Mgr:

LA 124: HOOTER CREEK BRIDGE

CATAHOULA

H.010815

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 124-P 143-03 NFA 6,831 ROAD TRANSFER 3-DESIGN/DEVELOPMENTCATAHOULA LA 124 143-04 NFA 662 ROAD TRANSFER CATAHOULA 000-13 NFA 293 ROAD TRANSFER CATAHOULA LA 3102 813-24 NFA 401 ROAD TRANSFER

CONSTRUCTION ON NEW ALIGNMENT OF AN EXISTING ROUTEMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

LA 124 EXTENSION (SEGMENT 1)

H.012167

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA US 84 022-06 NHPP 2,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 84: 3.7 MILES E. LA 28 - JONESVILLE

H.011029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA LA 559 813-29 STPFLEX 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTALCATAHOULA LA 559 346-01 STPFLEX 0 OTHER / MISCELLANEOUS

FEASIBILITY STUDY TO REPLACE DUTY FERRY WITH A BRIDGEWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 559: REPLACE DUTY FERRY WITH BRIDGE

Page 2 - 20 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 97: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012736

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA US 425 026-04 NHPP 6,870 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: TENSAS RIVER BRIDGE @ CLAYTON

H.013031

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA 000-13 RTP 130 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTAL

RESTORATION OF 3.1 MILES OF ATV TRAIL.BUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

DEWEY WILLS WMA - JAKEY ATV TRAIL

H.010281

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 2 085-07 STPFLEX 3,350 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE, ASPHALTIC OVERLAY, CTB SHOULDERS, PAVEMENT STRISPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: WEBSTER P/L TO LA 3062

CLAIBORNE

H.012943

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 2-A 083-10 STPFLEX 370 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2A: LA 9 TO UNION PARISH LINE

H.001674

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 146 085-08 STPFLEX 6,068 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

NEW BRIDGESPATTON, HEATHER Remrks:

Typ Imp:085-08-0032;4 BRIDGES

Project:Prj Mgr:

LA 146 BRIDGES NEAR HOMER

H.012960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 154 088-06 STPFLEX 266 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 154: BIENVILLE PL TO ATHENS

H.012986

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CLAIBORNE LA 534 290-01 NFA 867 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 534: LA 534 SPUR - LOG MILE 5.33

H.012246

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA 000-15 RTP 82 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTCONCORDIA 000-15 LOCAL 12 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 400' OF PED-BIKE TRAIL AND 6200' OF SHARROWBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

AZALEA CROSSING TRAIL

CONCORDIA

Page 2 - 21 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 98: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013201

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 425 026-03 NHPP 4,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: LA 903 - US 65

H.010462

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA LA 15 177-05 STPFLEX 3,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: LA 131 - US 84

H.011930

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 84 026-02 0 SAFETY 0-FEASIBILITY/SCOPINGCONCORDIA US 425 026-03 0 SAFETY

CORRIDOR STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 425/US 84: CORRIDOR STUDY

H.001749

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 5 098-03 HSIPPEN 1,200 SAFETY 3-DESIGN/DEVELOPMENT

CURVE REALIGNMENTSTURDIVANT, PHILLIP Remrks:

Typ Imp:

Project:Prj Mgr:

LA 5 REALIGNMENT AND CROSS SLOPE IMPROVE

DESOTO

H.010285

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 483 301-02 STPFLEX 4,600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 512 & LA 483: US 171 TO LA 175

H.011860

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO I-49 455-07 NHPP 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

CADDO I-49 455-08 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: NATCHITOCHES P/L TO INNER LOOP

H.012227

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 5 049-01 STPFLEX 2,635 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 5: LA 3015 TO LA 172

H.012939

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 3015 298-03 NFA 2,048 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3015: US 171 TO LA 175

Page 2 - 22 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 99: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012614

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 175 035-04 STPFLEX 5,300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: LA 509 TO LA 5

H.012965

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 175 035-03 STPFLEX 748 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: SABINE PL TO 4.16 MI S OF US 84

H.012982

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 3248 816-07 NFA 1,100 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3248: NABORTON LOOP

H.002337

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 327-S 257-03 STPFLEX 1,182 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

E BATON ROUGE LA 327-S 257-03 HSIP 1,297 SAFETY

NEW BRIDGEMOORE, DARRELL Remrks:

Typ Imp:257-03-0025;

Project:Prj Mgr:

LA 327-S: BAYOU FOUNTAIN

EAST BATON ROUGE

H.003047

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 DEMO 0 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTE BATON ROUGE I-10 450-10 STGEN 0 DEMO / HIGH PRIORITY

NEW INTERCHANGEMUSA, ELNUR Remrks:

Typ Imp:450-10-0161;

Project:Prj Mgr:

PECUE LANE/I-10 INTERCHANGE

H.007439

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 609 ENHANCEMENTS 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 596 ENHANCEMENTS

WIDENING EXISTING ROAD TO CONSTRUCT BIKE LANESMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

HYACINTH AVENUE BIKE LANES

H.009489

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: JEFFERSON HIGHWAY OVERPASS

H.010251

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 817-20 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REPLACE/UPGRADE PUMP HOUSE COMPONENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

CHIPPEWA ST PUMP STATION IMP US61/190-X

Page 2 - 23 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 100: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010319

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 NHPP 24,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

RECONSTRUCT JCP @ GRADEMOORE, DARRELL Remrks:

Typ Imp:

Project:Prj Mgr:

I-110: NORTH ST. - PLANK RD.

H.010652

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 73 077-05 NHPP 3,500 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

PCCP PATCHINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: US 61 (AIRLINE) - ESSEN LANE

H.011186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 019-01 STPFLEX 375 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

E BATON ROUGE US 61-X 013-04 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

E BATON ROUGE LA 67 060-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNALS TO BE UPGRADE TO CURRENT DOTD STANDARDSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 TRAFFIC CONTROL UPGRADE 3

H.011684

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPFLEX 7,350 ROAD TRANSFER 3-DESIGN/DEVELOPMENTE BATON ROUGE LA 327-S 257-03 STPFLEX 2,450 ROAD TRANSFER

EXTEND 4-LANE DIVIDED ROADWAYWAGUESPACK, BRENT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 327 SPUR: STARING LANE EXTENSION

H.011695

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 19 250-01 0 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

WIDENING OF LA 19EVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 19 WIDENING: LA 64 - SUNSET BLVD

H.011773

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 667 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:BATON ROUGE/PARISH OF EAST BATON ROUGE WILL PROVIDE MATCH

Project:Prj Mgr:

HANKS DR/LANDIS DR PED IMPROVEMENTS

H.011774

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 327-S 257-03 TAP>200K 617 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF BATON ROUGE/EAST BATON ROUGE PA

Project:Prj Mgr:

LA 327-S: GARDERE LANE PED IMPROVEMENTS

H.011791

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS

BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:

Typ Imp:EAST BATON ROUGE WILL PROVIDE MATCH

Project:Prj Mgr:

CAL RD AND MOSS SIDE LN BR REPLACEMENTS

H.011843

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STP>200K 2,700 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ACCESS MANAGEMENTLEBAS, MELISSA Remrks:

Typ Imp:EAST BATON ROUGE PROVIDING MATCH

Project:Prj Mgr:

S. SHERWOOD FOREST BLVD SUPERSTREET MO

Page 2 - 24 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 101: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011859

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 817-20 TAP>200K 126 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK, STREET SCAPINGMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF BATON ROUGE

Project:Prj Mgr:

BR: RIVER ROAD MULTI-USE CORRIDOR

H.012022

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 1,200 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

MULTI-USE PATHMEEK, STEPHEN Remrks:

Typ Imp:LOCAL MATCH PROVIDED BY BREC

Project:Prj Mgr:

BREC: GREENWOOD MULTI-USE TRAIL, PHASE 2

H.012449

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 OTHER 1,300 RAILROADS 3-DESIGN/DEVELOPMENTE BATON ROUGE US 61-X 013-04 OTHER 200 RAILROADS E BATON ROUGE LA 73 077-05 OTHER 200 RAILROADS

UPGRADE WARNINGS, ADD MEDIANS, REPLACE SURFACES, CLOSE XINLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

KCS XINGS BETWN NORTH ST & LOUISE (BTR)

H.012499

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 LOCAL 236 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 5,700' LONG BY 12' WIDE PED/BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WARDS CREEK TRAIL - PECUE EXTENSION

H.012693

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD RIGHT TURNLANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42 AT I-10: ADD RIGHT TURNLANE

H.012964

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 NHPP 4,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

THIN ASPHALTIC CONCRETELACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: BLUEBONNET BLVD - S END US 190

H.013328

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 73 077-05 NHPP 1,000 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

FULL/PARTIAL PCCP PATCHING, REPAIR SIDEWALKS, CURBS,PORTER BETTS, CONNIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: LA 3064 / ESSEN - LA 426 (RT II)

H.013387

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 2,218 SAFETY 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 STPFLEX 2,218 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

E BATON ROUGE 000-17 HSIPPEN 32 SAFETY IBERVILLE 000-24 STPFLEX 32 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 FLASHING YELLOW ARROW PART 1

Page 2 - 25 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 102: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013410

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 900 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT

CONSTRUCT ROUNDABOUTMCMILLAN, RYAN Remrks:

Typ Imp:CITY OF BATON ROUGE TO PROVIDE MATCH

Project:Prj Mgr:

LEE DR AT HYACINTH AVE ROUNDABOUT

H.013422

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 HSIPPEN 2,070 SAFETY 3-DESIGN/DEVELOPMENTE BATON ROUGE 000-17 STPFLEX 2,070 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 FLASHING YELLOW ARROW PART 2

H.004100

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 0 CAPACITY 1-PLANNING/ENVIRONMENTAL

INCREASE CAPACITY(STAGE 0/1 STUDIES)KENDRICK, BRIAN Remrks:

Typ Imp:700-17-0209;STAGE 0 & 1; ADVANCE CONSTRUCT STAGE 0 & 1

Project:Prj Mgr:

I-10: LA 415 TO ESSEN ON I-10 AND I-12

H.007963

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 410 817-05 STPFLEX 1,811 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

NEW BRIDGEGAUDRY, CARL Remrks:

Typ Imp:817-05-0017;

Project:Prj Mgr:

BLACKWATER BAYOU BRIDGE

H.009290

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 SR2S 190 SAFETY - SAFE ROUTES TO SCHOOLS 1-PLANNING/ENVIRONMENTALE BATON ROUGE 000-17 SR2S 37 SAFETY - SAFE ROUTES TO SCHOOLS

BICYCLE LANES AND EDUCATION AND ENCOURAGEMENT ACTIVITIESRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

LSU LABORATORY SCHOOL SRTS PROJECT

H.009332

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 73 077-05 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

COLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73 CORRIDOR STUDY

H.010051

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 TAP>200K 267 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS W/LIGHTING & LANDSCAPINGMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

LSU HIGHLAND RD PED CORRIDOR, PHASE I

H.010729

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 67 060-01 CM 4,413 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE LA 73 077-05 CM 232 CONGESTION MITIGATION E BATON ROUGE US 61-X 013-04 CM 697 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 2,787 CONGESTION MITIGATION

TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATIONHANKS, ANNA Remrks:

Typ Imp:EBR WILL PROVIDE 20% MATCH

Project:Prj Mgr:

TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)

Page 2 - 26 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 103: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011226

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

W BATON ROUGE US 190 008-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CORRIDOR STUDY ON US 190 / US 61COLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

US190/US61: LA 415 TO I-12 STUDY

H.011310

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL

CONSTRUCTION OF NEW ROADWAY (DETAILS TBD BY STUDY)MASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

FORD STREET EXTENSION

H.011543

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 3164 019-01 CM 3,421 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61 019-02 CM 540 CONGESTION MITIGATION E BATON ROUGE LA 408 255-01 CM 398 CONGESTION MITIGATION E BATON ROUGE 000-17 CM 1,852 CONGESTION MITIGATION E BATON ROUGE LA 37 254-01 CM 1,014 CONGESTION MITIGATION E BATON ROUGE LA 37 254-02 CM 1,022 CONGESTION MITIGATION

TRAFFIC SIGNAL COORDINATION AND SIGNAL SYNCHRONIZATIONHANKS, ANNA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

TRAFFIC SIGNAL COORD & SYNCH PH VII(EBR)

H.012059

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 37 254-03 STPFLEX 3,307 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

E BATON ROUGE LA 19 250-01 NHPP 3,159 PRESERVATION - BRIDGE (ONSYSTEM)

LA. 19 & LA. 37 BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

COPPER MILL B, N CANAL, & SANDY CR BRS

H.013035

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALE BATON ROUGE 000-17 LOCAL 768 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1.35 MILE LONG 12' MULTI-USE TRAIL.BUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

MANSIONS TO PERKINS TRAIL

H.013037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALE BATON ROUGE 000-17 LOCAL 565 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1.35 MILE BY 12' MULTI USE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WARDS CREEK BRIDGE TO MALL TRAIL

H.013042

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALE BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM

RESTORATION AND CONSTRUCTION OF TRAILS IN LARGE PUBLIC PARKBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

LSU AGCENTER RESTORATION TRAILS

Page 2 - 27 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 104: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013053

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

REPLACE EXISTING OVERHEAD SIGN TRUSS AND SIGN FACESNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10/I-110 SPLIT OH SIGN TRUSS UPGRADE

H.013267

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 4,026 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 61-X 019-01 CM 76 CONGESTION MITIGATION E BATON ROUGE I-110 450-92 CM 25 CONGESTION MITIGATION

CONSTRUCT PEDESTRIAN/BIKE PATHSMUSA, ELNUR Remrks:

Typ Imp:BREC WILL PROVIDE MATCH

Project:Prj Mgr:

SCOTLANDVILLE PKWY TO DWTN BR TRAIL-PH 1

H.013320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 257-04 NHPP 5,550 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL

PCCP PATCHING AND MAJOR REHAB OF EB. MILL AND OVERLAY WB.KELLEY, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: STARING LANE - LA 30 (RT II)

H.013329

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-31 STPFLEX 2,520 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL

MILL, PATCH AND OVERLAYKELLEY, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: LA 427 - LA 3246 (RT II)

H.013330

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-31 NHPP 4,623 ROAD TRANSFER 1-PLANNING/ENVIRONMENTALE BATON ROUGE LA 42 257-04 NHPP 377 ROAD TRANSFER

PCCP PATCHING AND MAJOR REHAB OF EB. MILL AND OVERLAY WB.PORTER BETTS, CONNIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: LA 3246 - STARING LANE (RT II)

H.013331

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-02 NHPP 2,753 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL

PCCP PATCHING, AND MILL AND OVERLAY.KELLEY, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 427: LA 3064 -ACADIAN THRUWAY (RT II)

H.013366

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPENH 509 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS, BIKE LANES, STRIPING AND LANDSCAPING.NUNES, BRIAN Remrks:

Typ Imp:EAST BATON ROUGE AND THE DDD WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

DOWNTOWN GREENWY LOUISIANA CONNECTOR

H.013367

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 STPENH 1,479 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:EAST BATON ROUGE WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

ELM GROVE GARDEN DR PED IMPROVEMENT EBR

H.013368

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 327-S 257-03 STPENH 309 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:EAST BATON ROUGE PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 327 S GARDERE LANE SHARED USE PATH

Page 2 - 28 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 105: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013373

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61-X 013-04 STPENH 1,862 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALE BATON ROUGE US 190 013-05 STPENH 132 ENHANCEMENTS E BATON ROUGE 000-17 STPENH 495 ENHANCEMENTS

STATIONS AND HUBS ON A NEW RAPID TRANSIT ROUTEMEEK, STEPHEN Remrks:

Typ Imp:CATS WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

US 61 BUS: BUS RAPID TRANSIT STATIONS

H.002297

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 37 254-02 NFI 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGE BATON ROUGE LA 37 254-03 NFI 0 OTHER / MISCELLANEOUS

RECON W/GEOMETRIC IMPROVEMENTSRICHARD, RYAN Remrks:

Typ Imp:254-02-0040;SAFETY TRANSFER FUNDS-4 MILLION MAX

Project:Prj Mgr:

LA 37: SULLIVAN ROAD - LIBERTY ROAD

H.011690

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 ROAD TRANSFER 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY TO WIDEN PORT HUDSON PRIDE RDEVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

PORT HUDSON PRIDE RD: LA 964-LA 19 STUDY

H.011718

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE US 61 007-90 0 CAPACITY 0-FEASIBILITY/SCOPINGW BATON ROUGE US 190 008-01 0 CAPACITY E BATON ROUGE US 190 007-10 0 CAPACITY E BATON ROUGE US 61 007-08 0 CAPACITY

IMPROVE EXISTING US 190/US61 TO FREEWAY TYPEOLIVIER, NICHOLAS Remrks:

Typ Imp:

Project:Prj Mgr:

BR URBAN RENEWAL & MOBILITY PLAN PROJECT

H.012306

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-31 0 ROAD TRANSFER 0-FEASIBILITY/SCOPINGE BATON ROUGE 000-17 0 ROAD TRANSFER

INTERSECTION IMPROVEMENTSZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: HIGHLAND ROAD AT PECUE LANE

H.012357

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-12 454-01 0 SAFETY 0-FEASIBILITY/SCOPINGLIVINGSTON I-12 454-02 0 SAFETY

FEASIBILITY STUDYMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

I-12 SHOULDER FEASIBILITY STUDY

H.012563

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 73 077-04 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY TO DETERMINE REHABILITATION/REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 73: BAYOU MANCHAC BRIDGE (HBI)

H.013024

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 CM 1,000 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPINGE BATON ROUGE 000-17 TAPFLEX 1,000 ENHANCEMENTS E BATON ROUGE 000-17 LOCAL 700 OTHER / MISCELLANEOUS

BATON ROUGE BIKE SHARE PROGRAMPORTER BETTS, CONNIE Remrks:

Typ Imp:

Project:Prj Mgr:

BATON ROUGE BIKE SHARE

Page 2 - 29 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 106: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 SAFETY 0-FEASIBILITY/SCOPING

SAFETY STUDY FOR INTERSECTION IMPROV. FOCUSED ON PED/BIKESRENARD, APRIL Remrks:

Typ Imp:

Project:Prj Mgr:

BATON ROUGE PED/BIKE SAFETY ACTION PLAN

H.013073

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

E BATON ROUGE LA 37 254-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

FEASIBILITY STUDY FOR SIDEWALKS AND BICYCLE PATHS CONSTRUCTRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

N. FOSTER DR-GREENWELL SPRGS RD PED IMP

H.013261

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

0-FEASIBILITY/SCOPING

INSTALL ITS EQUIPMENT ALONG I-110.NICHOLS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-110 ITS DEPLOYMENT

H.012952

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 2 037-04 STPFLEX 416 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: WEST CARROLL PL - US 65

EAST CARROLL

H.012954

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 585 332-05 STPFLEX 133 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 585: WEST CARROLL PL - US 65

H.001961

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 134 161-08 STPFLEX 2,873 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

NEW BRIDGESMISTICH, BRADLEY Remrks:

Typ Imp:161-08-0022;2 BRIDGES

Project:Prj Mgr:

JOES BAYOU & CARRAWAY LAKE BRIDGES

H.012031

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E CARROLL LA 585 332-05 STPFLEX 1,334 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 585: DRAINAGE CANAL BRIDGE

H.002365

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 63 259-01 STPFLEX 5,497 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESBRAUNER, KURT Remrks:

Typ Imp:259-01-0011;3 BRIDGES

Project:Prj Mgr:

LA 63 BRIDGES NEAR BLUFF CREEK

EAST FELICIANA

Page 2 - 30 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 107: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.009633

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 67 060-03 STPFLEX 4,938 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 67:EBR P/L TO 6.5 MI NORTH OF EBR P/L

H.012110

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 68 252-02 STPFLEX 2,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 68: US 61 - LA 964

H.002280

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 19 250-04 STPFLEX 2,122 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 19: LA 10 - WILSON-CLINTON RD

H.012554

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 67 060-04 STPFLEX 2,963 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 67: LA 432 - MISS ST LN

H.012995

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E FELICIANA LA 67 060-04 STPFLEX 5,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

MILL, STABILIZE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 67: LA 10 - LA 432

H.010219

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 104 200-02 STPFLEX 2,286 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABLIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 104: ALLEN P/L - LA 3277

EVANGELINE

H.013092

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE LA 376 820-07 NFA 2,756 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

COLD PLANE, STABILIZE BASE, AND ASPHALT OVERLAY.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 376: LA 1172 - US 167

H.013141

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE 000-20 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

GREEN VALLEY ROAD OVER PETITE PASS

H.013460

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

EVANGELINE US 167 066-07 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR REALIGNMENT OF US 167ZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: ENOLA STREET TO ROSS ROAD

Page 2 - 31 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 108: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012199

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN US 425 026-06 NHPP 1,700 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

FRANKLIN US 425 026-07 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: WINNSBORO 5-LANE

FRANKLIN

H.012886

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 869 821-21 NFA 1,200 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 869: E. JCT LA 618 - W. JCT LA 618

H.013003

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 865 349-03 STPFLEX 300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

FRANKLIN LA 865 349-03 NFA 800 PRESERVATION - NON-INTERSTATENFA

PATCH AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 865: LA 4 - END MAINT.

H.013236

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 17 051-02 STPFLEX 2,900 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 17: WINNSBORO - LA 577

H.013258

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 858 821-02 NFA 155 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

FRANKLIN LA 859 821-04 NFA 150 PRESERVATION - NON-INTERSTATENFA

FRANKLIN LA 865 821-17 NFA 30 PRESERVATION - NON-INTERSTATENFA

FRANKLIN LA 865 349-02 NFA 90 PRESERVATION - NON-INTERSTATENFA

LASALLE LA 774 830-10 NFA 65 PRESERVATION - NON-INTERSTATENFA

CONCORDIA LA 566 355-03 NFA 165 PRESERVATION - NON-INTERSTATENFA

CALDWELL LA 850 811-02 NFA 245 PRESERVATION - NON-INTERSTATENFA

CHIP SEALSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA858,LA859,LA856,LA774,LA566,LA850: AST

H.009583

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 4 036-02 STPFLEX 452 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCHING & SINGLE LIFT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: LA 562 - LA 128

Page 2 - 32 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 109: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.009605

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 4 036-03 STPFLEX 1,716 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

CHIP SEALSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: LA 128 - LA 15

H.011564

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN LA 857 168-01 STPFLEX 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 857: LA 15 - LA 132

H.001842

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT LA 471 123-01 FBROFF 3,534 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEPAINE, PEGGY JO Remrks:

Typ Imp:NFA AS MATCH FOR PHASES 1 TO 6

Project:Prj Mgr:

LA 471: DARTIGO CREEK & CREEK BRIDGES

GRANT

H.013205

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT US 165 015-04 NHPP 800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: SB LANE - LA 1230 TO LASALLE P/L

H.013206

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT US 165 015-04 NHPP 1,300 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: SB LANE - LA 524 TO LA 123

H.012543

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

GRANT LA 8 040-03 STPFLEX 4,985 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: BIG CREEK BRIDGE

H.002762

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 400-01 STPFLEX 3,850 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:400-01-0007; 400-01 NFA MATCH

Project:Prj Mgr:

LA 86: LA 3242 - LA 347

IBERIA

H.002765

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 400-31 STPFLEX 1,025 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:400-31-0013; 400-31 MATCH TTF

Project:Prj Mgr:

LA 86: LA 347 - LA 31

Page 2 - 33 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 110: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.006128

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 FBROFF 4,177 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:713-23-0001;MOVEABLE BRIDGE

Project:Prj Mgr:

VIDA SHAW BRIDGE OVER BAYOU TECHE

H.009892

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 STPFLEX 340 RAILROADS 3-DESIGN/DEVELOPMENTIBERIA US 90 424-04 LOCAL 10 RAILROADS

NEW XING PER DISTRICT 03 & NEW IBERIASHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

LDRR (NEW IBERIA) US 90 FR

H.010004

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 320 823-12 STPFLEX 3,642 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

ST MARTIN LA 350 400-30 STPFLEX 4,199 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:NFA AS MATCH TO C.S. 823-12; TTF AS MATCH TO C.S 400-30

Project:Prj Mgr:

BAYOU TECHE MOVABLE BRIDGES REHAB (HBI)

H.010155

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NHPP 15,000 RAILROADS - GRADE SEPARATION 3-DESIGN/DEVELOPMENT

BRIDGE OVERPASSPAINE, PEGGY JO Remrks:

Typ Imp:STBONDS AS MATCH

Project:Prj Mgr:

US 90 RAILROAD OVERPASS SE OF LA 85

H.012627

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 997 230-04 NFA 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

ROADWAY EMBANKMENT, BASE COURSE, & SUPERPAVE ASPHALT.GOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 997: 2 MI S IBERV PL-3 MI S IBERV PL

H.013265

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NHPP 2,560 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

CONCRETE PAVEMENT REHAB, ASPHALT SHOULDERS & RELATED WORSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 14 - LEWIS STREET

H.011987

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 182 004-05 STPFLEX 1,333 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: SANDAGER CANAL BRIDGE

H.012295

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 182 004-04 STPFLEX 2,850 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

1-PLANNING/ENVIRONMENTAL

IBERIA LA 182 004-05 STPFLEX 2,929 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

SIDEWALK IMPROVEMENTS AND ADA RAMPSBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182 NEW IBERIA SIDEWALKS

Page 2 - 34 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 111: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012991

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 87 823-27 STPFLEX 1,530 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

IBERIA LA 87 241-01 STPFLEX 510 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE, PATCH, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 87: LA 3182 - ST MARY P/L

H.013140

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA 000-23 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

EIGHTY ARPENT ROAD OVER UNNAMED COULEE

H.011988

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 237-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 86: BAYOU TECHE MB REHAB (HBI)

H.011991

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 86 400-31 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 86:BAYOU TECHE MB DASPIT REHAB (HBI)

H.012738

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 3195 823-44 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

IBERIA LA 344 823-14 0 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:

Project:Prj Mgr:

NELSON CANAL & MORBIHAN BRIDGE REH (HBI)

H.013083

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY TO STUDY INSTALLATION OF SIDEWALKRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

JEFFERSON ISLAND SIDEWALK

H.009484

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 75 257-01 FBROFF 1,381 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 75: BAYOU BREAUX BRIDGE

IBERVILLE

H.011686

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 3066 230-02 NFA 4,399 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

REPAIR AND REALINGMENT OF LA 3066. A PORTION SLID INTO GIWWMASTIN, CATHERINE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3066 REPAIR REALIGN: LA 3066-S -LA 75

Page 2 - 35 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 112: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012512

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RTP 76 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTIBERVILLE LA 69 231-02 RTP 38 RECREATIONAL TRAILS PROGRAM IBERVILLE 000-24 LOCAL 13 RECREATIONAL TRAILS PROGRAM IBERVILLE LA 69 231-02 LOCAL 13 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 2,640' SHARED USE PATHBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

WHITE CASTLE MISS RIVER LEVEE TRAIL

H.012588

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE I-10 450-07 NHPP 52,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTIBERVILLE I-10 450-07 NHPP 2,000 PRESERVATION - INTERSTATE IBERVILLE I-10 450-07 NHPP 2,000 PRESERVATION - INTERSTATE IBERVILLE I-10 450-07 NHPP 2,000 PRESERVATION - INTERSTATE IBERVILLE I-10 450-07 NHPP 2,000 PRESERVATION - INTERSTATE

GRADE RAISING & WIDEN IN ONE DIRECTION TO MAINTAIN TRAFFICTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: ATCH BASIN BR - W BATON ROUGE P/L

H.013242

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 75 230-03 STPFLEX 550 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

RAISE ROADWAY ELEVATION TO PREVENT FLOODINGGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 75 ROADWAY FLOODING: 3 MI N LA 404

H.013438

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE 000-24 RAIL PD 250 RAILROADS 3-DESIGN/DEVELOPMENTIBERVILLE 000-24 RAIL HE 100 RAILROADS

INSTALL GATES & CONC SURFACE ON DORCYSHREWSBERRY,BILL Remrks:

Typ Imp:MATCH FROM RAILROAD

Project:Prj Mgr:

DORCY ST: UP RR XING (IBERVILLE)

H.012060

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERVILLE LA 75-S 824-18 FBROFF 15,535 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

MOVABLE BRIDGE REPLACEMENT/REHABILITATIONBRIGNAC, CHRISTINA Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA75S:BAYOU SORREL MOVABLE BRIDGE (HBI)

H.010388

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 155 319-30 STPFLEX 1,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 155: LA 542 - QUITMAN HWY

JACKSON

H.001553

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 146 068-02 STPFLEX 4,696 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

JACKSON LA 4 068-03 STPFLEX 2,954 PRESERVATION - BRIDGE (ONSYSTEM)

NEW BRIDGESMISTICH, BRADLEY Remrks:

Typ Imp:068-02-0017;3 BRIDGES & JT W/068-03-0021 2BRS.

