Highlights Of Accomplishment Report CY 1st QUARTER 2017 Prepared by: Corporate Planning and Management Staff

Upload: others

Post on 13-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Highlights Of

    Accomplishment Report CY 1st QUARTER 2017

    Prepared by: Corporate Planning and Management Staff

  • Table of Contents TRAFFIC DISCIPLINE OFFICE ……………….. 1

    TRAFFIC ENFORCEMENT

    Income from Traffic Fines

    Traffic Direction & Control; Metro Manila Traffic Ticketing System

    60-Kph Speed Limit Enforcement

    Bus Management and Dispatch System

    South West Integrated Provincial Transport System (SWIPTS)

    Anti-Illegal Parking Operations

    Bicycle-Sharing Scheme

    Anti-Jaywalking Operations

    Enforcement of the Yellow Lane and Closed-Door Policy

    Anti-Colorum and Out-of-Line Operations

    Operation of the TVR Redemption Facility

    Towing and Impounding

    Road Emergency Operations (Emergency Response and Roadside Clearing)

    Personnel Inspection and Monitoring

    Unified Vehicular Volume Reduction Program (UVVRP)

    Other Traffic Management Measures implemented in 2016

    TRAFFIC ENGINEERING

    Design and Construction of Pedestrian Footbridges

    Upgrading of Traffic Signal System

    Application of Thermoplastic and Traffic Cold Paint Pavement Markings

    Fabrication and Manufacturing of Traffic Road Signs/ Facilities

    Other Special Projects

    TRAFFIC EDUCATION

    Institute of Traffic Management

    METROBASE

  • FLOOD CONTROL & SEWERAGE

    MANAGEMENT OFFICE (FCSMO) ……………….. 17

    Flood Control Information Center (FCIC) and Metro Manila Disaster Risk Reduction and Management

    Operation Center

    SOLID WASTE MANAGEMENT OFFICE ……………….. 22

    HEALTH, PUBLIC SAFETY & ENVIRONMENTAL PROTECTION OFFICE (HPSEPO) ……………….. 25

    Enforcement of MMDA Regulation No. 96-009 or Anti-littering Law

    Enforcement of RA 9211 or the Tobacco Regulation Act/

    No Smoking in Public Places/ MMDA-Bloomberg Project

    Public Safety Programs

    Anti-Smoke Belching Operations

    Metro Parkway Clearing Group

    METROPOLITAN SOCIAL SERVICE OFFICE ……………….. 35

    SIDEWALK CLEARING OPERATIONS ……………….. 36 GROUP (SCOG)

    OFFICE OF THE ASSISTANT GENERAL MANAGER FOR PLANNING (OAGMP) ……………….. 37

    Regional Development Council (RDC) NCR

    Urban Renewal Program, Zoning and Land Use Planning and Shelter Service

    COUNCIL SECRETARIAT ……………….. 39 MANAGEMENT AND INFORMATION ……………….. 41 SYSTEM STAFF PUBLIC AFFAIRS STAFF—PUBLIC ……………….. 42 INFORMATION CENTER PUBLIC CONCERNS AND RESPONSES ……………….. 44

    MANAGEMENT UNIT

    Design and Layout

  • SECURITY INTELLIGENCE AND ……………….. 47 INVESTIGATION OFFICE

    OFFICE OF THE DEPUTY CHAIRMAN …………….. 48

    LEGAL AND LEGISLATIVE ……………….. 49 AFFAIRS STAFF

    Traffic Adjudication Division

    CORPORATE PLANNING AND ……………….. 51 MANAGEMENT STAFF

    BILLBOARD CLEARANCE AND ……………….. 53 ENFORCEMENT OFFICE

    FINANCE SERVICE ……………….. 54 Accounting Division

    Budget Division

    Internal Audit Unit

    ADMINISTRATIVE SERVICE ……………….. 58 Personnel Benefits Division

    Payroll Group

    Medical and Dental Clinics

    Personnel Transaction Division

    General Administrative Service Division

    Transport Division

    Staff Development Division

    Supply and Property Division

    Records Division

    MMDA SPECIAL PROJECTS ……………….. 70

    MMDA Workers’ Inn

    Children’s Road Safety Park

  • 1| P a g e

    TRAFFIC DISCIPLINE OFFICE

    The MMDA earned a total of P31.915M gross income from traffic fines for the 1st quarter of 2017. Compared to the same period in 2016, earnings increased by P5.623M, or 21.39%.

    TRAFFIC ENFORCEMENT

    Traffic Direction and Control; Metro Manila Traffic Ticketing System

    As of March 31, 2017, a total of 2,374 traffic constables were deployed to manage traffic, of which 843 were active holders of Unified Ordinance Violation Receipts (UOVRs), who made a total of 99,881 apprehensions, or 249.70% more than the 40,000 target for the quarter. Below is a comparative chart of 2016 and 2017 first quarter data on deployment and apprehensions:

    1st Quarter 2017 1st Quarter 2016

    Income for Traffic Fines ₱31.915M ₱26.292M

    Target Output 1st Quarter 2017

    1st Quarter 2017

    1st Quarter 2016

    Average no. of TCs deployed - 2,374 2,512

    Ave. no. of active UOVR holders - 843 795

    Total no. of apprehensions 40,000/ qtr. 99,881 (249.70%)

    61,157

    Traffic Discipline Office (TDO) is the MMDA unit tasked with traffic management and enforcement in Metro Manila. It has a total manpower complement of 3,391 as of March 6, 2017, of which 2,311 are assigned in traffic enforcement and 402 in traffic engineering.

    Total number of apprehensions increased by 38,724, or 63.31%.

  • 2| P a g e

    The TDO Traffic Ticket Management Division (TTMD) released the top ten common traffic violations during 1st Quarter 2017 as follows:

    Top Ten Common Traffic Violations

    1. Disregarding Traffic Sign 2. Obstruction 3. Unified Vehicular Volume Reduction Program 4. Illegal Parking (not towed) 5. Illegal Parking (towed) 6. Loading/ Unloading in Prohibited Zone (as of July 12, 2012) (MC 08-12) 7. Bus/ PUJ Lane Ordinance 8. Reckless Driving 9. Stalled Vehicle 10. Truck Ban (as of August 1, 2014) (MMDA Res. #14-14 series of 2014)

    The top 5 administrative violations are:

    1. Out-of-Line Operation (MMDA Reg. No. 97-004) 2. Colorum Operation (Passenger) MMDA Reg. No. 97-004 3. Colorum Operation (Cargo Vehicle) 4. Tampering of OR/ CR/ CPC & Other Documents (Spurious Documents) MMDA Reg. No. 97-

    004 5. Illegal Transfer of Plates/ Tags/ Stickers

    60-km. Speed Limit Enforcement A 60-km./ hour speed limit is being enforced along the above-mentioned major roads since 2011 due to the high incidence of road accidents on Common-wealth Ave. and illegal drag racing/ reckless driving on Macapagal Ave.

    Macapagal Ave.

    Commonwealth Ave.

    No. of Apprehensions Target Output

    1st Quarter 2017 1st Quarter 2017 1st Quarter 2016

    Commonwealth Ave. 2,100/ qtr 8,400/ yr.

    923 1,808

    Macapagal Ave. 1,088 1,546

    Total 2,011 3,354

  • 3| P a g e

    Bus Management & Dispatch System (BMDS) BMDS is the scheme completed during the 1st quarter of 2012 where drivers were registered thru fingerprint scanners and dispatch is controlled in the 4 major terminals in Baclaran, Alabang, Fairview and Malabon and in 10 satellite stations to improve city bus operation particularly along EDSA. Following is a comparison of BMDS’ accomplishments in 2017 and 2016:

    Target Output

    1st Quarter 2017 1st Quarter

    2017 1st Quarter

    2016

    Total Bus Trips recorded for the quarter

    468,000 530,089 (113%)

    609,975

    Average Bus Trips recorded per day 5,200/ qtr. 5,873 (113%) 6,701

    Drivers registered thru fingerprint scanners

    150/ qtr. 393 (262%)

    360

    Total no. of drivers records being maintained and updated in the PUB Drivers’ Databank since 2012

    - 10,564 9,215

    No. of BMDS-related apprehensions 25/ qtr. 115 (460%)

    1,350

  • 4| P a g e

    Southwest Integrated Provincial Transport System (SWIPTS) The SWIPTS Terminal at Coastal Mall was launched on August 6, 2013 to serve as a temporary terminal for provincial buses coming from and going to Cavite and Batangas until a permanent South-West ITS (Integrated Transport System) Terminal is built. Hereunder is a comparative chart of the Terminal’s 1st Quarter accomplishments during 2016 and 2017:

    Target Output

    1st Quarter 2017 1st Quarter

    2017 1st Quarter

    2016

    Total no. of bus trips recorded/ dispatched

    18,000/ qtr. 18,219 (101.21%)

    28,829

    The decrease in the number of bus trips is due to the continued by-passing of the terminal by provincial buses.

    Anti-Illegal Parking Operations Forty (40) AIPO personnel, along with personnel from the PNP Highway Patrol Group, MMDA Motorcycle Unit and towing companies made the rounds of major metro streets and issued citation tickets to violators whose vehicles were parked beyond the designated sidewalk boundary marker, and towed unattended vehicles.

    Target Output

    1st Quarter 2017 1st Quarter 2017 1st Quarter 2016

    No. of apprehensions 3,960/ qtr. 4,463 (112.70%)

    1,075

  • 5| P a g e

    Bicycle-Sharing Scheme As of March 31, 2017, only two (2) MMDA bike lanes remain operational – those at Roxas Blvd. and at White Plains/ Temple Drive. Bicycle units have broken down and been reduced to only 92 functioning ones from 114 units during the same period last year. The decline in the number of bike borrowers as shown in the table below may also be attributed to the arrival of the hot summer days.

    Target Output

    1st Quarter 2017 1st Quarter 2017 1st Quarter 2016

    No. of bike borrowings 200/ qtr 310 (155%)

    715

    Anti-Jaywalking Operations Four (4) Anti-Jaywalking Unit (AJU) groups conducted operations along EDSA-Quezon Ave., EDSA-Taft Ave. (Pasay City), EDSA-Ortigas and EDSA-Ayala during 1st Quarter 2017 and apprehended a total of 6,278 violators.

