harrow weald campus...diet & nutrition h&wb rm.0.11 24 diet & nutrition lab rm.0.09 24...

2
Harrow Weald Campus Health & Social Care Building Following the successful completion of their new building for students with learning difficulties, Harrow College are delighted to have secured grant funding from the London enterprise Partnership towards another new building, the Health & Social Care Building. The adjacent site plan shows the location of the proposed building to the south east corner of the Harrow Weald campus. Following the completion of the proposed, it is intended that the Gaskell building will be demolished. The proposal forms the next step for Harrow College in providing bespoke teaching facilities as part of their evolving Care Campus. The new building will facilitate the delivery of high quality health and social care training at Levels 1,2,3,4 and above. The centre will provide training for approximately 300 learners per annum. Approximately 25% of those learners will be aged 16-18 and the remainder will be 19+. The building design has been carefully developed to integrate with and enhance the Harrow Weald campus setting. There is a simple palette of materials; brick, glazing and a zinc coated standing seam roof that wraps around the profile of the building. N VISUAL SCALE 1:250 @ A1 25m 5m 20m 15m 10m 0m 70 m² Triage RM.1.07 42 m² Classroom RM.1.03 46 m² Classroom RM.1.09 40 m² Counselling RM.1.13 43 m² Classroom RM.1.01 50 m² IT Classroom RM.1.08 41 m² Counselling RM.1.14 27 m² Void V.01 48 m² Classroom RM.1.06 42 m² Classroom RM.1.02 23 m² Stair 02 RM.1.05 41 m² Atrium RM.1.11 7 m² Void V.03 7 m² Void V.02 10 m² Void V.05 2 m² Void V.04 7 m² Lift RM.1.04 2 m² Store RM.1.03A 45 m² Atrium RM.1.12 4 m² Store RM.1.02A 6 m² Store RM.1.07A 51 m² Classroom RM.1.10 50 m² Diet & Nutrition H&WB RM.0.11 8 m² Reflective Room RM.0.13 Kitchen Bedroom Mockup Area Bathroom Mockup Area Main Entrance 7 m² Store RM.0.11A 50 m² Staffroom RM.0.06 50 m² Diet & Nutrition Lab RM.0.09 102 m² Care Suite RM.0.07 50 m² Ortho Beds RM.0.08 14 m² Plant RM.0.10 6 m² Switch Room RM.0.14 23 m² Stair 02 RM.0.12 73 m² Atrium RM.0.03 11 m² Entrance Lobby RM.0.01 3 m² Staff WC RM.0.19 11 m² Hygiene RM.0.15 19 m² Male WC RM.0.21 21 m² Female WC RM.0.16 7 m² Lift RM.0.17 31 m² Meeting/Breakout RM.0.02 7 m² One to One RM.0.04 3 m² Staff WC RM.0.20 7 m² Circulation RM.0.18 2 m² Clnr. RM.0.23 4 m² Dis. WC RM.0.22 3 m² Vending Area RM.0.02A 7 m² One to One RM.0.05 Living Room Mockup Area 55 m² Atrium RM.0.24 Circulation Practical Teaching Storage Teaching Circulation Meeting Plant Practical Teaching Sanitary Staff Storage Teaching Proposed First Floor Proposed Ground Floor

Upload: others

Post on 16-Sep-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Harrow Weald Campus...Diet & Nutrition H&WB RM.0.11 24 Diet & Nutrition Lab RM.0.09 24 Dis. WC RM.0.22 Entrance Lobby RM.0.01 Female WC RM.0.16 Hygiene RM.0.15 IT Classroom RM.1.08

Harrow Weald CampusHealth & Social Care Building

Following the successful completion of their new building for students with learning difficulties, Harrow College are delighted to have secured grant funding from the London enterprise Partnership towards another new building, the Health & Social Care Building.

The adjacent site plan shows the location of the proposed building to the south east corner of the Harrow Weald campus. Following the completion of the proposed, it is intended that the Gaskell building will be demolished.

The proposal forms the next step for Harrow College in providing bespoke teaching facilities as part of their evolving Care Campus.

The new building will facilitate the delivery of high quality health and social care training at Levels 1,2,3,4 and above. The centre will provide training for approximately 300 learners per annum. Approximately 25% of those learners will be aged 16-18 and the remainder will be 19+.