Project:Prj Mgr:

LA 146 BRIDGES NEAR KELLEYS

Page 2 - 36 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 113: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010452

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 144 318-01 STPFLEX 1,500 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

JACKSON LA 144 319-04 STPFLEX 500 PRESERVATION - NON-INTERSTATENFA

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 144: EROS (LA 34) - OUACHITA P/L

H.012962

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JACKSON LA 155 090-06 STPFLEX 217 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 155: BIENVILLE PL - US 167

H.002263

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 45 249-90 TAPFLEX 188 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

MEEK, STEPHEN Remrks:

Typ Imp:249-90-0040

Project:Prj Mgr:

JEAN LAFITTE: DOWNTOWN SIDEWALK, PHASE 1

JEFFERSON

H.002264

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 45 249-90 DEMO 546 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTJEFFERSON LA 45 249-90 STPFLEX 4,305 PRESERVATION - BRIDGE (ON

SYSTEM)

JEFFERSON LA 302 826-39 FBROFF 67,978 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPL.(KERNER'S)YANG, LI Remrks:

Typ Imp:249-90-0041;TEA-21 KERNER'S FERRY BRIDGE

Project:Prj Mgr:

BAYOU BARATARIA BRIDGE@JEAN LAFITTE

H.010017

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 NHPP 12,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z: WESTBANK EXPRESSWAY REHAB

H.010418

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 611-1 826-14 STPFLEX 200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

JEFFERSON LA 611-1 826-16 STPFLEX 500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

JEFFERSON LA 611-1 826-16 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM

JEFFERSON LA 611-1 826-17 STPFLEX 325 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 611-1 & LA 611-3:COLD PLANE & OVERLAY

H.010570

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 49 283-30 STP>200K 2,932 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTJEFFERSON LA 49 283-30 HSIP 2,932 SAFETY

ACCESS MANAGEMENT/SAFETY IMPROVEMENTS, BIKE LANES, SIDEWALEVANS, MISTY Remrks:

Typ Imp:MATCH FROM THE CITY OF KENNER

Project:Prj Mgr:

LA 49/WILLIAMS BLVD CORRIDOR IMPROVS

Page 2 - 37 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 114: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010626

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 FBROFF 1,033 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

SAUVE ROAD / SONIAT CANAL BRIDGE

H.010673

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 NHPP 10,160 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

JEFFERSON US 90-Z 283-09 STP>200K 2,540 URBAN SYSTEMS

CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILITATIBRIGNAC, CHRISTINA Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO.

Project:Prj Mgr:

US90Z:HARVEY CANAL TUNNEL REHABILITATION

H.011534

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 FBROFF 545 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

JEFFERSON 000-26 FBROFF 527 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

WEST LOYOLA & METAIRIE HEIGHTS BRIDGES

H.011547

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 560-2 826-49 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

JEFFERSON LA 541 826-13 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

ADD DRAINAGE STRUCTURESGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 541 & LA 560-2: JESSIE ST. - LA 18

H.011732

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 6,557 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE LANES; SIDEWALKS AND CROSSWALKSLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH PROVIDING MATCH

Project:Prj Mgr:

JEFFERSON PARISH: CANAL ST. IMPROVEMENTS

H.011779

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 TAP>200K 2,011 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

MULTI-USE PATHNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF KENNER.

Project:Prj Mgr:

POWER BLVD MEDIAN IMPROVEMENTS

H.011780

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 TAP>200K 429 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

PEDESTRIAN PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH

Project:Prj Mgr:

LAKEFRONT PEDESTRIAN PATH

H.011797

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 1,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

COLD-MILL AND OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

AMES BLVD (WB EXPY - HAPPY ST)

H.011805

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 TAP>200K 481 ENHANCEMENTS 3-DESIGN/DEVELOPMENTJEFFERSON LA 541 826-13 TAP>200K 141 ENHANCEMENTS

MULTI-USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY JEFFERSON PARISH

Project:Prj Mgr:

JEFFERSON WB MISS RIVER MU PATH 3B & 3C

Page 2 - 38 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 115: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 1,434 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

CONCRETE OVERLAYLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH PROVIDING MATCH

Project:Prj Mgr:

RIDGEWOOD/STROELITZ (AIRLINE TO LOUMOR)

H.012489

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTJEFFERSON I-10 450-15 LOCAL 66 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 3,665' LONG BY 13' WIDE PED-BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

I-10 TRAIL WIDENING, JEFFERSON PARISH

H.012553

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 541 826-13 STPFLEX 1,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE AND OVERLAY, NEW STRIPING AND MARKERSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 541: LA 18 (LOUISIANA) - LA 18 (4TH)

H.012571

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3152 826-03 NHPP 900 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE AND OVERLAY.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3152: ARGONNE ST. - W. METAIRIE

H.012594

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3134 429-02 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD J TURNS & U TURNS AT THE INTERSECTION OF LA 3134 & LA 45SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3134: INTERSECTION IMP @ LA 45

H.012595

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3154 826-44 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD RIGHT TURN LANE BY WIDENING ON LA 3154 AT DOCK STSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3154: RIGHT TURN LANE AT DOCK ST

H.012596

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 23 062-01 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD AN ADDITIONAL LEFT TURN LANE ON LA 23 AT GRETNA BLVDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 23: INTERSECTION IMP @ GRETNA BLVD

H.012619

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 006-30 NHPP 450 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 48 @ PLANTATION RD

H.012620

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 006-30 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 48: EVANS RD - EDWARDS AVE

Page 2 - 39 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 116: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012795

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 STCASH 35 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT

REPAIR OF GRATE SYSTEM ON ROADWAY AT TUNNEL ENTRANCEROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

HARVEY TUNNEL GRATE REPAIR

H.012884

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 3,155 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

CONCRETE PANEL REPLACEMENTLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

WOODMERE BLVD. PANEL REPLACEMENT

H.012885

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 466 063-02 STP>200K 4,364 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE LANES, MULTI-USE PATHS, ADA SIDEWALKSLEBAS, MELISSA Remrks:

Typ Imp:CITY OF GRETNA WILL PROVIDE MATCH

Project:Prj Mgr:

LA 466: 5TH ST IMPROVEMENTS (GRETNA)

H.012918

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NHPP 500 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

CONCRETE REHAB PATCH AND JOINT SEALING.LACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3139: DICKORY AVE. - ORLEANS P/L

H.012978

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 301 826-06 NFA 600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MILLING AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 301: 280' W MCMURTY- 800' W LA 3134

H.013209

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 61 007-02 NHPP 1,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 61: WILLIAMS BLVD - AIRPORT ACCESS RD

H.002861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NFI 70,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALJEFFERSON LA 3046 423-01 0 DEMO / HIGH PRIORITY

NEW INTERCHANGEYANG, LI Remrks:

Typ Imp:430-01-0013;JEFF. PH CONSULTANT WORKING (E)

Project:Prj Mgr:

CAUSEWAY BLVD - EARHART EXPRESSWAY INTE

H.008065

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3154 826-44 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

JEFFERSON 000-26 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INSTALLATIONHARROUCH, JOSHUA Remrks:

Typ Imp:826-44-0032;

Project:Prj Mgr:

LA 3154 @ DOCK ST. ROUNDABOUT

Page 2 - 40 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 117: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011514

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 61 007-02 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

JEFFERSON LA 3154 826-44 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

INTERSECTION IMPROVEMENT STUDYHOYT, RYAN Remrks:

Typ Imp:FEASIBILITY STUDY

Project:Prj Mgr:

INTERSECT IMPROV ALONG US 61 & LA 3154

H.011647

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 61 007-02 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

JEFFERSON LA 3152 826-03 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

JEFFERSON LA 611-9 826-04 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

CORRIDOR IMPROVEMENT STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US61, LA611 & LA3152 CORRIDOR IMPROVE

H.011670

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 0 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL

FEASIBILITY STUDY, IMR AND ENVIRONMENTAL ASSESSMENTNICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 / LOYOLA INTERCHANGE IMPROVEMENT

H.011752

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STP>200K 7,962 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS AND BIKELANESLEBAS, MELISSA Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

SEVERN AVE: VETERANS - W. ESPLANADE

H.013345

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STPENH 546 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIGNING, STRIPING AND BRIDGE.NUNES, BRIAN Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

KAWANEE AVENUE BIKE ROUTE PHASE I

H.013346

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 STPENH 572 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

PEDESTRIAN IMPROVEMENTSNUNES, BRIAN Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE LOCAL MATCH.

Project:Prj Mgr:

MANHATTEN BLVD PEDESTRIAN IMPROVEMENTS

H.013347

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 18 063-02 STPENH 517 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

BIKE PATHSNUNES, BRIAN Remrks:

Typ Imp:JEFFERSON PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 18: 4TH ST BIKE PATH JEFFERSON PARISH

H.013365

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 303 826-07 STPENH 551 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALJEFFERSON LA 45 249-90 STPENH 643 ENHANCEMENTS

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:THE TOWN OF JEAN LAFITTE WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 45/LA 303 ROSETHORNE PATH (LAFITTE)

Page 2 - 41 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 118: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013370

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 282-01 STPENH 282 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS, BICYCLE FACILITIES, LANDSCAPING AND BUS SHELTERSNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF KENNER WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 48: KENNER LEVEE TRAILHEAD EXPANSION

H.013411

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 48 006-30 TAP>200K 423 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS, DRAINAGEMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF HARAHAN WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 48 PED IMPROVEMENTS CITY OF HARAHAN

H.013090

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

JEFFERSON LA 18 063-02 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

FEASIBILITY TO STUDY PEDESTRIANS IMPROV. AT INTERSECTIONSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

GRETNA DOWNTOWN INTERSECTION IMPR

H.002980

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS I-10 450-03 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESDELATTE, BRIAN Remrks:

Typ Imp:450-03-0085;PARALLEL BRIDGES

Project:Prj Mgr:

I-10 OVERPASS OVER US 165 & MP R.R

JEFFERSON DAVIS

H.009486

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS US 90 003-07 STPFLEX 1,370 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: BAYOU BRIDGE

H.012621

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS I-10 450-03 NHPP 3,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

APPROACH SLAB REPLACEMENTTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: JEFF DAVIS APP. SLAB REPLACEMENTS

H.012872

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS 000-27 RAIL PD 350 RAILROADS 3-DESIGN/DEVELOPMENTJEFF DAVIS 000-27 RAIL HE 50 RAILROADS

INSTALL NEW F/L'S, GATES, AND BELLS AND CLOSE DOYLE ST. XINGSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

PLAQ/DOYLE: BNSF RR XINGS (JENNINGS)

H.013255

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS US 165 014-02 NHPP 6,860 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAY (SOUTHBOUND ONLY)SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: 0.26 M N I-10 - ALLEN P/L

H.002091

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS LA 97 201-01 STPFLEX 6,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:201-01-0008;PROJECT TO BE SCOPED

Project:Prj Mgr:

LA 97 OVERPASS (I-10)

Page 2 - 42 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 119: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.002151

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 339-S 216-02 FBROFF 1,525 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:

Typ Imp:216-02-0016; USE NFA AS MATCH

Project:Prj Mgr:

BAYOU PARC PERDU AND CREEK BRIDGES

LAFAYETTE

H.002735

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 1252 391-04 FBROFF 2,335 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTLAI, QUANG Remrks:

Typ Imp:391-04-0018; USE NFA AS MATCH

Project:Prj Mgr:

BAYOU VERMILION BRIDGE

H.003459

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-49 455-01 HSIP 850 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE LA 726 828-44 HSIP 850 SAFETY

CONSTRUCT ROUNDABOUTDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:455-01-0054 AND 828-44-0015

Project:Prj Mgr:

ROUNDABOUT @ LA 726 AND I-49 FRONTAGE RD

H.006538

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 SR2S 300 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 92 213-05 SR2S 140 SAFETY - SAFE ROUTES TO SCHOOLS

CONSTRUCTION OF SIDEWALKS AND CROSSWALKSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

LAFAYETTE CONSOLIDATED GOVT SIDEWALKS

H.009629

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 NHPP 8,813 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

P.C.C.P. REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90 (EB):RR JCT-JCT US 90BUS (PINHOOK)

H.009997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 167 080-02 STP>200K 1,645 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE US 167 080-02 HSIPPEN 3,013 SAFETY LAFAYETTE US 167 080-02 NHPP 3,013 OPER EFFICIENCY/MOTORIST

ASSISTANCE - ACCESSMANAGEMENT

LAFAYETTE US 167 080-02 STPFLEX 1,368 URBAN SYSTEMS

ACCESS MANAGEMENT AND OTHER SAFETY COUNTERMEASURESEVANS, MISTY Remrks:

Typ Imp:STUDY FUNDED WITH SAFETY TRANSFER FUNDS

Project:Prj Mgr:

US 167: JOHNSTON ST IMPROVEMENTS

H.010005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 733 828-14 STPFLEX 4,568 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

VERMILION LA 82 194-07 STPFLEX 3,418 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

VERMILLION RIVER MOVABLE BRS REHAB (HBI)

Page 2 - 43 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 120: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010207

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 94 080-03 STPFLEX 540 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ST MARTIN LA 94 080-04 NHPP 2,365 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

ST MARTIN LA 94 850-32 NHPP 290 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

COLD PLANE, PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 94: LA 353 - LA 328

H.011904

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182-2 828-50 STPFLEX 2,846 ROAD TRANSFER 3-DESIGN/DEVELOPMENTLAFAYETTE LA 182-2 828-50 LOCAL 487 ROAD TRANSFER

COLD PLANE, OVERLAY INCLUDING WIDENING, DRAINAGE STRMCMILLAN, RYAN Remrks:

Typ Imp:LOCAL FUNDS PROVIDED BY CITY OF BROUSSARD

Project:Prj Mgr:

LA 182: ST DE PORRES-ALBERTSONS PKWY(RT)

H.011932

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 89-1 216-03 STPFLEX 750 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, ASPHALT OVERLAY, AND RELATED WORK.DOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 89-1:N IBERIA ST-HEART D FARM RD(RT)

H.012231

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3025-S 828-38 STP>200K 835 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 3025-S 828-38 TAP>200K 583 URBAN SYSTEMS

ENHANCEMENTSBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATCH.

Project:Prj Mgr:

BERTRAND DRIVE STREETSCAPE

H.012393

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 98 391-02 HSIP 683 SAFETY 3-DESIGN/DEVELOPMENTLAFAYETTE 000-28 HSIP 683 SAFETY

THE EXISTING INTERSECTION WILL BE CONVERTED TO A ROUNDABOUTTONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 98: ROUNDABOUT AT MILLS STREET

H.012611

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 167 424-02 NHPP 351 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

LAFAYETTE I-49 455-01 NHPP 49 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

OFFSET TURN LANES, EXTEND MEDIAN ISLAND, REMOVE HURR. XOVERSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 167 @ CHALMETTE/I-49 HURR. CROSSOVER

H.012800

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

HIGH FRICTION SURFACE TREATMENTRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

LOCAL ROADS HFST (LAFAYETTE)

H.012866

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3025 828-23 STP>200K 532 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

CONSTRUCT SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH

Project:Prj Mgr:

SOUTH COLLEGE RD (LA 3025) SIDEWALKS

Page 2 - 44 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 121: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012867

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 1,938 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILATION, MINOR WIDENING (NO CAPACITY), TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH

Project:Prj Mgr:

S LARRIVIERE RD: LA 92 - CHEMIN METAIRIE

H.012868

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 1,020 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH

Project:Prj Mgr:

FORTUNE ROAD PAVEMENT PRESERVATION

H.012869

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 STP>200K 1,650 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFAYETTE LA 723 828-03 STP>200K 1,650 URBAN SYSTEMS

ROUNDABOUTBANKSTON, TANYA Remrks:

Typ Imp:LAFAYETTE CONSOLIDATED GOV'T WILL PROVIDE MATCH

Project:Prj Mgr:

LA 182(UNIV) @ LA 723(RENAUD) ROUNDABOUT

H.012870

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 93 217-01 STP>200K 4,400 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

WIDEN TO 3 LANESBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SCOTT WILL PROVIDE MATCH

Project:Prj Mgr:

LA 93: I-10 RAMP - RENAUD

H.012871

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 1,250 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

PRESERVATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF YOUNGSVILLE WILL PROVIDE MATCH

Project:Prj Mgr:

DETENTE ROAD PAVEMENT PRESERVATION

H.012880

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 FBROFF 700 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

HAPSBURG LANE / COULEE

H.012890

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3073 828-39 NHPP 120 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADDING A LEFT TURN LANE & MODIFYING MEDIAN OPENING.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3073: MEDIAN IMPROVEMENTS

H.012914

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3073 828-39 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

EXTENDING TURN LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3073: AMBASSADOR @ BONIN IMPROVEMENTS

H.012915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 STPFLEX 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ROADWAY WIDENING FOR CONTINUOUS TURN LANESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: PONT DES MOUTON - PREJEAN RD

Page 2 - 45 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 122: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 343 393-03 STPFLEX 617 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

THIN LIFT OVERLAY OGFCLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 343: VERMILION PL - 0.6 MI S US 90

H.013097

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 93 828-15 STPFLEX 1,380 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, OVERLAY, & RELATED WORKTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 93: 1.53 MI S US 90 - US 90

H.013256

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-10 450-05 STPFLEX 175 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

ACADIA I-10 450-04 STPFLEX 725 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

JEFF DAVIS I-10 450-03 STPFLEX 600 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

INSTALL ITS EQUIPMENT ON I-10 BETWEEN SCOTT AND LAKE CHARLESNICHOLS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 ITS SCOTT TO LAKE CHARLES

H.013303

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATE AND ADD CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH

Project:Prj Mgr:

W MAIN STREET: S BERNARD TO CLARA

H.013360

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 93 433-01 STPFLEX 700 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

WIDENING, ASPHALT OVERLAY, AND RELATED WORKDOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 93: US 90 - BENOIT PATIN RD

H.004490

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP<200K 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

STAGE 0 STUDYPHILLIPS, LAURA Remrks:

Typ Imp:700-28-0221; MATCH BY LAF MPO

Project:Prj Mgr:

STAGE 0 STUDY FOR VARIOUS ROUNDABOUTS

H.006531

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 HSIP 500 SAFETY - LOCAL ROADS SAFETY 1-PLANNING/ENVIRONMENTALLAFAYETTE 000-28 LOCAL 56 SAFETY - LOCAL ROADS SAFETY

CONSTRUCTION OF A ROUNDABOUTRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDABOUT AT GIRARD PK AND HOSPITAL DR

H.006534

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 1-PLANNING/ENVIRONMENTAL

CONSTRUCT A ROUNDABOUTRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDABOUT ON DULLES DR. AT NORTH DOMIN

H.009500

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

PLAN IMPLEMENTATION AND ACTION PLANPHILLIPS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

2040PLAN IMPLEMENTATION&I-49 ACTION PLAN

Page 2 - 46 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 123: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011992

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 343 393-03 STPFLEX 1,463 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTHERATH, SUBA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 343: INDIAN BAYOU BRIDGE

H.012533

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 1252 391-04 STPFLEX 1,871 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

LAFAYETTE LA 93 828-15 STPFLEX 1,250 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSTOURRES, VALERIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA1252,LA93:BAYOU PT BRULE AND DITCH BRS

H.013304

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 STP>200K 3,780 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

REHABILITATE AND MINOR WIDENING - ADD CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF BROUSSARD TO PROVIDE MATCH

Project:Prj Mgr:

MAIN STREET: CLARA TO ST. DEPORRES

H.013412

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 TAP>200K 356 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

SIXTH STREET SIDEWALKS LAFAYETTE

H.013413

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 TAPFLEX 262 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

PEDESTRIAN AND BIKE PATHNUNES, BRIAN Remrks:

Typ Imp:THE LAFAYETTE C-P GOVERNMENT WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

NORTHSIDE HS PED BIKEWAY PLAZA LAFAYETTE

H.013443

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 TAP>200K 701 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

NEW SIDEWALK CONSTRUCTIONMEEK, STEPHEN Remrks:

Typ Imp:LOCAL MATCH FROM CITY OF YOUNGSVILLE.

Project:Prj Mgr:

IBERIA STREET SIDEWALK, PH 1 YOUNGSVILLE

H.011990

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 92 213-05 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 92: VERMILLION RIVER MB REHAB (HBI)

H.012687

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-49 455-01 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY - PRELIMINARY ANALYSISMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 INTERCHANGE SAFETY IMPROV. STUDIES

H.013025

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:ACADIANA MPO PROVIDING MATCH

Project:Prj Mgr:

LA 182 (UNIVERSITY AVE) CORRIDOR STUDY

Page 2 - 47 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 124: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.001461

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 TAP<200K 66 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLAFOURCHE US 90 424-08 TAP<200K 66 ENHANCEMENTS

SCENIC OVERLOOK AND PARKING LOTMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

LAFOURCHE-TERREBONNE SCENIC BYWAY SCEN

LAFOURCHE

H.009662

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 308 407-01 STPFLEX 2,115 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 308: GOLDEN MEADOW BR - GALLIANO BR

H.010109

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 200 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTLAFOURCHE LA 316 412-02 HSIPPEN 600 SAFETY - SAFE ROUTES TO SCHOOLS LAFOURCHE LA 308 407-04 HSIPPEN 600 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALK IMPROVMENTS, CROSSWALK, SPEED DETECTION DEVICESMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

RACELAND AND BAYOU BLUE SIDEWALKS

H.010688

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 3235 829-26 HSIP 3,000 SAFETY 3-DESIGN/DEVELOPMENT

MEDIAN OPENINGS, TURN LANES, ACCEL/DECEL LANES, AND SIGNALSROONEY, BRITTANY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3235: IMP @ LA 3162, LA 3161 & LA 657

H.013225

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-90 NHPP 7,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: LA 1 BRIDGE -ST LOUIS STREET

H.013250

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE US 90 424-08 NHPP 4,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

LAFOURCHE US 90 005-07 NHPP 4,600 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 308 - 2.3 MI E LA 182

H.013269

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 STP<200K 469 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH

Project:Prj Mgr:

AUDUBON AVE OVLY:LA 1 TO TERREBONNE P/L

H.013270

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 20 065-05 STP<200K 691 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTTERREBONNE LA 20 065-04 STP<200K 296 URBAN SYSTEMS

OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF THIBODAUX WILL PROVIDE MATCH

Project:Prj Mgr:

LA 20 OVLY: PERCY BROWN RD - JACKSON ST

Page 2 - 48 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 125: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013382

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE US 90 424-08 NHPP 3,458 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

LAFOURCHE US 90 005-07 NHPP 342 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

ASPHALT CONCRETE MILLING AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 182 - LA 308

H.013388

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 1,140 SAFETY 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 STPFLEX 1,140 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02H FLASHING YELLOW ARROW PART 1

H.013402

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 STP<200K 110 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFOURCHE 000-29 STP<200K 74 URBAN SYSTEMS LAFOURCHE LA 308 407-90 STP<200K 36 URBAN SYSTEMS

SIDEWALK AND MULTIUSE PATHBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA1 &LA308 PED & MULTIUSE PATH(LOCKPORT)

H.013403

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 304 829-04 STP<200K 131 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTLAFOURCHE LA 20 065-06 STP<200K 131 URBAN SYSTEMS

ADA SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LA 20 & LA 304 SIDEWALK IMP (CHACKBAY)

H.013404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-04 STP<200K 117 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH PROVIDING MATCH

Project:Prj Mgr:

LA 1 SIDEWALKS (CUT-OFF)

H.013429

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 STP<200K 193 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ENHANCEMENTS - UPGRADE SIDEWALKS TO ADABANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE WILL PROVIDE MATCH.

Project:Prj Mgr:

DOWNTOWN THIBODAUX SIDEWALKS

H.011517

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 654 829-10 NFA 350 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

1-PLANNING/ENVIRONMENTAL

RAISING ROADWAY ELEVATION BY ADDING ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 654: LA 308 - GREENS S. CUT RD.

H.011963

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 648-S 829-29 STPFLEX 1,185 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 648: DRAIN CANAL BRIDGE

Page 2 - 49 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 126: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012447

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 182 005-07 STPFLEX 20,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

REPLACE EXISTING VERTICAL LIFT BRIDGEBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BAYOU LAF BR AT RACELAND (HBI)

H.012530

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 20 065-06 STPFLEX 2,155 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

LAFOURCHE LA 3185 829-25 STPFLEX 1,242 PRESERVATION - BRIDGE (ONSYSTEM)

LAFOURCHE LA 3185 829-25 STPFLEX 1,284 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 20, LA 3185:40 ARPENT & CANAL BRIDGES

H.013369

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 STPENH 592 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS, SIGNS, STRIPING, PARKING AND LANDSCAPINGNUNES, BRIAN Remrks:

Typ Imp:LAFOURCHE PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA1: LAFOURCHE PARISH GVMT CTR TRAILHEAD

H.011962

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-06 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

LAFOURCHE LA 308 407-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

MOVABLE BRIDGE REHABILITATION FEASIBILITY STUDYGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA1,308:CO C & BAYOU LAF MB REHAB (HBI)

H.012734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 307 829-15 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 307:BAYOU BOEUF BRIDGE REHABILITATION

H.013084

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 HSIPPEN 135 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

CONSTRUCT SIDEWALKS AND OTHER SAFETY IMPROVEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

PELTIER PARK SIDEWALK

H.000754

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-04 NHPP 5,500 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:022-04-0033;

Project:Prj Mgr:

US 84: UP RAILROAD OVERPASS (HBI)

LASALLE

Page 2 - 50 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 127: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012888

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 8 040-04 STPFLEX 294 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

CATAHOULA LA 124 041-01 STPFLEX 285 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

CATAHOULA LA 124 143-06 STPFLEX 157 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE LA 8 152-02 STPFLEX 69 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

CATAHOULA LA 8 152-03 STPFLEX 189 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

CATAHOULA LA 126 353-02 STPFLEX 264 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

CATAHOULA LA 126 353-03 STPFLEX 233 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE US 84 022-05 STPFLEX 246 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE LA 8 830-08 STPFLEX 113 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

LASALLE LA 126 130-02 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ASPHALT SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

58 AST: CATAHOULA AND LASALLE PARISHES

H.013221

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-05 NHPP 280 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

CATAHOULA US 425 026-05 NHPP 82 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

FRANKLIN US 425 026-06 NHPP 338 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

ASPHALT SURFACE TREATMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 84 AND US 425 ASPHALT SURFACE TREATME

H.009603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 3259 830-21 STPFLEX 294 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3259: LA 125 - US 165

H.012048

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-04 NHPP 8,810 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US 84: CASTOR CREEK AND RELIEF BRIDGES

H.012520

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE 000-30 RTP 194 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTAL

RESTORE 4.5 MILES OF ATV TRAIL AND CONST. OF TRAILHEAD PARK.BUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

DEWEY WILLS WMA YEAR ROUND ATV TRAIL

H.013093

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE 000-30 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

BREITHAUPT CUTOFF RD OVER RHINEHART CRK

Page 2 - 51 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 128: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.000133

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 STPFLEX 8,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:001-07-0026;

Project:Prj Mgr:

US 80 OVERPASS @ KCS RR

LINCOLN

H.007492

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 145 157-03 TAP<5K 204 ENHANCEMENTS 3-DESIGN/DEVELOPMENTLINCOLN US 80 001-08 TAP<5K 146 ENHANCEMENTS LINCOLN LA 145 157-02 TAP<5K 35 ENHANCEMENTS

SIDEWALK AND BIKE PATHMEEK, STEPHEN Remrks:

Typ Imp:15% OF MATCH IS TOLL CREDITS 5% IS LOCAL MATCH

Project:Prj Mgr:

CHOUDRANT SIDEWALK PROJECT

H.008161

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 3072 831-14 FBROFF 1,199 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:831-14-0005; USE NFA AS MATCH

Project:Prj Mgr:

CALVIN CREEK BRIDGE

H.010389

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 507 308-04 STPFLEX 735 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 507: US 80 - S. END OVERPASS I-20

H.010472

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 STPFLEX 700 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: 0.9 MILES E. OF LA 818 - US 167

H.011627

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN I-20 451-05 NHPP 11,900 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY OF ASPHALT PAVEMENT.THOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: BIENVILLE P/L - 1 MILE WEST LA 149

H.011772

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 824-3 831-21 TAPFLEX 41 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH BY THE TOWN OF DUBACH

Project:Prj Mgr:

LA 824-3: TOWN OF DUBACH SIDEWALKS

H.011803

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 TAP<200K 660 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND STREETSCAPINGMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF RUSTON.