    No. of Apprehensions Target Output

    1st Quarter 2017 1st Quarter 2017 1st Quarter 2016

    Unsettled 1,400 apprehensions

    per quarter

    5,177 6,818

    Paid fine 6,278 (448.42%)

    7,818

    Total 25,756 (460%)

    17,276

    Apprehended jaywalkers have the option to either attend the required seminar or pay the P200.- fine. Exempted cases are senior citizens, pregnant women, minors and foreigners.

  • 6| P a g e

    Enforcement of the Yellow Lane Rule & Closed-Door Policy

    The Yellow Lane (designated bus and PUJ lanes) Rule and Closed Door Policy are strictly implemented along EDSA to

    help improve traffic flow and promote passenger safety.

    Target Output

    1st Quarter 2017 1st Quarter 2017 1st Quarter 2016

    Yellow Lane Rule 100% apprehension

    3,416 (100%)

    2,266

    Closed-Door Policy 100% apprehension

    2,348 (100%)

    494

    Anti-Colorum & Out-of-Line Operations Public utility vehicles without LTFRB franchise and those op-erating outside their authorized routes contribute to traffic congestion and unduly compete with legal transport opera-tors

    No. of Apprehensions Target Output

    1st Quarter 2017 1st Quarter 2017 1st Quarter 2016

    Anti-Colorum operations 100% apprehension 184 112

    Out-of-Line operations 100% apprehension 211 94

  • 7| P a g e

    Operation of the TVR Redemption Facility The Traffic Ticket Redemption Facility along Orense St. operates from 8 a.m. to 5 p.m. Mondays thru Saturdays. Traffic ticket redemption, applications for traffic clearances, release of impounded vehicles and redemption of confiscated items are transacted/ received/ processed here.

    Target Output

    1st Quarter 2017 1st Quarter 2017

    1st Quarter 2016

    Traffic clearance applications processed

    10,890/ qtr. 19,892 (182.66 %)

    19,109

    Traffic clearances released - 19,599 (98.52% of processed)

    18,388

    Applications received and processed for release of impounded vehicles

    100/ qtr. 325 (325%)

    155

    Impounded vehicles released after penalty payment/ released with resolution from the Traffic Adjudication Div.

    -- 345 (includes

    147

    Bank payments downloaded and uploaded to MRRES database

    15,000/ qtr. 33,989 (226.59%)

    20,682

    Confiscated drivers licenses/ motor vehicle plates received/ released

    1,075 drivers licenses/ license plates received/ released per qtr.

    1,204 received/

    1,130 Released

    Total 2,334 (217.11%)

    1,592 received/

    1,371 released

    Total 2,963

    Towing and Impounding The MMDA maintains two (2) impounding areas for Metro Manila – one at the Ultra in Pasig City and another at Tumana in Marikina City. Illegally parked, out-of-line and colorum vehicles are subject to towing and impounding.

    Target Output

    1st Quarter 2017 1st Quarter

    2017 1st Quarter 2016

    Impounded 100% of stalled vehicles

    7,641 9,485

    Released 7,154 8,417 -

  • 8| P a g e

    Monitoring of Field Personnel The Personnel Inspection and Monitoring Group (PIMG) conducted inspection and monitoring of 2,374 traffic/ field personnel assigned at the different field enforcement units of the Traffic Discipline Office of the Authority for this quarter. The inspection and monitoring was conducted by 30 TDO personnel and 11 motorcycle units. Likewise, for non-compliance with office rules and regulations and poli-cies, the PIMG issued a total of 804 Deficiency Reports to

    erring traffic/ field personnel who were meted appropriate disciplinary actions.

    Road Emergency Operations (Emergency Response and Roadside Clearing)

    The TDO Road Emergency Group (REG) medical and rescue

    personnel respond to emergencies along EDSA and other major thoroughfares in Metro Manila with the aid of 10 ambulances, 1 rescue van, 6 tow trucks, 3 forklifts, heavy equipment operators and hand-held radios. There are seven (7) road emergency stations being maintained along Roxas Blvd., Nagtahan, Orense, Ortigas, Timog, C-5 Libis and Commonwealth.

    Target Output

    1st Quarter 2017 1st Quarter

    2017 1st Quarter

    2016

    No. of accident victims treated or assisted/ endorsed to hospitals for further treatment

    -

    674/ 433 618/ 428

    No. of accident areas responded to/ cleared within the 15 mins. maximum allotted time

    To respond within the 15 mins. maximum allotted time

    538/ 477 (88.66%)

    498/ 454

    No. of stalled vehicles towed or assisted/ cleared within the 15 mins. maximum allotted time

    To respond within the 15 mins. maximum allotted time

    393/ 305 ( 77.6%)

    438/ 367

    Roadside Clearing Operations

    Vehicular Emergency

    Response

  • 9| P a g e

    Continuing Implementation of the Unified Vehicular Volume Reduction Program (UVVRP)

    This program prohibits public and private vehicles (except tricycles and motorcycles), whose plates end in 1 and 2, from using national, city and municipal roads in Metro Manila on Mondays from 7 AM to 8 PM*, except on Saturdays, Sundays and official public holidays. Vehicle plates ending in 3 and 4 are banned on Tuesdays, 5 and 6 on Wednesdays, 7 and 8 on Thursdays, and 9 and 0 on Fridays.

    1st Quarter 2017 1st Quarter 2016 No. of Apprehensions 9,145 5,359

    *MMDA Resolution No. 16-12-A, s. 2016 extended the effective ban hours of UVVRP from 7AM-7PM to 7AM-8PM.

    TRAFFIC ENGINEERING

    Design and Construction of Pedestrian Footbridges

    The TEC designed and constructed the following footbridges for CY 1st Quarter 2017 compared with the same period last year:

    Target Output 1st Quarter

    2017 1st Quarter 2017 1st Quarter 2016

    Under construction - 2 -across Katipunan Ave. (C5) corner Boni Serrano, QC (90% done); -along East Ave. cor. V. Luna Road near LRA and NSO, QC (30% done)

    3 -NAIA Ave., Pascor Drive, Paranaque City -along Samson Road in front of UERM, Caloocan City; -North Ave.-Mindanao Ave., QC

    Under repair/ re-painting

    - 1 -Araneta Ave./ Aurora (35% done)

    -

  • 10| P a g e

    Upgrading of Traffic Signal System As of 1st Quarter 2017, Phases II and III of the Information Technology (IT)-based Traffic Signal System project that was launched in January, 2014 are almost finished at 97.20% and 80% completion, respectively. Phases II and III covers the rehabilitation of 161 and 155 signalized intersections field facilities, respectively.

    Traffic Signal Operation & Maintenance

    Throughout 1st Quarter of 2017, following are the highlights of accomplishments of the TEC Traffic Signal Operation & Maintenance Division, with comparative data during 1st Quar-ter of 2016:

    Intersections/ Locations Target Output

    1st Quarter 2017 1st Quarter

    2017 1st Quarter

    2016

    Signalization of new intersections As needed 1 1

    Adjustment of timing parameter & observation of traffic signal lights

    As needed 58 55

    Repair of defective local controller & resetting of logic system

    As needed 29 56

    Checking & repair of traffic signal facilities

    As needed 22 37

    Replacement of modules/ modules logic rack (Central Processing Unit)

    As needed 19 30

    Replacement of damaged/ defective/ missing traffic signal facilities/ accessories

    As needed 9 15

    Replacement of defective/ damaged parts of high-mast and streetlights

    As needed 2 13

    Checking and repair of defective high-mast and streetlights

    As needed 13 15

  • 11| P a g e

    Application of Thermoplastic & Traffic Cold Paint Pavement Markings Thermoplastic pavement markings were applied within Metro Manila for CY 2017 compared to that of 2016.

    1st Quarter 2017 1st Quarter 2016 Locations Sq. Mtrs. L. Mtrs. Locations Sq. Mtrs. L. Mtrs.

    In-house Implementation

    108 2,804.1162 - 78 2,805.4575 -

    Target Output 1st Quarter 2017

    1st Quarter 2017 1st Quarter 2016

    Fabricated 1,600 1,881 ( 117.56%)

    2,135

    Manufactured 1,600 2,954 (184.62 %)

    2,902

    Printed 400 1,496 (374%)

    -

    Installed 1,600 1,805 (112.81%)

    2,317

    Cleaned/ Re-cleaned As needed 17,145 10,879

    Repaired/ Re-aligned 298 629 As needed

    Removed 441 848 As needed

    Painted/ Repainted 2,119 3,281 As needed

    Fabrication & Manufacturing of Traffic Road Signs/ Facilities Following is a comparative chart of 2017 and 2016 accomplishments of the TEC Traffic Engineering Division

    (TED) on their production and maintenance of traffic road signs and other traffic facilities:

  • 12| P a g e

    Other TEC-TED special projects:

    1st Quarter 2017 1st Quarter 2016

    -installation of 17 flexible rubber bollards/ crash barriers along major throughfares; manufacturing/ installation of 69 info/ direc-tional signs for the Feast of the Black Naz-arene; delivery of 34 different traffic road signs at Batasang Pambansa; fabrication/ installation of waiting shed and 823 traffic road signs for New South-West Integrated Provincial Transport System at SSS Liber-tad, Pasay City.

    -manufacturing/ installation of 1,184 traffic info signs and facilities for Mabuhay Lanes, River Ferry Project, One Truck Lane Policy, EFCOS project, MMDA Clean-up program, etc.

    The following in-house projects were also completed during 1st Quarter 2017:

    1. Repainting of loading/ unloading bay at EDSA-Santolan (NB); 2. Road widening works at EDSA-Santolan (SB) fronting Camp Crame, QC; EDSA cor.

    McKinley Road (NB), Makati City; U-turn slot in front of EDSA Guadix, Mandaluyong City; and EDSA-Boni/ Pinatubo (SB), Mandaluyong City;

    3. U-turn improvement at EDSA-North Ave., QC; 4. Removal of see-thru fence at EDSA-Guadalupe, Makati City; 5. Opening of median island at Macapagal Blvd. 6. Painting works at MMDA Metrobase and Command Center interior.

