highway no. 29 bear flat - cache creek suggested bridge construction access · 2020. 4. 30. ·...
TRANSCRIPT
-
BEAR FLAT - CACHE CREEK
PROJECT NO. 37249-0006
HIGHWAY No. 29
DRAWING NUMBER REV
R3-340-1200
SUGGESTED BRIDGE CONSTRUCTION ACCESS
FOR REFERENCE ONLY
-
C
A
C
H
E
C
R
E
E
K
E
N
2
3
8
,
2
0
0
6
0
9
,
0
0
0
E
N
2
3
8
,
2
0
0
6
0
9
,
2
0
0
E
N
2
3
8
,
0
0
0
6
0
9
,
4
0
0
E
N
2
3
7
,
8
0
0
6
0
9
,
4
0
0
C
A
C
H
E
C
R
E
E
K
F
F
F
F
F
F
F
F
F
F
F
F
L
.
T
.
C
.
L
5
0
-
L
I
N
E
L
.
T
.
C
.
L
.
T
.
C
.
L.T
.C
.
L
.T
.C
.
L
.
T
.
C
.
L.T.C.
L
.
T
.
C
.
L
.
T
.
C
.
L
.
T
.
C
.
L
5
2
-
L
I
N
E
F
F
F
F
F
F
F
F
F
F
F
F
T
O
E
S
T
O
E
S
T
O
E
S
TO
ES
TOES
T
O
E
S
T
O
E
S
F
F
C
F
F
F
F
F
F
F
F
F
F
T
O
E
S
TO
ES
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
T
O
E
S
120+
100
120+
200
120+300
120+400
BC 1
20+0
15.0
98
EC 120+099.332
BC 120+260.042
EC 12
0+32
3.725
110+100
110+20
0
110+30
0
110+40
0
110+50
0
BC 11
0+07
0.823
BC
110+508.505
EC
110+211.552
EC
110
+570
.954
F
F
F
F
F
F
F
FF
F
F
F
F
F
F
F
F
F
352°07'41"267°15
'09"
318°22'02"
R95.000 LtΔ 84°52'32"Tc 86.862Arc 140.729Ec 33.724
R 70.000 Rt
Δ 51°06'53"Tc 33.474Arc 62.448Ec 7.592
21°3
9'44
"
341°07'12"
R90.000 Lt
Δ
40°32'32"
Tc33.240
Arc
63.683
Ec
5.942
14°50'46"
PI 110+541.980N 238047.642E 608931.870
PI 120+
293.282
N 2379
60.964
E 6093
89.944
L110-L
INE
L130
-LIN
E
L120
-LIN
E
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
PI 110+157.685N 238067.644E 609348.680LIMIT
OF
CO
NS
TR
UC
TIO
N
L130-LINE
ST
A. 130+100.000
TIE
TO
EX
IST
ING
N 238148.164
E 608969.637
LIMIT OF CONSTRUCTIONL120-LINE STA. 120+475.797MATCH BERM ELEV.N 238136.306E 609329.980
L110-LINE STA. 110+000.000 =L120-LINE STA. 120+240.000N 237911.445E 609370.276
L110-LINE STA. 110+530.000 =L130-LINE STA. 130+000.000N 238051.503E 608944.015
406+
700
406+
800
406+
900
407+
000
407+
100
407+
200
407+
300
LIMIT OF CONSTRUCTIONL110-LINE STA. 110+585.150
MATCH BERM ELEV.N 238083.271E 608900.200
133+100
BC
133
+069
.299
EC
133
+130
.647
357°15'09"
357°15'09"
310°24'24"
316°15'54"
R600.000 Rt
Δ 5°51'30"
Tc30.701Arc 61.348Ec 0.785
PI 133+100.000N 238105.750
E 609251.905L133-LINE
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
L131
-LIN
E
L132
-LIN
E
L133-LINE
L110-LINE STA. 110+390.000 =L131-LINE STA. 131+000.000N 238054.927E 609083.675
L110-LINE STA. 110+310.000 =L132-LINE STA. 132+000.000N 238058.762E 609163.583
L110-LINE STA. 110+140.000 =L133-LINE STA. 133+000.000N 238040.929E 609328.051
LIM
IT O
F C
ON
STR
UC
TIO
N
L133
-LIN
E S
TA. 1
33+1
37.3
44
TIE
TO
EX
ISTI
NG
N 2
3813
2.77
1E
609
226.