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE VII

H.011804

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 TAP<200K 675 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND STREETSCAPINGNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF RUSTON

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE IX

Page 2 - 52 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 129: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012220

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 147 043-03 STPFLEX 2,650 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 147: BIENVILLE P.L. - BIENVILLE P.L.

H.012695

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 STPFLEX 450 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD LEFT TURN LANE AT NUTMEGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: LEFT TURN LANE NUTMEG DRIVE

H.012704

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 545 308-08 NFA 5,092 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 545: LISBON HWY - LA 152

H.012711

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 151 317-04 NFA 3,123 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

UNION LA 151 317-03 NFA 107 PRESERVATION - NON-INTERSTATENFA

UNION LA 151 317-05 NFA 252 PRESERVATION - NON-INTERSTATENFA

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 151: LA 145 - LA 33

H.001679

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 146 085-09 STPFLEX 1,270 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

NEW BRIDGESUMEOZULU, JOE Remrks:

Typ Imp:085-09-0017;3 BRIDGES

Project:Prj Mgr:

LA 146 BRIDGES NEAR VIENNA

H.010616

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 544 296-03 STPFLEX 4,807 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

OVERPASS REHABILITATIONBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

I 20: LA 544 OVERPASS REPLACEMENT

H.012123

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 33 069-01 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

NB RIGHT TURN LANE AT LA 821SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 33: NB RIGHT TURN LANE AT LA 821

H.012539

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 145 157-03 STPFLEX 1,573 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 145: CREEK BRIDGE

Page 2 - 53 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 130: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012540

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 151 317-04 STPFLEX 2,319 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 151: CYPRESS CREEK BRIDGE

H.012697

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN US 80 001-07 NHPP 900 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

ADDITION OF TURN LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: LTURN LANES BARNETT/WESLEY CHAPLE

H.012740

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

LINCOLN I-20 451-05 NHPP 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: REPLACE FIVE OVERPASSES (LINCOLN)

H.013033

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALLINCOLN 000-31 LOCAL 305 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 10,078' LONG BY 12' WIDE, MULTI-USE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ROCK ISLAND GREENWAY, PHASE 2

H.013045

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALLINCOLN 000-31 LOCAL 770 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 6300' LONG BY 12' WIDE MULTI-USE TRAIL.BUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ROCK ISLAND GREENWAY, PHASE 3

H.013409

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 544 296-03 TAPFLEX 30 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALLINCOLN 000-31 TAPFLEX 16 ENHANCEMENTS LINCOLN LA 150 831-07 TAPFLEX 45 ENHANCEMENTS

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:LA TECH UNIVERSITY WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA TECH UNIV N CAMPUS TRAILS RUSTON

H.013414

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 TAP<200K 406 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALLINCOLN US 80 001-08 TAP<200K 296 ENHANCEMENTS

PED IMPROVEMENTS (SIDEWALKS, LANDSCAPING AND STREETSCAPINNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF RUSTON WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE X

Page 2 - 54 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 131: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013086

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 HSIPPEN 465 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

CONSTRUCT SIDEWALKS, DRAINAGE, AND OTHER SAFETY IMPROVEMEMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

I.A. LEWIS ELEM SIDEWALK - PHASE 2

H.002375

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 260-02 STPFLEX 23,124 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGETONEY, PATRICK Remrks:

Typ Imp:260-02-0040;

Project:Prj Mgr:

AMITE R.BR. NEAR FRENCH SETTLEMENT

LIVINGSTON

H.002381

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 43 260-07 STPFLEX 651 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEISEMANN, ROBERT Remrks:

Typ Imp:260-07-0025;

Project:Prj Mgr:

LA 43 CREEK BRIDGE NEAR ALBANY

H.003425

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 NHPP 7,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

C.P. AND OVERLAYTHOMAS, BEN Remrks:

Typ Imp:454-02-0077;

Project:Prj Mgr:

I-12: LA 63 - TANGIPAHOA PARISH LINE

H.011520

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1019 832-02 STPFLEX 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1019: LA 16-CALMES RD DRAINAGE

H.011528

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 FBROFF 845 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

LIVINGSTON 000-32 FBROFF 263 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

GEORGE MASHON RD & TRAVIS STREET BRIDGES

H.012348

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 273-03 STPFLEX 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

3-DESIGN/DEVELOPMENT

LIVINGSTON 000-32 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ROUNDABOUT INTERSECTION IMPROVEMENTSISEMANN, ROBERT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: ROUNDABOUT @ EDEN CHURCH ROAD

H.012622

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON I-12 454-02 NHPP 16,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

I-12 APPROACH SLAB REPLACEMENT AT HOG BRANCH BRIDGEBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

I-12:LIVINGSTON PAR APPROACH SLAB REP P3

Page 2 - 55 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 132: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013158

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 STP>200K 344 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTLEBAS, MELISSA Remrks:

Typ Imp:LIVINGSTON PARISH TO PROVIDE MATCH

Project:Prj Mgr:

LINDER ROAD BRIDGE REPLACEMENT

H.002397

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALLIVINGSTON I-12 454-02 0 DEMO / HIGH PRIORITY

INTERCHANGE IMPROVEMENTSMASTIN, CATHERINE Remrks:

Typ Imp:262-01-0037;

Project:Prj Mgr:

PETE'S HWY(LA 16)INTERCHANGE @ I-12

H.005734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 447 268-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC ANALYSISPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

LA 447 CORRIDOR STUDY

H.008170

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1024 832-10 FBROFF 1,302 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTISEMANN, ROBERT Remrks:

Typ Imp:832-10-0019;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

LA 1024 CREEK BRS. NEAR FRIENDSHIP

H.009552

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 STPFLEX 1,405 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

MAINTENANCE RESTORATION & REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

JCT. LA 1034 - JCT. US 190

H.009837

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 64 262-31 NFI 1,667 CAPACITY 1-PLANNING/ENVIRONMENTALLIVINGSTON LA 1019 832-05 NFI 1,667 CAPACITY LIVINGSTON LA 64 273-03 NFI 1,667 CAPACITY

CAPACITY AND SAFETY IMPROVEMENTS AT LA 64 AND LA 1019EVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 64: ROUNDABOUT @ LA 1019

H.010384

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 442 269-01 STPFLEX 2,420 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

LIVINGSTON LA 441 270-02 STPFLEX 190 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 442: LA 63 - W. JCT. LA 441

H.010551

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-02 STPFLEX 199 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PCCP REHABILITATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: LA 64/LA 1026 - AMITE CHURCH RD.

Page 2 - 56 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 133: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010672

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

TRAFFIC STUDY ON LA 3002, LA 16, AND LA 1034COLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3002 & LA 16 CORRIDOR STUDY

H.011014

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 3002 832-32 NHPP 545 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ADD SOUTH BOUND U-TURN FOR LEFT TURNING VEHICLES EXITING CVHARROUCH, JOSHUA Remrks:

Typ Imp:RT CREDITS USED AS MATCH FOR PHASE 3; OE AM PROGRAM MATCH

Project:Prj Mgr:

LA 3002: U-TURN

H.011645

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CORRIDOR STUDY FOR ACCESS MANAGEMENT IMPROVEMENTSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA3002:LA16:LA1034:CORRIDOR STUDY PHASE2

H.012068

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 273-03 STPFLEX 1,067 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: CREEK BRIDGE

H.012069

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 16 262-01 STPFLEX 1,491 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16: CANAL BRIDGE

H.012573

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1026 832-13 STPFLEX 1,725 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

IN PLACE STABILIZATION AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1026: LA 16 - FORREST DELATTE RD.

H.012971

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 42 260-02 STPFLEX 233 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

LIVINGSTON LA 16 262-01 STPFLEX 32 PRESERVATION - NON-INTERSTATEON STP SYSTEM

PATCH, MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42/LA 16:AMITE RIVER-MAIN ST.

Page 2 - 57 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 134: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013166

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 FBROFF 1,145 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

WHITTINGTON ROAD OVER GRAYS CREEK

H.013454

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON 000-32 TAP>200K 281 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

NEW SIDEWALK CONSTURCTIONRIGGS, LAURA Remrks:

Typ Imp:LOCAL ENTITY (CITY OF DENHAM SPRINGS) TO PROVIDE 20% MATCH.

Project:Prj Mgr:

CENTERVILLE ST. SIDEWALKS DENHAM SPRINGS

H.013088

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 1031 832-11 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF INSTALLATION OF SIDEWALKS.MORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

HATCHELL LANE SIDEWALKS

H.010897

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-09 NHPP 13,500 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MADISON 000-33 OTHER 13,500 PRESERVATION - BRIDGE (ONSYSTEM)

REHABILITATIOND'ANDREA, ARTUR Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: MRB ISLAND ANCHORING PIER E1

MADISON

H.011077

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 NHPP 6,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

COLD PLANE AND OVERLAYTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: MOUND TO DELTA SCALES PHASE 2

H.011623

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 NHPP 14,200 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY OF ASPHALT PAVEMENTTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: LA 577 - WALNUT BAYOU

H.011628

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 NHPP 6,395 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRICHLAND I-20 451-07 NHPP 1,305 PRESERVATION - INTERSTATE

ASPHALT OVERLAY OF ASPHALT PAVEMENTTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: LA 17 - LA 577

H.011861

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-09 NHPP 400 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

MADISON I-20 451-08 NHPP 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING AND SIGN STRUCTURE REPLACEMENT AND UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: US 80 TO MISSISSIPPI STATE LINE

Page 2 - 58 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 135: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012746

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MADISON I-20 451-08 FLH 390 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: QUEBEC ROAD OVERPASS APPROACHES

H.000665

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 165 016-05 STPFLEX 8,926 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEMASTIN, CATHERINE Remrks:

Typ Imp:016-05-0031;

Project:Prj Mgr:

UP R.R. OVERPASS NEAR BONITA (HBI)

MOREHOUSE

H.006170

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE 000-34 FBROFF 1,081 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

MARTIN LUTHER KING SOUTH BRIDGE

H.010470

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 138 330-01 STPFLEX 5,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 138: JCT LA 593 TO JCT LA 2

H.011613

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 425 038-03 NHPP 320 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

SUBSURFACE DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: DRAINAGE IMPROV AT EAST PINE AVE

H.012103

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 425 163-02 STPFLEX 147 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MOREHOUSE US 425 071-03 STPFLEX 1,340 PRESERVATION - NON-INTERSTATEON STP SYSTEM

MOREHOUSE US 425 071-04 STPFLEX 205 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: BAYOU LAFOURCHE BRIDGE - LA 134

H.012941

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE US 425 071-04 STPFLEX 690 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

US 425: LA 134 - LA 2

H.012950

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 3051 834-17 STPFLEX 180 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

MOREHOUSE LA 3051 834-17 NFA 186 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3051: US 165 - LA 133

Page 2 - 59 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 136: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.008203

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 835 834-07 STPFLEX 2,892 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

MOREHOUSE LA 835 834-07 STPFLEX 120 PRESERVATION - NON-INTERSTATEON STP SYSTEM

NEW BRIDGESMASTIN, CATHERINE Remrks:

Typ Imp:834-07-0022;2 BRIDGES

Project:Prj Mgr:

LA 835 CREEK BRIDGES

H.012032

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE LA 2 037-01 STPFLEX 2,047 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: BAYOU GALION BRIDGE

H.013118

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

MOREHOUSE 000-34 FBROFF 266 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT, NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

HILL AVENUE OVER DRAINAGE CANAL

H.001145

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 120 042-05 STPFLEX 3,812 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 120: SABINE PARISH LINE TO LA 6

NATCHITOCHES

H.001270

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 CAPACITY 3-DESIGN/DEVELOPMENTNATCHITOCHES LA 1-X 053-04 STPFLEX 5,000 PRESERVATION - BRIDGE (ON

SYSTEM)

WIDEN TO 3 LANESTONEY, PATRICK Remrks:

Typ Imp:053-04-0025;

Project:Prj Mgr:

LA 1X: 200' S WOODYARD DR - HANCOCK AVE.

H.001271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1-X 053-04 NHPP 4,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:053-04-0031;STAGE 0

Project:Prj Mgr:

CANE RIVER BRIDGE AT CHURCH STREET

H.001820

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 485 115-01 FBROFF 5,159 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NATCHITOCHES LA 485 115-02 FBROFF 2,085 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:115-01-0017;4 NEW BRIDGES.JT W/115-02-0011

Project:Prj Mgr:

LA 485 BRIDGES NEAR ALLEN

H.010346

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 487 113-03 STPFLEX 3,844 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 487: LA 120 - LA 174

Page 2 - 60 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 137: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012144

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 478 116-02 NFA 2,345 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 478: VOWELLS MILL TO LA 117

H.012145

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 120 042-07 NFA 2,651 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 120: LA 117 - 830' E OF BENNETT ROAD

H.012683

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES I-49 455-06 NHPP 420 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

I-49 SIGN UPGRADE FROM LA 6 TO DESOTO P/LFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: LA 6 TO DESOTO PARISH LINE

H.013204

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-05 NHPP 2,200 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 6: LA 504 TO LA 1

H.010342

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 155 091-02 STPFLEX 1,939 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 155: RED RIVER P/L - S JCT LA 153

H.010343

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 174 112-06 STPFLEX 1,925 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 174: DESOTO P/L - I-49 INTERCHANGE

H.010365

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 117 114-03 STPFLEX 1,288 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 117: BELLWOOD - LA 478

H.012999

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1 034-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

REMOVAL OF PCCP, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: FOUR LANE SECTION TO LA 6

H.013032

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTAL

NEW AGGREGATE TRAIL SURFACE AND MAINTAIN EXISTING TRAILSBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANGAER

Project:Prj Mgr:

LOUISIANA TRAILS RESTORATION

Page 2 - 61 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 138: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012307

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-05 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 6 FEASIBILITY STUDY

H.007274

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:742-36-0139; USE LOCAL AS MATCH

Project:Prj Mgr:

MAGAZINE ST (EAST DRIVE TO NASHVILLE)

ORLEANS

H.009308

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 1,000 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTORLEANS 000-36 HSIPPEN 100 SAFETY - SAFE ROUTES TO SCHOOLS ORLEANS US 90 006-03 HSIPPEN 200 SAFETY - SAFE ROUTES TO SCHOOLS ORLEANS US 90 006-03 HSIPPEN 50 SAFETY - SAFE ROUTES TO SCHOOLS

BICYCLE & PEDESTRAIN CROSSING IMPROVEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

NEW ORLEANS DPW SRTS SIDEWALK PROJECT

H.010018

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 11,758 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO EAST DRAIN CANAL BRIDGE REPLACE

H.010405

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-90 STPFLEX 1,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: 900' W INDUSTRIAL PKWY-FLOOD GATE

H.010414

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 1253 419-02 STPFLEX 250 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PCC REHABSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1253: DOWNMAN RD - I-10 FRONTAGE RD

H.010634

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 NHPP 4,410 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

JEFFERSON US 90-Z 283-09 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

UPGRADING SIGNS ENTIRE LIMITS.UPGRADING STRUCTURES AS NEEDNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z (ELMIRA AVE - STUMPF BLVD)

H.011220

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 4,842 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO CBD2 CARROLLTON - LAFITTE AVE

Page 2 - 62 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 139: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011222

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 5,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBCOURTIER, KAY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO CBD4 LOUISA - I-510

H.011447

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-03 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

INTERSECTION IMPROVEMENTS ON US 90 AT MLK BLVDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: INTERSECTION IMP AT MLK BLVD

H.011648

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 39 046-31 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

ST BERNARD LA 39 046-32 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ORLEANS LA 46 046-02 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ST BERNARD LA 46 046-03 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ST BERNARD LA 47 148-01 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

HOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA39, 46 & 47 CORRIDOR IMPROVE

H.011823

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 TAP>200K 287 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

TRAILHEADMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY CITY PARK IMPROVEMENT ASSOCIATION

Project:Prj Mgr:

NO CITY PARK: HARRISON AVENUE TRAILHEAD

H.011841

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 TAP>200K 348 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

PEDESTRIAN IMPROVEMENTSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO

Project:Prj Mgr:

NO: LAKESHORE DR. REC/OPERATIONAL IMPR

H.011847

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 1,050 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALK LIGHTINGNUNES, BRIAN Remrks:

Typ Imp:MATCH BY NON-FLOOD PROTECTION ASSET MANAGEMENT AUTHORITY

Project:Prj Mgr:

NO: NEW BASIN CANAL PATH PH V, LIGHTING

H.011965

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 47 148-02 NHPP 30,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

CLEANING, PAINTING, AND STRUCTURAL REPAIRS.KEMP, KELLY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 47: IWGO BRIDGE REHABILITATION (HBI)

Page 2 - 63 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 140: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012160

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-90 STPFLEX 981 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

RAISING ROADWAY GRADE BY ADDING ASPHALT.GOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: FLOODWALL - VICTORY RD.

H.012370

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 6,618 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

PRESERVATION ASPHALT OVERLAY AND RELATED ADA CURB WORKLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH TO PROVIDE MATCH

Project:Prj Mgr:

MORRISON RD: MAYO AVE - READ AVE

H.012372

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 4,412 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

CONCRETE PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH TO PROVIDE MATCH

Project:Prj Mgr:

MORRISON RD: READ AVE - BULLARD AVE

H.012373

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 4,483 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATION ASPHALT OVERLAY AND ADA COMPLIANT CURBSLEBAS, MELISSA Remrks:

Typ Imp:ORLEANS PARISH PROVIDING MATCH

Project:Prj Mgr:

ML KING BLVD: S CLAIBORNE - ST. CHARLES

H.012473

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 500 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

SIDEWALKS AND OTHER SAFETY ENHANCEMENTSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

ZACHARY TAYLOR & MARCONI DR SIDEWALKS

H.012591

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 20,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

2" OVERLAYTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: PARIS RD - LAKE PONTCHARTRAIN

H.012676

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-610 450-34 NHPP 125 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

EXTEND LEFT TURN LANE AND STORAGE OF I-610 AT WEST ENDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-610: OFF RAMP IMPROVEMENTS @ WEST END

H.012682

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 2,025 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

INSTALL PEDESTRIAN COUNTDOWN SIGNALSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

PEDESTRIAN CROSSWALK ENH. (NO PH 2)

H.012901

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 NHPP 5,023 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PERMANENT SIGN REPLACEMENTNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z (MAGNOLIA STREET - ELMIRA AVE)

Page 2 - 64 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 141: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012993

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 39 046-31 NHPP 1,400 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE AND OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: ST. BERNARD AVE. - CLAIBORNE BR.

H.013150

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STP>200K 1,743 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BICYCLE AND SIDEWALK IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:CITY OF NEW ORLEANS TO MATCH

Project:Prj Mgr:

ANDREW HIGGINS DR STREETSCAPES

H.013211

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 46 046-02 NHPP 3,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 46: ELYSIAN FIELDS - ARABI

H.013391

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 HSIPPEN 1,610 SAFETY 3-DESIGN/DEVELOPMENTORLEANS 000-36 STPFLEX 1,610 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

JEFFERSON 000-26 HSIPPEN 210 SAFETY JEFFERSON 000-26 STPFLEX 210 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

ST BERNARD 000-44 HSIPPEN 280 SAFETY ST BERNARD 000-44 STPFLEX 280 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADE.FILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02BC FLASHING YELLOW ARROW PART 2

H.013442

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 1,475 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

3-DESIGN/DEVELOPMENT

PROVIDE ROADWAY LIGHTINGARMENTOR, MICHAEL Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CROWDER BLVD INTERSTATE LIGHTING

H.000304

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 61 007-01 NHPP 4,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REHABILITATIOND'ANDREA, ARTUR Remrks:

Typ Imp:007-01-0022;STAGE 0 PROJECT FEASIBILITY STUDY

Project:Prj Mgr:

I 10 - US 61 OVERPASS

H.005720

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 0 TIME 1-PLANNING/ENVIRONMENTAL

FLORIDA AVENUE EXPRESSWAY - ENVIRONMENTAL ASSESSMENTUMEOZULU, JOE Remrks:

Typ Imp:TTF AS MATCH TO PHASE 2

Project:Prj Mgr:

FLORIDA AVENUE EXPRESSWAY

H.007272

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 DEMO 3,226 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

NEW 2-LANE ROADWAYBRIGNAC, CHRISTINA Remrks:

Typ Imp:742-36-0136;CITY OWNS R/W

Project:Prj Mgr:

HOWARD AVENUE EXTENSION

Page 2 - 65 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 142: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011223

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NHPP 2,800 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

ORLEANS I-10 450-17 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING & SIGNING STRUCTURES REPLACEMENT &UPGRADENGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: CBD5 (I-510 TO END OF TWIN SPAN)

H.011644

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-03 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ORLEANS US 90-Z 283-08 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CORRIDOR IMPROVEMENTSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US90: NASHVILLE - S PETERS IMPROVEMENTS

H.011646

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-03 NHPP 750 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

ORLEANS US 61 007-01 NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ORLEANS 000-36 STPFLEX 375 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ORLEANS LA 611-9 836-05 STPFLEX 375 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

INTERSECTION IMPROVEMENT STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 90 - US 61 - LA 611-9 CORRIDOR IMPROV

H.011836

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 TAP>200K 499 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT AUTHO

Project:Prj Mgr:

NEW ORLEANS: LAKE VISTA, SIDEWALKS

H.011964

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 39 046-31 NHPP 2,271 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REHABILITATIONDELATTE, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 39: INDUSTRIAL CANAL BRIDGE REHAB

H.013041

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALORLEANS 000-36 LOCAL 16 RECREATIONAL TRAILS PROGRAM

RESTORATION AND CONST. OF A 6325' LONG X 10' WIDE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

CITY PARK NATURE TRAILS (NOLA)

H.013364

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 STPENH 229 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:THE CPIA WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

CITY PARK PALM DRIVE SIDEWALKS (NO)

Page 2 - 66 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 143: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011967

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US 90Z: GNO1 BRIDGE & APP REHABILITATION

H.011968

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90-Z 283-08 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US90Z:GNO2 BRIDGE AND APP REHABILITATION

H.011969

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 1264 836-15 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1264: TED HICKEY MOVABLE BRIDGE REHAB

H.012312

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR INTERSECTION IMPROVEMENTSMCRAE, ADRIANE Remrks:

Typ Imp:TASK ORDER UNDER RETAINER NO. 44-4404 FOR ARCADIS

Project:Prj Mgr:

NEW ORLEANS PEDESTRIAN FEASIBILITY STUDY

H.012837

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 0 DEMO / HIGH PRIORITY 0-FEASIBILITY/SCOPING

STUDY WILL ADDRESS CONGESTION ON I-10 CORRIDOR INTO PORT/NONGUYEN, WAYNE Remrks:

Typ Imp:MATCH FROM NO RPC

Project:Prj Mgr:

I-10 NEW ORLEANS MASTER PLAN

H.013094

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 61 007-01 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

ORLEANS 000-36 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

ORLEANS US 90 006-03 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

FEASIBILITY STUDY FOR THE CONST. SIDEWALKS, STRIPING, SIGNSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

BROAD ST - READ BLVD PED IMPROVEMENTS

H.007300

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STPFLEX 10,000 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENTOUACHITA 000-37 DEMO 6,616 DEMO / HIGH PRIORITY OUACHITA 000-37 NFI 7,431 OTHER / MISCELLANEOUS

RD CONNECTOR & INTERCHANGE IMPRVMNTMASTIN, CATHERINE Remrks:

Typ Imp:742-37-0028;4TH FUND SOURCE US $300K STP<200K

Project:Prj Mgr:

KANSAS LANE-GARRETT RD CONNECTOR

OUACHITA

H.007528

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 TAP<200K 1,396 ENHANCEMENTS 3-DESIGN/DEVELOPMENTOUACHITA US 80 001-09 LOCAL 152 ENHANCEMENTS

NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 80:6TH ST-LAMY LN STREETSCAPING

Page 2 - 67 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 144: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.007530

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 TAP<200K 339 ENHANCEMENTS 3-DESIGN/DEVELOPMENTOUACHITA 000-37 LOCAL 199 ENHANCEMENTS OUACHITA US 165-Y 015-08 TAP<200K 339 ENHANCEMENTS OUACHITA US 165-Y 015-08 LOCAL 199 ENHANCEMENTS

NEW SIDEWALKS AND SIDEWALK LIGHTINGNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

JACKSON STREET CORRIDOR ENHANCEMENT

H.008226

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 3033 837-12 STPFLEX 9,617 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTOLIVIER, NICHOLAS Remrks:

Typ Imp:837-12-0026;

Project:Prj Mgr:

CHENIERE SPILLWAY & BRIDGE REPLACEMENT

H.008230

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 838 837-14 STPFLEX 1,055 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEMORVANT, RYAN C. Remrks:

Typ Imp:837-14-0009;

Project:Prj Mgr:

LA 838: STEEP BAYOU BRIDGE REPLACEMENT

H.009297

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 SR2S 130 SAFETY - SAFE ROUTES TO SCHOOLS 3-DESIGN/DEVELOPMENTOUACHITA 000-37 SR2S 10 SAFETY - SAFE ROUTES TO SCHOOLS OUACHITA LA 3033 837-12 SR2S 600 SAFETY - SAFE ROUTES TO SCHOOLS OUACHITA LA 3033 837-12 SR2S 100 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS/PED PATHSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

OUACHITA PAR. POLICE JURY SIDEWALKS

H.010012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 STPFLEX 5,643 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

REPLACEMENT OF BRIDGE OVERPASSCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: US 80 OVERPASS BRIDGE REPLACEMENT

H.010015

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 143 315-02 STPFLEX 8,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 143: BAYOU D'ARBONNE BRIDGE

H.010287

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 3249 837-19 HSIP 1,400 SAFETY 3-DESIGN/DEVELOPMENT

ROUNDABOUT AT I-20/WELL RD.GARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3249: ROUNDABOUT @ I-20/WELL RD.