    Other Activities During 1st Quarter 2017, TEC supervised the implementation of the MMDA’s ongoing Adopt-a-Footbridge program at EDSA-Quezon Ave. (85% completion), Timog-West Ave. footbridge (90% completion), Quezon Ave.-Sct. Borromeo footbridge (85% completion), and EDSA-Aurora/ Cubao footbridge (95% completion). Works consisted of installation of roofing structures, electrical and repainting.

  • 13| P a g e

    TRAFFIC EDUCATION Twelve personnel of the TDO Traffic Education Division (TED) conducted the following seminars during 1st Quarter 2017:

    MMDA Traffic Academy

    Type of Seminar Target Output 1st Quarter 2017

    1st Quarter 2017 1st Quarter 2016

    Seminar for Drivers 70 seminars/ 2,712 participants

    per quarter

    186 seminars/ 2,908 participants

    ( %/ %)

    155 seminars/ 5,428

    participants

    Seminar for Traffic Consta-bles

    6 seminars/ 150 participants

    per quarter

    9 seminars/ 139 par-ticipants ( %/ %)

    21 seminars/ 241 participants

    Other Seminars Conducted (for MMDA Deputized Agents & TEs outside MM)

    2 seminars/ 45 participants

    per quarter

    6 seminars/ 229 par-ticipants

    None (given per request)

    Inter-Agency Council on Traffic (IACT) - Traffic Di-rection & Control Seminar

    1,920 traffic personnel from August, 2016 to

    May, 2017

    10 seminars/ 395 participants

    The TED conducts its traffic seminars at the MMDA Traffic Academy located in Sta. Mesa, Manila. This TDO unit has run the Academy since the latter’s creation in April, 2004 by virtue of MMDA Resolution No. 04-07 to professionalize traffic management and enforcement in the metropolis.

  • 14| P a g e

    Institute of Traffic Management The Institute of Traffic Management (ITM) was created by virtue of MMDA Council Resolution No. 13-11 issued on March 22, 2013, but it formally opened only in April, 2015 with the inauguration of its new building along Orense St. It is designed to replace the Traffic Academy (now called ITM Extension) with the main functions of, among other things, providing comprehensive traffic management education & training and research & development of pertinent curricula

    and modules.

    OTHER TRAFFIC IMPROVEMENT-RELATED/ SPECIAL PROJECTS/ ACTIVITIES

    Type of Seminar Target Output 1st Quarter 2017

    1st Quarter 2017 1st Quarter

    2016

    Development of traffic management courses/ modules/ power point presentations/ topics

    3 modules per quarter 3 modules 40

    Following is a comparison of ITM’s 1st Quarter accomplishments during 2016 and 2017:

    Pending the approval of the ITM organizational structure by the DBM and the Institute ’s accreditation with the Commission on Higher Education (CHED) and the Technical Education & Skills Development Authority (TESDA), the MMDA issued on March 17, 2016 Memo Circular No. 06, series of 2016 defining the functions of ITM and TED.

    Establishment of a Uniform “Light Trucks” Ban In Metro Manila To further help in the decongestion of metro traffic, the Metro Manila Council passed MMDA Regulation No. 17-001 on March 7, 2017 establishing a uniform ban on “light trucks”, or motor vehicles with a gross capacity weight of 4,500 kg. or below. The regulation prohibits all “light trucks”, commercial or otherwise, from plying EDSA and Shaw Blvd. (Mandaluyong and Pasig Cities) from 6 AM-10 AM and from 5 PM-10 PM, Mondays thru Saturdays, from March 15 to June 15, 2017. Exempted are “light trucks” registered under any government office or unit including the AFP and PNP; emergency vehicles like firetrucks and ambulances; and those which are granted ex-emptions by the MMDA.

  • 15| P a g e

    METROBASE

    Metrobase is the MMDA’s 24-hour communications, monitoring and information unit. It is manned by 82 personnel rotating in three (3) shifts.

    Target Output 1st Quarter 2017

    1st Quarter 2017 1st Quarter 2016

    No. of calls attended to and coordinated/ directed to concerned units or parties for appropriate action

    18,000/ qtr.

    23,522

    (130.67%)

    21,296

    Management of the MMDA trunkline, 5 Metrocall 136 Hotlines, and 1 Direct Line

    Radio Control Communication Service

    Target Output

    1st Quarter 2017 1st Quarter 2017 1st Quarter 2016

    No. of stalled vehicle incidents monitored/ assisted

    1,050/ qtr. 1,702 (162.09%)

    1,507

    No. of traffic accidents monitored/ assisted

    2,700/ qtr. 5,007 (185%)

    4,453

    Management & Maintenance of Road Safety Surveillance Cameras Throughout 1st Quarter 2017, twenty-one (21) Metrobase personnel managed and maintained 250 operational CCTV cameras installed at various sites along major thoroughfares. During 1st Quarter 2016, twenty-one (21) Metrobase personnel managed and maintained 200 operational CCTV Cameras at various sites along major thoroughfares.

    Management & Maintenance of Telecommunications Equipment & Facilities Twenty-one (21) Metrobase personnel managed and maintained four (4) operational repeater systems and eight (8) base channel radio communication equipment, including all two-way radios, during 1st Quarter 2017. During 1st Quarter 2016, the same number of Metrobase personnel managed and maintained the four (4) operational repeater systems, eight (8) base channel radio communication equipment and two-way radios.

  • 16| P a g e

    Management & Maintenance of the Wireless Communication System As in the 1st Quarter of 2016, Metrobase continued to manage and maintain twelve (12) WIMAX base stations throughout 1st Quarter 2017.

    Management & Maintenance of Servers Metrobase continued to manage and maintain seventeen (17) units servers during 1st Quarter 2017, likewise during 1st Quarter 2016.

    Management & Maintenance of Mobile Base Equipment Metrobase continued to manage and maintain the three (3) mobile bases Agila 1, Agila 2 and Agila 3 during 1st Quarter 2017 and also during 1st Quarter 2016.

    Other Activities: Metrobase installed radio communication, cameras and operation centers in January, 2017 during the Feast of the Black Nazarene; in February, 2017 during ASEAN events in Davao and Boracay; and in March, 2017 during ASEAN events in Iloilo and Bacolod.

    Metrobase also maintains/ performs the following services 24/7:

    1. The Metro Manila Traffic Navigator – the online application for motorists to view real-time traffic situation and other road-related reports in ten (10) major MM thoroughfares;

    2. The MMDA Traffic Mirror – the latest internet-accessible website allowing the public to view the traffic situation straight from the MMDA’s CCTV cameras;

    3. The MMDA Twitter Service – a 24/7 team broadcasts traffic and event advisories and narrow-casts to individual queries/ needs;

    4. The MMDA LED Advisory Boards – lighted boards in 10 strategic locations along EDSA providing general and area-specific traffic and event advisories.

  • 17| P a g e

    FLOOD CONTROL AND SEWERAGE

    MANAGEMENT OFFICE

    Declogging of Drainage System Using Manual Scraper

    Dredging Works

    Riprapping Drainage Improvement

    Under the CY 2017 GAA, projects were programmed and funded under the Capital Outlays Allocation for Flood Control. These projects involve the construction of new improvement/ upgrading of drainage and flood control structures and waterways as a measure to mitigate flooding in perennially flooded areas of the metropolis where the existing flood control structures are no longer adequate to serve their respective drainage areas. The construction/ improvement of drainage as well as improvement of waterways is in response to the prevailing climate change phenomenon wherein the amount of surface runoff have increased due to higher rainfall intensities and the volume of flood water could no longer be accommodated by our existing flood control structures and waterways.

    The FCSMO has completed a total of 59 projects for the 1st Quarter of 2017 consisting of the following:

    Bank improvement of Esteros Drainage improvement, declogging and maintenance

    Desilting and deepening of esteros, creeks and canals

    Riprapping/ dredging to designed elevation of esteros Declogging/ cleaning activities

  • 18| P a g e

    On-going projects for the 1st Quarter of 2017 are as follows:

    Program/ Projects/ Activities Location

    Bank improvement/ riprapping of Estero de Maypajo (Phase I), Tondo, District I

    Drainage improvement & construction of sump pit with pump at Road I, Estero de Vitas, Tondo, District I

    Drainage improvement along Qurino Ave. cor. Pedro Gil and vicinity, District V

    Improvement & rehabilitation of drainage system, Zone 100 & vicinity, Punta, Sta. Ana, District VI

    Manila

    Drainage improvement along Kitanlad St. Brgy. Dona Josepa, District IV Quezon City

    Drainage improvement along Francisco St., District II Valenzuela City

    Drainage improvement along Pasong Tamo, Brgy. Bangkal, District I Makati City

    Construction of Flood Gate & Relief Pumping Station, Brgy. Zamiga Mandaluyong

    City

    According to the Flood Control and Sewerage Management Office (FCSMO), the rate of subsidence of floodwater for CY 2017 is 30 minutes to 1 ½ hour in Metro Manila after heavy rains. The office also undertook year-round/ continuous cleaning and maintenance of existing flood control structures and facilities utilizing MMDA-owned equipment and personnel to maintain their efficiency and designed capacity. These activities include, but not limited to the following:

    Target Output

    1st Quarter 2017 1st Quarter 2017 (linear meters)

    1st Quarter 2016 (linear meters)

    Declogging of Drainage Laterals 108,713 124,214 92,155

    Dredging/ Deepening of Open Waterways

    16,948 12,390 11,696

    Desilting of Drainage Mains 3,750 3,975 2,158

  • 19| P a g e

    The office has also fabricated and installed, as the need arises, the following for the year:

    1st Quarter 2017 1st Quarter 2016

    Manhole covers 42 43

    Steel gratings 28 15

    The Equipment Management Division of FCSMO is responsible for the mobilization, repairs/ maintenance and operations (including declogging, dewatering, clean-up, community service, special and emergency operations, etc.) of various kinds of light and heavy equipments used by FCSMO. The operation and maintenance of 54 Pumping Stations and the Effective Flood Control Operation System (EFCOS) were likewise routinely undertaken to ensure that these facilities are operating at their optimum capacity especially during heavy rains. The table below shows the amount of floodwater that were pumped out and total cubic meters of garbage that were re-trieved and disposed.