The building design has been carefully developed to integrate with and enhance the Harrow Weald campus setting. There is a simple palette of materials; brick, glazing and a zinc coated standing seam roof that wraps around the profile of the building.

N

VISUAL SCALE 1:250 @ A1

25m5m 20m15m10m0m

www.ibigroup.com

IntelligenceBuildingsInfrastructure

N

VISUAL SCALE 1:250 @ A1

25m5m 20m15m10m0m

www.ibigroup.com

IntelligenceBuildingsInfrastructure

N

VISUAL SCALE 1:250 @ A1

25m5m 20m15m10m0m

www.ibigroup.com

IntelligenceBuildingsInfrastructure

70 m²Triage

RM.1.07

42 m²ClassroomRM.1.03

46 m²ClassroomRM.1.09

40 m²Counselling

RM.1.13

43 m²ClassroomRM.1.01

50 m²IT Classroom

RM.1.08

41 m²Counselling

RM.1.14

27 m²VoidV.01

By Department Legend

Circulation

Practical Teaching

Storage

Teaching48 m²

ClassroomRM.1.06

42 m²ClassroomRM.1.02

23 m²Stair 02RM.1.05

41 m²Atrium

RM.1.11

7 m²VoidV.03

7 m²VoidV.02

10 m²VoidV.05

2 m²VoidV.04

7 m²Lift

RM.1.04

2 m²Store

RM.1.03A

45 m²Atrium

RM.1.12

4 m²Store

RM.1.02A

6 m²Store

RM.1.07A

51 m²ClassroomRM.1.10

50 m²Diet & Nutrition H&WB

RM.0.11

By Department Legend

Circulation

Meeting

Plant

Practical Teaching

Sanitary

Staff

Storage

Teaching

8 m²Reflective Room

RM.0.13

Kitchen

BedroomMockup Area

BathroomMockup Area

Main Entrance 7 m²Store

RM.0.11A

50 m²StaffroomRM.0.06

50 m²Diet & Nutrition Lab

RM.0.09

102 m²Care SuiteRM.0.07

50 m²Ortho Beds

RM.0.08

14 m²Plant

RM.0.10

6 m²Switch Room

RM.0.14

23 m²Stair 02RM.0.12

73 m²Atrium

RM.0.03

11 m²Entrance Lobby

RM.0.01

3 m²Staff WCRM.0.19 11 m²

HygieneRM.0.15

19 m²Male WCRM.0.21

21 m²Female WC

RM.0.16

7 m²Lift

RM.0.1731 m²Meeting/Breakout

RM.0.02

7 m²One to One

RM.0.04

3 m²Staff WCRM.0.20

7 m²CirculationRM.0.18

2 m²Clnr.