H.010430

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 594 326-01 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

THROUGH LANE WITH RIGHT TURN LANE AT HIGH SCHOOLSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 594: TURN LANE @ OUACHITA PAR HIGH

Page 2 - 68 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 145: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010989

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA I-20 451-06 NHPP 2,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTLINCOLN I-20 451-05 NHPP 1,500 PRESERVATION - INTERSTATE

RE-SURFACE SELECTED I-20 RAMPS IN LINCOLN & OUACHITA PARISHTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: LINCOLN/OUACHITA P. RAMP REHAB

H.011507

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

OUACHITA US 80 002-01 NHPP 1,250 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

THIS PROJECT WILL INSTALL CCTVS ALONG US 80.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MONROE ITS PHASE 3

H.011508

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 617 837-17 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

OUACHITA LA 840-6 837-04 NHPP 1,400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

THIS PROJECT WILL INSTALL CCTVS.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MONROE ITS PHASE 4

H.012247

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 RTP 112 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTOUACHITA 000-37 LOCAL 18 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF 1 MILE AGGREGATE LEVEE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

FORSYTHE POINT TRAIL

H.012279

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 HSIPPEN 330 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

IMPROVE SAFETY/OPERATION OF COLEMAN/RIVERFRONT ST INTERSECMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

ENDOM BRIDGE APPROACH REALIGNMENT

H.012297

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 HSIPPEN 225 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

IMPR TRAFFIC FLOW REPL STRIPING, ADD PED. SIG & TRAFFIC SIGMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

MCMILLAN RD/BLANCHARD ST IMPROVEMENTS

H.012507

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL IMPROVEMENTSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 05 TRAFFIC CONTROL UPGRADE I

H.012626

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 838 837-14 STPFLEX 105 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 838: DRAINAGE IMPROVEMENTS

Page 2 - 69 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 146: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012798

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 594 326-02 HSIP 750 SAFETY 3-DESIGN/DEVELOPMENTOUACHITA 000-37 HSIP 750 SAFETY

EXISTING INTERSECTION REPLACED WITH A ROUNDABOUT (SAFETY)TONEY, PATRICK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 594: ROUNDABOUT AT ROWLAND RD.

H.013392

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 611 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

MILL AND OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

MANE STREET REHABILITATION PHASE 2

H.013394

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 1,248 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

RECONSTRUCT 2-LANE ROADWAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.

Project:Prj Mgr:

MANE STREET REHABILITATION PHASE 1

H.013395

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 474 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH.

Project:Prj Mgr:

PARKWOOD DR REHAB: GLENWOOD - LA 143

H.013398

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 269 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

COLEMAN AVE REHABILITATION

H.013400

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 585 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

NATCHITOCHES ST REHAB: TRENTON - N 7TH

H.013401

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STP<200K 350 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT OVERLAYBANKSTON, TANYA Remrks:

Typ Imp:CITY OF WEST MONROE TO PROVIDE MATCH

Project:Prj Mgr:

CROSELY ST REHAB: TRENTON - N 7TH

H.004782

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 NFI 328,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

CONNECTOR & OUACHITA R. BR.(ENGR)PAINE, PEGGY JO Remrks:

Typ Imp:700-37-0129;STAGE O

Project:Prj Mgr:

LA 143 - US 165 CONNECTOR& OUACH

H.007289

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STBONDS 23,790 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALOUACHITA US 80 002-01 STBONDS 2,468 DEMO / HIGH PRIORITY OUACHITA US 165 016-01 STBONDS 1,336 DEMO / HIGH PRIORITY OUACHITA LA 840-6 837-23 STBONDS 717 DEMO / HIGH PRIORITY

ASPHALT NEW PAVEMENTMASTIN, CATHERINE Remrks:

Typ Imp:742-37-0016;US 80 - US 165. R/W & UTIL BY CITY

Project:Prj Mgr:

KANSAS LANE EXTENSION

Page 2 - 70 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 147: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.009932

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 80 001-09 STPFLEX 7,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

WIDEN ROADWAY, ADD LANESBRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: VANCIL ROAD - WELL ROAD

H.011643

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 617 837-17 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

OUACHITA LA 34 067-09 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

ACCESS MANAGEMENT FEASIBILITY STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 617: COUNTS FOR TRAFFIC STUDY

H.012033

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 143 315-02 STPFLEX 2,335 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

OUACHITA LA 594 326-02 STPFLEX 1,215 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 143, LA594:CROSS BAYOU & CANEY CR BRS

H.013122

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 475 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

OUACHITA 000-37 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

PINE ST. & HARRISON/COLLIER BRIDGES

H.013127

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

OUACHITA 000-37 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

BRITTON RD & HERMAN DICKERSON RD BRS

H.013130

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 583 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

OUACHITA 000-37 FBROFF 787 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

RED CUT RD & CHARLES RAWLS RD BRIDGES

H.013137

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 470 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

OUACHITA 000-37 FBROFF 204 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

HARMON JOHNSON RD & GOOD HOPE RD BRS

Page 2 - 71 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 148: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013144

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

OUACHITA 000-37 FBROFF 235 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

PINE BLUFF RD & TACK ALLEN RD BRIDGES

H.013371

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 STPENH 215 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS, TRUNCATED DOMES, SIGNS, STRIPING & FLASHING SIGNAMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF WEST MONROE WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

KIROLI RD SIDEWALKS AND PED IMPROVEMENTS

H.011440

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 165 015-31 0 SAFETY 0-FEASIBILITY/SCOPING

PEDESTRIAN CROSSING IMPROVEMENTSRENARD, APRIL Remrks:

Typ Imp:

Project:Prj Mgr:

US 165 PEDESTRIAN CROSSING STUDY

H.011688

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA US 165 015-31 0 SAFETY 0-FEASIBILITY/SCOPINGOUACHITA US 165 016-01 0 SAFETY

CORRIDOR STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: CORRIDOR STUDY US 165 BUS - LA 2

H.012541

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA LA 594 326-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY REHABILITATION OR REPLACEMENTEVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 594: OVERPASS I-20

H.013101

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 0 SAFETY - LOCAL ROADS SAFETY 0-FEASIBILITY/SCOPING

TRAFFIC STUDY TO DETERMINE APPLICABLE SAFETY IMPROVEMENTS.MORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

CONSTITUTION DR TRAFFIC STUDY

H.012079

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 NHPP 15,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

TUNNEL REPAIRSTOURRES, VALERIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA23:BELLE CHASSE TUNNEL INTERIM REPAIRS

PLAQUEMINES

H.012560

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 NHPP 2,500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE AND OVERLAY. APPLY NEW STRIPING AND MARKERSSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 23: TUNNEL - APRICOT (END OF ASPHALT)

H.012725

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES 000-38 RAIL PD 450 RAILROADS 3-DESIGN/DEVELOPMENTPLAQUEMINES 000-38 RAIL HE 50 RAILROADS

INSTALL GATES AT AVE G,LA 23 TRAF SIG AT AVE G & CLOSE MAINSHREWSBERRY,BILL Remrks:

Typ Imp:714-38-0003

Project:Prj Mgr:

AVENUE G: NOGC XING(BELLE CHASE)

Page 2 - 72 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 149: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012987

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 STPFLEX 174 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

PLAQUEMINES LA 23 062-03 STPFLEX 426 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 23: RAVENNA RD-LM 4.040

H.004791

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-02 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

STATE FUNDS FOR STUDYOLIVIER, NICHOLAS Remrks:

Typ Imp:700-38-0108;FEASIBILITY STUDY STAGE 0

Project:Prj Mgr:

LA 23: BELLE CHASSE BRIDGE & TUNNEL(HBI)

H.013030

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES 000-38 RTP 199 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTAL

TRAIL RESTORATION, WIDEN EXISTING TRAILS, CREATE NEW TRAILSBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

PLAQUEMINES OFF ROAD ATV PARK NORTH

H.002184

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 413 227-04 STPFLEX 4,395 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESMOORE, DARRELL Remrks:

Typ Imp:227-04-0019;2 BRIDGES

Project:Prj Mgr:

BAYOU CHENAL & BAYOU DISCHARGE BRS.

POINTE COUPEE

H.012215

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE 000-39 RTP 101 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTPOINTE COUPEE 000-39 LOCAL 18 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF CONNECTING TRAILS AND A TRAILHEADBUELL, SHAWN Remrks:

Typ Imp:CRT IS THE PROJECT MANAGER

Project:Prj Mgr:

NEW ROADS RECREATIONAL TRAIL & TRAILHEAD

H.012936

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 78 229-05 STPFLEX 1,000 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

PATCH, THIN ASPHALTIC CONCRETE OVERLAYTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 78: US 190 - LA 1

H.013192

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE US 190 008-03 NHPP 5,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAY (EASTBOUND ONLY)SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: E GROSSE TETE BR-E ATCH RIVER BR

H.013196

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE US 190 008-02 NHPP 6,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: WBR P/L - E GROSSE TETE BR

Page 2 - 73 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 150: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010434

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 15 177-01 STPFLEX 4,200 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: LA 1 - W. FELICIANA P/L

H.012061

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 1 052-04 STPFLEX 1,997 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: BAYOU MOREAU BRIDGE

H.012565

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 1 052-04 STPFLEX 1,433 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

E FELICIANA LA 963 819-19 STPFLEX 1,202 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 963, LA 1: BRIDGES

H.012063

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

POINTE COUPEE LA 15 177-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: OR NAV CANAL MB REHAB (HBI)

H.000574

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 TAP<200K 837 ENHANCEMENTS 3-DESIGN/DEVELOPMENTRAPIDES LA 1208-5 014-07 TAP<200K 59 ENHANCEMENTS

SIDEWALKS AND SIDEWALK LIGHTINGMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

MASONIC DRIVE STREETSCAPE, PHASE II

RAPIDES

H.000577

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165-X 015-01 NHPP 1,763 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REMOVAL. REPLACE WITH AT GRADE CROSSINGMUSA, ELNUR Remrks:

Typ Imp:015-01-0049;SCOPE CHANGED

Project:Prj Mgr:

US 165-X: KCS RAILWAY OVERPASS

H.008271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 STP<200K 2,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTRAPIDES 000-40 LOCAL 2,500 URBAN SYSTEMS

NEW CONSTRUCTION, 2-LANE WITH PAVED SHOULDERSBANKSTON, TANYA Remrks:

Typ Imp:840-37-0007;

Project:Prj Mgr:

SUGARHOUSE RD EXTENSION

H.009122

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 1204 840-31 STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESYANG, LI Remrks:

Typ Imp:840-31-0015; 3 BRIDGES

Project:Prj Mgr:

LA1204:BAYOU FLAGON & KITCHEN CR BRIDGES

Page 2 - 74 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 151: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.009498

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 121 029-05 FBROFF 8,900 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:029-05 USE NFA AS MATCH

Project:Prj Mgr:

LA 121: CALCASIEU RIVER BRIDGE

H.011361

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-09 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

MILL, CONSTRUCT TURN LANES, AND INSTALL PAVEMENT STRIPINGRACHAL, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: TURN LANES FOR EMERG STAGING AREA

H.011504

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 167 023-01 NHPP 1,800 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

INSTALLING BRIDGE ADVISORIES, CCTVS, AND DMSSKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

ALEXANDRIA ITS PHASE 2

H.011506

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

3-DESIGN/DEVELOPMENT

THIS PROJECT INVOLVES INSTALLING CCTVS AND DMSS.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ALEXANDRIA ITS PHASE 4

H.011526

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 FBROFF 636 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

RAPIDES 000-40 FBROFF 482 PRESERVATION - BRIDGE (OFFSYSTEM)

RAPIDES 000-40 FBROFF 354 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

CASTOR PLNGE/H.STRANGE/PALMER CHPL BRDG

H.011531

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 FBROFF 536 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

RAPIDES 000-40 FBROFF 445 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DIXIE CHURCH & SETLIFF ROAD BRIDGES

H.011536

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 4,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

PATCH, COLD PLANE, & OVERLAY I-49 SHOULDERS AND RAMPSTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: 0.44 MI N US 167 TO EXIT 80

H.011565

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 7,400 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 340 PRESERVATION - INTERSTATE

PATCH, MILL, OLY (I-49 MAINELINE, SHOULDERS & RAMPS) & SIDETHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: N OF LA 498 TO 0.66 MI E LA 1200

Page 2 - 75 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 152: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011569

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,700 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTRAPIDES 000-40 NHPP 350 PRESERVATION - INTERSTATE

PATCH, MILL, & OLY (I-49 MAINLINE SHOULDERS, RAMP & SIDE RD)THOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: NORTH OF LA 8 TO NATCHITOCHES P/L

H.011597

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 8 134-03 STPFLEX 2,210 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, COLD PLANING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: VERNON PARISH LINE TO LA 119

H.011938

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

SIGNING AND RELATED WORKFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: 2 MILES N LA 3265 - 4 MILES N LA 1

H.012931

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 3128 840-33 STPFLEX 250 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

MICORSURFACINGLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3128: LA 107 TO LA 28-ULTRATHIN

H.012935

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 121 029-06 STPFLEX 720 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 121: LA 112 TO LA 28- AST

H.012967

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 112 073-03 STPFLEX 1,320 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ULTRATHIN OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 112: US 165-RUTH FORD DR - ULTRATHIN

H.013207

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165 014-05 NHPP 350 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

PATCHING, MILLING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: NB LANE - MCNARY TO BOY SCOUT RD

H.013452

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 STP<200K 3,107 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ASPHALT REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF ALEXANDRIA TO PROVIDE MATCH.

Project:Prj Mgr:

HORSESHOE DRIVE ROADWAY IMPROVEMENTS

H.010341

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 115 033-04 STPFLEX 1,928 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 115: LA 1207 - LA 28

Page 2 - 76 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 153: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010824

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-09 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

RAPIDES US 71 840-43 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

RAPIDES US 71 008-30 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CONDUCT CORRIDOR STUDY ALONG US 71COLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

US 71 CORRIDOR STUDY

H.011942

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 165 015-01 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

RAPIDES US 165 015-02 NHPP 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

RAPIDES 000-40 STPFLEX 650 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CONSTRUCT ROUNDABOUT AND ADD TURN LANESHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: ROUNDABOUT AT PINECREST

H.012015

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 008-30 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

NATCHITOCHES LA 1 053-04 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

GRANT LA 158 009-32 STPFLEX 100 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING AND RELATED WORKFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

LA1,LA158 & US71 SIGN TRUSS & CANTILEVER

H.012046

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 3170 840-35 STPFLEX 2,807 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

RAPIDES LA 1208-1 840-48 STPFLEX 2,376 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

CHATLIN LAKE & HORSESHOE CANAL BRIDGES

H.012468

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES I-49 455-05 NHPP 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

AVOYELLES I-49 455-04 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

EVANGELINE I-49 455-92 NHPP 12 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGN UPGRADE ALONG I-49FILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 (ST LANDRY P/L - 2 MI. N. LA 3265)

Page 2 - 77 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 154: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013120

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES 000-40 FBROFF 368 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

BETHEL ROAD OVER SLASH BAYOU TRIBUTARY

H.011403

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 1208-3 368-03 0 SAFETY 0-FEASIBILITY/SCOPING

CORRIDOR STUDY FOR SAFETY & ACCESS MANAGEMENT IMPROVEMENHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA1208-3 TRAFFIC STUDY:VERSAILLES- LA488

H.001761

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 507 100-02 FBROFF 2,133 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:100-02-0013;

Project:Prj Mgr:

LA 507 CREEK BRIDGE

RED RIVER

H.011087

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER 000-41 FBROFF 1,794 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:DOTD PROVIDES THE MATCH FOR THE OFF-SYSTEM HWY BR PROGRA

Project:Prj Mgr:

WESTDALE PLANTATION ROAD / BAYOU PIERRE

H.012970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 480 305-04 NFA 214 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 480: US 84 TO US 371

H.011600

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 514 100-02 STPFLEX 1,260 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACING WITH MINOR WIDENISPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 514 & 507: US 371 TO BIENVILLE PL

H.012613

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 509 105-03 STPFLEX 144 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 509: DESOTO PL TO LA 1

H.012615

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER US 71 010-03 STPFLEX 2,700 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC CONCRETE PAVEMENT RESURFACINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 71: COUSHATTA TO BOSSIER PARISH LINE

H.012974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER LA 174 112-07 STPFLEX 150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 174: NATCHITOCHES PL TO LA 1

Page 2 - 78 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 155: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.000974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 15 026-09 STPFLEX 7,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:026-09-0024;

Project:Prj Mgr:

BOEUF RIVER BRIDGE

RICHLAND

H.001970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 561 166-03 FBROFF 7,011 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTALLEN, BRIAN Remrks:

Typ Imp:166-03-0015;

Project:Prj Mgr:

BOEUF RIVER BRIDGE NEAR HEBERT

H.011021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 17 051-04 STPFLEX 1,114 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE EXISTING SUBSURFACE DRAINAGE STRUCTURGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 17: SHARON STREET TO TENNESSEE STREET

H.012657

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 17 051-05 STPFLEX 102 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 17: DRAINAGE IMPROVEMENTS

H.012707

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 622 341-02 NFA 3,622 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 622: LA 576 - LA 576

H.012955

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 15 026-09 STPFLEX 829 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 15: US 425 - OUACHITA PL

H.013080

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND 000-42 FBROFF 1,727 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENT NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

MCLEMORE ROAD OVER BEE BAYOU

H.001972

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 135 167-02 STPFLEX 1,128 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

NEW BRIDGEGARY, VERTIE Remrks:

Typ Imp:167-02-0016;

Project:Prj Mgr:

MUDDY BAYOU BRIDGE

H.008288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 132 842-13 FBROFF 3,672 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDE REPLACEMENTHERATH, ANANDA Remrks:

Typ Imp:842-13-0009;USE NFA AS MATCH

Project:Prj Mgr:

BOEUF RIVER BRIDGE NEAR BUCKNER (HBI)

Page 2 - 79 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 156: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.008793

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 183 185-01 NFI 95,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL

INTERCHANGE IMPROV., NEW ROADWAY, ROADWAY WIDENINGLANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

FRANKLIN FARMS MEGA SITE

H.009529

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND US 80 002-02 STPFLEX 3,416 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

BASE STABILIZATION & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 80:BAYOU LAFOURCHE BR. - 1.44 MILES E

H.011603

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 132 166-05 STPFLEX 913 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 132: LA 135 TO LA 576

H.012036

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND US 80 002-03 STPFLEX 3,079 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: BOEUF RIVER BRIDGE

H.012926

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RICHLAND LA 135 167-04 STPFLEX 565 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

CHIP SEALLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 135: LA 15 - LA 137

H.010696

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE 000-43 RAIL PD 600 RAILROADS 3-DESIGN/DEVELOPMENT

INSTALL F/L'S & GATES AT BROWN AND GANDY XINGSSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

BROWN & GANDY: KCS RR XINGS (SABINE)

SABINE

H.010345

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 175 035-02 STPFLEX 1,973 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 175: N JCT LA 120 - RAY CANTO RD

Page 2 - 80 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 157: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012544

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

SABINE LA 120 042-03 STPFLEX 1,513 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 120 042-03 STPFLEX 1,630 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 120 042-03 STPFLEX 1,928 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 120 042-03 STPFLEX 1,646 PRESERVATION - BRIDGE (ONSYSTEM)

SABINE LA 474 120-01 STPFLEX 1,574 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 120, LA 474: BRIDGES

H.012966

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

SABINE US 171 025-04 NHPP 850 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

1-PLANNING/ENVIRONMENTAL

MIRCOSURFACINGLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: CONVERSE TO DESOTO P/L-MICORSURF

H.011800

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 TAP>200K 1,022 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATH ON LEVEE TOPMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH GOVERNMENT

Project:Prj Mgr:

ST. BERNARD MISS RIVER TRAIL PH III

ST BERNARD

H.011820

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 TAP>200K 433 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKS AND SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY ST. BERNARD PARISH

Project:Prj Mgr:

JEAN LAFITTE PKWY: SW & SHARED USE PATH

H.013343

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD 000-44 STPENH 728 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:ST. BERNARD PARISH WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

ST. BERNARD MISS RIVER TRAIL, PH IV

H.010413

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 48 282-02 STPFLEX 1,750 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 48: ORMOND PLANTATION - WESCO ST

ST CHARLES

H.010416

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 3127 428-03 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3127: ST. JOHN P/L - 3700' W I-310

Page 2 - 81 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 158: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010417

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 306 845-07 STPFLEX 3,600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

COLD PLANE, GEOGRID & 4" OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 306: LA 18 - LA 632

H.011553

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 632 845-09 STPFLEX 400 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ST CHARLES LA 632 845-09 STPFLEX 100 PRESERVATION - NON-INTERSTATEON STP SYSTEM

ASPHALT OVERLAY, PATCHING, STRIPINGSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 632: LA 306 - LA 631

H.011801

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES 000-45 TAP>200K 2,602 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY ST. CHARLES PARISH

Project:Prj Mgr:

ST. CHARLES WB LEVEE PATH PH IV AND V

H.012051

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES US 90 005-09 NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

TURN LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: OPERATIONAL IMP IN ST CHARLES

H.012617

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-38 NHPP 1,750 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTST CHARLES I-310 450-36 NHPP 500 PRESERVATION - INTERSTATE

COLD PLANE AND 2" OVERLAY AND PCCP REHABTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-310: 0.75 MI N OF LULING BR - US 90

H.012992

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 631 845-06 NFA 175 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MILLING AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 631: OLD SPANISH TRAIL- LEVEE ROAD

H.010753

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-38 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTALST CHARLES US 90 005-08 NFI 0 CAPACITY

RECONSTRUCTION OF INTERCHANGE OR NEW FLYOVER RAMPLANDRY, COREY Remrks:

Typ Imp:MATCH FOR ENVIRONMENTAL FROM DOTD SURPLUS

Project:Prj Mgr:

US 90/I-310 INTERCHANGE

H.012532

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES LA 631 845-06 STPFLEX 1,498 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 631: DRAIN CANAL BRIDGE

Page 2 - 82 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 159: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012977

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 432 846-10 STPFLEX 1,350 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

THIN LIFT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 432: DOUGHTY RD-LA 38

ST HELENA

H.008312

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST HELENA LA 1042 846-03 FBROFF 2,161 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTUMEOZULU, JOE Remrks:

Typ Imp:846-03-0014;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

LA 1042 BRIDGES NEAR GREENSBURG

H.009481

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 20 065-07 STPFLEX 6,320 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 20 BAYOU CHEVREVIL BRIDGE

ST JAMES

H.012075

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 3125 426-31 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD EB AND WB LEFT TURN LANES ON LA 3125SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3125: IMPROVEMENTS AT LA 642

H.013116

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 20 065-07 HSIPPEN 4,822 SAFETY 3-DESIGN/DEVELOPMENTST JAMES LA 20 065-07 HSIPPEN 655 SAFETY LAFOURCHE LA 20 065-06 HSIPPEN 1,456 SAFETY

WIDENING LA 20 TO INCLUDE 8' SHOULDERSLANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 20 WIDEN: LA 307 - S. VACHERIE

H.013087

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 44 256-04 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY TO STUDY CONSTRUCTION OF SIDEWALK AND SIGNSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 4 FACILITY PED IMPROVEMENTS

H.002960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 3213 434-01 STPFLEX 20,000 RAILROADS - GRADE SEPARATION 3-DESIGN/DEVELOPMENT

GRADE SEPARATE EXISTING AT GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3213:GRAMERCY BRIDGE OVER UP RAILROAD

ST JOHN

H.009594

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN I-10 450-13 NHPP 0 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

GRADE RAISING AND CROSS DRAIN WORK FEASIBILITY STUDYHANKS, ANNA Remrks:

Typ Imp:

Project:Prj Mgr:

I-10:E END OF RESERVE RELIEF CANAL-US 51

Page 2 - 83 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 160: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.010385

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 3127 428-02 STPFLEX 5,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3127: ST. JAMES P/L - ST. CHARLES P/L

H.011845

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN 000-48 TAP>200K 2,562 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST JOHN LA 44 256-02 TAP>200K 525 ENHANCEMENTS

SHARED USE PATHNUNES, BRIAN Remrks:

Typ Imp:MATCH PROVIDED BY ST. JOHN THE BAPTIST PARISH

Project:Prj Mgr:

ST JOHN EB MISS RIVER TRAIL, PHASE 4

H.013017

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN 000-48 RAIL PD 1,500 RAILROADS 3-DESIGN/DEVELOPMENTST JOHN LA 636-1 848-05 RAIL PD 250 RAILROADS ST JOHN LA 3217 848-17 RAIL PD 250 RAILROADS

INSTALL F/L'S, GATES, AND BELLS.SHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

IC RR CORRIDOR (ST JOHN THE BAPTIST)

H.013239

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN US 61 007-04 STP>200K 2,365 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

BIKE/PED IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:ST. JOHN PARISH TO PROVIDE MATCH

Project:Prj Mgr:

US 61:LA 3188-ORMOND BLVD,BIKE/PED IMP

H.011136

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN LA 44 256-02 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

STAGE 0 FEASIBILITY STUDYNGUYEN, WAYNE Remrks:

Typ Imp:20% NON-FEDERAL MATCH PROVIDED BY RPC

Project:Prj Mgr:

MRT EXTENSION ST. JOHN PARISH

H.012074

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN US 51 256-12 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

RECONFIG STRIPING FOR OFF RAMP MERGESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 51 @ I-55 OFF RAMP

H.010902

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JOHN US 61 007-04 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYRENARD, APRIL Remrks:

Typ Imp:FEASIBILITY STUDY FUNDED WITH SATRANS

Project:Prj Mgr:

US 61 FEASIBILITY STUDY

H.002176

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 10 219-07 STPFLEX 4,950 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGESSANCHEZ, VICTOR Remrks:

Typ Imp:219-07-0025;2 BRIDGES

Project:Prj Mgr:

LA 10 BRIDGES

ST LANDRY

H.008332

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 360 849-11 FBROFF 2,800 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTKEMP, KELLY Remrks:

Typ Imp:849-11-0010; USE NFA AS MATCH

Project:Prj Mgr:

LA 360: ROUGE BAYOU BRIDGE REPLACEMENT

Page 2 - 84 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 161: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011549

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-12 STPFLEX 800 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE BASE & SURFACING, RECONSTRUCT AT HIGHER ELEVGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 EB: DRAINAGE IMPROVEMENTS

H.011808

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 10 219-07 STPFLEX 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10: PALMETTO COMPANY CANAL BR

H.011844

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 TAP<200K 115 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST LANDRY US 190 012-12 TAP<200K 58 ENHANCEMENTS

SIDEWALKMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF OPELOUSAS

Project:Prj Mgr:

US 190: MARKET - MAIN, SIDEWALKS

H.011929

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY I-49 455-02 NHPP 600 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

EVANGELINE I-49 455-90 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

ST LANDRY I-49 455-91 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

EVANGELINE I-49 455-03 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

SIGNING & RELATED WORKFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-49: WASHINGTON TO AVOYELLES LINE

H.012558

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 182 032-03 STPFLEX 2,440 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE, OVERLAY, PATCHING, AND RELATED WORK.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: END ONE WAY COUPLET - US 167

H.013198

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 NHPP 6,450 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, OVERLAY, AND RELATED WORK.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 EB & WB: MPRR OPASS - LA 742

H.013200

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 NHPP 3,075 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, OVERLAY, AND RELATED WORK.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 (EB): LA 742 - BAYOU COURTABLEU

Page 2 - 85 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 162: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.000445

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 NHPP 6,500 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REHAB.REDECK & MAYBE WIDENGAUDRY, CARL Remrks:

Typ Imp:012-13-0101;

Project:Prj Mgr:

US 190: UPRR OVERPASS NEAR OPELOUSAS

H.010225

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 178 208-02 STPFLEX 700 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 178: ACADIA P/L - LA 357

H.011993

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 10 032-03 STPFLEX 1,984 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10: BAYOU CARRON BRIDGE

H.011994

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 167 066-08 STPFLEX 2,981 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: BAYOU GRAND LOUIS BRIDGE

H.012534

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 103 849-03 STPFLEX 1,238 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTGAUDRY, CARL Remrks:

Typ Imp:

Project:Prj Mgr:

LA103: DRAINAGE CANAL BRIDGE

H.012681

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY 000-49 RTP 114 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALST LANDRY 000-49 LOCAL 39 RECREATIONAL TRAILS PROGRAM

1.6 M. OF PED-BIKE TRAIL, 1 M. OF SHARROW AND 3 TRAILHEADSBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

OPELOUSAS PARKS PED-BIKE TRAIL

H.013407

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY LA 93 221-01 TAP<5K 498 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKSNUNES, BRIAN Remrks:

Typ Imp:THE TOWN OF GRAND COTEAU WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 93 (WMLK DR) SIDEWALKS GRAND COTEAU

H.011243

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-13 0 SAFETY 0-FEASIBILITY/SCOPING

TBD BY FEASIBILITY STUDYNICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 INTERCHANGE IMP. AT US 190 & LA 31

H.013459

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 167 066-08 0 SAFETY 0-FEASIBILITY/SCOPING

FEASIBILITY STUDY TO 3 LANE SECTION OF US 167ZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

US 167: ELSIE STREET TO GILBERT DRIVE

Page 2 - 86 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 163: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012130

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 347 404-03 NFA 3,376 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

COLD PLANE, PATCH, OVERLAY, & RELATED WORK.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 347: LA 328 - LA 686

ST MARTIN

H.012574

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 96 238-02 STPFLEX 3,107 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

LAFAYETTE LA 96 238-01 STPFLEX 580 PRESERVATION - NON-INTERSTATEON STP SYSTEM

COLD PLANE, BASE REHABILITATION, OVERLAY, AND RELATED WORK.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 96: LA 182 - 0.56 MI. W. OF LA 31

H.012618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 347 056-04 STPFLEX 540 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

RAISE ROAD X-SECTION AND/OR REPLACE SUBDRAINAGE STRUCTUREGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 347 DRAINAGE IMPROVEMENTS

H.013247

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN I-10 450-06 NHPP 1,200 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

EMBANKMENT, COLD PLANE, PATCH, OVERLAY, AND RELATED WORWKTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 RAMPS @ BUTTE LA ROSE

H.013327

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 336-1 850-25 STPFLEX 100 ROAD TRANSFER 3-DESIGN/DEVELOPMENT

MILL, PATCH, OVERLAY, AND RELATED WORK.DOMINGUE, CHRISTOPHER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 336-1: LA 31 - 0.19 MI SW LA 31

H.013142

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 FBROFF 388 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

CHES COURVILLE RD OVER COULEE NICOLE G.

