high street, glasgow · units: more than 700 homes for rent on a 7.5 acre site, including a new...

1
HIGH STREET, GLASGOW SITE: High Street, Glasgow DEVELOPER: Get Living & Stallan Brand LOCAL AUTHORITY: Glasgow City Council BUILDING TYPE: new residential neighbourhood. UNITS: more than 700 homes for rent on a 7.5 acre site, including a new public square, 99 student units and c.3,365sqm of retail, leisure, food, drink and commercial business space. FACILITIES: tbc CONCEPT: the development will connect the Merchant City through High Street and into the East End, via three new tree-lined streets. Looking to bring the area back to life, tying it to the city centre. PLANNING ISSUES: Opportunities: placemaking; investment; creation of a new city neighbourhood. Challenges: flat sizes and configuration—single aspect. PROGRESS: aim to commence construction of the entire project in a single phase, late 2018. FURTHER INFO: http://www.getlivinglondon.com/ news/get-living-announces-first-site-outside-london-get- living-glasgow

Upload: others

Post on 29-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIGH STREET, GLASGOW · UNITS: more than 700 homes for rent on a 7.5 acre site, including a new public square, 99 student units and c.3,365sqm of retail, leisure, food, drink and

HIGH STREET, GLASGOW

SITE: High Street, Glasgow

DEVELOPER: Get Living & Stallan Brand

LOCAL AUTHORITY: Glasgow City Council

BUILDING TYPE: new residential neighbourhood.

UNITS: more than 700 homes for rent on a 7.5 acre

site, including a new public square, 99 student units and

c.3,365sqm of retail, leisure, food, drink and commercial

business space.

FACILITIES: tbc

CONCEPT: the development will connect the

Merchant City through High Street and into the East

End, via three new tree-lined streets. Looking to bring

the area back to life, tying it to the city centre.

PLANNING ISSUES:

Opportunities: placemaking; investment; creation of

a new city neighbourhood.

Challenges: flat sizes and configuration—single

aspect.

PROGRESS: aim to commence construction of the

entire project in a single phase, late 2018.

FURTHER INFO: http://www.getlivinglondon.com/

news/get-living-announces-first-site-outside-london-get-

living-glasgow