RM.0.23

4 m²Dis. WCRM.0.22

3 m²Vending Area

RM.0.02A

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

7 m²One to One

RM.0.05

Living RoomMockup Area

55 m²Atrium

RM.0.24

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed First Floor

Occupancy Numbers

Name Number Occupants

Atrium RM.1.11

Atrium RM.0.03

Atrium RM.0.24

Atrium RM.1.12

Atrium RM.0.28

Atrium RM.0.24

Care Suite RM.0.07 20

Circulation RM.0.18

Classroom RM.1.03 20

Classroom RM.1.09 20

Classroom RM.1.06 20

Classroom RM.1.01 20

Classroom RM.1.02 20

Classroom RM.1.10 20

Clnr. RM.0.23

Counselling RM.1.13 20

Counselling RM.1.14 20

Diet & Nutrition H&WB RM.0.11 24

Diet & Nutrition Lab RM.0.09 24

Dis. WC RM.0.22

Entrance Lobby RM.0.01

Female WC RM.0.16

Hygiene RM.0.15

IT Classroom RM.1.08 16

Lift RM.0.17

Lift RM.1.04

Male WC RM.0.21

Meeting/Breakout RM.0.02

Office RM.0.06A

One to One RM.0.04

One to One RM.0.05

Ortho Beds RM.0.08 10

Plant RM.0.10

Reflective Room RM.0.13

Staff WC RM.0.19

Staff WC RM.0.20

Staffroom RM.0.06 14

Stair 02 RM.0.12

Stair 02 RM.1.05

Store RM.0.11A

Store RM.1.03A

Store RM.1.02A

Store RM.1.07A

Switch Room RM.0.14

Triage RM.1.07 30

Vending Area RM.0.02A

Void V.01

Void V.03

Void V.02

Void V.05

Void V.04

298

70 m²Triage

RM.1.07

42 m²ClassroomRM.1.03

46 m²ClassroomRM.1.09

40 m²Counselling

RM.1.13

43 m²ClassroomRM.1.01

50 m²IT Classroom

RM.1.08

41 m²Counselling

RM.1.14

27 m²VoidV.01

By Department Legend

Circulation

Practical Teaching

Storage

Teaching48 m²

ClassroomRM.1.06

42 m²ClassroomRM.1.02

23 m²Stair 02RM.1.05

41 m²Atrium

RM.1.11

7 m²VoidV.03

7 m²VoidV.02

10 m²VoidV.05

2 m²VoidV.04

7 m²Lift

RM.1.04

2 m²Store

RM.1.03A

45 m²Atrium

RM.1.12

4 m²Store

RM.1.02A

6 m²Store

RM.1.07A

51 m²ClassroomRM.1.10

50 m²Diet & Nutrition H&WB

RM.0.11

By Department Legend

Circulation

Meeting

Plant

Practical Teaching

Sanitary

Staff

Storage

Teaching

8 m²Reflective Room

RM.0.13

Kitchen

BedroomMockup Area

BathroomMockup Area

Main Entrance 7 m²Store

RM.0.11A

50 m²StaffroomRM.0.06

50 m²Diet & Nutrition Lab

RM.0.09

102 m²Care SuiteRM.0.07

50 m²Ortho Beds

RM.0.08

14 m²Plant

RM.0.10

6 m²Switch Room

RM.0.14

23 m²Stair 02RM.0.12

73 m²Atrium

RM.0.03

11 m²Entrance Lobby

RM.0.01

3 m²Staff WCRM.0.19 11 m²

HygieneRM.0.15

19 m²Male WCRM.0.21

21 m²Female WC

RM.0.16

7 m²Lift

RM.0.1731 m²Meeting/Breakout

RM.0.02

7 m²One to One

RM.0.04

3 m²Staff WCRM.0.20

7 m²CirculationRM.0.18

2 m²Clnr.