H.011279

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 328 404-02 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 328: LATIOLAIS DRIVE TO JULIE STREET

H.011995

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 96 238-03 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 96: BAYOU TECHE MB REHAB (HBI)

H.013023

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN LA 328 404-02 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING

FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:ACADIANA MPO PROVIDING MATCH

Project:Prj Mgr:

LA 328 CORRIDOR STUDY IN BREAUX BRIDGE

Page 2 - 87 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 164: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013089

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 0 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR THE CONSTRUCTION OF SIDEWALKSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

MARTIN STREET SIDEWALKS

H.011487

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 005-01 STPFLEX 15,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS.GUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BERWICK BAY BRIDGE REHAB (HBI)

ST MARY

H.011706

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 DEMO 585 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENTST MARY 000-51 RAIL HE 452 RAILROADS ST MARY 000-51 LOCAL 63 RAILROADS

NEW ROAD CONSTRUCTION TO CLOSE THREE BNSF & LDRR CROSSINGLUKE, SHAWN Remrks:

Typ Imp:

Project:Prj Mgr:

BNSF SEVERAL RR XINGS (BALDWIN)

H.011723

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 RAIL HE 350 RAILROADS 3-DESIGN/DEVELOPMENT

NEW ROAD CONSTRUCTION, RR CROSSING UPGRADE & RR CLOSURERAY, JARED Remrks:

Typ Imp:714-51-0010

Project:Prj Mgr:

COTTON & SILO: BNSF RR XINGS (ST MARY)

H.013203

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 NHPP 5,100 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

SEAL COAT, ASPHALT OVERLAY, ASPHALT SHOULDERS, & RELATED WRSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: LA 318 - LA 83

H.011328

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY US 90 424-05 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

UPGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:

Typ Imp:REF. H.005171 FEASIBILITY

Project:Prj Mgr:

I-49 SOUTH (RICOHOC TO BERWICK)

H.012535

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 004-07 STPFLEX 1,408 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTALLEN, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: HANSON CANAL BRIDGE

H.012990

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 004-07 STPFLEX 3,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, PATCH, ASPHALT OVERLAY, AND RELATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: 0.45 MI S LA 3069 - LA 317

H.011996

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY LA 182 004-06 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, & STRUCTURAL REPAIRCAVALIER, STEPHANIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: CHARENTON BRIDGE REHAB (HBI)

Page 2 - 88 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 165: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.001344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 059-30 STP<200K 17,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

WIDEN TO 4 LANES, NEW BRIDGELANDRY, COREY Remrks:

Typ Imp:059-30-0008;

Project:Prj Mgr:

US 190: LA 437 - US 190 BUS (PH 1)

ST TAMMANY

H.004113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 3241 852-33 NHPP 63,000 TIME 3-DESIGN/DEVELOPMENT

NEW 4-LANEUMEOZULU, JOE Remrks:

Typ Imp:852-33-0001;BL DATE 10-08 404 RE-SUBMITTED 3-96

Project:Prj Mgr:

LA 3241: LA 435 TO LA 40/LA 41

H.004435

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 3241 852-33 NHPP 92,000 TIME 3-DESIGN/DEVELOPMENT

NEW 4-LANEUMEOZULU, JOE Remrks:

Typ Imp:852-33-0003;BL DATE 7-08

Project:Prj Mgr:

LA 3241: LA 36 TO LA 435

H.004957

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 3241 852-33 NHPP 70,000 TIME 3-DESIGN/DEVELOPMENT

NEW 4-LANEUMEOZULU, JOE Remrks:

Typ Imp:852-33-0002;BL DATE 7-08

Project:Prj Mgr:

LA 3241:I-12/LA 434 INTERCHANGE TO LA 36

H.007588

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 156 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 36 ENHANCEMENTS

LANDSCAPING AND LIGHTING FOR SIDEWALKMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

GIROD STREET LANDSCAPING AND LIGHTING, P

H.008358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1077 852-13 FBROFF 1,391 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTGAUDRY, CARL Remrks:

Typ Imp:852-13-0017; USE NFA AS MATCH

Project:Prj Mgr:

BLACK BAYOU BR. NEAR MADISONVILLE

H.010668

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

ST TAMMANY 000-52 FBROFF 1,500 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

MILLION DOLLAR RD/HOSMER MILL RD BRIDGES

H.011721

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 013-12 STP<200K 2,134 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY LA 22 261-06 STP<200K 1,066 URBAN SYSTEMS

INTERSECTION IMPROVEMENTSBANKSTON, TANYA Remrks:

Typ Imp:USE TTF AS MATCH

Project:Prj Mgr:

US 190/LA 22 IMPROVEMENTS

H.011775

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 11 018-03 TAP<200K 372 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

PED/BICYCLE CROSSWALKS, SIGNS AND SIGNALSMEEK, STEPHEN Remrks:

Typ Imp:CITY OF SLIDELL PROVIDES MATCH

Project:Prj Mgr:

US 11 & US 190 BICYCLE AND PED CROSSINGS

Page 2 - 89 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 166: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011799

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 986 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF SLIDELL.

Project:Prj Mgr:

SPARTAN DRIVE SHARED USE PATH

H.011822

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 783 ENHANCEMENTS 3-DESIGN/DEVELOPMENTST TAMMANY LA 21 059-01 TAP<200K 363 ENHANCEMENTS

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY ST. TAMMANY PARISH

Project:Prj Mgr:

LA21: LA1085 - PINNACLE, SHARED USE PATH

H.012064

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 030-31 NHPP 2,584 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

WIDEN TO THREE LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 190: US 190B - LA 25

H.012172

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 NHPP 6,500 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

COLD PLANE & OVERLAYTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: LA 59 - BAYOU LACOMBE

H.012497

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 RTP 110 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 LOCAL 15 RECREATIONAL TRAILS PROGRAM

CONSTRUCT A 3,160' LONG BY 4' WIDE PED-BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ABITA SPRINGS TRAILS, PHASE 2

H.012572

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 21 030-01 STPFLEX 1,800 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 21: W. JCT. LA 1083-FAIRGROUNDS BLVD.

H.012812

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 STP<200K 6,655 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY 000-52 STP<200K 300 URBAN SYSTEMS

ROUNDABOUT INTERSECTION IMPROVEMENTSEVANS, MISTY Remrks:

Typ Imp:DOTD TO PROVIDE MATCH

Project:Prj Mgr:

US 190@NORTHSHORE, CHERRY & CAMP VILLER

H.012856

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 STP<200K 798 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

REHABILITATIONBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SLIDELL WILL PROVIDE MATCH

Project:Prj Mgr:

NATCHEZ DRIVE REHABILITATION

H.013151

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 852-24 STP<200K 624 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALK IMPROVEMENTSBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH

Project:Prj Mgr:

US 190(GAUSE BLVD) SIDEWALK IMPROVEMENTS

Page 2 - 90 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 167: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013268

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1129 279-02 NFA 2,900 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH, MILL, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1129: LA 40 - LA TUNG RD

H.013381

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 STP<200K 138 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTST TAMMANY US 190-Y 013-13 STP<200K 138 URBAN SYSTEMS

TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:CITY OF SLIDELL TO PROVIDE MATCH.

Project:Prj Mgr:

LINDBERG DRIVE @ US 190(GAUSE BLVD)

H.000286

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-08 STPFLEX 22,400 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

ST TAMMANY US 90 006-07 STPFLEX 850 PRESERVATION - BRIDGE (ONSYSTEM)

ST TAMMANY US 90 006-08 OTHER 23,250 OTHER / MISCELLANEOUS

BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:

Typ Imp:006-08-0031;STAGE 0 PROJECT

Project:Prj Mgr:

EAST PEARL RIVER BRIDGE

H.004981

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 434 852-12 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL

PHASES 1 AND 2 ENVIRONMENTAL STUDYBANKSTON, TANYA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 434 CORRIDOR

H.010116

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1088 852-11 STPFLEX 25,136 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

TRAFFIC STUDY ON LA 1088MUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1088 CORRIDOR STUDY

H.010377

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 36 280-03 STPFLEX 1,120 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 36: LA 41 - IGC RAILROAD

H.010380

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 433 018-30 STPFLEX 740 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 433: U-PASS I-10 - BEHRMAN STREET

H.010387

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-07 STPFLEX 3,323 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

RUBBILIZE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

U.S. 90: LA 433 - U.S. 190

Page 2 - 91 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 168: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012062

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 21 059-01 STPFLEX 2,814 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

1-PLANNING/ENVIRONMENTAL

WIDEN TO 3 LANESSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 21: LALANNE RD - BAYOU DEZAIRE

H.012457

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-10 450-18 NHPP 1,770 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

ST TAMMANY I-10 450-19 NHPP 30 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

INSTALLATION OF SIGNS AND OTHER RELATED ITEMSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 SIGNING (TWIN SPAN TO STATE LINE)

H.012567

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 36 280-03 STPFLEX 771 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

REMOVE STRUCTURE CONSTRUCT ROADWAYMETCALF, WILLIAM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 36: ICG RAILROAD BRIDGE REMOVAL

H.012633

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1088 852-11 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

CONSTRUCT ROUNDABOUTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1088: FOREST BROOK BLVD ROUNDABOUT

H.012658

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 59 281-03 STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ROUNDABOUTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 59: KOOP DRIVE ROUNDABOUT

H.012660

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 59 281-03 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ROUNDABOUTSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 59: LITTLE CREEK, I-12, DOVE RNBT

H.012662

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1088 852-11 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

ACCESS MANAGEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1088: I-12 ROUNDABOUTS

H.012696

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 435-S 852-37 NFA 300 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

MILL & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 435S: LA 435 - LA 41

Page 2 - 92 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 169: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013406

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 419 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS AND BIKE PATHSNUNES, BRIAN Remrks:

Typ Imp:THE CITY OF MANDEVILLE WILL PROVIDE THE LOCAL MATCH

Project:Prj Mgr:

W CAUSEWAY APPROACH BIKE/PED MANDEVILLE

H.013408

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 TAP<200K 1,198 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF COVINGTON WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

JEFFERSON AVE SHARED USE PATH COVINGTON

H.011454

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 261-06 0 SAFETY 0-FEASIBILITY/SCOPING

ACCESS MANAGEMENT AND SAFETY IMPROVEMENTHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA22:DALWILL-RODGER STORME CORRIDOR STU

H.012737

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 433 852-21 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR BRIDGE REHABILITATIONHINGLE, STEWART Remrks:

Typ Imp:

Project:Prj Mgr:

LA433:BAYOU BONFOUCA MVBR REHABILITATION

H.012855

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 0 URBAN SYSTEMS 0-FEASIBILITY/SCOPING

LAND USE STUDYSHOLMIRE, DAWN Remrks:

Typ Imp:RPC TO PROVIDE MATCH

Project:Prj Mgr:

EAST LACOMBE LAND USE STUDY

H.007598

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 16 262-07 TAP<200K 302 ENHANCEMENTS 3-DESIGN/DEVELOPMENTTANGIPAHOA LA 16 047-01 TAP<200K 302 ENHANCEMENTS

NEW SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

AMITE LA 16 PEDESTRIAN PROJECT - PHASE I

TANGIPAHOA

H.009425

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 16 047-01 STPFLEX 1,311 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 16 AMITE DRAINAGE IMPROVEMENTS

H.010289

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-04 HSIP 1,000 SAFETY 3-DESIGN/DEVELOPMENT

CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELLBRANTON, JENNIFER Remrks:

Typ Imp:

Project:Prj Mgr:

LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.

H.011856

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-04 TAP<200K 300 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALK RECONSTRUCTIONMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY CITY OF PONCHATOULA

Project:Prj Mgr:

LA 22: FIFTH ST - WAYNE STREET, SW

Page 2 - 93 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 170: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011858

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 TAP<200K 570 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY THE CITY OF HAMMOND

Project:Prj Mgr:

HAMMOND: JW DAVIS & CM FAGAN SW

H.013113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 22 261-03 STP<200K 3,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

ADDING CONTINUOUS TURN LANEBANKSTON, TANYA Remrks:

Typ Imp:DOTD WILL PROVIDE THE MATCH

Project:Prj Mgr:

LA 22:NATALBANY RIVER-YELLOW WATER CREEK

H.013271

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 HSIPPEN 1,300 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

INSTALL SIGNS, STRIPING, PAVEMENT MARKING & OTHER SAFETYIMPRMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

TANGIPAHOA PH LOCAL ROAD SAFETY UPGRADE

H.008399

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 NFI 40,000 CAPACITY 1-PLANNING/ENVIRONMENTAL

WIDEN TO 4 LANESEVANS, MISTY Remrks:

Typ Imp:853-36-0031;PORTION OF PROJECT COMPLETED UNDER

Project:Prj Mgr:

US 51 BUSINESS: LA 22 TO CLUB DELUXE RD

H.008915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 3234 853-40 27,500 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL

FEASIBILITY STUDY FOR LA 3234 EXTENSIONPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

LA3234 EXT FROM LA1065 - HAMMOND AIRPORT

H.011618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

TANGIPAHOA LA 22 261-03 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

TANGIPAHOA LA 22 261-04 STPFLEX 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

CORRIDOR STUDY FOR ACCESS MGMNT/TRAFFIC OP IMPROVEMENTSHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 22 CORRIDOR STUDY: ROU MAR NEI TO 1ST

H.012071

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-04 NHPP 2,017 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:

Project:Prj Mgr:

US 51: YELLOW WATER RIVER BRIDGE

H.012996

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA LA 10 061-09 STPFLEX 128 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

THIN LIFT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10:I-55 COA - US 51

H.013163

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA 000-53 FBROFF 317 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

WADESBORO ROAD OVER UNNAMED CREEK

Page 2 - 94 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 171: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013372

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 STPENH 1,074 ENHANCEMENTS 1-PLANNING/ENVIRONMENTALTANGIPAHOA LA 22 261-04 STPENH 668 ENHANCEMENTS

SIGNALS, LANDSCAPING, CURB AND GUTTER, PED IMPROVEMENTSMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF PONCHATOULA WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 22:PINE ST CORRIDOR IMPRV PONCHATOULA

H.011401

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51 017-04 0 SAFETY 0-FEASIBILITY/SCOPING

CORRIDOR/TRAFFIC STUDY FOR ACCESSMAN AND SAFETY IMPROVEMEHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 51: W UNIV AVE TO I55 CORRIDOR STUDY

H.011402

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TANGIPAHOA US 51-X 853-36 0 SAFETY 0-FEASIBILITY/SCOPING

TRAFFIC/CORRIDOR STUDY FOR ACCESS MGMT AND SAFETY IMPVEMEHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

US 51 BUS: I12 TO COLEMAN CORRIDOR STUDY

H.011734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 573 186-04 STPFLEX 1,235 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

TENSAS LA 568 075-03 STPFLEX 336 PRESERVATION - NON-INTERSTATENFA

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:USE NFA AS MATCH

Project:Prj Mgr:

LA 568, LA573: US 65 - BIG CHOCTAW BAYOU

TENSAS

H.012113

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS US 65 020-04 NHPP 3,800 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

TENSAS US 65 020-02 NHPP 500 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

COLD PLANE, BREAK & SEAT, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 65: SOUTH OF NEWELLTON

H.013235

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 608 854-06 NFA 2,700 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 608: LA 887 - N. JCT LA 605

H.009585

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 128 036-06 STPFLEX 1,772 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALT OVERLAY OF ASPHALT PAVEMENTSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 128: LA 573 - US 65

H.009591

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TENSAS LA 4 173-01 STPFLEX 541 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 4: US 65 - LA 605

Page 2 - 95 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 172: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.001498

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 STPFLEX 31,565 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPAINE, PEGGY JO Remrks:

Typ Imp:065-91-0017;STAGE 0 FEASIBILITY STUDY

Project:Prj Mgr:

LA 24 & LA 316: COMPANY CANAL BRIDGE

TERREBONNE

H.002238

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 56 247-01 NFA 1,200 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:247-01-0009;

Project:Prj Mgr:

LA 56: ROBINSON CANAL BRIDGE

H.002244

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 56 247-02 STPFLEX 30,000 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:247-02-0030;

Project:Prj Mgr:

LA 56: BOUDREAUX CANAL BR REPLACEMENT

H.010006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 58 247-30 STPFLEX 6,928 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

MOVABLE BRIDGE REHABILITATIONBRAUNER, KURT Remrks:

Typ Imp:BOTH CONTROL SECTIONS IN HOUMA MPO AREA.

Project:Prj Mgr:

LA 58: PETIT CAILLOU BR RH (SARAH) (HBI)

H.010410

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-04 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 24: LA 20 - LA 664 (SB)

H.010411

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 STPFLEX 4,500 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETESPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 24: LA 55 - PROSPECT STREET BRIDGE

H.011533

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 FBROFF 524 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

N. BAYOU BLACK DRIVE / HANSON CANAL

H.012026

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 24 065-91 TAP<200K 153 ENHANCEMENTS 3-DESIGN/DEVELOPMENT

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:LOCAL MATCH BY TERREBONNE PARISH CONSOLIDATED GOVERNMEN

Project:Prj Mgr:

BAYOU TERREBONNE EAST SW PROJECT, PH 2

H.012940

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 665 855-09 NFA 1,225 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

ASPHALT CONCRETE OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 665: HOPE FARM RD.-L.M. 9.878

Page 2 - 96 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 173: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012994

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3197 855-18 NFA 175 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

RESURFACE EXISTING ROADWAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3197: BARROW ST - LA 182

H.013213

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3040 065-30 NHPP 4,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3040: 600' S HOLLYWOOD - LA 24

H.013272

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STP<200K 145 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

NEW MULTI-USE PATHBANKSTON, TANYA Remrks:

Typ Imp:LAFOURCHE PARISH WILL PROVIDE MATCH

Project:Prj Mgr:

LAROSE MULTI-USE PATH

H.013340

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STP<200K 973 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

MULTI-USE PATHBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH PROVIDING MATCH

Project:Prj Mgr:

VALHI BLVD, MULTI-USE TRAIL, PHASE 1

H.013421

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 HSIPPEN 1,770 SAFETY 3-DESIGN/DEVELOPMENTTERREBONNE 000-55 STPFLEX 1,770 OPER EFFICIENCY/MOTORIST

ASSISTANCE - TRAFFIC CONTROLDEVICES

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02H FLASHING YELLOW ARROW PART 2

H.013453

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 316 412-04 STP<200K 126 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT

SIDEWALKSBANKSTON, TANYA Remrks:

Typ Imp:TERREBONNE PARISH TO PROVIDE THE MATCH.

Project:Prj Mgr:

BLUE BAYOU (LA 316) SIDEWALKS

H.010997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3185 855-17 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

1-PLANNING/ENVIRONMENTAL

TERREBONNE 000-55 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

INTERSECTION IMPROVEMENTSHARROUCH, JOSHUA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3185 @ MAIN PROJECT RD ROUNDABOUT

H.011970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 182 005-05 STPFLEX 2,697 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTSBUCCI, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BAYOU TERREBONNE BRIDGES

Page 2 - 97 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 174: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013199

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STPFLEX 777 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT - NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

COUNTRY ESTATES DR OVER ST. LOUIS BAYOU

H.013319

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE 000-55 STPENH 238 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SHARED USE PATHMEEK, STEPHEN Remrks:

Typ Imp:TERREBONNE PARISH WILL PROVIDE LOCAL MATCH.

Project:Prj Mgr:

WILLIAMS AVE SHARED USE PATH (HOUMA)

H.011974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 57 246-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF CLEANING, PAINTING, AND REPAIRSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 57: BAYOU DULAC MOVABLE BRIDGE REHAB

H.011986

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 58 247-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY - MOVABLE BRIDGE REHABILITATION OR REPLACEGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 58: BAYOU TERREBONNE MB REHAB (HBI)

H.012735

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 182 005-05 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDYHERATH, SUBA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: BARROW STREET BRIDGE

H.010392

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 550 311-01 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 550: LA 2 - LA 15

UNION

H.011530

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION 000-56 FBROFF 239 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

CYPRESS CREEK ROAD / BOATWRIGHT CREEK

H.011661

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 33 069-03 STPFLEX 210 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

WIDEN INTERSECTION WITH ASPHALTIC CONCRETEHICKS, MELVIN Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSECTION IMPROVEMENT LA 33 @ LA 15

Page 2 - 98 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 175: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011662

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 2 070-04 STPFLEX 200 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

INTERSECTION IMPROVEMENTSHICKS, MELVIN Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSECTION IMPROVEMENT LA 2 @ LA 15

H.011770

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 15 069-02 TAP<5K 291 ENHANCEMENTS 3-DESIGN/DEVELOPMENTUNION 000-56 TAP<5K 475 ENHANCEMENTS

RECONSTRUCTION OF EXISTING SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:TOWN OF FARMERVILLE PROVIDING MATCH

Project:Prj Mgr:

FARMERVILLE DOWNTOWN SW IMPROVEMENTS

H.012037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION US 63 023-11 NHPP 2,302 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

UNION LA 2 070-05 STPFLEX 1,047 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 167,LA2:MIDDLE SLOUGH & CREEK BRIDGES

H.012924

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION LA 2 070-06 STPFLEX 514 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

THIN OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: 0.48 M W LA 143 - OUACHITA PL

H.012345

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION 000-56 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

TRAFFIC STUDY: TRAFFIC ANALYSIS, CRASH ANALYSIS, COUNTS, ETCHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

FARMERVILLE ST & LOCAL RDS TRAFFIC STUDY

H.013079

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

UNION 000-56 HSIPPEN 606 SAFETY - SAFE ROUTES TO PUBLICPLACES

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY FOR SIDEWALKSMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

TOWN OF FARMERVILLE SIDEWALKS

H.012946

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 697 857-06 NFA 2,935 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

BASE STABILIZATION, ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 697: LA 343 - US 167

VERMILION

H.013014

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION 000-57 0 SAFETY - LOCAL ROADS SAFETY 3-DESIGN/DEVELOPMENT

SIGNS, STRIPING, RUMBLE STRIPS, LIGHTING, STOP BARSRICCA, MICHAEL A. Remrks:

Typ Imp:

Project:Prj Mgr:

LOCAL ROAD SIGNING(VERMILLION)

Page 2 - 99 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 176: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.009627

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 35 207-02 STPFLEX 2,234 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 35: LA 335 - LA 14

H.010226

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 82 215-01 STPFLEX 5,383 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

STABILIZE BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 82: LA 35 - LA 333

H.012001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 339 216-01 STPFLEX 2,864 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTTOURRES, VALERIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 339: CANAL & CREEK BRIDGES

H.012099

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 13 057-01 STPFLEX 2,036 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

COLD PLANE, PATCH, OVERLAY, & RELATED WORK.SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 13: 2.7 MI. N. LA 14 - ACADIA P/L

H.013428

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 35 207-03 TAP<5K 696 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL

SIDEWALKS, LANDSCAPING AND SIGNAGEMEEK, STEPHEN Remrks:

Typ Imp:THE CITY OF KAPLAN WILL PROVIDE THE LOCAL MATCH.