051
LIMIT O
F CO
NS
TRU
CTIO
N
L131-LINE
STA
. 131+060.000
TIE TO
EX
ISTIN
G
N 238114.858
E 609080.799
LIMIT O
F CO
NS
TRU
CTIO
N
L132-LINE
STA
. 132+060.000
TIE TO
EX
ISTIN
G
N 238118.693
E 609160.707
UNSUITABLE MATERIALS DISPOSAL SITE
FOR DETAILS SEE DWG. R3-340-383 TO 385
FOR TEMPORARY CONSTRUCTIONACCESS BRIDGE DETAILSEE DWG. R3-340-1205
DIVERSION CHANNEL
(SUGGESTED)
CACHE CREEK BRIDGE
FOR DETAILS SEE
DWG. 1025-101 TO 1025-313
PIER 1 BERM FOR DETAILS
SEE DWG. R3-340-341
PIER 6 BERM FOR DETAILS
SEE DWG. R3-340-342
UNSUITABLE MATERIALS DISPOSAL SITE
FOR DETAILS SEE DWG. R3-340-386
WEST ABUTMENT GIRDER EXCAV.
AND SHORELINE PROTECTION
FOR DETAILS SEE DWG. R3-340-343
EAST ABUTMENT GIRDER EXCAV.
AND SHORELINE PROTECTION
FOR DETAILS SEE DWG. R3-340-344
BC 1
20+0
15.0
98
F
F
F
328°02'14"
R
90.000 Rt
Δ 53°37'30"
Tc45.487
Arc84.234
Ec 10.842
PI 120
+060.5
85
N 2377
38.437
E 6093
01.560
F
F
F
F
LIM
IT O
F C
ON
STR
UC
TIO
N
L120
-LIN
E ST
A. 1
20+0
04.5
20TI
E TO
EXI
STIN
GN
237
690.
872
E 60
9331
.239
HIGHWAY DETOUR
(TO BE DESIGNED BY
CONTRACTOR)
EMBANKMENT (0-5% FINES) / GRANULAR BORROW
7.00m
VARI
ESVARIES
2
:
1
2
:
1
1
:
1
1
:
1
500mm ORGANIC STRIPPING (AVG)
ORIGINAL GROUND
BRITISHCOLUMBIA
DESIGNED
QUALITY CONTROL
QUALITY ASSURANCE
DRAWN
DATE
DATE
DATE
DATE
CAD FILENAME
DATE
SIGNATUREDATE REVISIONSREV
REG DRAWING NUMBERPROJECT NUMBERFILE NUMBER
DATE
SENIOR DESIGNER
SCALE
REV
MINISTRY OF TRANSPORTATIONAND INFRASTRUCTURE
HIGHWAY ENGINEERING
NORTHERN REGION
1200CON-15-0674-BFCC.DWG
2020-04-13
CL
DS
JN
NB
APR. 2020
APR. 2020
APR. 2020
APR. 2020
15-0674 37249-0006 NR R3-340-1201
SUGGESTED BRIDGE CONSTRUCTION ACCESS - PLAN
HIGHWAY No. 29
BEAR FLAT - CACHE CREEK
0 10 50m1:1000
MATCH LINE SEE INSET
MATCH LINE SEE RIGHT
CONSTRUCTION ACCESS ROAD TYPICAL SECTION
SCALE: 1:100
NOTES:
