Integration Plan Ideas Place Dots Here for Top Priorities
1. Convert Wesley Ave into a green, shared street with a direct trail connection to the South Platte River.
2. Prioritize pedestrian and bike bridge connection across Santa Fe and railroad (consistent with Evans Station Area Plan).
3. Provide enhanced street crossings and traffic signal along green/shared street (Wesley Ave), particularly at the Broadway crossing.
4. Provide wayfinding and educational signage along Wesley Ave.
5. Minimize impact to Denver Urban Garden’s Rosedale Gardens.
Other?
Reach 1
21
34 5
Wesley Ave. Green Street Concept
Wesley Ave
Harvard Ave
Vassar Ave
Iliff Ave
Warren Ave
Cher
okee
St
Del
awar
e St
Bann
ock
St
Acom
a St
Linc
oln
St
Sher
man
St
Broa
dway
NOT TO SCALE
HARVARD GULCHINTEGRATION PLAN
REVISED: November 21, 2016August 30, 2016
This document was presented at the Integration Plan Public Meeting for Harvard Gulch on August 31, 2016, and has
been edited to incorporate comments during that meeting and to clarify draft elements of the graphic examples.
Integration Plan Ideas Place Dots Here for Top Priorities
1. Realign open channel along southern edge of Harvard Park.
2. Minimize impact to the golf course and ball fields.
3. Minimize property impacts by utilizing a portion of the right-of-way and aligning the open channel with the north side of Harvard Ave.
4. Implement a shared street/green street along Harvard Ave between Ogden St. and Downing St. that enhances the edge of the open channel while maintaining Porter Hospital emergency access.
5. Coordinate with Porter Hospital about their future plans and possible future use of the new gulch alignment.
Other?
Reach 2 & 3
2
1 34
5
Harvard Ave. Shared/Green Street Concept
Iliff Ave
Wesley Ave
Harvard Ave
Vassar Ave
Mar
ion
St
Dow
ning
St
Coro
na S
t
Ogd
en S
t
Emer
son
St
Pear
l St
Penn
sylv
ania
St
Loga
n St
NOT TO SCALE
HARVARD GULCHINTEGRATION PLAN
REVISED: November 21, 2016August 30, 2016
This document was presented at the Integration Plan Public Meeting for Harvard Gulch on August 31, 2016, and has
been edited to incorporate comments during that meeting and to clarify draft elements of the graphic examples.
Integration Plan Ideas Place Dots Here for Top Priorities
1. Provide street crossings at Lafayette St, Franklin St, and High St only.• Further study traffic patterns to confirm proposed street crossing locations across the open channel.
2. Align the open channel to take advantage of existing, city-owned properties and minimize private property impacts.
3. Close Race, York and Columbine street crossings of the Gulch and allow Josephine to cross over the Gulch.
4. Provide pedestrian and bike only crossings at Gaylord St and York St.
5. Study feasibility of providing a grade-separated pedestrian and bike underpass at University.• Study how to best signalize at-grade crossing at Vassar and University if a grade-separated crossing is not feasible.
• If grade separated crossing and new signal at Vassar Ave are not feasible, then direct pedestrians to Harvard Ave.
Other?
Reach 4 & 5
4
4
3
1 11
5
2
3
NOT TO SCALE
3
Vassar Ave
Yale Ave
Iliff Ave
Wesley Ave
Mar
ion
St
Lafa
yett
e St
Hum
bold
t St
Fran
klin
St
Gilp
in S
t
Will
iam
s St
Hig
h St
Race
St
Vine
St
Gay
lord
St
York
St
Uni
vers
ity S
t
Jose
phin
e St
Colu
mbi
ne S
t
Mar
ion
St
HARVARD GULCHINTEGRATION PLAN
REVISED: November 21, 2016August 30, 2016
This document was presented at the Integration Plan Public Meeting for Harvard Gulch on August 31, 2016, and has
been edited to incorporate comments during that meeting and to clarify draft elements of the graphic examples.
Integration Plan Ideas Place Dots Here for Top Priorities
1. Preserve Vassar Ave and Adams St intersection by providing a culvert
2. Work with YMCA and other private property owners to determine how to extend trail connection to Colorado Blvd at signal.
Other?
Reach 6
1
2
Vassar Ave
Harvard Ave
Yale Ave
Clay
ton
St
Fillm
ore
St
Milw
auke
e St
St.P
aul S
t
Stee
le S
t
Adam
s St
Cook
St
Mad
ison
St
Mon
roe
St
Gar
field
St
Jack
son
St
Colo
rado
Blv
d
NOT TO SCALE