Project:Prj Mgr:

LA 35 REVITALIZATION PHASE III KAPLAN

H.011997

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 14-X 055-06 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14X: VERMILION RIVER MB REHAB (HBI)

H.011998

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 14 055-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: VERMILION RIVER MB REHAB (HBI)

H.012000

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 82 207-01 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 82: OLD ICC MB REHABILITATION (HBI)

H.012003

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 330 397-03 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY OF MOVABLE BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 330: BAYOU TIGRE MB REHAB (HBI)

Page 2 - 100 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 177: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012536

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 690 857-22 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

FEASIBILITY STUDY TO DETERMINE REHABILITATION / REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:NFA AS MATCH

Project:Prj Mgr:

LA 690: BANKER CANAL BRIDGE

H.001881

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 392 135-02 FBROFF 3,560 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTGAUDRY, CARL Remrks:

Typ Imp:135-02-0009;2 BRIDGES; USE NFA AS MATCH

Project:Prj Mgr:

LA 392 BRIDGES NEAR HORNBECK

VERNON

H.009955

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 111 132-02 STPFLEX 4,167 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 111: BEAUREGARD LINE - C DAVIS LOOP

H.011404

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON US 171 024-06 NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

CONSTRUCT ACCELERATION LANE SOUTH OF CRYER CEMETERY RDSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 171: ADD ACCELERATION LANE CRYER RD

H.012933

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 111 132-03 STPFLEX 300 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

ASPHALT SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 111: LA 8 TO JOHN KELL LOOP-AST

H.010348

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 8 029-02 STPFLEX 4,661 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: LA 464 - US 171

H.010358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 3226 858-11 STPFLEX 2,329 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3226: BEAUREGARD P/L - US 171

H.012058

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 8 029-02 NHPP 2,464 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMETCALF, WILLIAM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: FORKER CREEK BRIDGE

Page 2 - 101 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 178: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013098

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 FBROFF 1,942 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT; NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

JIM CRYER LANE OVER BAYOU ANACOCO

H.012353

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 8 029-02 0 CAPACITY 0-FEASIBILITY/SCOPING

STUDY FOR PROPOSED 4 LANE WIDENING OF CORRIDORZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: (SABINE RIVER TO US 171)

H.010980

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 10 047-04 NHPP 150 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

LANE CONFIGURATION MODIFICATIONSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10:CUMBERLAND ST- AUSTIN ST(BOGALUSA)

WASHINGTON

H.011835

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 25 059-04 TAPFLEX 276 ENHANCEMENTS 3-DESIGN/DEVELOPMENTWASHINGTON 000-59 TAPFLEX 69 ENHANCEMENTS

SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:MATCH PROVIDED BY WASHINGTON PARISH

Project:Prj Mgr:

LA25: WASHINGTON PARISH SW, SEG B AND C

H.012159

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 430 859-26 STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 430: LA 25 - LA 1069 DRAINAGE

H.012694

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 436 859-08 NFA 3,900 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

MILL, BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 436: LA 62 - MONROE CREEK RD.

H.012975

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 62 859-10 STPFLEX 1,150 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

3-DESIGN/DEVELOPMENT

THIN LIFT OVERLAYLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 62: LA 10 - LA 436

H.013067

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 436 274-01 STPFLEX 3,300 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

COLD PLANE AND 3.5 INCH OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 436: BURCH CREEK- LA 62

H.008449

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 450 859-04 FBROFF 1,093 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMOORE, DARRELL Remrks:

Typ Imp:859-04-0010;USE NFA AS MATCH

Project:Prj Mgr:

DRAIN BRIDGE NEAR STONEY POINT

Page 2 - 102 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 179: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012072

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 60 279-04 STPFLEX 888 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTYAP, KIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 60: DRAIN BRIDGE

H.011280

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON LA 10 047-04 0 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

0-FEASIBILITY/SCOPING

STAGE 0/FEASIBILITY STUDYZHANG, HONG Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10 IMPROVEMENTS IN BOGALUSA

H.001666

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 160 085-05 FBROFF 4,100 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

BRIDGE REPLACEMENTBRAUNER, KURT Remrks:

Typ Imp:085-05-0029;

Project:Prj Mgr:

DORCHEAT BAYOU BRIDGE

WEBSTER

H.001798

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 531 111-01 STPFLEX 1,843 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEBUCCI, MARK Remrks:

Typ Imp:111-01-0018;

Project:Prj Mgr:

LA 531: PARMERS CREEK BRIDGE

H.009513

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 164 122-03 STPFLEX 3,114 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RLEATED WORKSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 164: JCT. LA 163 TO JCT. US 371

H.010974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER US 79 027-04 STPFLEX 350 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADDING LEFT TURN LANE AT MILLER ROAD (WEBSTER PARISH)SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

US 79: NB LEFT TURN LANE AT MILLER ROAD

H.012495

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER 000-60 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTWEBSTER 000-60 LOCAL 26 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 3,000' LONG BY 10' WIDE PED-BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

JUDGE BURNS WAY

H.001799

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 531 111-02 STPFLEX 6,000 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

WEBSTER LA 531 111-02 STPFLEX 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

BRIDGE REPLACEMENTEVANS, MISTY Remrks:

Typ Imp:451-03-0047;GEOM. STUDY UNDERWAY (E)

Project:Prj Mgr:

LA 531 OVERPASS

Page 2 - 103 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 180: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER US 80 001-05 STPFLEX 2,325 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMICHAEL, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

US 80: COOLEY BRANCH AND CREEK BRIDGES

H.012030

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER US 371 027-03 STPFLEX 7,679 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTS/REHABILITATIONSANCHEZ, VICTOR Remrks:

Typ Imp:

Project:Prj Mgr:

US371:ICG & KCS RAILROAD OVERPASSES HBI

H.012958

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 159 087-01 STPFLEX 315 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 159: COUNTRY CLUB DR TO BENSON RD

H.013002

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 531 111-01 STPFLEX 330 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

1-PLANNING/ENVIRONMENTAL

ASPHALT SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 531: LA 792 TO LA 532

H.013111

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER 000-60 FBROFF 797 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT, NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

DORCHEAT ROAD OVER CANEY CREEK

H.005121

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 NFI 100,357 OTHER / MISCELLANEOUS 3-DESIGN/DEVELOPMENT

FEDERAL EARMARK FOR STUDYHANKS, ANNA Remrks:

Typ Imp:700-61-0113;STAGE 0 COMPLETED

Project:Prj Mgr:

LA 1/LA 415 CONNECTOR

W BATON ROUGE

H.010654

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 861-22 STP>200K 207 URBAN SYSTEMS 3-DESIGN/DEVELOPMENTW BATON ROUGE 000-61 LOCAL 323 URBAN SYSTEMS

PAVEMENT REHABILITATIONLEBAS, MELISSA Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

LA 415:I-10 TO APPROXIMATELY 0.41M SOUTH

H.011133

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 RAIL HE 300 RAILROADS 3-DESIGN/DEVELOPMENT

REMOVE CROSSINGLUKE, SHAWN Remrks:

Typ Imp:H.011133 MUST LET BEFORE H.009288

Project:Prj Mgr:

LA 1: UP RR XING (WEST BATON ROUGE)

H.012076

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 013-01 NHPP 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

3-DESIGN/DEVELOPMENT

ADD NB RIGHT TURN LANE ON LA 415SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 415: IMPROVEMENTS AT PLANTATION RD

Page 2 - 104 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 181: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012169

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE I-10 450-08 NHPP 40,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

GRADE RAISING & WIDEN IN ONE DIRECTION TO MAINTAIN TRAFFICTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: IBERVILLE P/L - W END MISS BR

H.012587

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE I-10 450-08 NHPP 38,000 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENTW BATON ROUGE I-10 450-08 NHPP 2,000 PRESERVATION - INTERSTATE

GRADE RAISING & WIDEN IN ONE DIRECTION TO MAINTAIN TRAFFICTHOMAS, BEN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: W END OF BR 290 - W END OF LA 415

H.013191

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NHPP 7,000 PRESERVATION - NON-INTERSTATEON NHS SYSTEM

3-DESIGN/DEVELOPMENT

MILL, PATCH & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: IBERVILLE P/L-PORT ALLEN CANAL BR

H.013397

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE I-10 450-08 NHPP 950 PRESERVATION - INTERSTATE 3-DESIGN/DEVELOPMENT

REMOVE EXIST ASPH OLAY & PCC PAVT, 24" ASPH BASE, 2"SPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 EB:PAVEMENT REPAIR AT W END MISS BR

H.012067

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 76 013-01 STPFLEX 1,352 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTWINDMANN, ANDREW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 76: NO NAME STREAM BRIDGE

H.012394

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415 225-01 STPFLEX 1,600 PRESERVATION - NON-INTERSTATEON STP SYSTEM

1-PLANNING/ENVIRONMENTAL

THIN OVERLAYGARY, VERTIE Remrks:

Typ Imp:

Project:Prj Mgr:

LA 415: CSLM 1.67 TO LA 620

H.013038

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE 000-61 RTP 112 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTALW BATON ROUGE 000-61 LOCAL 23 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 2,000' LONG X 10' WIDE MULTIPURPOSE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

PORT ALLEN RECREATIONAL TRAIL

H.008469

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 835 862-22 STPFLEX 3,551 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NEW BRIDGEBALLMER, SARAH Remrks:

Typ Imp:862-22-0006;

Project:Prj Mgr:

LA 835: BOEUF RIVER BRIDGE NEAR CONCORD

W CARROLL

Page 2 - 105 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 182: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.011529

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL 000-62 FBROFF 454 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

W CARROLL 000-62 FBROFF 308 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

MITCHINER ROAD & GUNTER LOOP BRIDGES

H.012491

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 17 051-08 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW CARROLL LA 17 051-08 LOCAL 66 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A 3,286' LONG BY 6' WIDE PED-BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

OAK GROVE RECREATIONAL TRAIL

H.012780

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 2 037-03 STPFLEX 313 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

DRAINAGE IMPROVEMENTGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 2: DRAINAGE IMPROVEMENTS

H.010393

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL LA 582 333-02 STPFLEX 3,000 PRESERVATION - NON-INTERSTATENFA

1-PLANNING/ENVIRONMENTAL

STABILIZED BASE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 582: JCT LA 17 TO EAST CARROLL LINE

H.013081

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W CARROLL 000-62 FBROFF 593 PRESERVATION - BRIDGE (OFFSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENT NO NEW ALIGNMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

ROUNDHILL ROAD OVER LITTLE COLEWA BAYOU

H.010597

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 FBROFF 3,879 PRESERVATION - BRIDGE (OFFSYSTEM)

3-DESIGN/DEVELOPMENT

W FELICIANA 000-63 FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTPENTEK, GARY Remrks:

Typ Imp:

Project:Prj Mgr:

SLIGO ROAD BRIDGES

W FELICIANA

H.011576

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA LA 965 863-06 STPFLEX 1,600 PRESERVATION - NON-INTERSTATENFA

3-DESIGN/DEVELOPMENT

STABILIZE & OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 965: LA 966 TO LA 10

H.012498

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA 000-63 LOCAL 63 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF A TRAILHEAD AND 3.2 MILES OF BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

ROSEDOWN BRANCH TRAIL-W FELICIANA PARISH

Page 2 - 106 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 183: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012505

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA LA 1263 061-04 RTP 114 RECREATIONAL TRAILS PROGRAM 3-DESIGN/DEVELOPMENTW FELICIANA LA 1263 061-04 LOCAL 39 RECREATIONAL TRAILS PROGRAM

CONSTRUCTION OF TWO TRAILHEADS AND 6300' OF PED/BIKE TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

TOWN CENTER BRANCH TRAIL

H.012518

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W FELICIANA 000-63 RTP 121 RECREATIONAL TRAILS PROGRAM 1-PLANNING/ENVIRONMENTAL

RESTORE 2.7 MILES OF ATV TRAILBUELL, SHAWN Remrks:

Typ Imp:DCRT IS THE PROJECT MANAGER

Project:Prj Mgr:

TUNICA HILLS WMA YEAR ROUND TRAM TRAIL

H.000382

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN US 71 009-04 STPFLEX 3,441 PRESERVATION - BRIDGE (ONSYSTEM)

3-DESIGN/DEVELOPMENT

NATCHITOCHES US 71 009-05 STPFLEX 5,709 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTBUCCI, MARK Remrks:

Typ Imp:009-04-0010;

Project:Prj Mgr:

US 71: BRIDGES NEAR ST. MAURICE

WINN

H.010356

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 126 091-07 STPFLEX 2,733 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 126: JCT LA 34 - NW JCT LA 499

H.012157

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 1228 864-04 STPFLEX 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

3-DESIGN/DEVELOPMENT

REPLACE CROSS DRAINS AND RAISE ROADWAY TO PREVENT FLOODINGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1228:CROSS DRAIN REPLACEMENT (WINN)

H.012951

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 126 091-08 STPFLEX 4,260 PRESERVATION - NON-INTERSTATEON STP SYSTEM

3-DESIGN/DEVELOPMENT

MILL, IN-PLACE CEMENTED BASE, OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 126: LA 1237 TO CALDWELL P/L

H.001711

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 126 091-05 STPFLEX 3,023 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

NEW BRIDGESYANG, LI Remrks:

Typ Imp:091-05-0014;2 BRIDGES

Project:Prj Mgr:

SALINE BAYOU RELIEF & MILL CR. BRS.

H.009153

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN US 84 022-02 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTALWINN US 84 022-03 NFI 0 DEMO / HIGH PRIORITY

MAJOR WIDENINGMASTIN, CATHERINE Remrks:

Typ Imp:STBONDS AS MATCH; $1.5M IN CLOC PRIORITY 1 AVAILABLE

Project:Prj Mgr:

US HWY 84 IMPROVEMENTS

Page 2 - 107 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 184: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012047

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN US 167 023-05 NHPP 2,822 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

BRIDGE REPLACEMENTMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

US167: BIG CREEK BRIDGE

H.012562

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WINN LA 1232 864-06 STPFLEX 1,228 PRESERVATION - BRIDGE (ONSYSTEM)

1-PLANNING/ENVIRONMENTAL

WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1232 864-06 STPFLEX 1,251 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1232 864-06 STPFLEX 1,644 PRESERVATION - BRIDGE (ONSYSTEM)

WINN LA 1231-1 864-08 STPFLEX 1,377 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENTSMISTICH, BRADLEY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1232, LA 1231-1: BRIDGES

H.009054

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MAKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02 PAVEMENT MARKING REPLACEMENT II

DISTRICT 02

H.009186

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAVISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 02 PAVEMENT MARKING REPLACE III:

H.005158

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

UPRGRADING US 90 FOR FUTURE I-49 SOUTHLANDRY, COREY Remrks:

Typ Imp:700-92-0011; EIS

Project:Prj Mgr:

FUTURE I-49 SOUTH (RACELAND TO WESTBANK

H.005168

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL

EISGOODELL, DEAN Remrks:

Typ Imp:STATE & RR EACH PUTTING UP 10% OF MATCH FOR DEMO

Project:Prj Mgr:

NEW ORLEANS RAIL GATEWAY EIS

H.009731

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 02

Page 2 - 108 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 185: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012663

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02H TRAFFIC CONTROL UPGRADE Y3

H.012664

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y2

H.012680

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 02BC TRAFFIC CONTROL UPGRADE Y3

H.012891

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 02 000-92 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

LAFOURCHE LA 308 407-03 0 PRESERVATION - BRIDGE (ONSYSTEM)

ST BERNARD LA 300 284-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

BRIDGE REPLACEMENT FEASIBILTY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST02:ABC BR REPLACE LAFOUR,ST BER PARS

H.009732

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 03

DISTRICT 03

H.012644

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 03 TRAFFIC CONTROL UPGRADE Y3

H.012665

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 03 TRAFFIC CONTROL UPGRADE Y2

Page 2 - 109 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 186: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012892

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENTS FEASIBILTY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST03:ABC BR REPLACE AC,LAF,ST MAR PARS

H.013009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 03 000-93 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBLITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST03:ABC BR REP EV,ST LA,IB,VER PARS

H.009189

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 04 PAVEMENT MARKING REPLACE III:

DISTRICT 04

H.012451

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 NHPP 960 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

3-DESIGN/DEVELOPMENT

BRIDGE DECK JOINT REPAIRS.TULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 04-MISCELLANEOUS BRIDGE REPAIRS

H.012506

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 04 TRAFFIC CONTROL UPGRADE I

H.009733

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 04

H.012643

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNALSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 04 TRAFFIC CONTROL UPGRADE Y3

H.012666

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 04 TRAFFIC CONTROL UPGRADE Y2

Page 2 - 110 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 187: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012893

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST 04:ABC BR REPLACE BIENVILLE PARISH

H.012894

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENTSVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST04:ABC BR REP CLA, WEB PARISHES

H.012896

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 04 000-94 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST04:ABC BR REP BOSS,CADD,RED RIV PARS

H.009191

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 05 PAVEMENT MARKING REPLACE III:

DISTRICT 05

H.009734

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 05

H.012642

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 05 TRAFFIC CONTROL UPGRADE Y3

H.012668

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 05 TRAFFIC CONTROL UPGRADE Y2

H.012895

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST05:ABC BR REP E CAR,W CAR,MOR PARISH

Page 2 - 111 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 188: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012897

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST05:ABC BR REP JACK,LIN,UNION PARISH

H.012898

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 05 000-95 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST05:ABC BR REP OUACHITA, RICH PARS

H.012467

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL IMPROVEMENTSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 07 TRAFFIC CONTROL UPGRADE I

DISTRICT 07

H.009193

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 07 PAVEMENT MARKING REPLACE III:

H.009735

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 07

H.012899

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST07:ABC BR REP ALLEN, BEA, J DAV PARS

H.012900

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST07:ABC BR REP CALCASIEU, CAMERON PAR

H.011960

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 STPFLEX 409 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

UPGRADE OF EXISTING SIGNAL CONTROLLERSFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 CONTROLLER UPGRADES

DISTRICT 08

Page 2 - 112 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 189: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012486

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 TRAFFIC CONTROL UPGRADE I

H.009736

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 08

H.012641

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 TRAFFIC CONTROL UPGRADE Y3

H.012909

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST08:ABC BR REP AVOYELLE, RAPIDES PARS

H.012910

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENTVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST08:ABC BR REP GRAN, NATCH, WINN PARS

H.013005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST08:ABC BR REP SABINE, VERNON PARS

H.013264

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 0 SAFETY 0-FEASIBILITY/SCOPING

SAFETY PLAN TO PRIORITIZE POTENTIAL SAFETY PROJECTSMCRAE, ADRIANE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 08 SAFETY INVESTMENT PLAN

H.009197

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 58 PAVEMENT MARKING REPLACE III:

DISTRICT 58

Page 2 - 113 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 190: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012464

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 58 TRAFFIC CONTROL UPGRADE I

H.009052

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 STPFLEX 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 58 PAVEMENT MARKING REPLACEMENT II

H.009737

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 58

H.013006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST58:ABC BR REPL CA,CO,FR,TN,LA PARISH

H.013011

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 58 000-91 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST58: ABC BR REPLACE CALDWELL PARISH

H.012465

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 STPFLEX 3,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 61 TRAFFIC CONTROL UPGRADE I

DISTRICT 61

H.009738

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 61

H.012640

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 61 TRAFFIC CONTROL UPGRADE Y3

Page 2 - 114 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 191: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.012667

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 61 TRAFFIC CONTROL UPGRADE Y2

H.013012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST61:ABC BR RP AC,AS,E FL,P CO,WBR PAR

H.012466

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 1,650 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

3-DESIGN/DEVELOPMENT

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 TRAFFIC CONTROL UPGRADE I

DISTRICT 62

H.009739

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL

FLEET CONVERSION TO CNGBROWN, JEFF Remrks:

Typ Imp:

Project:Prj Mgr:

L/CNG FUEL FLEETS DISTRICT 62

H.012639

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADEFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 TRAFFIC CONTROL UPGRADE Y3

H.012670

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 STPFLEX 1,620 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

1-PLANNING/ENVIRONMENTAL

TRAFFIC SIGNAL UPGRADESFILLASTRE, ANDRE Remrks:

Typ Imp:

Project:Prj Mgr:

DISTRICT 62 TRAFFIC CONTROL UPGRADE Y2

H.013007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST62:ABC BR REPLACE TANGIPAHOA PARISH

H.013008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST62:ABC BR REPLACE ST TAM,WASH PARS

Page 2 - 115 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 192: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

H.013010

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

BRIDGE REPLACEMENT FEASIBILITY STUDYVAUGHT, PAUL Remrks:

Typ Imp:

Project:Prj Mgr:

DIST62:ABC BR REPL LIVING, ST HELENA PAR

H.009884

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 RAIL HE 250 RAILROADS 3-DESIGN/DEVELOPMENT

RELOCATING LED CROSSBUCK ASSEMBLIESSHREWSBERRY,BILL Remrks:

Typ Imp:

Project:Prj Mgr:

NOGC (STATEWIDE)

STATEWIDE

H.012908

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STCASH 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

3-DESIGN/DEVELOPMENT

CONSTRUCT NEW FERRY LANDING BARGESIBLEY, STEVEN Remrks:

Typ Imp:

Project:Prj Mgr:

CONSTRUCT NEW LANDING BARGE(SUNSHINE EB

H.012832

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 STPFLEX 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

1-PLANNING/ENVIRONMENTAL

ADVANCED VEHICLE SYSTEM RESEARCH, DESIGN, AND IMPLEMENTATIKIMBENG, LUCY Remrks:

Typ Imp:

Project:Prj Mgr:

AV/CV TECHNOLOGY DEPLOYMENT PHASE 1

H.011247

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING

UPDATE THE STATE GIS DATABASE FOR HISTORIC SITESARDOIN, NOEL Remrks:

Typ Imp:

Project:Prj Mgr:

UPDATES TO GIS HISTORIC SITES DATABASE

H.012485

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 PRESERVATION - BRIDGE (ONSYSTEM)

0-FEASIBILITY/SCOPING

OFF SYSTEM BRIDGE RATINGFENG, DANA Remrks:

Typ Imp:

Project:Prj Mgr:

OFF-SYSTEM BRIDGE RATING

H.013396

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

STATEWIDE 000-99 0 SAFETY 0-FEASIBILITY/SCOPING

LRSP TECH ASSISTANCE CRASH DATA ENGRRIGGS, LAURA Remrks:

Typ Imp:

Project:Prj Mgr:

LRSP/SR2PP CRASH DATA ENG 2018-2023

L.000001

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 3,100 INTERMODAL CONNECTOR STAGES 4, 3, 2, 1, 0 - NHPP 6,200 INTERMODAL CONNECTOR

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INTERMODAL CONNECTORS PROGRAM

L-PROJECTS

L.000002

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,000 PRESERVATION - INTERSTATE STAGES 4, 3, 2, 1, 0

SURFACE IMP, PM, REPAIR FOR PAVEMENT/EMBANKMENTNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSTATE PAVEMENT PREVENTIVE MAINT

Page 2 - 116 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 193: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

L.000003

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 2,000 PRESERVATION - NON-INTERSTATEON STP SYSTEM

STAGES 4, 3, 2, 1, 0

PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

PREVENTIVE MAINTENANCE NON-INTERSTATE

L.000004

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NFA 2,500 PRESERVATION - NON-INTERSTATENFA

STAGES 4, 3, 2, 1, 0

PREVENTIVE MAINTENANCE/REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

PREVENTIVE MAINT NON-INTERSTATE (NFA)

L.000005

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 4,400 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

STAGES 4, 3, 2, 1, 0

- STCASH 6,000 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ROAD PREVENTIVE MAINTENANCE

L.000006

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,200 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

STAGES 4, 3, 2, 1, 0

- STCASH 1 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

MAPNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MOTORIST ASSISTANCE PATROL

L.000007

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 250 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

STAGES 4, 3, 2, 1, 0

- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

TRANSPORTATION SYSTEMS MANAGEMENT

L.000008

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STP>200K 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 1,000 URBAN SYSTEMS

SELECTED BY MPO'SNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

URBAN SYSTEM PROJECTS

L.000009

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STBONDS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

AS APPROVED BY LEGISLATURENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC BOND PROJECTS

Page 2 - 117 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 194: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

L.000010

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- REIMB 5,000 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- NHPP 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

- STCASH 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

REIMBURSABLE AND NON-REIMBURSABLENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

URGENT BRIDGE REPAIR/REPLACEMENT

L.000011

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- STPFLEX 1,500 PRESERVATION - BRIDGE (ONSYSTEM)

- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)

MAINTENANCENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

BRIDGE PREVENTIVE MAINTENANCE

L.000012

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 1,000 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 1 PRESERVATION - BRIDGE (ONSYSTEM)

MISC SITESNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

BRIDGE PAINTING PROGRAM

L.000013

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - MOVABLE BRIDGEREHABILITATION

STAGES 4, 3, 2, 1, 0

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MOVABLE BRIDGE PREVENTIVE MAINTENANCE

L.000014

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - STBONDS 500 OTHER / MISCELLANEOUS

IN CONJUNCTION WITH DEDNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC ECONOMIC DEVELOPMENT INITIATIVES

L.000015

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- OTHER 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

STAGES 4, 3, 2, 1, 0

- STCASH 500 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

REHABILITATION/REPAIRNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC FERRY PROJECTS

Page 2 - 118 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 195: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

L.000016

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- HSIP 300 SAFETY STAGES 4, 3, 2, 1, 0 - STPFLEX 200 SAFETY - STCASH 100 SAFETY

MISC PROJECTSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

FEDERAL SAFETY PROGRAMS

L.000017

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

STAGES 4, 3, 2, 1, 0

- DEMO 300 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

- CM 400 OPER EFFICIENCY/MOTORISTASSISTANCE - ITS

ENGINEERING, CONSTRUCTION, MAINTENANCE, OPERATIONSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC ITS SYSTEMS

L.000018

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

STAGES 4, 3, 2, 1, 0

- STCASH 100 OPER EFFICIENCY/MOTORISTASSISTANCE - INTERSTATE LIGHTING

IN ACCORDANCE WITH MAINTENANCE AGREEMENTSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INTERSTATE LIGHTING PROGRAM

L.000019

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STBONDS 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

OVERLAY/REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

STATE PARK ROADS

L.000020

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

STAGES 4, 3, 2, 1, 0

- STCASH 250 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

TO ALLEVIATE FLOODINGNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC DRAINAGE PROJECTS

L.000021

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- FLH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

FEDERAL LANDS HIGHWAYS, ETC.Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC FEDERAL PROJECTS/PROGRAMS

L.000022

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- RAIL HE 3,000 RAILROADS STAGES 4, 3, 2, 1, 0 - RAIL PD 3,000 RAILROADS - STPFLEX 2,000 RAILROADS - STCASH 200 RAILROADS

FEDERAL RAILROAD CROSSING IMPROVEMENTS PROGRAMNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

RAILROAD CROSSING IMPROVEMENTS

L.000025

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- TOLLS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

ORLEANS AND JEFFERSON PARISHESNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

TOLL FUNDED PROJECTS

Page 2 - 119 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 196: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

L.000026

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0 - TIME 1,000 OTHER / MISCELLANEOUS

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

WETLAND MITIGATION BANK

L.000027

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- ER 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

EMERGENCY RELIEFNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

EMERGENCY RELIEF PROVIDED BY CONGRESS

L.000028

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 5,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

HOT MIX, PIPE, BRIDGE MATERIAL, ETCNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MAINTENANCE MATERIALS

L.000029

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- TAPFLEX 1,000 ENHANCEMENTS STAGES 4, 3, 2, 1, 0

MISC PROJECTSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

FEDERAL ENHANCEMENT PROGRAM

L.000030

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 200 SAFETY STAGES 4, 3, 2, 1, 0 - STCASH 100 SAFETY

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

CRASH ATTENUATOR REPAIRS

L.000031

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- DEMO 10,000 DEMO / HIGH PRIORITY STAGES 4, 3, 2, 1, 0

AS DEFINED BY FEDERAL GOVERNMENTNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

DEMO/HI-PRI/OTHER FEDERAL PROGRAMS

L.000032

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 500 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

STAGES 4, 3, 2, 1, 0

FACILITY REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

REST AREA REHABILITATION

L.000033

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

STAGES 4, 3, 2, 1, 0

- STPFLEX 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC SIGNS, STRIPING, SIGNALS

L.000034

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

STAGES 4, 3, 2, 1, 0

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

INSTALL RAISED PAVEMENT MARKERS

Page 2 - 120 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 197: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

L.000035

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- FBROFF 1,000 PRESERVATION - BRIDGE (OFFSYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 200 PRESERVATION - BRIDGE (OFFSYSTEM)

BRIDGE REPLACEMENTS/INSPECTIONSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC FEDERAL OFF-SYSTEM BRIDGES

L.000036

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 1,900 OPER EFFICIENCY/MOTORISTASSISTANCE - WEIGH STATIONS

STAGES 4, 3, 2, 1, 0

MISC SITES STATEWIDENot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

WEIGH STATION REHABILITATION/UPGRADE

L.000037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 2,000 SAFETY STAGES 4, 3, 2, 1, 0

RUMBLE STRIPSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

HIGHWAY SAFETY IMPROVEMENTS

L.000039

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 50 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0

CONSTRUCT TEST SECTIONSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ACCELERATED LOADING FACILITY

L.000040

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 3,000 PRESERVATION - BRIDGE (ONSYSTEM)

STAGES 4, 3, 2, 1, 0

- STCASH 600 PRESERVATION - BRIDGE (ONSYSTEM)

INSPECTIONS, RATINGS, LOAD FACTORSNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

FEDERAL BRIDGE INSPECTION PROGRAMS

L.000041

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

NON-ATTAINMENT AREASNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

CONGESTION MITIGATION PROJECTS

L.000042

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 500 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

IN LAKE CHARLES AS APPROVED BY FHWANot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC CONGESTION MITIGATION PROJ - LKC

L.000043

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0

IN BATON ROUGE AS APPROVED BY FHWANot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

MISC CONGESTION MITIGATION PROJ - BTR

Page 2 - 121 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 198: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

L.000068

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

STAGES 4, 3, 2, 1, 0

- STPFLEX 2,500 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

- STPFLEX 8,300 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

- STPFLEX 8,100 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ACCESS MANAGEMENT PROJECTS

L.000069

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STCASH 1,000 ROAD TRANSFER STAGES 4, 3, 2, 1, 0 - STPFLEX 1,000 ROAD TRANSFER

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ROAD TRANSFER PROGRAM

L.000093

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 5,500 CONGESTION MITIGATION STAGES 4, 3, 2, 1, 0

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

STATEWIDE CONGESTION MITIGATION

L.000094

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- CM 100 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0 - STP<200K 100 URBAN SYSTEMS - STPFLEX 100 URBAN SYSTEMS

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

URBAN TRANSIT(INCL TRANSFER TO AGENCIES)

L.000097

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- STPFLEX 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

STAGES 4, 3, 2, 1, 0

- NHPP 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - AMERICANS WITHDISABILITIES ACT

ADA PROGRAMNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

ADA PROGRAM

L.000024

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- HSIP 1,000 SAFETY STAGES 2, 1, 0 - STCASH 500 SAFETY

HANDLED THROUGH OPERATIONS BUDGETNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

SOFT SIDE SAFETY

L.000038

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- SPR MAND 7,000 OTHER / MISCELLANEOUS STAGES 2, 1, 0 - SPR OPT 7,000 OTHER / MISCELLANEOUS

HANDLED THROUGH OPERATING BUDGETNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

PLANNING, TRAINING AND RESEARCH

Page 2 - 122 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 199: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019PROJECTS IN DEVELOPMENT

L.000023

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

- NHPP 400 OTHER / MISCELLANEOUS STAGES 1, 0 - STPFLEX 300 OTHER / MISCELLANEOUS - STCASH 300 OTHER / MISCELLANEOUS

Not assigned Remrks:

Typ Imp:

Project:Prj Mgr:

SCOPING AND ENVIRONMENTAL STUDIES

Page 2 - 123 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 200: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority
Page 201: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

STAGE 2 – WAITING FOR FUNDING

This is a list of all projects in the program that can be funded

if additional revenues become available.