1. CONTOURS SHOWN ON BERMS ARE FINISHED SURFACE .
2. STABILITY OF CONSTRUCTION ACCESS ROADS TO BE CONFIRMED BY CONTRACTOR.
3. NO LARGE WOODY DEBRIS WILL BE PERMITTED IN THE DIVERSION CHANNEL.
4. CONTRACTOR TO PROVIDE APPROPRIATE SIZED SETTLEMENT PONDS.
TO
H
WY
FOR REFERENCE ONLY
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text430
AutoCAD SHX Text435
AutoCAD SHX Text435
AutoCAD SHX Text435
AutoCAD SHX Text435
AutoCAD SHX Text440
AutoCAD SHX Text440
AutoCAD SHX Text440
AutoCAD SHX Text440
AutoCAD SHX Text445
AutoCAD SHX Text445
AutoCAD SHX Text445
AutoCAD SHX Text445
AutoCAD SHX Text450
AutoCAD SHX Text450
AutoCAD SHX Text450
AutoCAD SHX Text450
AutoCAD SHX Text455
AutoCAD SHX Text455
AutoCAD SHX Text455
AutoCAD SHX Text455
AutoCAD SHX Text460
AutoCAD SHX Text460
AutoCAD SHX Text460
AutoCAD SHX Text465
AutoCAD SHX Text465
AutoCAD SHX Text465
AutoCAD SHX Text470
AutoCAD SHX Text470
AutoCAD SHX Text470
AutoCAD SHX Text470
AutoCAD SHX Text430
AutoCAD SHX Text435
AutoCAD SHX Text440
AutoCAD SHX Text445
AutoCAD SHX Text450
AutoCAD SHX Text455
AutoCAD SHX Text460
AutoCAD SHX Text465
AutoCAD SHX TextHOUSE
AutoCAD SHX TextHOUSE
AutoCAD SHX TextBLDG
AutoCAD SHX TextBLDG
AutoCAD SHX TextBUILDING
AutoCAD SHX TextSHED
AutoCAD SHX TextSHED
AutoCAD SHX TextSHED
AutoCAD SHX TextHOUSE
AutoCAD SHX TextGRAVEL
AutoCAD SHX TextGRAVEL
AutoCAD SHX TextGRAVEL
AutoCAD SHX TextDIRT ROAD
AutoCAD SHX TextDIRT ROAD
AutoCAD SHX TextSHOULDER
AutoCAD SHX TextW/L
AutoCAD SHX TextY/L
AutoCAD SHX TextW/L
AutoCAD SHX TextSHOULDER
AutoCAD SHX TextHYDRO
AutoCAD SHX TextMETER
AutoCAD SHX TextWOOD
AutoCAD SHX TextSHED
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF
AutoCAD SHX TextSLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF
AutoCAD SHX TextSLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextSLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextOF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF
AutoCAD SHX TextSLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF
AutoCAD SHX TextSLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX Text4 STR BARBED
AutoCAD SHX TextBASE
AutoCAD SHX TextE/P
AutoCAD SHX TextE/P
AutoCAD SHX TextPAGE WIRE
AutoCAD SHX TextGARDEN
AutoCAD SHX TextPAGE WIRE
AutoCAD SHX TextPAGE WIRE
AutoCAD SHX TextPAGE WIRE
AutoCAD SHX Text3 STR. BARBED
AutoCAD SHX Text4 STR. BARBED
AutoCAD SHX TextDILAPITATED
AutoCAD SHX Text4 STR. BARBED
AutoCAD SHX TextDILAPITATED
AutoCAD SHX TextBASE OF
AutoCAD SHX TextOVER
AutoCAD SHX TextFLOW
AutoCAD SHX TextPUMP
AutoCAD SHX TextUNIT
AutoCAD SHX TextWATER
AutoCAD SHX TextSPRING
AutoCAD SHX TextWOODEN FENCE POST
AutoCAD SHX TextWOODEN FENCE POST
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextBASE OF SLOPE
AutoCAD SHX TextOIP
AutoCAD SHX TextMON
AutoCAD SHX TextMON
AutoCAD SHX TextPlastic
AutoCAD SHX Text150MM
AutoCAD SHX TextPlastic
AutoCAD SHX Text100MM
AutoCAD SHX Text1 TRANS
AutoCAD SHX TextWood
AutoCAD SHX TextTAG#2113 5616 233 127
AutoCAD SHX TextUP
AutoCAD SHX TextUP
AutoCAD SHX TextWood
AutoCAD SHX Text180 TAG#2113 5616 249 055
AutoCAD SHX TextWood
AutoCAD SHX Text2113 5616 222 076
AutoCAD SHX TextWood
AutoCAD SHX Text2443476