    Target Output CY 2016

    1st Quarter 2017

    1st Quarter 2016

    Floodwater Pumped Out (cu. m.) 516.21M 16,804,746 7,992,031.69

    Garbage Collected (cu. m.) 13,200 1,231 1,649.83

    The FCSMO has likewise provided assistance in the 3 in 1 Program (Estero Blitz, Linis Palengke & Lingap sa Barangay) of MMDA.

  • 20| P a g e

    FLOOD CONTROL INFORMATION CENTER (FCIC)/ METRO MANILA DISASTER RISK REDUCTION

    & MANAGEMENT OPERATION CENTER (MMDRRMOC)

    FCIC and MMDRRMOC were established to serve as operations coordination and control facilities and provide a decision support system for the MMDA and the Metro Manila Disaster Risk Reduction and Management Council (MMDRRMC) during inclement weather and emergencies.

    For 1st Quarter 2017, FCIC/ MMDRRMOC accomplished the following:

    Dissemination/ Issuance of Incidents/ Hazards Information and Warning Advisories FCIC/ MMDRRMOC sent 220 alert notifications/ messages via SMS to concerned MMDA officials/ directors/ unit heads and other key officials and emergency responders on the following;

    1. Tracks of tropical depressions “Auring” and “Bising” and other low pressure areas, thunderstorms and northeast monsoons that might affect Metro Manila;

    2. 61 reported conflagrations; 3. 1 transport strike; 4. Flashfloods in four (4) locations and other hazards.

    Monitoring of Various Meteorological Websites and Flood Control Sites To develop a Flood Intelligence System for timely warning information and decision making by concerned officials and mitigate risk to the public, FCIC/ MMDRRMOC accomplished the following throughout 1st Quarter 2017:

    1. Obtained hourly rainfall intensity from forty-three (43) gauging stations of Weather link A.W.S; wind and rain direction and amount of rain to occur at Windyty website; and PAGASA thunderstorms report; and notified concerned officials and officers for probable deployment of emergency operations team;

    2. Watched dams’ water elevation and notified concerned MM LGUs, MMDA officials and directors, MMDRRMC Response Cluster Leads and LGUs DRRMOs;

    3. Monitored/ obtained percentage chance of rain to occur in Metro Manila at the DOST Climate Radar Results

    4. Obtained hourly rainfall data from seven (7) EFCOS Project rainfall gauging stations and water level along eleven (11) gauging stations located at Pasig and Marikina rivers;

    5. Obtained PAGASA tide elevation report daily.

  • 21| P a g e

    Monitoring of Seismic Website 1. Kept track of the magnitude, depth, location and time of seismic activities posted at

    Phivolcs website; 2. Reported via SMS to concerned MMDA officials, directors and unit heads earthquakes

    with magnitude 5 and above.

    Services Coordination and Other Activities 1. Conducted daily net call to MMDRRMC Response Cluster Leads, LGUs Disaster Risk

    Reduction and Management Office (DRRMO) or their Disaster Operations Center thru emergency network;

    2. Participated in 22 related events/ endeavors for linkage and cooperation, including coordination with OCD and PSD for the deployment of 12 personnel to bring water purifier machines for use in the aftermath of the February 13, 2017 Surigao del North earthquake.

    3. Responded to 179 queries, complaints and requests received thru calls.

  • 22| P a g e

    SOLID WASTE MANAGEMENT OFFICE

    Solid Waste Disposal Activities As a regular activity, the office documents the volume of wastes received at three (3) disposal facilities namely the Rizal Provincial Sanitary Landfill (1,337,077.77 cu. m.), Quezon City SLF (613,319 cu. m.) and Navotas SLF (752,736.54 cu. m.). For the 1st Quarter of 2017, the total actual volume of garbage/ waste disposed was 2,703,133.31 cubic meters. With a target of 2,677,200.30 cubic meters for the 1st Quarter of 2017, SWMO accomplished 101% of the set target. The chart below shows the comparison against the previous year’s accomplishment:

    Garbage trucks on queue at the Rizal Provincial Sanitary

    Lanfill

    1st Quarter 2017 1st Quarter 2016

    Actual Volume of Garbage/ Waste Dis-posed (cu. m.)

    2,703,133.31 2,662,586.47

    Flagship Programs and Projects of SWMO include:

    1. The office inspects garbage trucks prior to issuance of Permit to Dump based on their roadworthiness and compliance with required paraphernalia and truck criteria. The total number of garbage collection trucks who applied for accreditation (inspected) were 1,036 units.

    2. Conducted 4 ocular site inspections in the following SWM facilities: NVSLF, New SMSLF, QCSLF and Morong SLF.

    3. The office implemented effective Information and Education campaign on RA 9003 and Solid Waste Management in different barangays, schools and private sectors in Metro Manila. Among these are the conduct of 37 SWM orientation trainings/ seminars/ workshops with a total of 1,371 participants. With a target output of 60 orientation seminars for the 1st quarter, the office accomplished 61.67% for the said activity. 37 out of 37 of these seminars conducted were evaluated (pre and post evaluation activities) for effectiveness. Also, a total of 500 copies of IEC materials were disseminated to different barangays, officials, community and private sector. Likewise, the office has provided technical assistance to 8 students/ researchers regarding SWM matters.

    The office also reviews and evaluates the claims for payment of the disposal fees in these SLFs and the total volume of wastes processed for payment of tipping fees is 2,506,296.17 cu. m. amounting to Php 429,629,289.46. The office likewise evaluates the remaining capacities of these disposal sites in which RPSLF (50 has.) has a lifespan of 21 years and 2 months, NSLF (15 has.) has 9 years and 6 months and QCSLF (6.2 has.) still has 1 year and 9 months. Four (4) meetings were also attended by the office for Mutli-Partite Monitoring Team (MMT) inspections & meetings for MMDA designated landfills (QCSLF & NVSLF).

  • 23| P a g e

    Regular Activities of SWMO include:

    1. For the maintenance of Carmona Sanitary Landfill, a total of 9 inspections were conducted by the CDF Group including 1 inspection with Usec. Frisco San Juan and grass-cutting activities were also done which covered a total area of 2,420 sq. m. The office also made actions (issuance of demand letter for the removal of housing unit encroaching the property) regarding the encroachment issue at the CSLF and sent a letter to Carmona Mayor Dahlia Loyola requesting for a joint survey of the parcel of land donated by MMDA.

    2. For the monitoring and collection of volume of garbage from pumping stations and disposal

    at Pier 18, Marine Loading Transfer Station and RPSLF, the office has monitored a total of 3,177 cu. m. accumulated volume of garbage and coordinated the collection and disposal of 2,128 cu. m. of garbage 9 Pumping Stations in Manila, Pasay and Taguig City.

    3. For the monitoring of LGU’s SWM facilities, the office has inspected and monitored prices of

    recyclable materials in 21 junk shops in Metro Manila.

    4. For the final closure plan (safe closure and rehabilitation) of Carmona Sanitary Landfill (CSLF), the following were accomplished: Critical points in the lay-out/ design of CSLF for revision was given to FCSMO. Provided OAGMP copies of the lay-out/ design of the CSLF closure and rehabilitation

    plan as update on projects included in the 2016 SONA. Completed the following documents: concept paper, terms of reference, schedule of

    work, budget and typical drawings. 5. For the development of a new MMDA Integrated Solid Waste Disposal Facility of Metro

    Manila, the following were accomplished:

    Updated chronology of activities as of February 22, 2017.

    Coordinated with Mayor Bruno Ramos of Bay, Laguna regarding the status of the prop-erty and requested a letter reiterating the offer to sell the property.

    6. Attended a meeting/ project preparatory activity with FCSMO for the Metro Manila Flood

    Management Project - Phase 1, Component 2: Minimizing Solid Waste in Waterways funded by World Bank.

    7. For the proposed supply and installation of 6 weighbridges for 3 sanitary landfills, the

    following were accomplished: Canvass, submission of 4 quotations for weighbridges were made.

    Presentation of Terriniel Scales Inc., Uptown Industrial Scales and Co Ban Kiat Hardware Inc. were received/ entertained by the office.

    Prepared justification for the supply and installation of weighbridges.

  • 24| P a g e

    4. Attended the following various meetings within MMDA: Directors’ Meeting, Bids and Awards Committee (BAC) for Infrastructure, Metro Manila Council Meeting, MMDRMMC-Oplan Metro Yakal, Pre-Corplan, SCANNA Presentation on developing sustainable transport system, Committee on Decorum and Investigation, etc.

    5. For SWMO’s participation in Inter-Agency Groups, the office has attended and participated in various hearings and meetings with DENR, MMSWM Board, NSWMC-TWG and DILG-Environmental Compliance Audit (ECA). SWMO likewise participated in various meetings, workshops, conferences with LGUs, NGOs, private sector programs, consultations & other activities.

    Special Activities of SWMO include: 1. For SWMO’s compliance to the Supreme Court Mandamus on the Clean-Up of Manila Bay,

    SWMO attended and participated in various meetings, workshops, events and clean-up activities. 1 Quarterly Report was also prepared and submitted to the Supreme Court.

    2. For the conduct of WACS Project in Metro Manila (markets, streets, sweepings and schools) of SWMO, the office has revised the calculation of WACS submitted by Woodfields, and coordinated with COA regarding the balance for payment thereof. Also, final billing for the conduct of WACS is being processed by the office.

    Other activities of SWMO include: 1. Attended various trainings/ meetings/ workshops/ presentations/ scholarships/ activities

    with regards to DENR Special Projects, Exploration of Appropriate Waste-to-Energy Technology & other SWM Proposals for Metro Manila, etc.