Projects in this list may also be funded in future fiscal years

with existing revenue sources if identified through the project

selection process as a high priority relative to other candidate

projects within the same category.

Page 202: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority
Page 203: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.002729

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 98 389-01 NFI 19,734 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGACADIA I-10 450-04 0 DEMO / HIGH PRIORITY

NEW BRIDGE. NEW CONCRETE PAVEMENTYANG, LI Remrks:

Typ Imp:389-01-0011;

Project:Prj Mgr:

GRAND PRAIRIE HWY INTR.&FRONTAGE RD

ACADIA

H.003756

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA 000-01 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

FED EARMARK FOR STUDYNGUYEN, WAYNE Remrks:

Typ Imp:700-01-0112;$993.500(IMD)&$110.000C.O.AVAILABLE

Project:Prj Mgr:

NEW INTERCHANGE LA 98 RAYNE

H.010885

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ACADIA LA 91 801-09 0 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

REPLACEMENT OF PONTOON BRIDGETOURRES, VALERIE Remrks:

Typ Imp:CONSTRUCTION FUNDS WILL BE STATE BONDS

Project:Prj Mgr:

LA 91: BAYOU PLAQUEMINE BRULE BR REPLACE

H.003790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 930 803-14 STBONDS 5,300 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN LA 930 & ADD OPEN DITCHESMUSA, ELNUR Remrks:

Typ Imp:803-14-0005;STATE BONDS BEING REQUESTED

Project:Prj Mgr:

LA 930: CAUSEY RD TO LA 42

ASCENSION

H.006457

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION 000-03 NFI 500 SAFETY - LOCAL ROADS SAFETY 2-WAITING FOR FUNDING

ROUNDABOUT CONSTRUCTIONRICCA, MICHAEL A. Remrks:

Typ Imp:737-03-0104;

Project:Prj Mgr:

ROUNDABOUT @ PR 929 & PARKER ROADS

H.009266

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION I-10 450-11 NFI 46,700 CORRIDOR 2-WAITING FOR FUNDING

WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LA 73 TO LA 30

H.009276

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION I-10 450-11 NFI 50,300 CORRIDOR 2-WAITING FOR FUNDING

WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONPAINE, PEGGY JO Remrks:

Typ Imp:LHIP USED FOR ENG

Project:Prj Mgr:

I-10: LA 30 TO LA 22

H.010909

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASCENSION LA 44 265-01 NFI 1,200 SAFETY 2-WAITING FOR FUNDINGASCENSION LA 941 803-27 NFI 600 SAFETY ASCENSION 000-03 NFI 200 SAFETY

CONSTRUCT ROUNDABOUT AT OR NEAR THE LA 44/LA 941 INTERSECTHANKS, ANNA Remrks:

Typ Imp:FEASIBILITY STUDY FUNDED WITH SATRANS

Project:Prj Mgr:

LA 44: ROUNDABOUT AT LA 941

H.010571

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ASSUMPTION LA 70 232-01 NFI 140,000 CAPACITY 2-WAITING FOR FUNDING

STUDY FOR BYPASS ROAD FOR LA 70-PIERRE PART TO NEAR LA 69JONES, MATTHEW Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70 BYPASS

ASSUMPTION

Page 3 - 1 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 204: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009493

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES LA 107 147-03 NFI 2,322 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

CTB AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 107: LA 1179 - LA 1181

AVOYELLES

H.009741

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

AVOYELLES 000-05 NFI 338 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALK W/ LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGENUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

MARKSVILLE SIDEWALK IMPROVEMENTS

H.003251

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NFI 61,140 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 69,390 PRESERVATION - BRIDGE (ON

SYSTEM)

BOSSIER I-20 451-02 NFI 26,360 CAPACITY

WIDEN INTERSTATE TO 3 LANES EACH DIRECTIONOLIVIER, NICHOLAS Remrks:

Typ Imp:451-02-0078;

Project:Prj Mgr:

I-20 (HAMILTON RD TO AIRLINE DR)

BOSSIER

H.003855

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 NFI 27,900 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

ROADWAY EXT (WINFIELD RD) STUDYOLIVIER, NICHOLAS Remrks:

Typ Imp:700-08-0130;STAGE 0

Project:Prj Mgr:

BOSSIER PAR CONG RELIEF WINFIELD RD

H.003857

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

ROAD EXTENSION (ENGINEERING) STUDYOLIVIER, NICHOLAS Remrks:

Typ Imp:700-08-0132;

Project:Prj Mgr:

WAFER ROAD EXTENSION

H.005184

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER 000-08 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGCADDO 000-09 0 DEMO / HIGH PRIORITY

ENVIRONMENTAL IMPACT STATEMENTTSAI, LOONG SHEN Remrks:

Typ Imp:700-94-0003;NCPD FUNDS

Project:Prj Mgr:

HIGH PRIORITY CORRIDOR NO. 18

H.009522

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 3105 808-07 NFI 9,100 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 300 RAILROADS - GRADE SEPARATION

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3105:UNDERPASS@KCS S OF I-20(BOSSIER)

H.011319

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER I-20 451-02 NFI 94,907 PRESERVATION - INTERSTATE 2-WAITING FOR FUNDINGBOSSIER I-20 451-02 NFI 40,919 CAPACITY BOSSIER I-20 451-02 NFI 19,977 PRESERVATION - BRIDGE (ON

SYSTEM)

INTERSTATE WIDENINGOLIVIER, NICHOLAS Remrks:

Typ Imp:

Project:Prj Mgr:

I-20: AIRLINE DR. TO I-220

Page 3 - 2 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 205: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.012953

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

BOSSIER LA 157 082-03 NFI 227 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

2-WAITING FOR FUNDING

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 157: OAKLAND TO KCS R/R TRACKS

H.001618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 538 078-02 NFI 5,604 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCADDO LA 173 094-01 0 OTHER / MISCELLANEOUS

RECONST.W/GEOMETRIC IMP NEED STAGE0KENDRICK, BRIAN Remrks:

Typ Imp:078-02-0019;NEED FUNDS

Project:Prj Mgr:

JCT LA 173 - MIDDLE SCHOOL

CADDO

H.001724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 173 094-01 NFI 25,000 CAPACITY 2-WAITING FOR FUNDING

4 LANING (CONTINGENT ON BOND FUNDS)MCMILLAN, RYAN Remrks:

Typ Imp:094-01-0029;ORIGINATED BY DEPT OF ECON DEV.

Project:Prj Mgr:

SHREVEPORT-BLANCHARD HWY.

H.001725

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO LA 173 094-01 NFI 10,000 CAPACITY 2-WAITING FOR FUNDING

WIDENINGMCMILLAN, RYAN Remrks:

Typ Imp:094-01-0032;

Project:Prj Mgr:

JCT. LA 3094 - JCT. I-220

H.006447

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

DESIGN AND ACQUIRE R/WBRIGNAC, CHRISTINA Remrks:

Typ Imp:736-99-1032;

Project:Prj Mgr:

I-69: SIU 14 JCT I-20 TO US 82

H.006472

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 NFI 216 SAFETY - LOCAL ROADS SAFETY 2-WAITING FOR FUNDING

TRAFFIC SIGNAL POWER GENERATOR INSTRICCA, MICHAEL A. Remrks:

Typ Imp:737-09-0104;

Project:Prj Mgr:

CITY OF SHREVEPORT TRAFFIC SIG BKUP

H.006475

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 NFI 158 SAFETY - LOCAL ROADS SAFETY 2-WAITING FOR FUNDING

TRAFFIC SIGNAL POWER GENERATORRICCA, MICHAEL A. Remrks:

Typ Imp:737-09-0108;

Project:Prj Mgr:

CITY OF SHRVPRT TRAFFIC SIGNAL BKUP

H.009744

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 NFI 438 ENHANCEMENTS 2-WAITING FOR FUNDING

MULTI-USE TRAIL AND RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

OIL CITY MULTI-USE TRAIL, PHASE 2

H.011448

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CADDO 000-09 NFI 19,000 OPER EFFICIENCY/MOTORISTASSISTANCE - REST AREAS

2-WAITING FOR FUNDING

DESIGN AND CONSTRUCT NEW REST AREAGUINN, SCOTT Remrks:

Typ Imp:

Project:Prj Mgr:

IDA SAFETY REST AREA

Page 3 - 3 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 206: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009488

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 378 810-12 NFI 0 CAPACITY 2-WAITING FOR FUNDING

STAGE 0 STUDY TO WIDEN LA 378 (WESTLAKE TO MOSS BLUFF)LANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 378 WIDENING (WESTLAKE TO MOSS BLUFF)

CALCASIEU

H.009521

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 397 193-31 NFI 10,200 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 397: NEW BRIDGE AT UPRR

H.009750

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU 000-10 NFI 145 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS, SUBSURFACE DRAINAGE, & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:ROW IS 80/20, CONSTRUCTION 95/5

Project:Prj Mgr:

TOPSY ROAD SIDEWALK

H.009751

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 14 196-01 NFI 106 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS, SUBSURFACE DRAINAGE, WARNING LIGHTS &RELATED WOMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

BELL CITY SCHOOL SIDEWALK

H.012052

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CALCASIEU LA 3092 810-28 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

2-WAITING FOR FUNDING

CALCASIEU 000-10 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRANSPORTATIONSYSTEMS MANAGEMENT

ADD A ROUNDABOUT TO AID IN TRAFFIC FLOW.BRIGNAC, CHRISTINA Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3092: ROUNDABOUT

H.000762

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CATAHOULA US 84 022-06 NFI 6,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGCATAHOULA US 84 022-06 NFI 6,000 CAPACITY

WIDEN TO 4 LANESMOORE, DARRELL Remrks:

Typ Imp:022-06-0038;

Project:Prj Mgr:

JCT LA 28 - JCT LA 3037

CATAHOULA

H.000770

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 84 022-07 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMOORE, DARRELL Remrks:

Typ Imp:022-07-0053;

Project:Prj Mgr:

JCT LA 565 - JCT LA 129

CONCORDIA

H.000771

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

CONCORDIA US 84 022-07 NFI 3,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:022-07-0054;

Project:Prj Mgr:

LA 129 - US 65 (FERRIDAY)

Page 3 - 4 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 207: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.001790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DESOTO LA 509 105-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGRED RIVER LA 509 105-03 0 OTHER / MISCELLANEOUS

RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:

Typ Imp:105-02-0017;$.5 AVAIL. (ORIGINATED BY DED)

Project:Prj Mgr:

INT. PAPER PLANT - LA 1

DESOTO

H.002317

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 LOCAL 10,928 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

NEW 4 LANE DIVIDED CONCRETE HIGHWAY WITH RAISED MEDIANREVIERE, RYAN Remrks:

Typ Imp:GREEN LIGHT PROJECT

Project:Prj Mgr:

LA 408: HOOPER RD (JOOR RD-SULLIVAN RD)

EAST BATON ROUGE

H.002344

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 427 258-01 LOCAL 44,552 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 4 LANESREVIERE, RYAN Remrks:

Typ Imp:258-01-0033;GREEN LIGHT PROJECT(LET BY CITY); STAGE 0 COMP

Project:Prj Mgr:

LA 427: PERKINS RD (SIEGEN - HIGHLAND)

H.002358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 3064 258-32 DEMO 14,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

(PHASE 2)(REQ DEMO FUNDS)REVIERE, RYAN Remrks:

Typ Imp:454-01-0068;IM-D $250K FY03.REQ MORE DEMO

Project:Prj Mgr:

ESSEN LANE INTERCHANGE (WB)

H.005403

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 NFI 108,100 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

EXTENSION OF HOOPER ROAD FROM LA 37 TO LA 16EVANS, MISTY Remrks:

Typ Imp:700-99-0527;GEN.OBLIGATION BOND(PR2=$100K & PR5=$900K)

Project:Prj Mgr:

LA408(HOOPER RD EXT)LA37-LA16

H.007970

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 426 817-09 NFI 8,658 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

WIDEN TO 4 LANESREVIERE, RYAN Remrks:

Typ Imp:817-09-0035;INCLUDES I'SECT @ FLANNERY;

Project:Prj Mgr:

OLD HAMMOND (BLVD DE PROV-MILL)

H.007974

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 426 817-09 LOCAL 9,681 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

NEW CONC PAVEMENTREVIERE, RYAN Remrks:

Typ Imp:817-09-0042; LET BY CITY. GREEN LIGHT PROJECT

Project:Prj Mgr:

OLD HAMMOND HWY(MILLERVILLE-O'NEAL)

H.008415

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 DEMO 600 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGE BATON ROUGE 000-17 OTHER 1,773 OTHER / MISCELLANEOUS

FEDERAL EARMARKUMEOZULU, JOE Remrks:

Typ Imp:DEMO$ & $ FROM SOUTHERN;AUTHORIZED;

Project:Prj Mgr:

INFORMATION CENTER @ SOUTHERN UNIVERSIT

H.008732

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

EISNGUYEN, WAYNE Remrks:

Typ Imp:EIS IS DEMO WITH MATCH FROM LOCALS

Project:Prj Mgr:

STUDY OF BATON ROUGE LOOP

Page 3 - 5 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 208: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009300

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 NFI 51,000 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO FOUR LANESEVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

HOOPER ROAD WIDENING (LA 3034 - LA 37)

H.009327

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-10 NFI 10,139 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

E BATON ROUGE I-110 450-92 NFI 123 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

W BATON ROUGE I-10 450-08 NFI 4,432 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

EPOXY BRIDGE DECK OVERLAYTULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10/110 EPOXY BR DECK OVERLAY-BTN ROUGE

H.009783

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 NFI 401 ENHANCEMENTS 2-WAITING FOR FUNDINGE BATON ROUGE I-10 450-10 NFI 320 ENHANCEMENTS E BATON ROUGE 000-17 NFI 332 ENHANCEMENTS

MULTI-USE PATH W/LIGHTING, LANDSCAPING & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

BR DOWNTOWN GREENWAY MULTI-USE PATH

H.010320

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 42 258-31 NFI 2,400 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

E BATON ROUGE LA 42 257-04 NFI 4,100 PRESERVATION - NON-INTERSTATEON STP SYSTEM

PCC PATCHSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 42: JCT. HIGHLAND RD - LA 30

H.011098

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 30 414-01 NFI 1,319 OPER EFFICIENCY/MOTORISTASSISTANCE - ACCESSMANAGEMENT

2-WAITING FOR FUNDING

E BATON ROUGE LA 30 414-01 NFI 1,080 ROAD TRANSFER E BATON ROUGE LA 30 414-01 NFI 10,000 ROAD TRANSFER

MEDIAN AND PAVEMENT WIDENING, AND RELATED WORKWAGUESPACK, BRENT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 30: SOUTH BLVD - W CHIMES ST

H.011892

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-10 450-09 NFI 35,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

CLEAINING & PAINTING BRIDGE APPROACHES AND MAIN SPAN STEEL.TULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-10 MISS RIVER BRIDGE CLEAN & PAINT

H.011906

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 37 254-02 NFI 2,000 OTHER / MISCELLANEOUS

ROUNDABOUT AT HOOPER RD AND GREENWELL SPRINGS RDEVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

HOOPER RD: ROUNDABOUT AT LA 37

Page 3 - 6 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 209: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.011923

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE LA 408 255-02 NFI 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGE BATON ROUGE LA 3034 255-30 NFI 2,000 OTHER / MISCELLANEOUS

ROUNDABOUT: INTERSECTION IMPROVEMENTEVANS, MISTY Remrks:

Typ Imp:

Project:Prj Mgr:

HOOPER RD: ROUNDABOUT AT SULLIVAN RD

H.012025

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE I-110 450-92 0 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

BRIDGE PREVENTIVE MAINTENANCE WORK.TULLIER, DANNY Remrks:

Typ Imp:

Project:Prj Mgr:

I-110 IN BATON ROUGE BRIDGE REPAIRS

H.012232

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

E BATON ROUGE 000-17 NFI 11,650 URBAN SYSTEMS 2-WAITING FOR FUNDING

NEW ALIGNMENTBRIGNAC, CHRISTINA Remrks:

Typ Imp:ENTITY WILL PROVIDE MATCH

Project:Prj Mgr:

LA 3064 TO LA 1248 PHASE 2

H.009784

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

FRANKLIN 000-21 NFI 229 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS W/LIGHTING, & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

WINNSBORO: ADAMS&COMMON ST STREETSCAPI

FRANKLIN

H.002893

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA US 90 424-04 NFI 21,391 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTKEMP, KELLY Remrks:

Typ Imp:424-04-0059;EAST AND WEST BOUND LANES

Project:Prj Mgr:

US 90: LA 14 OVERPASS REPLACEMENT

IBERIA

H.007453

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 TAP>200K 865 ENHANCEMENTS 2-WAITING FOR FUNDING

NEW SIDEWALKSMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

HOPKINS STREET SIDEWALKS, PHASE II

H.011655

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

IBERIA LA 675 823-02 NFI 155 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

2-WAITING FOR FUNDING

IBERIA LA 675 823-02 NFI 85 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

DRAINAGE STRUCTURES, PATCH & THIN OVERLAYLACOMBE, JASON Remrks:

Typ Imp:823-02 LM 0.41 TO 1.19 NFA AS MATCH (DETIAL 2)

Project:Prj Mgr:

LA 675: 0.53 MI SE US 90 - LA 674

H.002955

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NFI 5,000 URBAN SYSTEMS 2-WAITING FOR FUNDING

ACCESS IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:430-01-0016

Project:Prj Mgr:

EARHART EXPRESSWAY

JEFFERSON

Page 3 - 7 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 210: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.002956

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3139 430-01 NFI 2,375 URBAN SYSTEMS 2-WAITING FOR FUNDING

RAMP CONNECTOR (EB EARHART - DAKIN)LEBAS, MELISSA Remrks:

Typ Imp:430-01-0020; USE TTF AS MATCH

Project:Prj Mgr:

EARHART AT DAKIN

H.003074

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NFI 100,000 CORRIDOR 2-WAITING FOR FUNDING

MAJOR WIDENING - ADD TRAVEL LANESYANG, LI Remrks:

Typ Imp:450-15-0124; TOLL CREDITS USED AS MATCH FOR PART OF PHASE 5

Project:Prj Mgr:

I 10: WILLIAMS BLVD - VETERANS BLVD

H.004359

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 3154 826-44 STBONDS 7,296 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGJEFFERSON LA 3154 826-44 OTHER 2,673 OTHER / MISCELLANEOUS

RELOCATION AND 4-LANINGYANG, LI Remrks:

Typ Imp:826-44-0027;

Project:Prj Mgr:

HICKORY (LA 48 - MOUNES)

H.004367

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 125,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY

ENVIRONMENTAL. LINE & GRADE STUDYYANG, LI Remrks:

Typ Imp:700-26-0242;HP NO.1600 (SEE ALSO 736-92-0003)

Project:Prj Mgr:

LA3139:EARHART EXPRESSWAY EXT TO US 61

H.006441

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON LA 23 062-01 NFI 3,345 URBAN SYSTEMS 2-WAITING FOR FUNDINGPLAQUEMINES LA 23 062-02 NFI 2,900 URBAN SYSTEMS

WIDENING FEASIBILITY STUDYLEBAS, MELISSA Remrks:

Typ Imp:736-38-0002;TRAFFIC STUDY FOR BELLE CHASE HWY.

Project:Prj Mgr:

LA 23 (ENGINEERS RD. - LAPALCO)

H.006513

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 DEMO 6,750 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGORLEANS 000-36 0 DEMO / HIGH PRIORITY ST CHARLES 000-45 0 DEMO / HIGH PRIORITY

ABANDONED RR R/W ACQ. (HP NO 1600)NGUYEN, WAYNE Remrks:

Typ Imp:737-26-0001;HP=$0.5M. >2OOK=$0.3M IN FY 2001

Project:Prj Mgr:

US 61 CORRIDOR PRESERVATION

H.007214

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 7,400 URBAN SYSTEMS 2-WAITING FOR FUNDING

WIDEN FROM 2 TO 3 LANESLEBAS, MELISSA Remrks:

Typ Imp:742-26-0080;OREGON DR.-BLANCHE DR.

Project:Prj Mgr:

EAST AMES BOULEVARD IMPROVEMENTS

H.007223

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 7,100 URBAN SYSTEMS 2-WAITING FOR FUNDING

WIDEN TO 4 LANE URBAD SECT W MEDIANLEBAS, MELISSA Remrks:

Typ Imp:742-26-0090; USE LOCAL AS MATCH

Project:Prj Mgr:

HARVEY BLVD (MANHATTAN - WALL)

H.009087

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON I-10 450-15 NFI 10,000 CORRIDOR 2-WAITING FOR FUNDING

MAJOR WIDENING - ADD TRAVEL LANESYANG, LI Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LOYOLA DR. TO WILLIAMS BLVD.