AutoCAD SHX TextACCESS TRAIL
AutoCAD SHX TextACCESS TRAIL
AutoCAD SHX TextACCESS TRAIL
AutoCAD SHX TextBH16-A-015
AutoCAD SHX TextBH16-A-017
AutoCAD SHX TextBH16-A-018
AutoCAD SHX TextBH16-A-019
AutoCAD SHX TextBH16-A-020
AutoCAD SHX TextBH16-A-021
AutoCAD SHX TextBH16-A-022
AutoCAD SHX TextBH16-A-022A
AutoCAD SHX TextBH16-A-023
AutoCAD SHX TextBH16-A-024
AutoCAD SHX TextBH16-A-025
AutoCAD SHX TextBH17-A-001
AutoCAD SHX TextBH17-A-002
AutoCAD SHX TextBH17-A-003
AutoCAD SHX TextBH18-A-003
AutoCAD SHX TextBH18-A-014
AutoCAD SHX TextBH18-A-017
AutoCAD SHX TextBH18-A-031
AutoCAD SHX TextBH18-A-061
AutoCAD SHX TextBH18-A-062
AutoCAD SHX TextBH18-A-063
AutoCAD SHX TextBH18-A-064
AutoCAD SHX TextBH18-A-065
AutoCAD SHX TextBH18-A-066
AutoCAD SHX TextBH18-A-067
AutoCAD SHX TextBH18-A-068
AutoCAD SHX TextBH18-A-069
AutoCAD SHX TextBH18-A-070
AutoCAD SHX TextBH18-A-071
AutoCAD SHX TextBH18-A-072
AutoCAD SHX TextBH18-A-073
AutoCAD SHX TextBH18-A-074
AutoCAD SHX TextBH18-A-075
AutoCAD SHX TextBH18-A-076
AutoCAD SHX TextTH
AutoCAD SHX TextTH16-A-051
AutoCAD SHX TextTH
AutoCAD SHX TextTH16-A-052
AutoCAD SHX TextTH
AutoCAD SHX TextTH18-A-044
AutoCAD SHX TextTP16-A-043
AutoCAD SHX TextTP16-A-044
AutoCAD SHX TextTP16-A-045
AutoCAD SHX TextTP16-A-046
AutoCAD SHX TextTP16-A-047
AutoCAD SHX TextTP16-A-048
AutoCAD SHX TextTP16-A-049
AutoCAD SHX TextTP16-A-050
AutoCAD SHX TextCPT16-A-001
AutoCAD SHX TextCPT16-A-002
AutoCAD SHX TextPV16-026
AutoCAD SHX TextSHOULDER
AutoCAD SHX TextSHOULDER
AutoCAD SHX TextSHOULDER
AutoCAD SHX TextSHOULDER
AutoCAD SHX TextGRAVEL
AutoCAD SHX TextGRAVEL
AutoCAD SHX TextY/L
AutoCAD SHX TextW/L
AutoCAD SHX TextW/L
AutoCAD SHX TextSHOULDER
AutoCAD SHX TextSCH29-12
AutoCAD SHX TextE/P
AutoCAD SHX TextE/P
AutoCAD SHX TextE/P
AutoCAD SHX TextW-041
AutoCAD SHX TextW-054-L
AutoCAD SHX TextWood
AutoCAD SHX Text2481700
AutoCAD SHX TextWood
AutoCAD SHX TextACCESS TRAIL
AutoCAD SHX TextPV16-025
-
400
410
420
430
440
450
460
400
410
420
430
440
450
460STRIPPING m³
EMBANKMENT m3
110+000 110+100 110+200 110+300 110+400 110+500 110+600
352° 07' 41"R 95 LT.
R 95 RT.
267° 15' 09"R 70 LT.
R 70 RT.
318° 22' 02"
BC
110
+07
0.82
3
EC
110
+21
1.55
2
BC
110
+50
8.50
5
EC
110
+57
0.95
4
-0.928%+1.030%
+9.11
5%+4.0
00%
+2.000%
BV
C 1
10+
550.
000
EV
C 1
10+
580.
000
ST
A 1
10+
565.
000
PIV
C 4
39.6
94
30 VCK 5.9
BV
C 1
10+
055.
000
BV
C 1
10+
385.
000
BV
C 1
10+
495.
000
EV
C 1
10+
135.
000
EV
C 1
10+
435.
000
EV
C 1
10+
545.
000
ST
A 1
10+
095.
000
PIV
C 4
30.1
47
ST
A 1
10+
410.
000
PIV
C 4
33.3
92
ST
A 1
10+
520.
000
PIV
C 4
35.5
92
80 VCK 40.9
50 VCK 51.6
50 VCK 7.0
ST
A 1
10+
092.
903
LP 4
30.3
42
TOTAL:
4,386
21,363
TOTAL:
10,011
3,346
NIL 11,352
NIL 1,040
PIER 1 BERM
DIVERSION CHANNEL
(SUGGESTED)
L110
-LIN
E S
TA
110
+00
0.00
0L1
20-L
INE
ST
A 1
20+
240.
000
ELE
V 4
31.0
28
LIM
IT O
F C
ON
ST
RU
CT
ION
ST
A 1
10+
584.
873
ELE
V 4
40.5
00
L110
-LIN
E S
TA
110
+14
0.00
0L1
33-L
INE
ST
A 1
33+
000.
000
ELE
V 4
30.6
10
L110
-LIN
E S
TA
110
+31
0.00
0L1
32-L
INE
ST
A 1
32+
000.
000
ELE
V 4
32.3
62L1
10-L
INE
ST
A 1
10+
390.
000
L131
-LIN
E S
TA
131
+00
0.00
0E
LEV
433
.189
L110
-LIN
E S
TA
110
+53
0.00
0L1
30-L
INE
ST
A 1
30+
000.