  • 25| P a g e

    HEALTH, PUBLIC SAFETY AND ENVIRONMENTAL PROTECTION OFFICE (HPSEPO)

    Health and Sanitation Services Coordinating Assistance Division (HSSCAD)

    Enforcement of MMDA Regulation No. 96-009 or the Anti-Littering Law For the 1st Quarter of 2017, a total of 9,171 Anti-Littering Enforcement violators were apprehended which is 146% of the 6,255 target for the 1st Quarter of CY 2017. 2,430 of whom have settled their administrative fines with a total revenue of Php 1,215,500.00. Also 35 of these violators have rendered community service in place of their adminis-trative fines. Also, 6.290 Summons/ Notices were sent to violators, 1,507 cases were filed/ subscribed to different Metropolitan Trial Courts (MTCs) 1,689 court hearings were attended by Environmental Enforcers at different MTCs and 565 cases were submitted to the NBI in violation of Sec. 48 of RA 9003 (Anti-Littering Law). The table below shows the comparison against the previous year’s accomplishment:

    Environmental Enforcers in operation

    1st Quarter 2017 1st Quarter 2016

    No. of Apprehensions 9,171 11,552

    No. of Settled Violations (Administrative Fines) 2,430 2,147

    No. of Violators Who Rendered Community Service 35 1,474

    Total Revenue (in Php) 1,215,500.00 1,074,000.00

    For HPSEPO’s Information and Education Campaign on MMDA Regulation No. 96-009 or Anti-Littering Law, the office distributed a total of 13,202 “Bawal Magkalat” IEC flyers to public schools, public markets, barangays and other public places for the quarter. Also, the office conducted orientations in public high schools, public markets, barangays, public places and to violators who rendered community service with a total of 779 participants.

    Other HASSCAD activities include the following:

    1. Conducted 15 monitoring rounds and apprehended 3 smokers in monitoring the compliance of MMDA as a 100% Smoke Free Workplace (Memorandum Circular No. 10 series of 2010).

    2. For the Urban Pest Abatement Assistance Program, the Division conducted 78 misting operations in different locations to include MMDA Offices, public elementary & high schools, public markets, creeks and barangays.

    3. For HASSCAD’s special operation, the division has monitored a total of 290 environmental discrepancies, issued 122 Notice of Environmental Sanitation Violation Receipts (NESVR) and coordinated the implementation of Anti-Littering Law to 202 barangays in 4 LGUs.

  • 26| P a g e

    Enforcement of RA 9211 or the Tobacco Regulation Act/ No Smoking in Public Places/ MMDA-Bloomberg Project For the Access Restriction – Monitoring of school vicinities on sale of and display of tobacco products within 100 meters of school boundaries, the office monitored a total of 461 school vicinities, inspected 5,035 stores and disseminated 21,200 IEC materials. For the Orientation on Dangers of Smoking, the office has

    conducted 47 orientation sessions in 35 schools and 7,570 individuals were given orientations.

    For the Smoking Cessation Services for PUV Operators/ Drivers/ Staff, the office provided brief advice on smoking cessation to 2,434 drivers. Likewise 2,070 stickers were posted on PUVs and PUJs. For the monitoring of activities, the office has re-inspected 761 stores for validation and conducted monitoring of projects and activities in 252 areas.

    Note: Anti-Smoking Apprehension was temporarily suspended since August 6, 2015 up to present due to the Court of Appeals Ruling.

    Plans, Programs Development and Monitoring Division

    DISSEMINATION OF IEC MATERIALS AND APPREHENSION

  • 27| P a g e

    Public Safety Division

    Included in the mandate of the Public Safety Division (PSD) is the formulation of programs, policies and procedures to achieve public safety, especially disaster preparedness, conduct of rescue operations during times of calamities and disasters such as: conflagrations, earthquakes, floods and tidal waves, and coordination and mobilization of resources and the implementation of contingency plans for rehabilitation and relief operations in coordination with national agencies concerned. For the Community Hazards Information and Disaster Education Program, the Division has trained/ oriented the following individuals/ participants for the 1st Quarter of 2017:

    Trainings/ Orientations Conducted Number of Participants

    1st Quarter 2017 1st Quarter 2016

    Disaster Preparedness Orientation (DPO) 27,256 671

    Earthquake and Landslide Search and Rescue Orientation Course (ELSAROC)

    608 714

    Flood Incident Rescue & Search Training (FIRST) 25 -

    Basic Emergency Responder’s Course (BERC) 882 118

    High Angle Rescue Techniques (HART) 115 17

    Note: The targets reflected herein are not based on the total number of population in Metro

    Manila but based on the number of manpower and resources of the office.

    For the 1st Quarter of 2017, Public Safety Division has maintained and inventoried 4 Disaster Response Equipment Field Storage (DREFSUs). The office was also able to maintain at least 1 daily/ overnight standby Rescue Team for Rescue Van Operations with 24-hour quick response standby duty. The office also undertook regular/ daily deployment of Paramedic Teams to respond to vehicular accidents and other emergencies. The office likewise maintained a 24/7 monitoring and coordination team at the Metrobase and FCIC and maintained a 24/7 logistics team for flood operations response at the MMDA Rescue Equipment Warehouse in Marikina City. The Office also conducted one (1) Earthquake Drill and one (1) Fire Drill for the 1st Quarter of 2017.

    Target output for the 1st Quarter of 2017 is to aggregately train 40,000 individuals/

    participants. With a total of 28,886 individuals/ participants aggregately trained on the five (5)

    different courses on disaster risk reduction and management, the division has accomplished

    72% of the target output.

  • 28| P a g e

    Other activities of the Public Safety Division for the 1st Quarter of 2017 are as follows: 1. On-going construction of Rappelling Tower at Napindan, Pasig City. 2. Deployed 8 WASAR Teams, 2 CSSR Team and 2 Paramedic Teams during the Feast of the

    Black Nazarene. 3. Deployed 2 Paramedic Teams and 1 CSSR Team during the 65th Miss Universe Pageant. 4. Deployed 12 personnel (CSSR/ Medic Team) and rationed 13,904.56 gallons of water

    during the Humanitarian Mission for “Surigao 6.7 Magnitude Earthquake”. 5. Conducted orientation on safety induction measures for the Simultaneous Clean-Up

    World Water Day. 6. Served as Drill Evaluator during the Fire Drill in Marco Polo Hotel. 7. Deployed 1 CSSR Team and 1 Paramedic Team for water search and rescue operation

    during a drowning incident at Napindan Compound involving 1 Flood Control personnel. 8. Attended and trained the personnel/ participants of the 525th Engineer Combat Battal-

    ion, 51st Engineer Brigade of the Philippine Army for the Collapsed Structure Search and Rescue Training.

    9. Attended Civil Military CBRN Response Activity. 10. Supervised the MMDA Earthquake Drill last March 31, 2017 at the MMDA Building. 11. Deployed 2 Paramedic Teams for “Digong’s Day for Women”. 12. Attended various meetings, workshops, conferences, etc. related to PSD’s mandate.

  • 29| P a g e

    ANTI-SMOKEBELCHING UNIT

    Pursuant to RA 8749 or the Clean Air Act, the unit, which is deputized by the Land Transportation Office (LTO), under-took Smoke Belching Operations (Roadside Inspection and Apprehension) for the 1st Quarter of 2017 as shown below:

    Free Smoke Emission Tests were also conducted for Tow Trucks in relation to the renewal of their application for accreditation with MMDA which totaled as follows:

    1st Quarter 2017 1st Quarter 2016

    Passed 69 314

    Failed 156 607

    Total Inspected/ Tested 225 921

    Note: Roadside inspection was temporarily suspended pending instructions from NAECTF. Vehicles inspected and failed the emission tests for January to February were only warned.

    Free Smoke Emission Tests for Public Utility Buses (PUBs) were also done at the SWIPT and BMDS Terminals which totaled as follows:

    1st Quarter 2017 1st Quarter 2016

    Passed 1,068 623

    Failed 814 549

    Total Inspected/ Tested 1,882 1,181

    1st Quarter 2017 1st Quarter 2016

    Passed 184 123

    Failed 15 36

    Total Inspected/ Tested 199 159

  • 30| P a g e

    ENVIRONMENTAL MANAGEMENT DIVISION (formerly MPCG)

    Street Sweeping

    Manual and mechanical sweeping/mopping is done regularly to

    clean/maintain Metro Manila sidewalks, center islands,

    flyovers, underpasses, and footbridges.

    Mopping Operations and Hauling Activities

    This refers to the collection, movement, and transfer of various

    materials to be used/replaced/disposed in the daily operation

    of the unit.

    1st Quarter 2017 1st Quarter 2016

    Volume of garbage swept/ collected 8,068.77 cu.m. 6,217 cu.m.

    Length of roads/ areas cleaned 79,897.66 km 78,351 km

    1st Quarter 2017 1st Quarter 2016

    Garden soil 108.07 cu.m. 36.3 cu.m

    Ornamental plants / Eco pots 8,462 pcs 2,850 pcs

    Concrete plant boxes 12 cu.m. 77 pcs

    Concrete / Plastic barriers 5,162.40 cu.m 935 pcs

    See thru fences / Steel railings 90 sq.m 21 panels

    Sand / Garbage / Debris / Dry leaves 1,161.32 cu.m 34 cu.m.

    Refilling of sand/water in plastic barrier 125.04 pcs -

    Portalets 280 pcs -

    Gravel 72 cu.m -

    DEMOLITION REMOVAL

    The EMD likewise undertook the removal of illegal tarpaulins and posters along the streets and

    major thoroughfares as shown in the table below:

    1st Quarter 2017 1st Quarter 2016

    Illegal tarpaulins / posters 36,537.60 sq.m 23,589 pcs

  • 31| P a g e

    Clean-up Operations

    The following table shows the EMD’s 1st Quarter 2017 accomplishments with comparative data

    for the same period last year.

    Iglesia Ni Cristo at Philippine Arena, Ciudad De Victoria,

    Bocaue, Bulacan

    Commonwealth Ave. after SONA of Pres. Benigno Simeon

    Aquino III

    1st Quarter 2017 1st Quarter 2016

    Volume of garbage collected

    861.53 cu.m (from operations con-ducted in connection with the Feast of the Black Nazarene and Sto. Niño Feast, HK Sun Plaza, and ASEAN Summit)

    989 cu.m (from operations conducted in connection with the Feast of the Black Nazarene, Rizal Park Clean-up operation, 30th EDSA People Power Anniversary 2016, MMDA Oplan Baklas 2016, MMDA Alalay Semana Santa, Bayanihan sa Daan Shake a Road, in Malibay, Pasay, and in Brgy. 49 Baseco, Port Area, Manila)

    In addition, EMD Clearing Operations resulted in the removal of 281 illegal vendors & 105

    illegal structures in footbridges, sidewalks, and Public Markets including assistance to LGUs,

    NGAs, and NGOs, with a total volume of 943.09 cu.m. the volume of confiscated items/

    garbage.

