harvesting introduction, components, work elements, planning january 10, 2002 james b. hart
TRANSCRIPT
![Page 1: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/1.jpg)
HarvestingIntroduction, Components, Work Elements, Planning
January 10, 2002
James B. Hart
![Page 2: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/2.jpg)
Why Harvest? To satisfy public craving for wood products
(demand side)--yearly harvest of roundwood in the U.S.
So land owners (sellers), loggers, milling and equipment manufacturing enterprises and their employees can make a buck (supply side)
To accomplish silvicultural & other objectives(ecological, hydrological, recreational, fish & game habitat)
To salvage timber killed or damaged by natural agents (fire, wind, disease, old age, ice damage, etc)
Clear land for development (agricultural, industrial, or residential-urban)
![Page 3: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/3.jpg)
The Forester’s Perspective & Objectives of Harvesting
Forester’s perspective – The territory of the logging contractor or the logging engineer,
but a forester must have significant knowledge of it to do his Objectives of timber harvesting
– production, from standing or naturally downed timber, of round logs or other useable elements
– their transportation to the mill site – in such a way that
value of logged material is maximized costs are minimized, with due consideration given to environmental, legal and other
constraints.
![Page 4: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/4.jpg)
Wood Elements
Primary Products
Secondary Products
Harvesting Wood Products Processing
“HARVESTING --All work elements leading to the total
preparation of a primary product”
Trees,stump, logs, branches, tops, foliage, etc
e.g.lumber
e.g. furniture
![Page 5: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/5.jpg)
0
1
2
3
4
5
Northeast
North Central
Southeast
South Central
Great Plains
Intermountain
Alaska
Pacific NE
Pacific SW
Volume of Roundwod Products (Billions of cubic feet)
Volumes of roundwood products harvested by region in US, 1991
(total of 17.9 billion cubic feet)
![Page 6: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/6.jpg)
0123456
Vol
umes
(B
illio
ns
of c
ubic
fee
t)
NortheastNorth Central
SoutheastSouth Central
Great Plains
Intermountain
AlaskaPacific NEPacific SW
growth removals
Annual Growth and Removals by region in US, 1991
![Page 7: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/7.jpg)
hardwoods37%
softwoods63%
Distribution of hardwood and softwood product volume harvested in US, 1991 (percent of 17.9 billion cubic feet)
![Page 8: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/8.jpg)
oaks13%
maples23%
aspens27%
other HW16%
Jack & Red Pine
14%
other conifers
7%
Distribution of roundwood product volume harvested in Michigan by species group, 1992 (percent of 391.1 million cubic feet)
![Page 9: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/9.jpg)
A HARVEST SETTING in Arkansas
![Page 10: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/10.jpg)
“CLASSIC” LOGGING SYSTEM WORK ELEMENTS
FELLING
LIMBING
MEASURING &
BUCKING
SKIDDING, YARDING
LOADING
TRANSPORTING
UNLOADING
LIMBING
LOADING
![Page 11: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/11.jpg)
“EXPANDED” ELEMENTS (approximately chronological)
Planning--"Failing to plan is planning to fail”, or “6P’s - Proper Prior Planning Prevents Poor Performance”
Road design & construction--always a part of system, earlier or current
Felling, bunching?, bucking, limbing, --hand or completely mechanical (some may be done @ the landing)
Primary Transport -- (skidding or yarding or Forwarding)--move material to a landing
Transport--from the woods to the mill site (or may be an intermediate wood yard); road, rail or water
Unloading--in the wood and/or mill yard; highly mechanized Storage--awaiting processing; most of the time
![Page 12: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/12.jpg)
Choice of a Logging System and Equipment determined by many things: Management and capital considerations Volume per stem and per acre Forwarding distance Limbiness & defect Underbrush Terrain Soils Weather Silvicultural considerations
Systems can be as simple as a single person with a chain saw, a tractor, and an old truck... to a highly mechanized (computerized) system
![Page 13: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/13.jpg)
TYPES OF LOGGING SYSTEMS
Based on the piece length forwarded & equipment used Short-wood (pulpwood) --trees delimbed & bucked into 4 ft. or
100 in logs Long-log (veneer & saw logs) --trees delimbed and bucked
into 8, 16, or 32 ft lengths (or any length in between) Tree-length--trees limbed and topped at min. diameter limit Whole-tree--limbing and bucking () done at landing
Total system components do not vary but the expression of them has many variations...