000
ELE
V 4
36.6
64
FOR TEMPORARY CONSTRUCTIONACCESS BRIDGE DETAILSEE DWG. R3-340-1205
BRITISHCOLUMBIA
DESIGNED
QUALITY CONTROL
QUALITY ASSURANCE
DRAWN
DATE
DATE
DATE
DATE
CAD FILENAME
DATE
SIGNATUREDATE REVISIONSREV
REG DRAWING NUMBERPROJECT NUMBERFILE NUMBER
DATE
SENIOR DESIGNER
SCALE
REV
MINISTRY OF TRANSPORTATIONAND INFRASTRUCTURE
HIGHWAY ENGINEERING
NORTHERN REGION
1200CON-15-0674-BFCC.DWG
2020-04-13
CL
DS
JN
NB
APR. 2020
APR. 2020
APR. 2020
APR. 2020
15-0674 37249-0006 NR R3-340-1202
SUGGESTED BRIDGE CONSTRUCTION ACCESS - PROFILE
HIGHWAY No. 29
BEAR FLAT - CACHE CREEK
0
0
20 100mH 1:2000
2 10mV 1:200
NOTES:
1. ELEVATIONS SHOWN ARE FINISHED GRADE
2. EMBANKMENT FIGURES SHOWN ARE COMPACTED QUANTITIES
3. EXCAVATION FIGURES SHOWN ARE NEAT LINE
UNADJUSTED QUANTITIES
L110-LINE
FOR REFERENCE ONLY
-
400
410
420
430
440
450
460
400
410
420
430
440
450
460STRIPPING m³
EMBANKMENT m3
120+000 120+100 120+200 120+300 120+400 120+500
328° 02' 14"R 90 LT.
R 90 RT.
21° 39' 44"R 90 LT.
R 90 RT.
341° 07' 12"
BC
120
+01
5.09
8
EC
120
+09
9.33
2
BC
120
+26
0.04
2
EC
120
+32
3.72
5
TOTAL:
4,246
21,234
4,246
21,234
TOTAL:
PIER 6 BERM
ORIGINAL GROUND
LIM
IT O
F C
ON
ST
RU
CT
ION
ST
A 1
20+
475.
797
ELE
V 4
40.0
00
MA
TC
H E
XIS
TIN
G
LIM
IT O
F C
ON
ST
RU
CT
ION
ST
A 1
20+
000.
000
ELE
V 4
30.8
38
+3.200% -1.000% +1.200%
+5.800
%
+1.654%B
VC
120
+01
0.00
0 BV
C 1
20+
415.
000
EV
C 1
20+
040.
000 E
VC
120
+46
5.00
0
ST
A 1
20+
025.
000
PIV
C 4
31.6
38
ST
A 1
20+
440.
000
PIV
C 4
39.4
08
30 VCK 7.1
50 VCK 12.1
STA 120+032.857HP 431.524
BV
C 1
20+
130.
000
BV
C 1
20+
270.
000
EV
C 1
20+
210.
000
EV
C 1
20+
350.
000
ST
A 1
20+
170.
000
PIV
C 4
30.1
88
ST
A 1
20+
310.
000
PIV
C 4
31.8
68
80 VCK 36.4
80 VCK 17.4
ST
A 1
20+
166.
364
LP 4
30.4
06
L120
-LIN
E S
TA
120
+24
0.00
0L1
10-L
INE
ST
A 1
10+
000.
000
ELE
V 4
31.0
28
420
425
430
435
440
445
450
420
425
430
435
440
445
450STRIPPING m³
EMBANKMENT m3
130+000 130+050 130+100
14° 50' 46"
-4.500%
-7.865%
-0.500%
BV
C 1
30+
005.
000
EV
C 1
30+
035.
000
ST
A 1
30+
020.
000
PIV
C 4
35.7
64
30 VCK 8.9
BV
C 1
30+
040.
000
EV
C 1
30+
090.
000
ST
A 1
30+
065.
000
PIV
C 4
32.2
25
50 VCK 6.8
TOTAL:650
2,634
650
TOTAL:2,634
ORIGINAL GROUND
L130
-LIN
E S
TA
130
+00
0.00
0L1
10-L
INE
ST
A 1
10+
530.
000
ELE
V 4
36.6
64
MA
TC
H E
XIS
TIN
G
LIM
IT O
F C
ON
ST
RU
CT
ION
ST
A 1
30+
100.
