hec renewable - djadadji · 5.93 mwp audrey solar project, nc, usa 3.71 mwp amethyst solar project,...
TRANSCRIPT
HEC RENEWABLE ENERGY PORTFOLIO
SOLAR WIND
WE MAKE SOLAR BETTER AND CHEAPER GLOBALLY
CONSTRUCTION CONSTRUCTION
UTILITY SCALE MEDIUM SCALE SMALL SCALE
600+ TARGET MARKET
HYDRPOPLANTSYEARS AROUND THE GLOBEEMPLOYEES
103PROJECTS OF GLOBAL SOLAR
CAPACITY9001, 14001, 18001
ISO PELLET AND GLUED BEAM
PRODUCTION LINES0.66%
1.7+ GW ELECTRICAL & THERMAL
CAPACITY 14+10
BOOM INNOVATION NORWAY BOOMDESIGN&BUILD
BIOMASS HYDRO
HEC GLOBAL SOLAR PRESENCE AND EXPERIENCE
UNITED KINGDOM
BULGARIA HEADQUARTERS
HYDROENERGY COMPANY JSC
BLAGOEVGRAD & SOFIA
GREENSUN ENERGY LTDLONDONUNITED STATES OF
AMERICA
JAPANTURKEY SOLAR ENERGY
COMPANY LLCMIAMI, FL
SPAIN HEC SOLAR SERCVICES
G.K.HYOGO
HEC TURKEY YENİLENEBİLİR ENERJİ A.Ş.ANTALYA
SOLAR BUILD INGENERIEA Y CONSTRUCCION, S.L.MADRID
JORDAN
HEC JORDANIAN BULGARIAN FOR RENEWABLE ENERGY GENERATION
AMMAN
TAIWAN
MOROCCO UNITED ARAB EMIRATES
MEXICO
HEC SOLAR SYSTEM CONTRACTING LLCABU DHABI
CONSTRUCCION Y MANTENIMIENTO HEC, S. DE R.L. DE C.V.MEXICO CITY
AUSTRALIA
CHILE HEC SOLAR ENERGY PTY LTD
SYDNEY INGENIERÍA Y
CONSTRUCCIÓN HEC CHILE LIMITADA
SANTIAGO
HEC INSTALLED0.66%OF ALL SOLAR GLOBAL CAPACITY
AFRICA 65 MWP
AUSTRALIA 18 MWP
ASIA 171 MWP
USA 366 MWP
LATAM 562 MWP
EUROPE 400 MWP
SOLAR SCOPE OF SERVICES
&
Site surveyTechnology selection
Conceptual design Project layout and shading
Detailed designElectrical
CivilStructural
Value engineeringDesign optimization
As build
Total Construction Management ConceptPermitting & licensingSite managementCivil worksMechanical installationElectrical installationPull-out tests
Commissioning
O&M
Material supply
PROCUREMENT
BUILDDESIGN
OUR APPROACH IS BASED ON
Reliable and long-term partnerships
Know-how gathered in 10 years experience
Flexibility
Competitive pricing
Quick and effective project execution
Оur team
PHOTOVOLTAIC PROJECTS EUROPE
BULGARIA
YEAR 2010
YEAR 2011
YEAR 2012
1.00 MWP
5.00 MWP
18.70 MWP
ROMANIA
YEAR 2013 3.14 MWP
EUROPEGREECE
YEAR 2012 29.60 MWP
GERMANY
YEAR 2011
YEAR 2012
YEAR 2013
6.40 MWP
80.10 MWP
20.20 MWP
FRANCE
YEAR 2012
YEAR 2013 10.50MWP
25.00 MWP
THE UNITED KINGDOM
YEAR 2012 YEAR 2013
YEAR 2014
YEAR 2015
11.90 MWP
64.14 MWP
83.40 MWP
40.40 MWP
400 MWP
EUROPE
HEC JSC
EUROPE
PV PROJECT HADZHIDIMOVO
TOTAL POWER CAPACITY:
POWER CAPACITY INSTALLED BY HEC:
LOCATION:
YEAR OF COMPLETION:
11.0 MWP
5.5 MWP
BULGARIA
2012
HECSYSTEM INTEGRATOR:
SCOPE OF WORKS
TOTAL CONSTRUCTION MANAGEMENT
--
-
-
-
-
-
-
-
-
-
SITE SET-UP
FENCING
RAMMING OF PILES
ASSEMBLY OF MOUNTING STRUCTURE
MODULE DEPLOYMENT
MATERIAL LOGISTICS
TRENCHES
CABLE LAYING
DC/AC CONNECTION AND TERMINATION
TESTING AND COMMISSIONING
