HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY. Luminosity Polarization Operations Developments Plans. Beam Currents. RF conditioning during injection seems to be successful so far get to 39mA positron current quickly. Efficiency. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/1.jpg)
HERA-Experim.-Coord.03/28/06 1
HERA Status March 2006HERA-Experiments-Coordination March 28, 2006
F. Willeke, DESY
• Luminosity
• Polarization
• Operations
• Developments
• Plans
![Page 2: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/2.jpg)
HERA-Experim.-Coord.03/28/06 2
Beam Currents
RF conditioning during injection seems to be successful so far
get to 39mA positron current quickly
![Page 3: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/3.jpg)
HERA-Experim.-Coord.03/28/06 3
Efficiency
![Page 4: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/4.jpg)
HERA-Experim.-Coord.03/28/06 4
Specific Luminosities
![Page 5: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/5.jpg)
HERA-Experim.-Coord.03/28/06 5
Luminosity Production
![Page 6: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/6.jpg)
HERA-Experim.-Coord.03/28/06 6
Polarisation
No change w.r.t. last year
30-40 % for the colliding, good polarization for non-
colliding bunches
Machine interested in flipping rotators one-by-one starting at next maintenance day
![Page 7: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/7.jpg)
HERA-Experim.-Coord.03/28/06 7
H1 Backgrounds: Quick recovery of IR vacuum and gas induced p-
backgrounds
![Page 8: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/8.jpg)
HERA-Experim.-Coord.03/28/06 8
ZEUS p Backgrounds:improved by using complementary collimator set
![Page 9: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/9.jpg)
HERA-Experim.-Coord.03/28/06 9
HERMES Target Cell
new target cell is heating up due to HOML‘s during 12GeV positron injection limits e beam intensity at present (~39mA)
Synchrotron Radiation heating at 27.5GeV?
![Page 10: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/10.jpg)
HERA-Experim.-Coord.03/28/06 10
Successful commissioning of longitudinal broad band damper system short bunches
(1ns) at 920GeV
FWHM=1.1nsFWHM=1.1ns
Enhanced emittance growth (IBS, RF noise)
Need more RF voltage
Factor of 2 reserve available needs more work
Beam energyBeam energy
Bunchlength FWHMBunchlength FWHM
FWHM=2.8nsFWHM=2.8ns
![Page 11: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/11.jpg)
HERA-Experim.-Coord.03/28/06 11
HERA Week #12 2006
Intergrated Luminosity: 7.9 pb-1 (Z), Peak : Lp 4.68 1031cm-2s-1
Efficiency: 73%
ZEUS Backgrouind problems reduced
Only minor technical problems
![Page 12: HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY](https://reader036.vdocuments.us/reader036/viewer/2022070417/56815441550346895dc24841/html5/thumbnails/12.jpg)
HERA-Experim.-Coord.03/28/06 12
Further Plans• Consolidate operations with high beam currents (>40mA
positrons, 100mA protons) and high specific luminosity• Prepare luminosity optics with
xp:2.30, yp=16cm (& matched e-beam)• Use long feedback in routine operation• Increase RF Voltage by a factor of 2• Increase the number of bunches to 180 to raise the
intensity limitation by the HERMES target cell• Explore injection with frequency offset.• Maintenance day April 5 with IR warm-up North (and South?)