000
ELE
V 4
32.0
50
BRITISHCOLUMBIA
DESIGNED
QUALITY CONTROL
QUALITY ASSURANCE
DRAWN
DATE
DATE
DATE
DATE
CAD FILENAME
DATE
SIGNATUREDATE REVISIONSREV
REG DRAWING NUMBERPROJECT NUMBERFILE NUMBER
DATE
SENIOR DESIGNER
SCALE
REV
MINISTRY OF TRANSPORTATIONAND INFRASTRUCTURE
HIGHWAY ENGINEERING
NORTHERN REGION
1200CON-15-0674-BFCC.DWG
2020-04-13
CL
DS
JN
NB
APR. 2020
APR. 2020
APR. 2020
APR. 2020
15-0674 37249-0006 NR R3-340-1203
SUGGESTED BRIDGE CONSTRUCTION ACCESS - PROFILE
HIGHWAY No. 29
BEAR FLAT - CACHE CREEK
AS SHOWN
L120-LINE
SCALE: H 1:2000 V 1:200
L130-LINE
SCALE: H 1:1000 V 1:100
NOTES:
1. ELEVATIONS SHOWN ARE FINISHED GRADE
2. EMBANKMENT FIGURES SHOWN ARE COMPACTED QUANTITIES
3. EXCAVATION FIGURES SHOWN ARE NEAT LINE
UNADJUSTED QUANTITIES
FOR REFERENCE ONLY
-
415
420
425
430
435
440
445
415
420
425
430
435
440
445STRIPPING m³
EMBANKMENT m3
131+000 131+050 131+100
357° 15' 09"
-2.000%
-4.000%-5.285%
BV
C 1
31+
005.
000
EV
C 1
31+
025.
000
ST
A 1
31+
015.
000
PIV
C 4
32.5
89
20 VCK 15.6
BV
C 1
31+
035.
000
EV
C 1
31+
055.
000
ST
A 1
31+
045.
000
PIV
C 4
31.0
03
20 VCK 6.1
415
420
425
430
435
440
445
415
420
425
430
435
440
445STRIPPING m³
EMBANKMENT m3
-4.000%
-1.186%
BV
C 1
32+
025.
000
EV
C 1
32+
055.
000
ST
A 1
32+
040.
000
PIV
C 4
30.7
62
30 VCK 10.7
415
420
425
430
435
440
445
415
420
425
430
435
440
445STRIPPING m³
EMBANKMENT m3
+1.555% -2.500%-0.912%
BV
C 1
33+
030.
000
EV
C 1
33+
060.
000
ST
A 1
33+
045.
000
PIV
C 4
31.3
10
30 VCK 7.4
ST
A 1
33+
041.
504
HP
431
.166
BV
C 1
33+
085.
000
EV
C 1
33+
115.
000
ST
A 1
33+
100.
000
PIV
C 4
29.9
35
30 VCK 18.9
133+000 133+050 133+100 133+150
310° 24' 24"R 600 LT.
R 600 RT.
316° 15' 54"
BC
133
+06
9.29
9
EC
133
+13
0.64
7
132+000 132+050 132+100
357° 15' 09"
TOTAL:
706
329
TOTAL:
TOTAL:
582
310
TOTAL:
TOTAL:
1,283
624
TOTAL:
329
706
310
582
624
1,283
ORIGINAL GROUND
ORIGINAL GROUND
ORIGINAL GROUND
L131
-LIN
E S
TA
131
+00
0.00
0L1
10-L
INE
ST
A 1
10+
390.
000
ELE
V 4
33.1
89
MA
TC
H E
XIS
TIN
G
LIM
IT O
F C
ON
ST
RU
CT
ION
ST
A 1
31+
060.
000
ELE
V 4
30.7
03
L132
-LIN
E S
TA
132
+00
0.00
0L1
10-L
INE
ST
A 1
10+
310.
000
ELE
V 4
32.3
62
MA
TC
H E
XIS
TIN
G
LIM
IT O
F C
ON
ST
RU
CT
ION
ST
A 1
32+
060.
000
ELE
V 4
30.5
25
L133
-LIN
E S
TA
133
+00
0.00
0L1
10-L
INE
ST
A 1
10+
140.
000
ELE
V 4
30.6
10
MA
TC
H E
XIS
TIN
G
LIM
IT O
F C
ON
ST
RU
CT
ION
ST
A 1
33+
137.