Page 3 - 8 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 211: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009753

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 302 ENHANCEMENTS 2-WAITING FOR FUNDINGNOT ASSIGNED - NFI 34 ENHANCEMENTS NOT ASSIGNED - LOCAL 1 ENHANCEMENTS

SIDEWALK W/LIGHTING, LANDSCAPE & RELATED WORK#MULTIVALUE Remrks:

Typ Imp:

Project:Prj Mgr:

JEAN LAFITTE: DOWNTOWN SIDEWALK, PHASE 2

H.009794

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 170 ENHANCEMENTS 2-WAITING FOR FUNDINGJEFFERSON US 90-Z 283-09 NFI 75 ENHANCEMENTS JEFFERSON LA 466 063-02 NFI 50 ENHANCEMENTS JEFFERSON LA 466 063-02 NFI 25 ENHANCEMENTS

SIGNING, PAVEMENT MARKINGS, M/U PATH & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

GRETNA BICYCLE ACCESS IMPROVEMENTS

H.009804

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON 000-26 NFI 446 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS W/ LIGHTING, STREETSCPAING & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

KENNER: S WILLIAMS BLVD STREETSCAPING

H.011309

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFFERSON US 90-Z 283-09 NFI 40,000 CAPACITY 2-WAITING FOR FUNDING

RELOCATE THE EXIT RAMP AND CONSTRUCT AN ENTRANCE RAMPYANG, LI Remrks:

Typ Imp:USE CCCD TOLL CREDITS AS MATCH TO THE PHASE 5 FUNDS

Project:Prj Mgr:

MACARTHUR INTERCHANGE COMPLETION PH. II

H.009420

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

JEFF DAVIS US 165 014-02 NFI 1,000 SAFETY 2-WAITING FOR FUNDING

INSTALL J-TURN ON US 165 @ LA 101CORMIER, CLAYTON Remrks:

Typ Imp:

Project:Prj Mgr:

US 165: INSTALL J-TURN @ LA 101

JEFFERSON DAVIS

H.002868

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 NFI 105,000 CORRIDOR 2-WAITING FOR FUNDING

NEW INTERCHANGEPAINE, PEGGY JO Remrks:

Typ Imp:424-02-0090;ENG DEMO. RW/UTL S9$1.2M AVAILABLE.NFI FOR CONST

Project:Prj Mgr:

I-49 S:AMB CAFFERY/US90 INTERCHANGE

LAFAYETTE

H.003454

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE I-49 455-01 NFI 850,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

IN LAFAYETTE NEW INTERSTATENICKEL, TIM Remrks:

Typ Imp:455-01-0035;ENGR 700-24-0073. R/W 455-01-0034

Project:Prj Mgr:

LAFAYETTE CONNECTOR

H.004492

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE 000-28 0 URBAN SYSTEMS 2-WAITING FOR FUNDING

INTERCHANGE DESIGNUMEOZULU, JOE Remrks:

Typ Imp:700-28-0223;STUDY FED FY2013.ENGR FED FY2014

Project:Prj Mgr:

I-10 INTERCHANGE AT N AMBASSADOR CAFFERY

Page 3 - 9 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 212: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009214

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 339 828-11 0 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE LA 339 828-12 0 CAPACITY

WIDENINGBRIGNAC, CHRISTINA Remrks:

Typ Imp:LCG PROVIDE MATCH PHASE 2

Project:Prj Mgr:

LA 339: WIDENING (LA 82 TO LA 3073)

H.009215

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 0 CAPACITY 2-WAITING FOR FUNDING

WIDENINGBRIGNAC, CHRISTINA Remrks:

Typ Imp:LCG PROVIDE MATCH PHASE 2

Project:Prj Mgr:

LA182:WIDENING(W PONT DES MOUTON RD-I49)

H.009335

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 NFI 40,200 CAPACITY 2-WAITING FOR FUNDING

WIDENING AND ADDING TRAVEL LANES TO PROVIDE 4 LANE HIGHWAYBABIN, TEDDY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: I-10 TO WEST PONT DES MOUTON RD

H.009520

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 3168 433-01 NFI 24,700 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3168:NEW BRIDGE@BNSF-US 90(LAFAYETTE)

H.009795

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE LA 182 032-01 NFI 571 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 182: US 90-MLK DRIVE SIDEWALKS

H.011235

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 NFI 97,000 CAPACITY 2-WAITING FOR FUNDING

CONSTRUCT NEW INTERSECTION - CONCRETELANDRY, COREY Remrks:

Typ Imp:

Project:Prj Mgr:

I-49 SOUTH @ VEROT SCHOOL ROAD

H.011303

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFAYETTE US 90 424-02 NFI 6,000 CAPACITY 2-WAITING FOR FUNDING

FRONTAGE RD CONSTRUCTIONPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

US 90:ALBERTSON TO SOUTHPARK FRONTAGE R

H.008145

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 STBONDS 30,280 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLAFOURCHE LA 1 829-32 LOCAL 4,995 OTHER / MISCELLANEOUS

ROUTE LA 1 RELOCATIONNICKEL, TIM Remrks:

Typ Imp:829-32-0010;NEW BRIDGE.NEW ALIGNMENT; AC-ING WITH STBONDS

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2C

LAFOURCHE

H.009742

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 NFI 191 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALK WITH LIGHTINGMEEK, STEPHEN Remrks:

Typ Imp:MATCH IS 15% TOLL CREDITS AND 5% LOCAL

Project:Prj Mgr:

ACADIA RD: AUDUBON - MLK/BAYOU PED PATH

H.010152

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 064-90 STBONDS 2,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

DREDGE CANAL AND MITIGATION FOR LA 1 ELEVATED CONSTRUCTIONNICKEL, TIM Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1: CONSTRUCTION CANAL DREDGING

Page 3 - 10 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 213: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.011207

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 NFI 43,400 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

CONSTRUCT RELOCATED LA 1 ON ELEVATED STRUCTURENICKEL, TIM Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2A

H.011208

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 NFI 230,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

ELEVATED RELOCATED LA 1 -LEEVILLE TO GOLDEN MEADOW LEVEENICKEL, TIM Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2B

H.011209

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE LA 1 829-32 NFI 10,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

NEW TOLL FACILITY FOR LA 1 SOUTHBOUND AND APPROACH.NICKEL, TIM Remrks:

Typ Imp:SEE NOTES FOR FUNDING INFO

Project:Prj Mgr:

LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2D

H.011915

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LAFOURCHE 000-29 NFI 24,506 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLAFOURCHE 000-29 NFI 1,054 ROAD TRANSFER

NEW BRIDGE AND NEW ROAD BETWEEN LA 308 AND LA 3235BROWN, JOSEPH C. Remrks:

Typ Imp:

Project:Prj Mgr:

AIRPORT CONNECTOR ROAD AND BRIDGE

H.000758

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE US 84 022-05 NFI 55,000 CORRIDOR 2-WAITING FOR FUNDING

WIDENINGMASTIN, CATHERINE Remrks:

Typ Imp:022-05-0045;

Project:Prj Mgr:

LA 772 - HAIR CREEK(JENA)

LASALLE

H.009644

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LASALLE LA 125 131-01 NFI 1,384 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

ASPHALT OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 125: US 165-PENTECOSTAL CHURCH ROAD

H.001550

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 146 068-01 0 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 5 LANESJESCLARD, TREY Remrks:

Typ Imp:068-01-0009;$200 BONDS AVAIL. FOR PE (E?)

Project:Prj Mgr:

CHATHAM RD. (RUSTON)

LINCOLN

H.004608

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN 000-31 LOCAL 6,500 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

NEW SERVICE ROADPAINE, PEGGY JO Remrks:

Typ Imp:700-31-0121;STAGE 0 COMPLETED

Project:Prj Mgr:

CHOUDRANT I-20 SERVICE ROAD

H.008157

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 150 831-07 NFI 4,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGLINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS

RECON W/GEOMETRIC IMPROVEMENTSMCMILLAN, RYAN Remrks:

Typ Imp:831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX

Project:Prj Mgr:

JCT US 80 - JCT LA 150

Page 3 - 11 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 214: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009746

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LINCOLN LA 150 831-07 NFI 695 ENHANCEMENTS 2-WAITING FOR FUNDINGLINCOLN LA 150 831-07 LOCAL 150 OTHER / MISCELLANEOUS LINCOLN 000-31 NFI 1,210 ENHANCEMENTS LINCOLN 000-31 LOCAL 220 OTHER / MISCELLANEOUS LINCOLN US 80 001-08 NFI 277 ENHANCEMENTS LINCOLN US 80 001-08 LOCAL 9 OTHER / MISCELLANEOUS

SIDEWALK W/ LIGHTING, STREETSCAPING, & RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:FEDERAL SHARE IS 80%. 15% MATCH TOLL CREDITS & 5% LOCAL

Project:Prj Mgr:

RUSTON DOWNTOWN REVITALIZATION PHASE 6

H.000470

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

LIVINGSTON LA 441 270-02 NFI 236 ENHANCEMENTS 2-WAITING FOR FUNDINGLIVINGSTON LA 441 270-02 LOCAL 16 ENHANCEMENTS

ENHANCEMENTMEEK, STEPHEN Remrks:

Typ Imp:744-32-0011;

Project:Prj Mgr:

HOLDEN SIDEWALK PROGRAM

LIVINGSTON

H.001061

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 6 034-05 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGNATCHITOCHES LA 6 034-05 NFI 20,182 DEMO / HIGH PRIORITY

MAJOR WIDENING LA 117 TO I 49EVANS, MISTY Remrks:

Typ Imp:034-05-0035;USING STBONDS AS MATCH TO DEMO TO ACQUIRE R/W

Project:Prj Mgr:

EL CAMINO EAST/WEST COR (EAST SEG )

NATCHITOCHES

H.001809

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 174 112-06 NFI 2,410 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

CURVE REALIGNMENTMOORE, DARRELL Remrks:

Typ Imp:112-06-0008;PROJECT TO BE RE-SCOPED

Project:Prj Mgr:

AJAX - I-49

H.010359

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 9 089-01 NFI 1,509 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCH. COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 9: JCT US 71 - JCT LA 156

H.012972

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

NATCHITOCHES LA 1225 835-02 NFI 1,904 PRESERVATION - NON-INTERSTATENFA

2-WAITING FOR FUNDING

MILLING, CEMENT TREATED BASE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1225: US 71 TO LA 6

H.000263

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS US 90 006-05 NFI 89,691 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTMASTIN, CATHERINE Remrks:

Typ Imp:006-05-0067;STAGE 1 PROJECT

Project:Prj Mgr:

CHEF MENTEUR PASS BRIDGE & APPROACH

ORLEANS

Page 3 - 12 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 215: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.007250

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 NFI 20,000 INTERMODAL CONNECTOR 2-WAITING FOR FUNDINGORLEANS 000-36 NFI 20,000 PRESERVATION - BRIDGE (ON

SYSTEM)

ORLEANS 000-36 OTHER 22,000 OTHER / MISCELLANEOUS

BRIDGE REPLACEMENTYANG, LI Remrks:

Typ Imp:742-36-0104;OTHER FUNDS - PORT

Project:Prj Mgr:

ALMONASTER AVENUE BRIDGE REPLACEMENT

H.008220

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS LA 406 836-14 NFI 1,500 URBAN SYSTEMS 2-WAITING FOR FUNDINGPLAQUEMINES LA 406 838-03 0 URBAN SYSTEMS PLAQUEMINES LA 406 838-06 0 URBAN SYSTEMS

WIDENINGLEBAS, MELISSA Remrks:

Typ Imp:836-14-0002;JT W 838-06-0002

Project:Prj Mgr:

LA406/WOODLAND HWY (LA23 - LA407)

H.009499

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 0 URBAN SYSTEMS 2-WAITING FOR FUNDING

PLANNING STUDYBROUSSARD, DAN Remrks:

Typ Imp:

Project:Prj Mgr:

LEAKE AVENUE IMPROVEMENTS

H.011219

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NFI 4,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO CBD1 I610-CARROLLTON

H.011221

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS I-10 450-90 NFI 5,700 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO CBNGO, DUC Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: NO CBD3 POYDRAS - LOUISA

H.011651

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ORLEANS 000-36 NFI 750 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

JEFFERSON LA 3152 826-03 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

JEFFERSON I-10 450-15 NFI 750 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

CORRIDOR IMPROVEMENT STUDYHOYT, RYAN Remrks:

Typ Imp:

Project:Prj Mgr:

I-10: LOYOLA DR-BONNABEL CORRIDOR IMPROV

H.009752

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

OUACHITA 000-37 NFI 513 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALK W/ LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

DESIARD ST: STREETSCAPING S GRAND-6TH ST

OUACHITA

Page 3 - 13 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 216: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.001399

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

PLAQUEMINES LA 23 062-04 NFI 30,000 CORRIDOR 2-WAITING FOR FUNDING

WIDEN TO 4 LANESUMEOZULU, JOE Remrks:

Typ Imp:062-04-0029;$1M GS9$ FOR STUDY

Project:Prj Mgr:

HAPPY JACK - N.PORT SULPHUR

PLAQUEMINES

H.000790

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 167 023-01 NFI 3,000 PRESERVATION - BRIDGEPREVENTIVE MAINTENANCE

2-WAITING FOR FUNDING

BRIDGE MAINTENANCERACHAL, JASON Remrks:

Typ Imp:023-01-0069;BRPM

Project:Prj Mgr:

US 167 BRIDGE MAINTENANCE

RAPIDES

H.004825

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 28 074-02 NFI 29,185 CAPACITY 2-WAITING FOR FUNDING

WIDEN FROM 3 TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:700-40-0145;FEASIBILITY/STAGE 0 WIDEN TO 4 LANE

Project:Prj Mgr:

WIDENING LA 28 EAST (LIBUSE TO HOLLOWAY)

H.008277

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES US 71 840-43 NFI 32,500 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING

RED RIVER BRIDGEUMEOZULU, JOE Remrks:

Typ Imp:840-43-0014;PHASE 3 OF FORT BUHLOW RED RIVER BR

Project:Prj Mgr:

FT. BUHLOW BR (US 71/US 165)

H.009543

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 113 140-02 NFI 3,449 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

BASE AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 113: VERNON LINE - LA 112

H.011598

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RAPIDES LA 8 134-04 NFI 4,626 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCHING, COLD PLANING, STABILIZING, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 8: LA 119 TO LA 1

H.009402

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

RED RIVER US 371 021-30 NFI 535 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

2-WAITING FOR FUNDING

SUBSURFACE DRAINAGE AND OUTFALL CHANNEL IMPROVEMENTSGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

RDWY DRAINAGE IMP.-US 71 @ US 371 PH III

RED RIVER

H.002567

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST BERNARD LA 300 284-30 NFI 1,834 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTOLIVIER, NICHOLAS Remrks:

Typ Imp:284-30-0023;

Project:Prj Mgr:

REGGIO CANAL BRIDGE

ST BERNARD

Page 3 - 14 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 217: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.004876

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES 000-45 NFI 1,850 URBAN SYSTEMS 2-WAITING FOR FUNDINGST CHARLES 000-45 OTHER 1,850 URBAN SYSTEMS

SAFETY AND TSM IMPROVEMENTSLEBAS, MELISSA Remrks:

Typ Imp:STAGE O COMPLETED UNDER DESIGN PHASE

Project:Prj Mgr:

LA 52: LA 18 - N OAK COURT

ST CHARLES

H.012531

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

ST CHARLES I-310 450-36 NFI 1,773 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-37 NFI 55,697 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)

ST CHARLES I-310 450-38 NFI 995 PRESERVATION - BRIDGE (ONSYSTEM)

CLEANING, PAINTING, AND STRUCTURAL REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

I-310: LULING BRIDGE REHBILITATION

H.002424

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 70 426-02 NFI 6,730 CAPACITY 2-WAITING FOR FUNDINGASCENSION LA 70 426-03 NFI 11,457 CAPACITY

WIDEN TO 4 LANESNICKEL, TIM Remrks:

Typ Imp:426-02-0042;(C&G)426-02-52.426-03-05.NO FUNDING

Project:Prj Mgr:

LA 70: SUNSHINE BRIDGE - LA 22

ST JAMES

H.002426

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 70 426-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGASCENSION LA 22 266-01 NFI 0 OTHER / MISCELLANEOUS

CLEARING AND GRUBBINGNICKEL, TIM Remrks:

Typ Imp:426-02-0052;(CONST)426-02-42.426-03-04.NO FUNDS

Project:Prj Mgr:

SUNSHINE BRIDGE - I-10

H.009483

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 3125 426-31 LOCAL 775 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST JAMES LA 44 256-05 LOCAL 620 OTHER / MISCELLANEOUS

ADDING TURN LANES ON LA 3125 AND REALIGNING LA 44WAGUESPACK, BRENT Remrks:

Typ Imp:

Project:Prj Mgr:

LA HIGHWAY 44 RE-ROUTE

H.009724

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES 000-47 NFI 1,259 ENHANCEMENTS 2-WAITING FOR FUNDING

MULTI-USE PATH AND RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

ST JAMES MISS EBANK MULTI-USE TRAIL PH 1

H.011717

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 70 426-02 0 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

PIER PROTECTION SYSTEMGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 70: SUNSHINE BRIDGE PIER PROTECTION

Page 3 - 15 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 218: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.012066

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST JAMES LA 3213 434-02 0 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

MAJOR BRIDGE REHABILITATIONGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3213: GRAMERCY BRIDGE REHABILITATION

H.011358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST LANDRY US 190 012-12 NFI 6,384 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDINGST LANDRY US 190 012-13 NFI 3,888 OTHER / MISCELLANEOUS

STAGE 0/FEASIBILITY STUDYHANKS, ANNA Remrks:

Typ Imp:

Project:Prj Mgr:

US 190 (VINE STREET) RECONSTRUCTION

ST LANDRY

H.004924

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN 000-50 NFI 0 URBAN SYSTEMS 2-WAITING FOR FUNDING

FEDERAL EARMARK FOR STUDYYANG, LI Remrks:

Typ Imp:700-50-0112;STAGE 0 COMPLETED

Project:Prj Mgr:

DEV.& CONST ST. MARTINVILLE BYPASS

ST MARTIN

H.011298

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARTIN US 90 424-03 NFI 3,500 CAPACITY 2-WAITING FOR FUNDINGLAFAYETTE US 90 424-02 NFI 2,500 CAPACITY IBERIA US 90 424-04 NFI 1,500 CAPACITY

NEW CONSTRUCTION OF FRONTAGE RDSPAINE, PEGGY JO Remrks:

Typ Imp:

Project:Prj Mgr:

US 90: CAPT CADE TO AMB CAFF FRONTAGE RD

H.009748

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST MARY 000-51 NFI 87 ENHANCEMENTS 2-WAITING FOR FUNDINGST MARY 000-51 LOCAL 58 ENHANCEMENTS

SIDEWALKS AND RELATED WORKNUNES, BRIAN Remrks:

Typ Imp:USE LOCAL AS MATCH

Project:Prj Mgr:

BERWICK DOWNTOWN SIDEWALKS

ST MARY

H.000284

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 90 006-07 NFI 40,733 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

NEW BRIDGESMASTIN, CATHERINE Remrks:

Typ Imp:006-07-0048; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

US 90: PEARL RIVER BRIDGES (HBI)

ST TAMMANY

H.000494

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 0 CORRIDOR 2-WAITING FOR FUNDING

WIDEN TO 4 LANESJESCLARD, TREY Remrks:

Typ Imp:013-12-0031;404 REQ.(E?). PUB.MT.TO BE HELD.

Project:Prj Mgr:

LA 433 - US 11

H.000497

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 NFI 12,000 CORRIDOR 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMCMILLAN, RYAN Remrks:

Typ Imp:013-12-0039;PROJ ON XXX PER LIST FROM F.BORNE

Project:Prj Mgr:

US190: BAYOU CASTINE-SE LA HOSPITAL

Page 3 - 16 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 219: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.000688

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 11 018-04 NFI 30,000 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTOLIVIER, NICHOLAS Remrks:

Typ Imp:018-04-0049; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

US 11 NORFOLK SOUTHERN RR OVERPASS (HBI)

H.002391

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 22 261-06 0 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY LA 22 261-06 0 OTHER / MISCELLANEOUS

WIDEN TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:261-06-0030;CITY/STATE AGREEMENT REQUIRED

Project:Prj Mgr:

TCHEFUNCTE - CAUSEWAY APPROACH

H.004983

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 11 018-03 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDINGST TAMMANY US 11 018-03 NFI 19,346 DEMO / HIGH PRIORITY

WIDENING WITH BIKE PATHOLIVIER, NICHOLAS Remrks:

Typ Imp:700-52-0196

Project:Prj Mgr:

US HIGHWAY 11 WIDENING

H.009793

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 NFI 954 ENHANCEMENTS 2-WAITING FOR FUNDING

SIDEWALKS W/LIGHTING, LANDSCAPING, & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

SLIDELL: OLDE TOWN STREETSCAPING

H.009934

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY 000-52 NFI 218 ENHANCEMENTS 2-WAITING FOR FUNDINGST TAMMANY LA 435 281-04 NFI 82 ENHANCEMENTS

SIDEWALK LIGHTING & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

ABITA SPRINGS TOWN CTR SIDEWALK LIGHTING

H.010274

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 013-12 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING

STAGE 0 FEASIBILITY STUDY FOR INTERIM CAPACITY IMPROVEMENTSNGUYEN, WAYNE Remrks:

Typ Imp:DUE TO HURRICANE ISAAC MPO CAN'T FORMALLY APPROVE PROJECT

Project:Prj Mgr:

US 190: US 11 TO LA 433

H.010441

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 1077 852-13 NFI 2,000 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

2-WAITING FOR FUNDING

DRAINAGEGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

GRADE RAISING ON LA 1077

H.011137

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 NFI 36,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY I-12 454-04 NFI 7,000 PRESERVATION - INTERSTATE ST TAMMANY I-12 454-04 NFI 7,000 PRESERVATION - BRIDGE (ON

SYSTEM)

ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: LA 21 TO US 190

Page 3 - 17 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 220: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.011152

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY I-12 454-04 NFI 10,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY I-12 454-04 NFI 10,000 PRESERVATION - INTERSTATE ST TAMMANY I-12 454-04 NFI 25,000 PRESERVATION - BRIDGE (ON

SYSTEM)

ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:

Project:Prj Mgr:

I-12: US 190 TO LA 59

H.012382

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 059-30 NFI 16,000 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 4 LANES, 5 ROUNDABOUTSLANDRY, COREY Remrks:

Typ Imp:059-30-0008

Project:Prj Mgr:

US 190: LA 25 - BOGUE FALAYA (PH 2B)

H.012386

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY US 190 059-30 NFI 18,000 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 15,000 CAPACITY

WIDEN BRIDGE, 4 ROUNDABOUTSLANDRY, COREY Remrks:

Typ Imp:059-30-0008

Project:Prj Mgr:

US 190: LA 437 - US 190 BUS (PH 3)

H.012398

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

ST TAMMANY LA 25 059-02 NFI 2,500 CAPACITY 2-WAITING FOR FUNDINGST TAMMANY US 190 059-30 NFI 2,500 CAPACITY ST TAMMANY US 190 030-31 NFI 2,500 CAPACITY ST TAMMANY 000-52 NFI 1,200 CAPACITY

TWO LANE ROUNDABOUTLANDRY, COREY Remrks:

Typ Imp:059-30-0008

Project:Prj Mgr:

US 190 @ LA 25 ROUNDABOUT (PH 2A)

H.005043

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 311 413-01 NFI 38,000 CAPACITY 2-WAITING FOR FUNDING

WIDEN TO 4 LANESMUSA, ELNUR Remrks:

Typ Imp:700-55-0122

Project:Prj Mgr:

LA311: LA 664 (ST CHARLES ST)-SAVANNE RD

TERREBONNE

H.010328

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 659 855-04 NFI 200 OPER EFFICIENCY/MOTORISTASSISTANCE - ROADWAY FLOODING

2-WAITING FOR FUNDING

CB-06 TOP MODIFICATIONS, CROSS DRAIN REMOVAL AND REPLACEMENGOLZ, SARAH Remrks:

Typ Imp:

Project:Prj Mgr:

LA 659: HOWARD BRIDGE-DAIGLEVILLE BRIDGE

H.011972

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 3040 065-30 0 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

TUNNEL REHABILITATIONNot assigned Remrks:

Typ Imp:

Project:Prj Mgr:

LA 3040: ICW HOUMA TUNNEL REHABILITATION

H.011973

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

TERREBONNE LA 315 245-90 0 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

CLEANING, PAINTING, AND STRUCTURAL REPAIRSGUIDRY, CHRIS Remrks:

Typ Imp:

Project:Prj Mgr:

LA 315:ICWW DULARGE MOVABLE BRIDGE REHAB

Page 3 - 18 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 221: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009761

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERMILION LA 14 055-06 NFI 500 ENHANCEMENTS 2-WAITING FOR FUNDINGVERMILION LA 14 055-06 LOCAL 167 ENHANCEMENTS

SIDEWALKS W/LIGHTING, LANDSCAPE & RELATED WORKMEEK, STEPHEN Remrks:

Typ Imp:

Project:Prj Mgr:

LA 14: DOWNTOWN ABBEVILLE STREETSCAPING

VERMILION

H.000986

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 8 029-01 NFI 12,700 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTMUSA, ELNUR Remrks:

Typ Imp:029-01-0004;ADMIN. BY TEXAS

Project:Prj Mgr:

SABINE RIVER BR (BURR FERRY)

VERNON

H.001883

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 465 137-02 NFI 336 PRESERVATION - NON-INTERSTATENFA

2-WAITING FOR FUNDING

CHIP SEALLACOMBE, JASON Remrks:

Typ Imp:137-02-0017;

Project:Prj Mgr:

LA 8 - LA 28

H.006618

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 NFI 96 SAFETY - LOCAL ROADS SAFETY 2-WAITING FOR FUNDINGVERNON 000-58 LOCAL 8 SAFETY - LOCAL ROADS SAFETY

SIDEWALK INSTALLATIONRICCA, MICHAEL A. Remrks:

Typ Imp:737-58-0001;

Project:Prj Mgr:

SIDEWALK ON HIGH SCHOOL DRIVE

H.006619

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON 000-58 NFI 134 SAFETY - LOCAL ROADS SAFETY 2-WAITING FOR FUNDINGVERNON 000-58 LOCAL 13 SAFETY - LOCAL ROADS SAFETY

SIDEWALK INSTALLATIONRICCA, MICHAEL A. Remrks:

Typ Imp:737-58-0002;

Project:Prj Mgr:

SIDEWALK ON LOUISIANA AVENUE

H.010339

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 10 066-02 NFI 1,226 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 10: LOOK OUT RD - 850' E BAILEY RD

H.010354

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

VERNON LA 111 133-03 NFI 1,898 PRESERVATION - NON-INTERSTATEON STP SYSTEM

2-WAITING FOR FUNDING

PATCH, COLD PLANE, AND OVERLAYSPURLOCK, DLON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 111: US 171 - LA 117

H.011202

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WASHINGTON 000-59 NFI 200 SAFETY - SAFE ROUTES TO SCHOOLS 2-WAITING FOR FUNDINGWASHINGTON 000-59 NFI 25 SAFETY - SAFE ROUTES TO SCHOOLS

SIDEWALKS STRIPING AND SIGNAGEMORVANT, MARK Remrks:

Typ Imp:

Project:Prj Mgr:

FRANKLINTON JR HIGH SCHOOL SIDEWALKS

WASHINGTON

Page 3 - 19 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 222: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.012929

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

WEBSTER LA 159 087-01 NFI 115 PRESERVATION - ROAD PREVENTIVEMAINTENANCE

2-WAITING FOR FUNDING

ASPHALTIC SURFACE TREATMENTLACOMBE, JASON Remrks:

Typ Imp:

Project:Prj Mgr:

LA 159: LEWISVILLE ROAD

WEBSTER

H.000358

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE US 190 008-01 NFI 55,866 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

NEW BRIDGEPAINE, PEGGY JO Remrks:

Typ Imp:008-01-0051; PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

US 190 @ LA 415: LOBDELL INTER (HBI)

W BATON ROUGE

H.001234

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NFI 100,000 PRESERVATION - BRIDGE (ONSYSTEM)

2-WAITING FOR FUNDING

BRIDGE REPLACEMENTDELATTE, BRIAN Remrks:

Typ Imp:050-07-0066;2 STRUCTURES PRIORITY BRIDGE PROJECT

Project:Prj Mgr:

PORT ALLEN CANAL BRIDGE (HBI)

H.009288

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 1 050-07 NFI 20,000 RAILROADS - GRADE SEPARATION 2-WAITING FOR FUNDING

GRADE SEPARATE EXISTING AT-GRADE CROSSINGRAY, JARED Remrks:

Typ Imp:H.011133 MUST LET BEFORE H.009288

Project:Prj Mgr:

LA 1:NEW RR BRIDGE@DOW SPUR XING (WBR)

H.009905

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

W BATON ROUGE LA 415-S 013-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

W BATON ROUGE LA 415 225-01 0 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

W BATON ROUGE LA 415 861-22 0 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

EFFICIENCY AS DETOUR ROUTECOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

LA 415 CORRIDOR STUDY

H.009056

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 NFI 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

PLASTIC PAVEMENT STIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST 07. PAVEMENT MARKING REPLACEMENT II

DISTRICT 07

H.010037

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 07 000-97 NFI 16,640 OPER EFFICIENCY/MOTORISTASSISTANCE - FERRY PROJECTS

2-WAITING FOR FUNDING

CONSTRUCT NEW FERRY BOATSIBLEY, STEVEN Remrks:

Typ Imp:

Project:Prj Mgr:

NEW FERRY BOAT / CAMERON FERRY CROSSING

Page 3 - 20 Version: 1.17.1 Report Date: 3/8/18 5:01 AM

Page 223: HIGHWAY PROGRAM FY 2018-2019 - €¦ · stgen (state general funds cash) tolls local (funds provided by local government) other (other source not listed) ... dotd highway priority

DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2018 - 2019WAITING FOR FUNDING

H.009194

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 08 000-98 NFI 1,000 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 08 PAVEMENT MARKING REPLACE III:

DISTRICT 08

H.009199

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 NFI 1,500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 61 PAVEMENT MARKING REPLACE III:

DISTRICT 61

H.013284

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 61 000-96 NFI 0 CAPACITY 2-WAITING FOR FUNDING

NEW BRIDGE AND APPROACHES TO FEASIBILITY STUDYLOTT, ROBERT Remrks:

Typ Imp:

Project:Prj Mgr:

LA 1 TO LA 30 CONNECTOR

H.009200

Parish RouteCtrlSec Fund

Con Est(x $1000) Category/SubCategory Stage

DISTRICT 62 000-90 NFI 500 OPER EFFICIENCY/MOTORISTASSISTANCE - TRAFFIC CONTROLDEVICES

2-WAITING FOR FUNDING

PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERSCOLVIN, JODY Remrks:

Typ Imp:

Project:Prj Mgr:

DIST. 62 PAVEMENT MARKING REPLACE III:

DISTRICT 62

Page 3 - 21 Version: 1.17.1 Report Date: 3/8/18 5:01 AM