highwa 1 amloop lbert our˜lanin rogram · retaining wall area = 780m³ additional lane over chase...

15
TRANS-CANADA Kamloops Chase Salmon Arm Sicamous Revelstoke Golden Alberta Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) I HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 Hoffman’s Bluff to Jade Mountain Project, part of the Highway 1 Kamloops to Alberta Four-Laning Program. You can provide us with your feedback by: completing the hard-copy feedback form and leaving it with a member of our team filling out the feedback form online at: gov.bc.ca/bchwy1-projects mailing your feedback form to: Ministry of Transportation and Infrastructure ATTN: Hoffman’s Bluff to Jade Mountain Project 447 Columbia Street Kamloops, BC V2C 2T3

Upload: others

Post on 30-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

WelcomeThank you for attending this community engagement on the Trans-Canada Highway 1 Hoffman’s Bluff to Jade Mountain Project, part of the Highway 1 Kamloops to Alberta Four-Laning Program.

You can provide us with your feedback by:

• completing the hard-copy feedback form and leaving it with a member of our team

• filling out the feedback form online at: gov.bc.ca/bchwy1-projects

• mailing your feedback form to:

• Ministry of Transportation and Infrastructure ATTN: Hoffman’s Bluff to Jade Mountain Project 447 Columbia Street Kamloops, BC V2C 2T3

Page 2: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

The Hoffman’s Bluff to Jade Mountain Project is a $199.2 million partnership between the Province of B.C. and the Government of Canada.The project will upgrade approximately 12 kilometres of Trans-Canada Highway 1 from two lanes to four, and will tie into the four-laning improvements that were carried out between Monte Creek and Hoffman’s Bluff. The project will increase safety and capacity on the highway and will provide safer connections to local roads and businesses.

The project will be delivered in three phases.

Page 3: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Develop Options Evaluate Options Risk Assessment Business Case First Nations Consultation Community Engagement Public Open House

Design Shortlisted Options Value Analysis Road Safety Seek Partnerships Cultural Assessment First Nations Consultation Stakeholder Meetings Community Engagement Public Open House

Re ne Designs Archeological Assessment Environmental Assessments Geotechnical Assessments First Nations Consultation Stakeholder Meetings Community Engagement Public Open House

Tender Drawings Construction Documents Value Engineering First Nations Accommodation Property Acquisition Environmental Permitting Public Open House

Early Works Construction Activities Major Works Construction Activities Archaeological, Cultural, and Spiritual Monitoring

Conceptual Planning

Functional Design

Tender & Construction

Preliminary Design

Chase Creek Road to Chase West

Chase West to Jade Mountain

Ü

Ho�man’s Blu� to Chase Creek Road

Ü Ü

Detailed Design

Data Collection

Project Development Stages

Page 4: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

First Open House• May 31, 2016

Highest Priority• Improving safety• Improving traffic flow

Response• Added CVSE pullout• Moved westbound interchange closer to Chase• Continued direct engagement with Village of

Chase, First Nations and property owners

Public Engagement to Date

Page 5: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Planning for Trans-Canada Highway ImprovementsPrinciples to Guide Us:

• Improve safety, traffic flow and reliability of the highway• Improve access and connectivity with the local road

network• Support adjacent land uses and minimize impacts to

residents and businesses• Enhance pedestrian and cyclist safety• Investigate measures to reduce wildlife collisions

Factors We Consider:• Traffic Operation and Safety – how will the concept

perform in terms of traffic operation, access, reliability and safety on the TCH?

• Transportation System – how does the design concept support the municipal road connectivity and existing accesses?

• Archeological and Cultural - what is the history of this area?• Environmental – what is the impact to our local

environment?• Property Impacts – what are the impacts to residential,

commercial and farm land and how do we limit those impacts?

• Geotechnical – what is the rock condition in the area?• Aesthetic – are there any visual impacts?• Constructability – how feasible will construction be?• Estimated Cost vs. Benefits – is it a good investment of

taxpayers’ dollars?

