Heat Networks Regulations Update
Chris Smith
What an Exciting Summer
• NMRO merged with BRDO on 1 April 2016 to form Regulatory Delivery
• BEIS merged with DECC to form BEIS• Now a new Directorate within BEIS• Focus on better regulatory delivery• Build a national “centre of excellence” for enforcement
Present Regulations
• Retrofitting of individual meters subject to viability on hold
• Fitting of individual meters subject to viability in new build and renovated communal on hold
• Not on hold:– Notifying of networks– Fitting of block level meters– Fitting of individual meters– Maintaining meters– Billing subject to actual use
Notifications
• Received circa 18,000 notifications by end of 2015• Presently staff and DECC analysts working on QA• BEIS to publish later this year• Many returns have errors and will need to be followed up• List of late organisations and agreed return dates• Starting to chase
If you have notifications you are late with and working on let us know
New Regulations
• BEIS policy plan for– Consultation early 2017– new regulations 2017
• Make regulations clearer• Deal with snags• BEIS policy liaising with Commission over block meters• BEIS policy planning to set a new date for fitting of
meters• New viability test and new tool• New EED 2017?
VIABILITY TOOL
Viability Tool Principles
£ fuel savings Installation and running costs>=
10 Year period
New Viability Tool Principles
• First stage test categorise into: viable/test/exempt• Use actual numbers and not benchmark costs for energy
use• Market costs for meters, fitting and billing• NPV test over 10 years• Allow testing of networks or sections of networks, not
every building
Viable–Test–Exempt from Consultation WorkshopsExempt
Transition medium as per 2014 regs (steam, cooling other than liquids etc)
Multiple entry point of pipework
Grade 1 (2?) listed EPC/DEC “A” (B?) rated Low energy properties
<15kWh/m2/y <10% heat used by final
customers in building Planned limited life Hot water only Vulnerable groups
Test
All not in other categories
Viable
New build connections to DN Major renovations on DN New build communal
networks Buildings that are already
metered EPC/DEC “F-G” rated
Calculation
New Tool
• Release aligned with new regulations• Will be based on principles discussed• Cover meters and HCAs• Assumptions in tool will be founded on evidence base• Tool’s use will not be statutory, you can use your own
method but will need to justify
Our Next Steps
• Collect evidence on costs for tool• Regulation development• Impact assessment being worked on now• Full consultation in Summer 2016• Inspection programme focused on notification returns
and heat supplier support• Continued engagement with Commission• EED Recast
Thank You and Questions