– e.g. tree-length logs can be bucked into length at the landing or transported directly to the mill for merchandizing into the highest-value log package
![Page 14: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/14.jpg)
Four Logging System Variations
![Page 15: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/15.jpg)
Operation Planning and Scheduling
System components, whatever they may be, must be properly matched for effective performance in reaching objectives -- e.g. if the feller gets way ahead of the skidder, or if the loader cannot keep up with the skidder, etc., then the whole system is not optimized.
Planning is the first and most critical function performed in a logging business--it provides the discipline that weld together all parts of the harvesting system.
What is a plan? "A projected course of action which defines a necessary sequence of activities, identifies the techniques to be applied, and determines the timing requirements."
Planning must be done in the context of interfacing components and other system externalities.
![Page 16: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/16.jpg)
HARVEST HARVEST PLANNING ADMINISTRATION
AREA LAYOUT HAUL ROAD &
CROSSING ANALYSIS
SKIDROAD DESIGN & LAYOUT
TURN-OUTS TURN-AROUNDS TRUCK
SCHEDULING
BOUNDARY MARKING HAUL ROAD
PERMITTING CROSS ROAD
PERMITING WETLAND, STREAM
CROSSING PERMITS ROAD CONSTRUCTION
CONTRACTING SAFETY TRAINING
![Page 17: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/17.jpg)
TRANSPORT - ROADS
![Page 18: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/18.jpg)
Skid Trail and Roads Overview
Road location, layout, and construction concerns significantly influence the logging system & equipment used.
Most Michigan commercial forest areas already have a good network of secondary transport roads. building permanent truck haul roads is usually not a forester or logger responsibility weight and season restrictions may require permits
Woods road systems (primary transport) are often inadequate Forester frequently locate and may lay out skid roads and skid trails operation in wetlands and riparian areas may require permits steep slopes require special consideration
Culverts and bridges may require engineer design, lay out and construction.
Many roads on public lands are being closed—current rule-of-thumb the fewer roads the better (not always popular).
![Page 19: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/19.jpg)
A Forester’s Harvesting Plan should include: Management objectives—independent contractor (large or small) vs.
company crew
Silvicultural factors—impose constraints and limitations– What treatment (e.g. a thinning vs. small clearcut vs. large clearcut)?– Are there seed bed requirements? Will site preparation treatments be used?– How about insects and diseases?
Physical site characteristics - including topography, soils, hydrology– mostly affects equipment limitations, erosion, timing, and safety – also pertains to road issues
Environmental, wildlife & aesthetic limitations– eg. Threatened & Endangered species, wetlands, old growth– more and more stringent, whether set by law or landowner / publics
“There is less and less place for careless harvesting.”
![Page 20: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/20.jpg)
![Page 21: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/21.jpg)
FELLING
![Page 22: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/22.jpg)
MEASURING, BUCKING
![Page 23: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/23.jpg)
LIMBING
![Page 24: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/24.jpg)
PRIMARY TRANSPORT
SKIDDING YARDING
![Page 25: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/25.jpg)
PRIMARY TRANSPORT (CONTINUED)
FORWARDING
![Page 26: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/26.jpg)
STORAGE ?, LOADING
![Page 27: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/27.jpg)
SECONDARY TRANSPORT
![Page 28: Harvesting Introduction, Components, Work Elements, Planning January 10, 2002 James B. Hart](https://reader036.vdocuments.us/reader036/viewer/2022062422/56649ec45503460f94bce978/html5/thumbnails/28.jpg)
UNLOADING