Page 6: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Community Benefits• Interchange reduces crashes – safer community access for residents

and visitors through grade separation

• Moves Commercial Vehicle Safety Enforcement to less populated area

• New Service and Attraction Signs to promote local services to visitors

• Improvements to local road network

• Better connection to the recreation area south of Highway 1

Page 7: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Key Changes Since May 2016 Open House

• Westbound connection moved closer to Chase

• New Commercial Vehicle Safety Enforcement pullout

Expected Results• Reduced Agricultural Land Reserve

impacts• Less traffic on frontage road• Safer pedestrian and cyclist provisions• Improved connection with Harper Lake

Rd and Shuswap Chase Creek Rd• Minimized impact to environmentally

sensitive Acid Rock Drainage area

Chase Creek Road to Chase West: Updated Concept

Page 8: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Frontage Road Improves Safety By:• VLA Road, Planters Road and farm

accesses connected via new frontage road• Underpass connects Shuswap-Chase

Creek Road and Harper Lake Road• Potential future connection to

Neskonlith IR#2 • 60 km/hour speed limit• Minimum two-metre wide paved

shoulders provide safe access for non-motorized users

Chase Creek Road to Chase West: Frontage Road with Pedestrian and Cyclist Routes

Page 9: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Chase West to Jade Mountain: Key Design Objectives• Four median-separated lanes• Grade separation to access Chase• Additional emergency vehicle access• Improved access to commercial

development opportunities in Foothill Road area

• Improved pedestrian safety• Full traffic movement both eastbound

and westbound

Page 10: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Additional design exploration and stakeholder discussion identified Brooke Drive as a safer, centralized access point to the community.Advantages:

• Eastbound on-ramps provide distance for safe acceleration prior to steep hill

• Direct access to Brooke Drive businesses and recreation centre

• Better able to accommodate vehicle traffic than Coburn Street

• Better connectivity upgrades to key Shuswap Avenue / Pine Street intersection

• Less property impacts

Chase West to Jade Mountain: Updated Concept

Page 11: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Chase West to Jade Mountain: Other Access Options Considered

Coburn Street Interchange OptionReasons why this concept wasn’t selected:

• Safety and operational concerns with on/off ramps at base of hill• Coburn Street could not handle increased vehicle and pedestrian

traffic• Large vehicles would be of particular concern, with narrow road

and condition of Chase Creek Bridge on Coburn Street• Inadequate spacing of westbound off ramps proposed at

Shuswap East and Coburn Street• Inconsistent spacing of interchanges in conjunction with Chase West• Larger impact to property

Coburn Street At-Grade Intersection OptionReasons why this concept wasn’t selected:

• Safety concerns with having an at-grade intersection as the primary access into Chase

• Safety concerns with intersection location at base of hill• Operational concerns – during peak summer hours the

intersection will have unacceptable delays• Coburn Street could not handle increased vehicle and pedestrian

traffic• Large vehicles would be of particular concern, with narrow road

and condition of Chase Creek Bridge on Coburn Street

Page 12: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Features Supporting Community Priorities Being Reviewed

Shuswap Avenue East On-rampCommunity Priority:

• Improve connectivity to TCHChallenges include:

• Wider bridge at Chase Creek required• Additional property impacts

Coburn to Foothills Pedestrian UnderpassCommunity Priority:

• Improve pedestrian safetyChallenges include:

• Requires raising highway• Additional property impacts• Conflicts with potential emergency

connection

Coburn Emergency Vehicle ConnectionCommunity Priority:

• Ensure emergency access to TCHChallenges include:

• Potential safety concerns with unexpected access to highway

• Specialized maintenance requirements

PI 4

73+

96.0

46

TS 470+33.317

ST

473

+16

.046

CS 471+45.285

CS

472

+66

.046

SC 470+73.317

SC 471+95.285

97°13'28"

223°41'15"221°11'42"

Ls 40.000

Θs20°50'05"

Ls 50.000Θs 0°57'18"

Ls 50.000

Θs 26°59'54"

Rc=55.000

Δ=74°5

8'19"

Tc=42.182

Arc=71.968

Ec=14.313

Rc=1500.000Δ=2°42'10"Tc=35.387Arc=70.761Ec=0.417

PI 4

72+4

4.27

0N

633

141.