PARTIAL PROCUREMENT
EUROPE
PV PROJECT ORTAFFA
TOTAL POWER CAPACITY:
POWER CAPACITY INSTALLED BY HEC:
LOCATION:
YEAR OF COMPLETION:
25 MWP
25 MWP
FRANCE
2013
HECSYSTEM INTEGRATOR:
SCOPE OF WORKS
TOTAL CONSTRUCTION MANAGEMENT
--
-
-
-
-
-
-
-
RAMMING OF PILES
ASSEMBLY OF MOUNTING STRUCTURE
MODULE DEPLOYMENT
MATERIAL LOGISTICS
TRENCHES
CABLE LAYING
DC/AC CONNECTION AND TERMINATION
TESTING AND COMMISSIONING
PARTIAL PROCUREMENT
EUROPE
PV PROJECT CASTLE EATON
TOTAL POWER CAPACITY:
POWER CAPACITY INSTALLED BY HEC:
LOCATION:
YEAR OF COMPLETION:
17.8 MWP
17.8 MWP
UNITED KINGDOM
2014
HECSYSTEM INTEGRATOR:
SCOPE OF WORKS
TOTAL CONSTRUCTION MANAGEMENT
--
-
-
-
-
-
-
-
SITE SET-UP
FENCING
MODULE DEPLOYMENT
MATERIAL LOGISTICS
TRENCHES
CABLE LAYING
DC/AC CONNECTION AND TERMINATION
TESTING AND COMMISSIONING
PARTIAL PROCUREMENT
PHOTOVOLTAIC LATAM REGIONPROJECTS IN
SOUTH AMERICA
INGENERIA Y CONSTRUCCION HEC CHILE LIMITADA
LLANO DE LLAMPOS SOLAR PHOTOVOLTAIC PLANT, CHILE
100 MWP
SAN ANDRES SOLAR PHOTOVOLTAIC PLANT, CHILE
51 MWP
PULL OUT TEST SAN PEDRO III SOLAR PHOTOVOLTAIC PLANT, CHILE
33.6 MWP
PULL OUT TEST FOTONES SOLAR PHOTOVOLTAIC PLANT, CHILE
40 MWP
LUZ DEL NORTE SOLAR PHOTOVOLTAIC PLANT, CHILE
147 MWP
PARTIAL WORKS ANDES SOLAR PARK, CHILE
23 MWPSOUTHAMERICA
EL ROMERO SOLAR PROJECT, CHILE
247 MWP
CONEJO I SOLAR PROJECT, CHILE
42.7 MWP
EL PELICANO SOLAR PHOTOVOLTAIC PLANT, CHILE
100.8 MWP
562 MWP
LATAM
LUZ DEL NORTE SOLAR PHOTOVOLTAIC PLANT
POWER CAPACITY:LOCATION:
YEAR OF COMPLETION:
MAIN SUB-CONTRACTOR:
147 MWP
CHILE
2016
HEC
PROJECT DESCRIPTION
THE LUZ DEL NORTE PHOTOVOLTAIC SOLAR PLANT IS LOCATED IN THE ATACAMA
REGION NEAR THE CITY OF COPIAPO AND HAS AN INSTALLED CAPACITY OF
147MWP. THE PLANT CONSISTS OF 1,511,880 THIN-FILM PHOTOVOLTAIC
MODULES SPREAD ACROSS 458 HECTARES. THE PLANT IS EXPECTED TO BE FINISHED
DURING Q4 2015.
SCOPE OF WORKS
TOTAL CONSTRUCTION MANAGEMENT
LATAM
ROMERO SOLAR PHOTOVOLTAIC PLANT
POWER CAPACITY:
POWER CAPACITY INSTALLED BY HEC:
LOCATION:
YEAR OF COMPLETION:
MAIN SUB-CONTRACTOR:
247 MWP
247 MWP
CHILE
2016
HEC
SCOPE OF WORKS
-
-
-
-
-
-
-
-
-
-
-
-
LEVELLING OF THE TERRAIN
ROAD CONSTRUCTION
CLEARING OF STONES
DEEP EXCAVATION FOR SUBSTATION AND TRAILER COMPLEX PLATFORMS
CLEANING OF VEGETATION;
WASTE MANAGEMENT AND DISPOSAL OF MATERIALS;
ARCHEOLOGICAL, TEMPORARY AND SECURITY FENCING;
TRAILER COMPLEX
STAFF AND RECOURSES MANAGEMENT
SITE LOGISTICS FOR MECHANICAL ASSEMBLY WORKS
ASSEMBLING OF PHOTOVOLTAIC RACKS
INSTALLATION OF PHOTOVOLTAIC MODULES
PHOTOVOLTAIC USAPROJECTS IN THE
THE UNITED STATES OF AMERICA
SOLAR ENERGY COMPANY WAS FORMED AS A LIMITED LIABILITY
COMPANY IN ACCORDANCE WITH THE LAWS AND REGULATIONS
OF THE STATE OF DELAWARE.