344
ELE
V 4
29.5
94
BRITISHCOLUMBIA
DESIGNED
QUALITY CONTROL
QUALITY ASSURANCE
DRAWN
DATE
DATE
DATE
DATE
CAD FILENAME
DATE
SIGNATUREDATE REVISIONSREV
REG DRAWING NUMBERPROJECT NUMBERFILE NUMBER
DATE
SENIOR DESIGNER
SCALE
REV
MINISTRY OF TRANSPORTATIONAND INFRASTRUCTURE
HIGHWAY ENGINEERING
NORTHERN REGION
1200CON-15-0674-BFCC.DWG
2020-04-13
CL
DS
JN
NB
APR. 2020
APR. 2020
APR. 2020
APR. 2020
15-0674 37249-0006 NR R3-340-1204
SUGGESTED BRIDGE CONSTRUCTION ACCESS - PROFILE
HIGHWAY No. 29
BEAR FLAT - CACHE CREEK
AS SHOWN
L133-LINE
SCALE: H 1:1000 V 1:100
NOTES:
1. ELEVATIONS SHOWN ARE FINISHED GRADE
2. EMBANKMENT FIGURES SHOWN ARE COMPACTED QUANTITIES
3. EXCAVATION FIGURES SHOWN ARE NEAT LINE
UNADJUSTED QUANTITIES
L132-LINE
SCALE: H 1:1000 V 1:100
L131-LINE
SCALE: H 1:1000 V 1:100
FOR REFERENCE ONLY
-
Northern Region
Ministry of TransportationBRITISHCOLUMBIA & Infrastructure
PRELIMINARY
NOT ISSUED FOR CONSTRUCTION
AutoCAD SHX TextL110 CONTROL LINE
AutoCAD SHX TextSUGGESTED CACHE CREEK DIVERSION
AutoCAD SHX Text WEST ABUT. BRG'S
AutoCAD SHX Text EAST ABUT. BRG'SBRG'S
AutoCAD SHX TextTEMPORARY BRIDGE
AutoCAD SHX TextTEMPORARY BRIDGE
AutoCAD SHX TextTEMPORARY BRIDGE
AutoCAD SHX Text INTERMEDIATE PIER
AutoCAD SHX TextEXISTING GROUND
AutoCAD SHX Text500 MIN. FREEBOARD
AutoCAD SHX Text WEST ABUT. BRG'S BRG'S
AutoCAD SHX Text20-YEAR FLOOD LEVEL (Q20)
AutoCAD SHX TextBRIDGE ABUTMENTS (BY CONTRACTOR)
AutoCAD SHX Text EAST ABUT. BRG'S
AutoCAD SHX Text2
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text1
AutoCAD SHX Text PIER
AutoCAD SHX Text43 000 (APPROX.)
AutoCAD SHX Text43 000 (APPROX.)
AutoCAD SHX Text2.0%
AutoCAD SHX TextLOW FLOW STREAM CHANNEL BY CONTRACTOR FOR SUGGESTED CREEK DIVERSION DETAILS SEE T3 SCHEDULE DWGS. R3-340-801 & 802
AutoCAD SHX TextINTERMEDIATE PIER (BY CONTRACTOR SEE NOTE 3)
AutoCAD SHX TextOFFSET
AutoCAD SHX TextOFFSET
AutoCAD SHX TextOFFSET
AutoCAD SHX TextOFFSET
AutoCAD SHX TextOFFSET
AutoCAD SHX Text L110 CONTROL LINE
AutoCAD SHX Text7000 TO MATCH ACCESS ROAD WIDTH
AutoCAD SHX Text7000 TO MATCH ACCESS ROAD WIDTH
AutoCAD SHX Text7000 TO MATCH ACCESS ROAD WIDTH
AutoCAD SHX Text7000 TO MATCH ACCESS ROAD WIDTH
AutoCAD SHX Text7000 TO MATCH ACCESS ROAD WIDTH
AutoCAD SHX Text7000 TO MATCH ACCESS ROAD WIDTH
AutoCAD SHX TextTEMPORARY BRIDGE SUPERSTRUCTURE (BY CONTRACTOR)
AutoCAD SHX TextTL-2 BARRIER (TYP.) (BY CONTRACTOR)
AutoCAD SHX TextSCALE 1:
AutoCAD SHX Text50
AutoCAD SHX TextB
AutoCAD SHX Text-
AutoCAD SHX TextSCHEMATIC SECTION
AutoCAD SHX TextPIER CAP (BY CONTRACTOR)
AutoCAD SHX TextPIER COLUMNS/FOUNDATION (PILE SIZE, NUMBER AND DESIGN BY CONTRACTOR)
AutoCAD SHX TextCANCEL PRINTS BEARING PREVIOUS LETTER
AutoCAD SHX TextH-308j-r3-c(07-08)
AutoCAD SHX TextPREPARED UNDER THE DIRECTION OF
AutoCAD SHX TextENGINEER OF RECORD
AutoCAD SHX TextDATE
AutoCAD SHX TextFILE No.