735

E 31

1318

.351

PI 471+57.285

N 633276.881E 311431.870

X

X

X

XX

X

X

X

X

EW

EW

EW

EW

EW

EW

EW

EW

EW

EW

EW

EW

EW

EW

X

X X

F

C

C

C C C C C

C

C

C

C C C

FC

470+00

471+

00

472+00473+00474+00

474+81.13

REG DRAWING NUMBERPROJECT NUMBERFILE NUMBER

DATE

SENIOR DESIGNER

DATE

DATE

DATE

DATE

REV

BRITISHCOLUMBIA

0 10 50m1:1500

2803 23909 R2 R2-1006-SK012 1

PLANTRANS-CANADA HIGHWAY No. 1 - CHASE TO JADE MOUNTAINOPTION B - SHUSWAP AVENUE TO HIGHWAY 1 WESTBOUND

SOUTHERN INTERIOR REGION

A. WARNER

DRAWN

QUALITY ASSURANCE

QUALITY CONTROL

DESIGNED 2017-09-01

R2-1006-SK-012

11/03/2017

CAD FILENAME

PLOT DATESCALE

MINISTRY OF TRANSPORTATIONAND INFRASTRUCTURE

YYYY-MM-DD

REV DATE REVISIONS NAME

0 2017-09-01 ISSUED FOR INFORMATION E. NEWCOMBE

1 2017-11-03 ADDED ORTHO PHOTO P.YATES

SHUSWAP AVENUE

P. YATES

E. NEWCOMBE

A. WARNER

APPROXIMATERETAINING WALL

AREA = 780m³

ADDITIONAL LANEOVER CHASE CREEK

BRIDGE REQUIRED

ASSUMED PARALLELLANE LENGTH = 196m

(6.7% DOWNGRADE)