USA IS A NEW MARKET TO HEC, BUT BASED ON HEC’S
EXPERIENCE ALL OVER THE WORLD, WE ARE READY TO FACE ANY
CHALLENGES THAT MAY ARISE. HEC PROVIDES FULL SUPPORT IN
ALL FUTURE WORK THAT IS PLANNED TO BE PERFORMED BY SEC.USA
SOLAR ENERGY COMPANY LLCWWW.SOLAR-EC.COM
SOPHIE SOLAR PROJECT, NC, USA5.93 MWP
AUDREY SOLAR PROJECT, NC, USA
3.71 MWP
AMETHYST SOLAR PROJECT, NC, USA
4.34 MWP
OWEN SOLAR PROJECT, NC, USA
7.02 MWP
TAYLOR 3 SOLAR PROJECT, GA, USA
180 MWP
DECATOUR SOLAR PROJECT, GA, USA
30 MWP
BUTLER SOLAR PROJECT, GA, USA
140 MWP
1000 NORTH WEST STREET, SUITE 1200
WILMINGTON, DE 19801
USA
366 MWP
USA
USA
TAYLOR III SOLAR PROJECT
POWER CAPACITY:
LOCATION:
YEAR OF COMPLETION:
MAIN SUB-CONTRACTOR:
180 MWP
USA
2016
HEC
PROJECT DESCRIPTION
THE TAYLOR III PHOTOVOLTAIC SOLAR PLANT IS LOCATED IN BUTLER, GEORGIA.
THE PROJECT’S INSTALLED CAPACITY IS 180MWP. THE PLANT CONSISTS OF
1,565,520 THIN-FILM PHOTOVOLTAIC MODULES SPREAD ACROSS 955 ACRES.
THE PLANT IS EXPECTED TO BE FINISHED DURING Q4 2016.
SCOPE OF WORKS
TOTAL CONSTRUCTION MANAGEMENT
SITE SUPERVISION
LOGISTICS
SURVEY
POST INSTALLATION
MODULAR SUPPORT STRUCTURE INSTALLATION
BOS ELECTRICAL INSTALLATION
COMMISSIONING AND TESTING
USA
BUTLER SOLAR PROJECT
POWER CAPACITY:
LOCATION:
YEAR OF COMPLETION:
MAIN SUB-CONTRACTOR:
140 MWP
USA
2016
HEC
PROJECT DESCRIPTION
THE BUTLER PHOTOVOLTAIC SOLAR PLANT IS LOCATED IN BUTLER, GEORGIA AND
HAS AN INSTALLED CAPACITY OF 140MWP. THE PLANT CONSISTS OF 1,250,160
THIN-FILM PHOTOVOLTAIC MODULES SPREAD ACROSS 1,070 ACRES. THE PLANT IS
EXPECTED TO BE FINISHED DURING Q4 2016.
SCOPE OF WORKS
TOTAL CONSTRUCTION MANAGEMENT
SITE SUPERVISION
LOGISTICS
SURVEY
POST INSTALLATION
MODULAR SUPPORT STRUCTURE INSTALLATION
BOS ELECTRICAL INSTALLATION
COMMISSIONING AND TESTING
PHOTOVOLTAIC PROJECTS IN ASIA
JAPAN
HEC SOLAR SERCVICES G.K. IN HYOGO
JORDAN
HEC JORDANIAN BULGARIAN FOR RENEWABLE ENERGY GENERATION IN AMMAN
TAIWAN
ASIA
Table Module Material Pre- Cable DC/AC Cable TestMWp Country Year Ramming El.
52.50 Jordan 2016 X XMaan
Supply
Assembly Deployment Logistics assembly Laying Connection Trenches Comp.
Protocols
B2 Maan 11.00 Jordan 2016 X X X X X X
B3 Maan 11.00 Jordan 2016 X X X
B4 Maan 11.00 Jordan 2016 X X X
Glae 11.00 Jordan 2016 X X
EJRE 22.00 Jordan 2016 X X X X X X X X X
Oryx 11.00 Jordan 2016 X
Shams
Kawasaki 19.80 Japan 2016 X X X
Bruberk 4.87 Taiwan 2017 X X X
171 MWP
ASIA
AFRICA: Market penetration for HEC
Morocco: 10MW
Leasing of HEC personnel with a local company; partial
procurement
Contemplating a local LLC setup
MASEN: local solar agency
Upside:
- Highest rates of sunshine per year in Africa, ca 3600 hrs
- Increasing need of electricity and growing penetration
within households
- Government policies and incentives towards investment in
Renewables
- 20% of renewables by 2022
Challenges:
- Slow institutional processes: online portal
- Protectionist measures: you need a local partner to operate
- Administrative hurdles
Egypt: FOB
Currently working on securing a major role within in upcoming
projects
Also working towards setting up an LLC
EFCBC: local chamber of constructors
GAFTA: foreign investors
NREA: renewable agency authority
Upside:
- Speeds up processes when using local partners/subcontractors
- Plans to install 3.5GW Solar by 2027
- Huge territory compatible for solar
Challenges:
- Set contracts needed in order to open a branch or company
- Protectionist measures: 90%-to10% quota
- Legal and political risks
- Complex procedures for issuing various permits
Currently, the largest solar energy projects are in Morocco, S. Africa, Alger and Egypt
Tanzania and Nigeria have more recently adopted large-scale PV programs
HEC has shifted focus on the sunniest continent and there is no doubt that Africa will be next big winner, not just in solar!
Thank You for Your Time
WWW.HEC.GLOBAL
+ 359 (0)73 53 01 00
Georgi S. Penchev, CFACorporate Finance Manager