HFM TIPS &TECHNIQUES HSS:It provides a central location to manage user provisioning,LCM,and task flow management for all EPM System products. Also It includes the shared services registry,which is a central repository that stores and reuses information for most EPM System products Installed EPMA:It allows Creating,Maintaining,Synchronizing the core applications through a graphical interface and It works with Calculation manager,Planning,HFM,Essbase,Profitability, and Cost Management To implement HFM we need to have two groups Internal External Internal Team:SME,aPP aDMNISTRATOR Infrastruture support, and a Project Manager External Team: SME'S: HAS Accounting required,Including Tax,Treasury,Management Reproting and especially Consolidation accounting .Subject Matter Exper's Second thing we need to slect App Administrator Which is a critical thing Although HFM uses Visual basic spots and has scripting,HFM is not a tool used by Infrastruture group,it is a finance tool

Upload: ramachendruni-sreenu

Post on 02-May-2017

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HFM TIPS

HFM TIPS &TECHNIQUES

HSS:It provides a central location to manage user provisioning,LCM,and task flow management for all EPM System products.

Also It includes the shared services registry,which is a central repository that stores and reuses information for most EPM System products Installed

EPMA:It allows Creating,Maintaining,Synchronizing the core applications through a graphical interface and It works with Calculation manager,Planning,HFM,Essbase,Profitability,

and Cost Management

To implement HFM we need to have two groups

Internal

External

Internal Team:SME,aPP aDMNISTRATOR

Infrastruture support, and a Project Manager

External Team:

SME'S: HAS Accounting required,Including Tax,Treasury,Management Reproting and especially Consolidation accounting

.Subject Matter Exper's

Second thing we need to slect App Administrator Which is a critical thing

Although HFM uses Visual basic spots and has scripting,HFM is not a tool used by Infrastruture group,it is a finance tool

Project Manager to communicate risks,track tasks to the budget,

Most full implemenataion takes 5 to 8 months .

HFM Project Time Line

Page 2: HFM TIPS

First Month:Establishing Requirements and Design

Installation,Adminsitrator Training and Change Control Process Meeting Should also happen during this month

Second and Third Month:Building Activities

Develop Rule's,Create Strutures[Often Called Metadata] and Build Reports

during this month

Data should be loaded into HFM asap,It is important to load data early for two reasons

First

Page 3: HFM TIPS

The Development Team determine performance and identify issue's during the build

Second

It will help with determining performance issues early in the project.