2017-09-01

2017-09-01

2017-09-01

TRANS CANADA HIGHWAY

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

EWEW

EW

EW

EW

EW

EWEW

EW

EW

EW

EW

EW

EW

EW

EW

EW

EW

EW

C

F F F F F F FF

F

FFFFF

F F F F F F

FFFFFF

289+00 290+00291+00

292+00 293+00 294+00

358+00359+00

360+00

361+

0036

1+34

.40

REG DRAWING NUMBERPROJECT NUMBERFILE NUMBER

DATE

SENIOR DESIGNER

DATE

DATE

DATE

DATE

REV

BRITISHCOLUMBIA

2803 23909 R2 R2-1006-SK015A 2

PLAN AND PROFILETRANS-CANADA HIGHWAY No. 1 - CHASE TO JADE MOUNTAIN

OPTION B-2 - BROOKE DRIVE OPTION WITH PEDESTRIAN UNDERPASSSOUTHERN INTERIOR REGION

A. WARNER

DRAWN

QUALITY ASSURANCE

QUALITY CONTROL

DESIGNED 2017-09-01

R2-1006-SK-015A

11/9/2017

CAD FILENAME

PLOT DATE

MINISTRY OF TRANSPORTATIONAND INFRASTRUCTURE

YYYY-MM-DD

REV DATE REVISIONS NAME

0 2017-09-01 ISSUED FOR INFORMATION E. NEWCOMBE

1 2017-11-03 UPDATED FOR OPEN HOUSE P.YATES

2 2017-11-09 UPDATED FOR OPEN HOUSE A. WARNER

P. YATES

E. NEWCOMBE

A. WARNER

TRANS-CANADA HIGHWAY

CEDAR AVE

CO

BU

RN

ST

FOOTHILLS RD

<<< TO KAMLOOPSTO SALMON ARM >>>

COBURN STREETPEDESTRIAN WALKWAYAND UNDERPASS

2017-09-01

2017-09-01

2017-09-01

0 10 50m1:1500SCALE

REG DRAWING NUMBERPROJECT NUMBERFILE NUMBER

DATE

SENIOR DESIGNER

DATE

DATE

DATE

DATE

REV

BRITISHCOLUMBIA

2803 23909 R2 R2-1006-SK019 1

PLANTRANS-CANADA HIGHWAY No. 1 - CHASE TO JADE MOUNTAINOPTION B - EMERGENCY ONLY ACCESS TO COBURN ROAD

SOUTHERN INTERIOR REGION

A. WARNER

DRAWN

QUALITY ASSURANCE

QUALITY CONTROL

DESIGNED 2017-09-26

R2-1006-SK-019A

11/3/2017

CAD FILENAME

PLOT DATESCALE

MINISTRY OF TRANSPORTATIONAND INFRASTRUCTURE

YYYY-MM-DD

P. YATES

E. NEWCOMBE

A. WARNER

COBURN STREET

TO

SA

LMO

N A

RM

>>>

<<<

TO

KA

MLO

OP

S

TR

AN

S-C

AN

AD

A H

IGH

WA

Y

2017-09-26

2017-09-26

2017-09-26

FOO

THILLS R

OAD

PA

QU

ET

TE

RO

AD

REV DATE REVISIONS NAME

1 2017-11-03 UPDATES FOR OPEN HOUSE P. YATES

CE

DA

R A

VE

NU

E

0 5 25m1:1000

EMERGENCY ACCESSCONTROLLED GATE

RIGHT IN/ RIGHT OUTEMERGENCY USE ONLY

Page 13: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Welcoming Travellers to Chase

The ministry recognizes the importance of marketing local communities through highway signage.The ministry will use a combination of the blue and white Service and Attraction Signs, as well as green and white Guide Signs to give travellers ample notice of local services and attractions in Chase.The project will also provide an opportunity for the Village of Chase to have a marketing sign (e.g.: “Welcome to Chase”) to encourage travellers to stop in the community.

Page 14: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Project Schedule

Phase 3: Hoffman’s Bluff to Chase Creek Road

• Currently in Preliminary Design while working with Neskonlith Indian Band on their Land Use Plan

• Design work to start following completion of Land Use Plan

Phase 1: Chase Creek Road to Chase West

• 2017 – Complete Detailed Design

• 2018 – Complete Property Acquisition and Tender Project

• 2018 – Commence Construction

• 2019 – Complete Construction

Phase 2: Chase West to Jade Mountain

• 2017 – Complete Preliminary Design

• 2018 – Complete Functional Design

• 2018 – Community Open House

• 2019 – Complete Detailed Design and Property Acquisition

• 2020 – Tender Project and start Construction

• 2023 – Complete Construction

Delivery of the Highway 1 four laning from Hoffman’s Bluff to Jade Mountain is split into three phases. Each will follow a separate, but coordinated schedule, with construction to commence in 2018.

Here is the current delivery schedule:

Page 15: HIGHWA 1 AMLOOP LBERT OUR˜LANIN ROGRAM · retaining wall area = 780m³ additional lane over chase creek bridge required assumed parallel lane length = 196m (6.7% downgrade) 20170901

TRANS-CANADA KamloopsChase

Salmon Arm

Sicamous Revelstoke Golden

Alberta

Ministry of Transportation and Infrastructure jurisdiction (337 km)

Federal Parks Canada jurisdiction (103 km) I

HIGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANING PROGRAM

Thank you for attending.Please provide your feedback by:

• Completing the feedback form and leaving it with our team

• Filling out the feedback form online at gov.bc.ca/bchwy1-projects by December 10, 2017

• Mailing your form to:

• Ministry of Transportation and Infrastructure ATTN: Hoffman’s Bluff to Jade Mountain Project 447 Columbia Street Kamloops, BC V2C 2T3

Project information is available at: gov.bc.ca/bchwy1-projects