  • 32| P a g e

    GREENING / LANDSCAPING MAINTENANCE ACTIVITY

    The EMD is also tasked by the Agency to plant, propagate

    and maintain plants & trees, gardens, and landscapes in

    various places of Metro Manila. The Group’s

    accomplishments for 1st Quarter of 2017 are shown in the

    table below with comparative data for 1st Quarter of 2016.

    1st Quarter 2017 1st Quarter 2016

    Planting, propagation and marcotting of trees & or-namental plants, including replacement of plants at vertical garden

    410,623 pcs 147,828 pcs

    Cultivation & trimming of plants, uprooting, grass cutting & leveling of soil (area covered)

    234,314.31 sq.m 118,610 sq.m

    Replacement of plant pots/boxes at vertical garden, and Meralco post

    32,055 pcs 9,620 pcs

    Trimming, pruning, cutting & balling of trees & plants

    1,601 pcs 164 pcs

    Watering of plants (volume of water used) 3,821,735 liters 2,430,287 liters

    Fixing of trees at plant boxes / bagging of soil 2,500 pcs -

    FLUSHING, WASHING AND CLEANING

    Cleaning/Maintenance of the following street furnitures was likewise undertaken by the EMD:

    Tree Planting

    1st Quarter 2017 1st Quarter 2016

    Maintenance of 25 urinals 975 units 2,940 sq.m. (area cleaned)

    Cleaning of 25 units portalet 16,798.70 sq.m. 2,149 sq.m.

    Footbridges 51,296 sq.m. 31,095 sq.m.

    Tunnel tiles 19,564.20 sq.m. 3,915 sq.m.

    Sidewalks /concrete gutters 9,086.70 sq.m. 1,342 sq.m.

    Plant boxes (movable / fixed) 12,644.68 sq.m. 1,059 sq.m.

    See thru fence/railings/waiting shed/signages

    3,084.90 sq.m. 3,435 sq.m.

    Plastic/ concrete barrier cleaned 15,007.80 sq.m. 3,511 sq.m.

    MRT post/loading bays/urinating areas 15,267.50 sq.m. -

    Comfort rooms / others 396.80 sq.m. -

    Water used in flushing 267,778 liters -

  • 33| P a g e

    MMDA Shuttle Service Transportation Assistance

    CONSTRUCTION, REPAIR, FABRICATION, INSTALLATION AND PAINTING WORKS

    Construction, repair, fabrication, installation and painting works undertaken by the EMD

    consist of the following:

    1st Quarter 2017 1st Quarter 2016

    Concreting and masonry works 795.23 sq.m. 170 sq.m.

    Bundling of wires 780 m -

    Repair/fabrication / installation of miscellaneous items

    1,945.92 sq.m. 2,337.47 sq.m.

    1st Quarter 2017 1st Quarter 2016

    Painting Works 2,288.80 sq.m. (painting of Camp karingal – fenc-es, post, gate, roof, gutter, plant boxes, wall, railings & façade, MPCG field offices along EDSA, pink line markings, hanging plant boxes, sidewalk, flyovers, por-talets, Metrobase Bldg, SWIPT (HK Sun Plaza) CR - wall, roof, ceiling, doors including plant boxes and EDSA MRT walls/posts)

    932 sq.m. (painting of plant boxes along ED-SA, scrapper, chairs, plant pots, single hook, wall vandalism, por-talets, decorative bricks & jars, rubber tree & round posts, wall fences of GSIS, trash can, male urinal, see thru fence, dog house, compost bin, and pedestrian lane)

    1st Quarter 2017 1st Quarter 2016

    Shuttle Service 1,961 employees 24,838 employees

    Libreng Sakay 2,507 passengers 35 passengers

    Goods/materials/equipments 20 units -

    SHUTTLE SERVICES/TRANSPORTATION ASSISTANCE

    EMD likewise provided shuttle services to MMDA personnel as well as in the hauling, transfer

    of goods, materials and equipments:

  • 34| P a g e

    LGU Requests 1st Quarter 2017

    (43 Requests) 1st Quarter 2016

    (42 Requests)

    Clearing/removal of vendors 63.02 cu.m. 40 (vendors)/

    30 (illegal structures)

    Provision for portalets 30 units 56 units

    Transportation of persons 615 persons 30 persons

    Towing of illegally parked vehicles 29 units -

    Demolition works 37.2 cu.m 30 cu.m.

    Trimming of trees 11 pcs 7 pcs

    Bundling of wires 780 m 900 m

    Hauling of garbage 24 cu.m 12 cu.m.

    Special Operations

    EMD provided the following assistance to 43 Local Government Units (LGUs), 25 National

    Government Agencies (NGAs) and 9 Non-Governmental Organizations (NGOs) per their requests:

    NGA Requests 1st Quarter 2017

    (25 Requests) 1st Quarter 2016

    (23 Requests)

    Trimming of trees 40 pcs 51 pcs

    Clearing/removal of vendors 24.64 cu.m -

    Provision for portalets 40 units 22 units

    Transportation of persons 240 persons -

    NGO Requests 1st Quarter 2017

    (9 Requests) 1st Quarter 2016

    (21 Requests)

    Transportation of persons 305 persons -

    Clearing/removal of vendors 2.5 cu.m. -

    Trimming of trees 8 pcs 28 pcs

    Provision for portalets 9 units 46 units

    Hauling of garbage 3.52 cu.m. 105.6 cu.m

    Demolition works 30 cu.m. -

    Clean-up drive 2 cu.m. -

  • 35| P a g e

    METROPOLITAN SOCIAL SERVICE OFFICE

    Street Dwellers Care Program/ Balik Probinsya Program A regular activity of MSSO is the Street Dwellers Care Program in which the office conducts rescue operations of street dwellers/ nomads in various locations in Metro Manila and are turned-over to Jose Fabella Center, LGUs or other DSWD facilities. This resulted to the rescue of 3,699

    mendicants, nomads, psychotic and other street dwellers along major roads and thoroughfares. 2,164 of them were turned-over to the Jose Fabella Center, 493 to their respective LGU’s/ Barangays, 1,042 were referred and turned-over to other facilities like RAC, SSDD, Graces, RSCC and NCMH, etc. 18 of these rescued street dwellers were transported back to their respective places of origin in Metro Manila or nearby provinces through the “Balik Probinsya” Program of the DSWD. 19 Joint Inter-Agency Rescue Operations were also participated by the office in cooperation with DSWD, PNP, LGUs and other agencies which resulted to the rescue of 1,529 street dwellers. The office is also regularly providing referral and transfer of street dwellers as well as relief assistance to the Jose Fabella Center, NGOs, NGAs and other social welfare institutions catering to rescued street nomads. The office has likewise transported 7 clients from RAC-Manila & JFC to National Center for Mental Health.

    Balik Probinsya Program

    Street Dwellers Care Program

    Other activities of MSSO for the 1st Quarter of 2017 include the following:

    1. As member of the Technical Working Group (TWG), the office attended/ participated in

    various coordinative meetings as MMDA representative and coordinator in preparation of

    inter-agency programs such as:

    Attended meeting regarding the NHCP-Commemoration of the 199th Anniversary of the Proclamation of Philippine Independence.

    Attended the DILG Orientation on Alert & Ready Communities Project.

    Participated during the conduct of the National Simultaneous Earthquake Drill as

    Marshall.

    Target Output 1st Quarter 2017

    1st Quarter 2017 1st Quarter 2016

    No. of Rescued Street Dwellers 2,700 3,699 2,873

  • 36| P a g e

    SIDEWALK CLEARING OPERATIONS GROUP

    Programs, Projects, and Activities (PPA) of SCOG include Sidewalk Clearing, Sidewalk Discipline &

    Maintenance, and Special Projects/Intervening Activities. The table below shows the 1st Quarter

    2017 accomplishments of the unit with comparative data for 1st Quarter of 2016.

    Removal of illegal vendors

    Target Output 1st Quarter 2017

    1st Quarter 2017 1st Quarter 2016

    Illegal vendors cleared 4,500 5,719 872

    Illegal obstructions/structures 3,450 4,405

    99 (illegally parked vehicles towed)

    Illegal informal settlers 101 129 78

    To monitor the proliferation of illegal vendors and structures, SCOG posted 227 personnel in

    various areas of Metro Manila.

    Special Projects / Intervening Activities

    For 1st Quarter of 2017, SCOG deployed personnel to perform crowd control during the Feast

    of the Black Nazarene at Luneta Grandstand. Likewise, the unit undertook clearing, removal,

    and clean-up operations as per request of 31 government units/offices, 4 business

    establishments, and 2 concerned citizens.

    Removal of Illegal Obstructions / Structures

  • 37| P a g e

    OFFICE OF THE ASSISTANT GENERAL MANAGER FOR PLANNING (OAGMP)

    REGIONAL DEVELOPMENT COUNCIL (RDC) – NCR

    The OAGMP, acting as the Regional Development Council for

    the National Capital Region accomplished the following:

    For the 1st Quarter of 2017, the Office of the Assistant General Manager for Planning

    accomplished the following programs, projects and activities with comparative data for the same

    period in 2016:

    1st Quarter 2017 1st Quarter 2016

    Evaluation of Development Project for RDC-NCR approval thru the conduct/ participation in RDC-related meetings

    9 7

    Updated Investment Programs for NCR submitted to NEDA 2

    Drafting of sectoral assessment of Regional Development Plan 2017-2022 is ongoing.

    On Land Use Planning and Zoning, coordination with Metro Manila City Planning and

    Development Officers/ Coordinators on the status of the Comprehensive Land Use Planning

    (CLUPs) and Zoning Ordinances (ZOs) are being conducted by the Planning Office.

    Shelter Services

    The OAGMP provided technical assistance to LGUs and

    NGAs for the relocation of Informal Settlers (ISFs) from

    eight (8) priority waterways as follows:

    1st Quarter 2017 1st Quarter 2016

    Biometrics registration of ISFs 555 4

    No. of documents processed/ reports/ communications submitted

    12 8

    Relocation of ISFs 3 -

  • 38| P a g e

    Activities/ meetings provided with technical assistance/ attended/ participated in by the

    Planning Office for this quarter:

    1st Quarter 2017

    Traffic and Transport 13

    Disaster Risk Management 3

    Inter-Agency meetings (Senate, HOR, LRTA, LLDA, HLURB, DPWH, DOTr, etc.)