AutoCAD SHX TextPROJECT No.
AutoCAD SHX TextDRAWING No.
AutoCAD SHX TextREG.
AutoCAD SHX TextR E V I S I O N S
AutoCAD SHX TextDESIGNED
AutoCAD SHX TextCHECKED
AutoCAD SHX TextDRAWN
AutoCAD SHX TextDATE
AutoCAD SHX TextDATE
AutoCAD SHX TextDATE
AutoCAD SHX TextSCALE
AutoCAD SHX TextNEGATIVE No.
AutoCAD SHX TextDate
AutoCAD SHX TextRev
AutoCAD SHX TextDescription
AutoCAD SHX TextInit
AutoCAD SHX TextSCALE 1:100
AutoCAD SHX TextPLAN
AutoCAD SHX TextSCALE 1:
AutoCAD SHX Text100
AutoCAD SHX TextA
AutoCAD SHX Text-
AutoCAD SHX TextSECTION
AutoCAD SHX TextGENERAL ARRANGEMENT
AutoCAD SHX TextR3-340-1205
AutoCAD SHX Text%%U
AutoCAD SHX Text3
AutoCAD SHX Text20/03/16
AutoCAD SHX Text20/03/16
AutoCAD SHX Text20/03/16
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX Text%%U
AutoCAD SHX TextAK
AutoCAD SHX TextHA
AutoCAD SHX TextGL
AutoCAD SHX TextJACEK DONIEC
AutoCAD SHX Text37249-0006
AutoCAD SHX Text20/03/16
AutoCAD SHX TextCACHE CREEK TEMPORARY CONSTRUCTION ACCESS BRIDGE
AutoCAD SHX TextHIGHWAY NO.29
AutoCAD SHX TextNORTHERN REGION
AutoCAD SHX TextNOTES: 1. DESIGN - CSA S6:14 CHBDC DESIGN - CSA S6:14 CHBDC 2. LOADING - BY CONTRACTOR LOADING - BY CONTRACTOR 3. INTERMEDIATE PIERS, IF USED, SHALL BE LOCATED OUTSIDE OF THE LOW INTERMEDIATE PIERS, IF USED, SHALL BE LOCATED OUTSIDE OF THE LOW FLOW CHANNEL.
AutoCAD SHX Text-
AutoCAD SHX TextA
AutoCAD SHX TextREFERENCE NOTES: 1. BASE MAPPING CREATED FROM LIDAR INFORMATION PROVIDED BY BC HYDRO BASE MAPPING CREATED FROM LIDAR INFORMATION PROVIDED BY BC HYDRO IN 2015/2018 AND FIELD SURVEY PERFORMED BY BINNIE FROM 2011, 2017, AND 2018. 2. BRIDGE ALIGNMENT AND ELEVATIONS TO BE DESIGNED BY CONTRACTOR AND BRIDGE ALIGNMENT AND ELEVATIONS TO BE DESIGNED BY CONTRACTOR AND CONFIRMED PRIOR TO CONSTRUCTION DETAILED DESIGN. 3. HYDROLOGY DATA REFERENCED FROM NHC CACHE CREEK EAST HYD DESIGN HYDROLOGY DATA REFERENCED FROM NHC CACHE CREEK EAST HYD DESIGN REPORT FINAL_R1a, 25 FEB 2020. 4. THE DETOUR BRIDGE CONFIGURATION, NUMBERS OF SPANS AND RIPRAP THE DETOUR BRIDGE CONFIGURATION, NUMBERS OF SPANS AND RIPRAP TREATMENT, ETC. ARE SUBJECT TO CHANGE AND DEPENDENT ON THE FINAL DESIGN BY THE CONTRACTOR. THE EXTENT OF INSTREAM STRUCTURAL ELEMENTS SHOWN (E.G. PIERS AND RIPRAP) ARE ANTICIPATED TO BE THE MAXIMUM AQUACTIC IMPACTS.
AutoCAD SHX Text-
AutoCAD SHX TextB
Sheets and ViewsR3-340-1200R3-340-1201R3-340-1202R3-340-1203R3-340-1204
r3-340-1205Sheets and ViewsR3-340-1201R3-340-1202R3-340-1203R3-340-1204
R3-340-1205 BERM ACCESS BRIDGE GENERAL ARRANGEMENTSheets and ViewsBermAccessBridgeOLE2OLE3
1200-COVERSheets and ViewsR3-340-1200