HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed in Ventura Co, CA

Upload: phamkhanh

Post on 24-Jan-2019

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

HEC-RAS 1D+2D Modeling in the

Santa Clara River Watershed in

Ventura Co, CA

Page 2: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

• Is 2D modeling a better alternative

to 1D modeling in some cases of

riverine hydraulics?

• Have we seen 2D modeling be a

common request from communities

during Risk MAP?

• Is it possible with HEC-RAS 5.0 that

more communities will be open to

or eager for 2D modeling?

Page 3: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Introductions

• Ed Curtis, PE, CFM – Senior Engineer

with FEMA Region IX

FEMA project manager for the Ventura

County, CA project highlighted in this

presentation

• Joe Thomas, PE, CFM – Project

Manager with AECOM as part of the

BakerAECOM JV

Page 4: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Presentation Objectives

Page 5: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

First, a Brief Project History

• Phase 1 – MapMod Project

47 miles

Preliminary September 2014

• Phase 2 – Risk MAP Project

70 miles

Preliminary December 2015

Page 6: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Santa Clara River Valley

Page 7: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Santa Clara River Valley

Page 8: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

First, a Brief Project History

• FEMA proposed mixed scopeStream Reach Length 2D Flow Area Stream Reach Length 2D Flow Area

Adams Barranca 7.0 1.0 Harmon Barranca 3.8 N/A

Balcom Canyon* 2.0 0.5 O’Leary Creek 2.0 N/A

Bear Creek 2.0 0.5 Peck Drain 2.0 1.0

Briggs Drain 2.0 1.0 Piru Creek 4.0 N/A

Brown Barranca 3.8 0.5 Real Canyon 3.0 1.0

Clark Barranca 2.8 0.5 Reimer Ditch 3.0 1.0

Ellsworth Barranca

7.5 1.0 Santa Paula Creek*

10.0 0.5

Fagan Canyon 5.0 1.0 Sudden Barranca 2.7 2.0

Fairview Canyon 1.0 0.3 Timber Canyon* 4.0 0.5

Franklin Barranca 3.2 1.0 Todd Barranca 8.1 2.0

Haines Barranca 3.0 0.5 Wiley Canyon 1.0 N/A

Totals 82.9 15.8

Page 9: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

MODEL BUILD

Page 10: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Model Build/Conversion

Page 11: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Model Build/Conversion

Page 12: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Model Build/Conversion

USACE Feasibility Study FEMA Physical Map Revision Study

HEC-RAS v4.1.0 HEC-RAS 5.0 October 2015 BETA(June Beta initially)

Steady state hydrology Unsteady flow hydrographs

2005 LiDAR 2005 LiDAR

Calibrated ‘n’ values USACE ‘n’ values (channel)

Detailed channel crossing structure data Detailed channel crossing structure data

~250 – 500’ cross spacing <200’ cross section spacing (most ~50’)

Lateral Structures + Split flows + OBReaches

Lateral structures + 2D flow areas

1% & 0.2% ACF events 10%-, 2%-, 1%-, & 0.2%- ACF events

N/A 10 – 20’ cell sizes

~2.6/3.0 Weir coefficients 0.5 Weir coefficients

Page 13: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

RESULTS

Page 14: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Did it work???

• Several weeks for initial build

• Level of detail for ‘n’ values

• Hydraulic structures in 2D Mesh

• Levees

• Weirs (1D/2D connections)

• Conversion from June to October Beta

Page 15: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Sharing the Results

• Webinar with stakeholders

• General concurrence

• Local consultant recreation issues

• Preliminary Issuance 12/23/2015

• Official RAS 5.0 was released February

2016…

Page 16: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

PROJECT STATUS /

PATH FORWARD

Page 17: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Current Project Status/Path Forward

• Re-run in HEC-RAS 5.0

• Slight change in results

• Pending Revised Preliminary

• Unknown comments/appeals future

Page 18: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

Caveats, Considerations, Thoughts

• Revised Zone A to Zone AE

• More refined analysis of flooding in the

valley

• NOT calibrated to high water marks

• Future revisions/additions to HEC-RAS

• Flow path assumptions

• Downstream tie-in

Page 19: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,

RAS 5.0 vs. effective

Page 21: HEC-RAS 1D+2D Modeling in the Santa Clara River Watershed … · Introductions •Ed Curtis, PE, CFM –Senior Engineer with FEMA Region IX FEMA project manager for the Ventura County,