RM.0.23

4 m²Dis. WCRM.0.22

3 m²Vending Area

RM.0.02A

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

7 m²One to One

RM.0.05

Living RoomMockup Area

55 m²Atrium

RM.0.24

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed First Floor

Occupancy Numbers

Name Number Occupants

Atrium RM.1.11

Atrium RM.0.03

Atrium RM.0.24

Atrium RM.1.12

Atrium RM.0.28

Atrium RM.0.24

Care Suite RM.0.07 20

Circulation RM.0.18

Classroom RM.1.03 20

Classroom RM.1.09 20

Classroom RM.1.06 20

Classroom RM.1.01 20

Classroom RM.1.02 20

Classroom RM.1.10 20

Clnr. RM.0.23

Counselling RM.1.13 20

Counselling RM.1.14 20

Diet & Nutrition H&WB RM.0.11 24

Diet & Nutrition Lab RM.0.09 24

Dis. WC RM.0.22

Entrance Lobby RM.0.01

Female WC RM.0.16

Hygiene RM.0.15

IT Classroom RM.1.08 16

Lift RM.0.17

Lift RM.1.04

Male WC RM.0.21

Meeting/Breakout RM.0.02

Office RM.0.06A

One to One RM.0.04

One to One RM.0.05

Ortho Beds RM.0.08 10

Plant RM.0.10

Reflective Room RM.0.13

Staff WC RM.0.19

Staff WC RM.0.20

Staffroom RM.0.06 14

Stair 02 RM.0.12

Stair 02 RM.1.05

Store RM.0.11A

Store RM.1.03A

Store RM.1.02A

Store RM.1.07A

Switch Room RM.0.14

Triage RM.1.07 30

Vending Area RM.0.02A

Void V.01

Void V.03

Void V.02

Void V.05

Void V.04

298

70 m²Triage

RM.1.07

42 m²ClassroomRM.1.03

46 m²ClassroomRM.1.09

40 m²Counselling

RM.1.13

43 m²ClassroomRM.1.01

50 m²IT Classroom

RM.1.08

41 m²Counselling

RM.1.14

27 m²VoidV.01

By Department Legend

Circulation

Practical Teaching

Storage

Teaching48 m²

ClassroomRM.1.06

42 m²ClassroomRM.1.02

23 m²Stair 02RM.1.05

41 m²Atrium

RM.1.11

7 m²VoidV.03

7 m²VoidV.02

10 m²VoidV.05

2 m²VoidV.04

7 m²Lift

RM.1.04

2 m²Store

RM.1.03A

45 m²Atrium

RM.1.12

4 m²Store

RM.1.02A

6 m²Store

RM.1.07A

51 m²ClassroomRM.1.10

50 m²Diet & Nutrition H&WB

RM.0.11

By Department Legend

Circulation

Meeting

Plant

Practical Teaching

Sanitary

Staff

Storage

Teaching

8 m²Reflective Room

RM.0.13

Kitchen

BedroomMockup Area

BathroomMockup Area

Main Entrance 7 m²Store

RM.0.11A

50 m²StaffroomRM.0.06

50 m²Diet & Nutrition Lab

RM.0.09

102 m²Care SuiteRM.0.07

50 m²Ortho Beds

RM.0.08

14 m²Plant

RM.0.10

6 m²Switch Room

RM.0.14

23 m²Stair 02RM.0.12

73 m²Atrium

RM.0.03

11 m²Entrance Lobby

RM.0.01

3 m²Staff WCRM.0.19 11 m²

HygieneRM.0.15

19 m²Male WCRM.0.21

21 m²Female WC

RM.0.16

7 m²Lift

RM.0.1731 m²Meeting/Breakout

RM.0.02

7 m²One to One

RM.0.04

3 m²Staff WCRM.0.20

7 m²CirculationRM.0.18

2 m²Clnr.