    108

    Local and International Trainings/ Workshops 82

    Likewise, Planning Office prepared a total of 106 correspondences/ communications to

    different stakeholders and officials of the MMDA relative to its infrastructure projects,

    programs and activities.

  • 39| P a g e

    COUNCIL SECRETARIAT

    The MMDA Council Secretariat (CS) provides legislative and secretariat support to the Metro Manila Council (MMC) Mayors and organizes the Council’s regular and special meetings. The conduct of the aforementioned meetings depend on the legislative needs of the MMC, whereas the preparation and packaging of materials such as the Agenda as well as the folders vary on the kind of meetings to be conducted and the number of participants.

    The following regular activities were accomplished by the Council Secretariat for the 1st Quarter

    of 2017 compared to the same period of 2016:

    PROGRAM/ PROJECT/ ACTIVITY

    Target Output 1st Quarter 2017

    1st Quarter 2017 1st Quarter 2016

    1. Council and MMC Committees- MMDA meetings Assisted

    1 meeting 1 MMC Meeting 2 Metro Sports Fest Meeting

    2 Council Meetings

    2. Resolutions prepared/ revised 2 resolutions 2 resolutions 7 resolutions

    3. Published approved MMDA Res-olutions, Special Traffic Com-mittee Resolutions and Memorandum Circulars

    1 issuance 12 issuances 3 issuances

    4. Registered with the Office of the National Administrative Register (ONAR), U.P. Law Centre

    2 issuances 2 issuances 7 issuances

    5. Provided information assistance to researchers/callers re MMDA regulations and resolutions

    100 callers/ re-searchers per

    Quarter

    105 researchers/ callers

    -

    6. Agenda prepared/ Kits prepared

    1 set 30 folders/ kits per

    meeting

    3 sets of Agenda 35 folders/ kits

    2 sets 50 folders

    METRO MANILA COUNCIL 5th REGULAR COUNCIL MEETING

    2:00 p.m. to 3:30 p.m. Office of the Chairman, MMDA Bldg. EDSA Corner Orense street, Barangay Guadalupe Nuevo, Makati

  • 40| P a g e

    The following are the MMDA Approved Resolutions approved by the Metro Manila Council for

    the 1st Quarter 2017:

    No. MMDA RESOLUTION

    NUMBER TITLE ISSUED ON

    1 MMDA Resolution No. 17-01 s. 2017

    Creating the Metropolitan Development Authority External Relations Office and Designating Action Officers in the Sixteen Cities and One Municipality of Metro Manila

    March 7, 2017

    2 MMDA Regulation No. 17-001 s. 2017

    Establishing a Uniform Light Trucks ban in Metropolitan Manila

    March 7, 2017

    As gleaned from the table above, the number of Resolutions prepared, published and

    registered with the Office of the National Administrative Register (ONAR), UP Law Centre for

    this quarter has decreased compared to the same period in 2016.

  • 41| P a g e

    MANAGEMENT AND INFORMATION SYSTEM

    The Management and Information System Staff (MISS) is responsible for the management and maintenance of the Local Area Network (LAN) and Attendance Monitoring System using Biometrics (Finger Scanners) for the timely release of the daily time records to MMDA Personnel. The Office is also responsible for the maintenance of the MMDA Portal and Document Tracking System (DTS) as well as the E-NGAS work stations.

    The following regular activities/ programs were accomplished for the First Quarter of 2017:

    PROGRAM/ PROJECT/ ACTIVITY Target Output

    1st Quarter 2017 1st Quarter 2017

    1. Management and Maintenance of Biometrics 38 44

    2. Printing and release of DTRs 32, 500 40, 308

    3. Maintenance of E-NGAS work stations 33 40

    4. Management of Local Area Connectivity issues ad-dressed

    Connectivity issues addressed

    No. of work stations connected to the LAN No. of work stations connected to the internet

    70 357 228

    88 408 239

    5. No. of PRs assessed and evaluated 3 6

    6. Technical Assistance to MMDA Offices/ Personnel on hardware issues

    Hardware/ Software troubles resolved

    Computers maintained Printers maintained

    Servers maintained

    100 500 244 17

    205 640 264 18

    Other Accomplishments:

    1. The Office printed a total of 412 MMDA Employees’ ID. 2. They also maintained, updated and printed the following as a support to the Bus

    Management and Dispatch System Office (BMDS): 45 Bus Records, 9249 Trip Records and 3, 125 Active Bus Records

    3. The new website per AO 39 was migrated to the Government Web Hosting Service (GWHS) using Government Web template (GWT) and was put live on December 23,

    2014.

    No report was submitted to this office for the first quarter of the same period last year hence,

    no comparison can be made.

  • 42| P a g e

    PUBLIC AFFAIRS STAFF—PUBLIC INFORMATION CENTER

    The flagship project of this office is to sustain the proactive and positive image of the agency to

    its stakeholders. The PAS-PIO accomplished the following programs, projects, activities for the 1st

    quarter of 2017 as compared to the same period of 2016:

    PROGRAM/ PROJECT/ ACTIVITY

    Target Output 1st Quarter

    2017

    1st Quarter 2017

    1st Quarter 2016

    1. Special press activities, Media Requests and Media Coverage for events such as the following:

    Tulfo Interview with Gen. Gonzales Traffic Summit

    Dry Run of EDSA Zipper Lane

    Kapihan sa Manila Bay Clearing Operations at Buendia Taft

    Signing of MOA with the Chinese General Hospital

    Dialogue at Barangay Guadalupe Nuevo

    Inspection at Munoz Graduation of Traffic Volunteers

    Meeting with the Liga ng mga Barangay

    Metro Manila Council Meeting MOA Signing with TESDA

    MOA Signing with LTFRB and QC LGU

    Launch of Estero Blitz Clearing Operations at Scout Borromeo

    Clearing Operations at Commonwealth Avenue

    RDC Budget Review

    Consultation with the Transport Groups

    MOA Signing with Reyes Haircutters Pasay Bus Terminals Inspection

    Announcement re: Transport Strike on February 6 with Transport Leaders

    Meeting with Philippine Animal Welfare Society and MMFF Execom

    Press Conference re: EDSA Zipper Lane

    60 157 22

  • 43| P a g e

    PROGRAM/ PROJECT/ ACTIVITY

    Target Output 1st Quarter

    2017

    1st Quarter 2017

    1st Quarter 2016

    2. Writing talking points of the Chairman for the radio program “MMDA sa GMA” every Sunday

    12 12 13

    3. Press Releases 9 46 20

    4. Advisories 45 176 -

    5. Photo Coverage and Video documenta-tion of all MMDA activities

    45 73 -

    6. Compilations of News clipping related to MMDA, the Chairman and the transport

    89 89 88

    7. Installation of MMDA Pylons/ Pahayagan ng Bayan

    75 82 80

    As gleaned from the table above, the number of accomplishment in special press activities, media requests and media coverage exceeded last year’s accomplishments due to the volume of request for interviews and coverage on various operations/ topics and because its the prerogative of the Chairman/ GM to approve press releases.

    The Public Information Office also handles the performances of the MMDA Drum and Bugle

    Corps.

  • 44| P a g e

    PUBLIC CONCERNS AND RESPONSES MANAGEMENT UNIT

    PCRMU administers the interaction between the Agency and its prospective target public by accepting inquiries/concerns from the public through social media accounts, e-mail, MMDA hotline and MMDA websites. The unit provides appropriate solution/action/response to every inquiries/concerns, or transmit them to the department concerned for immediate action.

    For the 1st Quarter of 2017, Public Concerns and Responses Management Unit accomplished the

    following programs, projects and activities with comparative data for the 1st Quarter of 2016:

    Program/Project/ Activity

    Target Output 1st Quarter 2017

    1st Quarter 2017

    1st Quarter 2016

    1. Validation and processing of public concerns and inquiries received through:

    Facebook Email

    Viber

    Twitter Metro Call 136

    Info Desk I Will Act

    65,000 inquiries/ concerns

    27,399 408

    10,293 14,329 23,165 6,020 329

    3,471 28

    1,012 20,358 20,511

    350 -

    2. Prepare and transmitted referrals of valid concerns to departments concerned

    246

    194

    225

    3. Answered and published responses to complainants on their concerns through:

    Facebook Twitter

    Viber

    I Will Act

    12 1 1

    38

    57 34 - -

    50

    4. Public advisories Facebook

    Twitter

    Traffic Navigator EDSA LED Gantries

    3,923 2,705 3,893 6,143

    6,790

    20,586 4,681 7,141

    12,000

    The table above shows a significant increase in validated and processed concerns/inquiries thru

    Facebook 789.3%, Viber 1017.1%, and Info Desk 172% as compared to last year. However,

    MMDA’s newly launched “I Will Act” Portal has validated and processed a total of 329 public

    concerns and inquiries.

  • 45| P a g e

    MetroSolusyon Website

    MMDA Facebook Account

    MMDA Gmail Account

    Likewise there is a significant increase in public advisories made this year thru Facebook, Twitter, Traffic Navigator and EDSA LED gantries compared last year.

  • 46| P a g e

    DESIGN AND LAYOUT

    The Design and Layout Section is the unit assigned in the fabrication of in-house designs, printing

    of streamers, design & layout of tarpaulins for job out, and reproduction of information materials

    relevant to the Agency’s operation. The table below shows the 1st Quarter 2017 accomplishments

    of the unit with comparative data for the same period last year.

