ELECTRICITY CONSUMPTION- Key Statistics of 13-14

• IR consumed 17.5 billion units- 1.8% of the country’s power generation.

-15 BUs for traction

- 2.5 BUs for non traction

• Total annual bill was Rs.11,300 crore

- Rs.9650 cr. for traction

- Rs.1650 cr. for non traction

• Peak requirement of power – 4000 MW

• Average cost of power – Rs.6.50 per unit (ranging from Rs.4.11 to Rs.8.38 per unit)

Solar Mission of Indian Railways

IR envisages to source 10% of electrical energy from renewable sources by 2020.

Budgetary pronouncement to harness solar energy by utilizing roof top spaces and land including PPP mode.

Renewable Energy Renewable Energy

Railway Energy Management Company (REMC):

REMC, a JV of RITES and MoR, set up to renewable energy projects

Activities mandated to REMC • Harnessing Green Energy• Undertaking power trading activities to reduce electricity bill. • Developing power projects to economise electricity tariff. • Co-ordination with regulatory authorities to obtain relief on

increased electricity tariff. • Efficient Power evacuation from captive power plants to TSS

Initiative taken so far : • Setting up of 25 MW wind mill in Rajasthan• Pilot projects for procuring power at a lower tariff through bi-

lateral arrangements (a) from Gujarat for Maharashtra and (b) From DVC for Delhi Kanpur Section of NCR.

• Further planning to set up 132.5 MW wind mill plants for Railways

(a)Railway’s funding :(i) Capacity Installed : 10 MWp solar energy being harnessed

at LC gates, stations, office buildings, hospitals etc..(ii)Sanctioned Works: Total 7.82 MWp of solar plants -

SOLAR ENERGY MISSION- SOLAR ENERGY MISSION-

SN

Initiative Capacity

A Under IR’s funding1 Provision of solar plant at Katra

station, NR1 MW

2 Provision of solar PV modules at rooftop --10KWp x 200 stations-100KWp x 20 Offices-45KWp at RDSO-500 KWp x 5 buildings

6.55 MW

3 Provision of solar PV modules at 2000 LC gates and office buildings

1.28 MW

(b ) Under PPP- IR’s Solar Mission: Total 1000 MWp in next 5 years with Viability Gap Funding (VGF) support from MNRE.

SOLAR MISSION OF RAILWAYS SOLAR MISSION OF RAILWAYS

SN Initiative Cap.a Phase- I: 200 MW through tariff based

bidding process for the states of Maharashtra & AP where the cost of power is high , without subsidy

200 MW

b Phase-II:50 MW on Rooftop with Central Financial Assistance (CFA) from MNRE through tariff based bidding process by ZR/REMC. In principle approval of MNRE for Rs.60 Cr subsidy received.

50 MW

SN

Initiative Cap.

c Phase-III: 500 MWwith VGF support under National Clean Energy Fund (NCEF) on tariff based bidding process through REMC (Ground mounted).

500 MW

d Phase-IV:100 MW on Rooftop with Central Financial Assistance (CFA) from MNRE.

100 MW

e Phase-IV:150 MW with CFA support from MNRE. (Ground mounted).

150MW

SOLAR MISSION OF RAILWAYSSOLAR MISSION OF RAILWAYS

500 MWp Ground Mounted solar plant 500 MWp Ground Mounted solar plant

MODALITIES:• Policy issued vide letter dt 07.10.14• REMC will select the developer, identify the sites/states, interact

with DISCOMS for wheeling of power, co-ordination with Railways for signing of PPAs, payment mechanism etc

• Priority in States having higher tariff & declared Solar Policy• Power generated will be fed to the grid & utilised at railway end.• Developer will set up the solar plant at its own cost. • Zonal Railways to sign Power Purchase Agreement (PPA) for getting

power at a fixed tariff for next 25 years. • VGF support upto Rs. 1 Cr/MW from MNRE will be passed on to

developer.

DISCOMs Total energy consumed (mil Kwh)

Total energy bill paid in Crores.

Average cost Rs/Kwh.

1 2 3 4 51 APTRANSCO 709.67 507.68 7.152 BSEB 260.77 162.89 6.253 CSEB 429.45 239.98 5.594 DVB 35.93 28.63 7.975 DVC 326.02 124.71 3.836 GEB 377.91 241.47 6.397 GRIDCO 397.21 243.88 6.148 HVPN 167.59 118.84 7.099 JSEB 208.82 129.66 6.2110 KSEB 108.19 58.51 5.4111 KPTCL 29.36 16.24 5.5312 MPSEB 969.15 582.49 6.0113 MSEB 751.99 703.08 9.3514 TATA 463.71 361.73 7.8015 NTPC 339.35 223.09 6.5716 PSEB 81.89 51.59 6.3017 RSEB 199.45 107.97 5.4118 TNEB 738.96 508.26 6.8819 UPPCL 446.71 329.37 7.3720 WBSEB 407.00 321.05 7.8921 UPCL 7.04 3.08 4.3822 CESC 26.96 19 7.05  G.TOTAL 7483.13 5083.20 6.79

States having declared Solar Policy;

GREEN ENERGY INITIATIVES- Wind GREEN ENERGY INITIATIVES- Wind Mills Mills S

NInitiative Capacit

yAction by

Target

A Under IR’s funding

1 10.5 MW wind mill installed in Tamil Nadu

10.5 MW SR Tender scheduled to open on 28.01.15

B. Under JV/PPP-Total 157.5 MW

2 Setting up of wind mill in Rajasthan through REMC

25 MW REMCNWR

Contract awarded. To be Commissioning - Oct 15

3 132.5 MW-wind mill in Gujarat & Maharashtra

132.5 MW

REMCWR, CR