RM.0.23

4 m²Dis. WCRM.0.22

3 m²Vending Area

RM.0.02A

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

7 m²One to One

RM.0.05

Living RoomMockup Area

55 m²Atrium

RM.0.24

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed First Floor

Occupancy Numbers

Name Number Occupants

Atrium RM.1.11

Atrium RM.0.03

Atrium RM.0.24

Atrium RM.1.12

Atrium RM.0.28

Atrium RM.0.24

Care Suite RM.0.07 20

Circulation RM.0.18

Classroom RM.1.03 20

Classroom RM.1.09 20

Classroom RM.1.06 20

Classroom RM.1.01 20

Classroom RM.1.02 20

Classroom RM.1.10 20

Clnr. RM.0.23

Counselling RM.1.13 20

Counselling RM.1.14 20

Diet & Nutrition H&WB RM.0.11 24

Diet & Nutrition Lab RM.0.09 24

Dis. WC RM.0.22

Entrance Lobby RM.0.01

Female WC RM.0.16

Hygiene RM.0.15

IT Classroom RM.1.08 16

Lift RM.0.17

Lift RM.1.04

Male WC RM.0.21

Meeting/Breakout RM.0.02

Office RM.0.06A

One to One RM.0.04

One to One RM.0.05

Ortho Beds RM.0.08 10

Plant RM.0.10

Reflective Room RM.0.13

Staff WC RM.0.19

Staff WC RM.0.20

Staffroom RM.0.06 14

Stair 02 RM.0.12

Stair 02 RM.1.05

Store RM.0.11A

Store RM.1.03A

Store RM.1.02A

Store RM.1.07A

Switch Room RM.0.14

Triage RM.1.07 30

Vending Area RM.0.02A

Void V.01

Void V.03

Void V.02

Void V.05

Void V.04

298

70 m²Triage

RM.1.07

42 m²ClassroomRM.1.03

46 m²ClassroomRM.1.09

40 m²Counselling

RM.1.13

43 m²ClassroomRM.1.01

50 m²IT Classroom

RM.1.08

41 m²Counselling

RM.1.14

27 m²VoidV.01

By Department Legend

Circulation

Practical Teaching

Storage

Teaching48 m²

ClassroomRM.1.06

42 m²ClassroomRM.1.02

23 m²Stair 02RM.1.05

41 m²Atrium

RM.1.11

7 m²VoidV.03

7 m²VoidV.02

10 m²VoidV.05

2 m²VoidV.04

7 m²Lift

RM.1.04

2 m²Store

RM.1.03A

45 m²Atrium

RM.1.12

4 m²Store

RM.1.02A

6 m²Store

RM.1.07A

51 m²ClassroomRM.1.10

50 m²Diet & Nutrition H&WB

RM.0.11

By Department Legend

Circulation

Meeting

Plant

Practical Teaching

Sanitary

Staff

Storage

Teaching

8 m²Reflective Room

RM.0.13

Kitchen

BedroomMockup Area

BathroomMockup Area

Main Entrance 7 m²Store

RM.0.11A

50 m²StaffroomRM.0.06

50 m²Diet & Nutrition Lab

RM.0.09

102 m²Care SuiteRM.0.07

50 m²Ortho Beds

RM.0.08

14 m²Plant

RM.0.10

6 m²Switch Room

RM.0.14

23 m²Stair 02RM.0.12

73 m²Atrium

RM.0.03

11 m²Entrance Lobby

RM.0.01

3 m²Staff WCRM.0.19 11 m²

HygieneRM.0.15

19 m²Male WCRM.0.21

21 m²Female WC

RM.0.16

7 m²Lift

RM.0.1731 m²Meeting/Breakout

RM.0.02

7 m²One to One

RM.0.04

3 m²Staff WCRM.0.20

7 m²CirculationRM.0.18

2 m²Clnr.

RM.0.23

4 m²Dis. WCRM.0.22

3 m²Vending Area

RM.0.02A

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

7 m²One to One

RM.0.05

Living RoomMockup Area

55 m²Atrium

RM.0.24

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed First Floor

Occupancy Numbers

Name Number Occupants

Atrium RM.1.11

Atrium RM.0.03

Atrium RM.0.24

Atrium RM.1.12

Atrium RM.0.28

Atrium RM.0.24

Care Suite RM.0.07 20

Circulation RM.0.18

Classroom RM.1.03 20

Classroom RM.1.09 20

Classroom RM.1.06 20

Classroom RM.1.01 20

Classroom RM.1.02 20

Classroom RM.1.10 20

Clnr. RM.0.23

Counselling RM.1.13 20

Counselling RM.1.14 20

Diet & Nutrition H&WB RM.0.11 24

Diet & Nutrition Lab RM.0.09 24

Dis. WC RM.0.22

Entrance Lobby RM.0.01

Female WC RM.0.16

Hygiene RM.0.15

IT Classroom RM.1.08 16

Lift RM.0.17

Lift RM.1.04

Male WC RM.0.21

Meeting/Breakout RM.0.02

Office RM.0.06A

One to One RM.0.04

One to One RM.0.05

Ortho Beds RM.0.08 10

Plant RM.0.10

Reflective Room RM.0.13

Staff WC RM.0.19

Staff WC RM.0.20

Staffroom RM.0.06 14

Stair 02 RM.0.12

Stair 02 RM.1.05

Store RM.0.11A

Store RM.1.03A

Store RM.1.02A

Store RM.1.07A

Switch Room RM.0.14

Triage RM.1.07 30

Vending Area RM.0.02A

Void V.01

Void V.03

Void V.02

Void V.05

Void V.04

298

Proposed First FloorProposed Ground Floor

Page 2: Harrow Weald Campus...Diet & Nutrition H&WB RM.0.11 24 Diet & Nutrition Lab RM.0.09 24 Dis. WC RM.0.22 Entrance Lobby RM.0.01 Female WC RM.0.16 Hygiene RM.0.15 IT Classroom RM.1.08

Harrow Weald CampusHealth & Social Care Building

The design has been developed within a concept of linking the landscaped exterior with the inside, sustainable passive design and creating bright vibrant spaces. The corner of the building is fully glazed at ground floor forming a clear main entrance area, drawing people into the reception and atrium space.

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed East Elevation

1 : 100

Proposed West Elevation

1 : 100

Proposed North Elevation

1 : 100

Proposed South Elevation

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed East Elevation

1 : 100

Proposed West Elevation

1 : 100

Proposed North Elevation

1 : 100

Proposed South Elevation

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed East Elevation

1 : 100

Proposed West Elevation

1 : 100

Proposed North Elevation

1 : 100

Proposed South Elevation

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

www.ibigroup.com

IntelligenceBuildingsInfrastructure

1 : 100

Proposed East Elevation

1 : 100

Proposed West Elevation

1 : 100

Proposed North Elevation

1 : 100

Proposed South Elevation

VISUAL SCALE 1:100 @ A1

10m2m 8m6m4m0m

Proposed East Elevation

Artist’s Impression

Proposed South Elevation Proposed West Elevation

Proposed North Elevation