    PROGRAM/ PROJECT/ ACTIVITY 1st Quarter 2017 1st Quarter 2016

    1. Design and layout images, logos, banners, and other relevant graphics (in-house printing)

    24 designs 65 designs

    2. Printing of streamers with pictures, logos, flyers, posters, and maps in glossy and plotting papers and tarpaulins.

    1,209 336

    3. Design and layout of tarpaulins, banners, and streamers (job out)

    188 223

    4. Copying of information materials with Risograph. 170 reams 74 reams

  • 47| P a g e

    SECURITY INTELLIGENCE AND

    INVESTIGATION OFFICE

    The Security Intelligence and Investigation Office accomplished the following projects /activities

    for the 1st quarter of 2017 as compared to the same period of 2016:

    PROGRAM/ PROJECT/ ACTIVITY

    Target Output 1st Quarter 2017

    1st Quarter 2017

    1st Quarter 2016

    1. Investigations of Administrative Complaints

    Cases referred from the Office of the Chairman

    4 referred cases 3 summons

    7 Investigations 7 summons

    2 Investigations 2 summons

    Cases referred by other MMDA Offices

    5 referred cases 15 summons

    7 Investigations 15 Summons

    prepared

    5 Investigations 8 Summons

    prepared

    Cases lodged by walk-in complainants

    8 referred cases 6 summons

    11 Investiga-tions

    6 Summons Prepared

    4 Investigations 6 Summons

    prepared

    2. Investigations of Traffic Accident Complaints

    Investigation conducted 300 Traffic Accident Cases

    357 Traffic accident

    investigated

    471 Traffic accident

    investigated

    Referred case to the Office of the Public Prose-cutor

    2 cases referred 2 cases referred -

    Cases attended 1 case 2 cases attend-ed at proper

    court

    -

    3. Investigation of cases involv-ing MMDA Properties

    1 cases 1 case investigated

    3 cases investigated

    4. Security Detail/Augmentation Clearing Operations, Rallies, Traffic Operations, Towing Operations etc.

    22 Security Aug-mentations

    20 Security Augmentations

    conducted

    6 Security Augmentations

    conducted

    5. Surveillance and validation of reports Subject for Investigation

    11 cases validated/monitored

    10 cases validated/ monitored

    7 cases validated/monitored

    6. Intelligence gathering for both local and national security concern

    10 intelligence gatherings attended

    10 intelligence gatherings attended

    14 intelligence gatherings attended

  • 48| P a g e

    OFFICE OF THE DEPUTY CHAIRMAN

    For the 1st Quarter of 2017, the Office of the Deputy Chairman accomplished the follow-

    ing programs/ activities:

    PROGRAM/PROJECT/ACTIVITY 1st Quarter of 2017

    1. Oversee the repair and rehabilitation of the MMDA Main Building and other facilities

    1 Office Order was issued

    2. Flood Control Projects 31 Projects Approved

    3. MMDA Housing Programs 1 visit to Carmona Landfill 2 Meetings with SAKAMAY Officers

    4. External Relations Office 1 Initial Meeting 17 Action Officers Activated

    1 MMDA Resolution Institutionalized

    5. Presentation of MMDA Resolutions to President Rodrigo Roa Duterte

    1 Courtesy Call 2 MMDA Resolutions Institutionalized

    Other Accomplishments: 1. The office also represented MMDA to different meetings such as LRTA BOD meeting, Senate

    meeting and Cabinet Assistance Meeting. 2. Represented MMDA at the 2nd Tokyo Global Partners Seminar Gathering. 3. Met with the Mayors of Taytay, and Angono to discuss the expansion of the scope of the

    agency’s ferry service to Rizal Towns and looked for possible locations of terminals. 4. Represented the MMDA in the Liga ng Barangay meetings (LGUs of Pasay, Pateros, Las Pinas

    and Quezon City) 5. The meeting was all about the jurisdiction concerns that may be improved. 6. Made a request to different LGUs re: relocation of winged van and two trucks, declogging of

    canal, traffic code, parking ordinances and inspection/ removal of obstruction in the Lawton Ferry Station.

    7. Coordinated with 17 LGUs for attendance and participation for the Metro Manila Sports Fest. 8. Completed 14 Metro Manila barangays directory.

    No report was submitted to this office for the first quarter of the same period last year hence, no

    comparison can be made.

  • 49| P a g e

    LEGAL AND LEGISLATIVE AFFAIRS STAFF

    The Legal Staff accomplished the following regular activities during the 1st Quarter 2017, with

    comparative data for the same period in 2016:

    Activity/ Project/ Program Target Output

    1st Quarter 2017

    1st Quarter 2017

    1st Quarter 2016

    1. Agency representation in courts (preparation of court pleadings and SPAs, attendance in court hearings)

    50 53 80

    2. Investigation of administrative complaints: Complaints received

    Conduct of preliminary investigations

    Resolved cases/ resolutions prepared

    25 13 25

    54 19 35

    17 36 21

    3. Prosecution of administrative cases: Conduct of hearings/ trails of formal

    charges

    Decisions prepared

    20 4

    21 9

    37 7

    4. Release of impounded vehicles: Review/ approval of release order

    150

    321

    63

    5. Legal research 50 84 62

    6. Legal documents prepared (contract, MOA, Resolutions, Regulations, Memo Circular, Position Papers, etc.)

    150 179 165

    7. Review of colorum apprehensions (3rd offense):

    Revocation of driver’s license (Truck Ban and Colorum Operation)

    Cancellation of certificate of registration (Colorum Operation)

    10 1

    7/ 4 0

    48 6

    8. Provision of legal advice 75 101 77

    9. No. of errant MMDA personnel terminated 1 5 1

    10. No. of errant MMDA personnel suspended 10 48 2

    11. No. of errant MMDA personnel preventively suspended pending investigation

    2 5 2

    12. No. of errant personnel with extortion cases 1 6 1

  • 50| P a g e

    TRAFFIC ADJUDICATION DIVISION

    For the 1st Quarter of 2017, the Traffic Adjudication Division accomplished the following regular

    activities as compared to the same period of the preceding year:

    Target Output 1st Quarter 2017

    1st Quarter 2017

    1st Quarter 2016

    1. Contested traffic violations received

    125 187 146

    2. Contested traffic violations adjudicated and resolved

    125 139 140

    3. Review of contested Impounded motor vehicle

    10 55 6

    As shown in the table above, there is an increase in the number of contested traffic violations

    received as well as in the number of contested impounded motor vehicles reviewed for this

    quarter as against last year’s.

    Based on the above chart, the number of complaints received/ filed with the Legal Office has increased from 17 complaints in the 1st Quarter of 2016 to 54 complaints this year.

    Likewise, there is a significant increase in the review/ approval of release order for impounded vehicles, from 63 last year to 321 for this quarter.

    The same is true with regard to the number of errant MMDA personnel suspended, terminated

    and preventively suspended pending investigation of the complaint filed against them as well as

    in the number of personnel with extortion cases for this Quarter as compared last year.

  • 51| P a g e

    CORPORATE PLANNING AND MANAGEMENT STAFF

    The Corporate Planning and Management Staff assists top management in the attainment of Agency goals and objectives though the facilitation of Corporate Planning Workshops, documentation and consolidation of Corplan Outputs into Agency Action Plan and Performance Commitment, and integration, preparation of periodic sectoral reports into quarterly, semestral and annual accomplishment reports required for submission to DBM, Congress, COA and Key Management Officials.

    The following are the regular programs/ activities accomplished by the CPMS for the 1st Quarter

    of 2017 as compared to the same period of 2016:

    PROGRAM/ PROJECT/ ACTIVITY

    1st Quarter 2017 1st Quarter 2016

    Team Building Pre-Corporate Planning Activi-ties:

    Prepared corresponding memoranda

    Prepared Corplan Program

    Prepared/drafted Special Order

    Corplan Venue and transport coordination

    Conduct Ocular Inspection

    Conduct of Pre-Corpan Meeting

    Meeting with Corplan/ Team Building Facilitators

    Preparation of Corplan/ Team Building Facilitators’ Certificates

    No Corporate Planning Activity was conducted in this quarter

    Monitoring/ evaluation/ preparation and packaging of reports

    Monitoring and evaluation of:

    40 CY 2016 Annual Accomplishment Reports

    1 Highlight of CY 2016 AR

    Packaged 4 Reports (CY 2016 Annual AR)

    Monitoring and evaluation of:

    35 CY 2015 Annual Accom-plishment Reports

    Highlights of CY 2015 AR

    Packaged 6 Reports (CY 2015 Annual AR)

  • 52| P a g e

    PROGRAM/ PROJECT/ ACTIVITY

    1st Quarter 2017 1st Quarter 2016

    Provision of technical, administrative and secretariat services

    9 Directors’/ Organizational Meetings :

    9 Agenda Prepared

    9 Highlights of the Meeting prepared

    9 Verbal Directives prepared

    17 Directors/Department Meetings:

    15 Agenda prepared

    15 Highlights of the Meeting prepared

    15 Verbal Directives prepared

    Monitoring /review/evaluation of Office Performance Commitment and Review (OPCR) forms and conduct of Performance Planning and Review Conference

    42 OPCRs monitored/ reviewed/ evaluated

    41 OPCRs monitored/reviewed/ evaluated 1 Performance Planning and Re-view Conference conducted

    Rendering technical/ management and other forms of assistance to:

    MMDA employees in accomplishing the required management forms/ reports.

    Periodic briefing being done to employees in preparation of their reports.

    Periodic briefing being done to employees in preparation of their reports.

    Instead of Corporate Planning Activity, Team Building was conducted as directed/ approved by the OIC Chairman & General Manager.

    The OPCRs for July to December, 2016 were no longer submitted to the GM for his signature

    because the same were already signed by the GM thru Dir. Lydia Domingo of the

    Administrative Service.

  • 53| P a g e

    BILLBOARD CLEARANCE AND ENFORCEMENT OFFICE

    BCEO’s campaign on removal of unsafe and illegally displayed/mounted tarpaulins, posters, and signages within Metro Manila was terminated on February 2017, The Department of Public Works and Highways is the authorized government agency to undertake the removal of unsafe and illegally displayed/installed tarpaulins, posters and billboards.

    The following table shows the 1st Quarter 2017 accomplishments of the BCEO with comparative

    data for the same period last year.

    Program/Project/Activity 1st Quarter 2017 1st Quarter 2016 Target Output

    1st Quarter 2017

    Small Tarpaulin rolled down / removed

    8,704 pcs 13,421 pcs 4,000 pcs

    Special Project / Intervening Activity

    Surveyed and inspected the Provident Housing Project for MMDA employees in Carmona, Cavite

    Participated in Security Meetings & Conferences for the 65th Miss Universe Pageant in Pasay City

    Deployed equipment, t